Center of Research and Energy Technologies www.crten.rnrt.tn
Prof. AmenAllah GUIZANI
MAGHRENOV Workshop on Research Infrastructures RE&EE in EU-MPC countries
Local needs of infrastructure for RE implementa;on
Marrakech, January 16th 2015
2
Outline
• INTRODUCTION
• CRTENn BRIEFLY
• INFRASTRUCTURE
• CONCLUSION
Local needs of infrastructure for RE implementa;on
� - Solar Energy (Thermal, PV, CSP, applications) � - Wind Energy � - Hydropower � - Biomass � - Bio fuel � - Geothermal Energy
Local needs of infrastructure for RE implementa;on
Local needs of infrastructure for RE implementa;on
Material Component System
•Absorber •nano composite •Fluid •Thin film •Storage Material
•Solar cell •Inverter •Blade •Subassemblies •Controls
•PV Panel •Tower •Application unit (Desalination, A/C, pumping station…) •Power plant
Characterisation •Mechanical •Electrical •Optical •Thermal
Overall Efficiency •Effectiveness • Conformity to standards
Performance •Mechanical •Electrical… •Conformity to standards
20/01/15 5
Meteorological Data
Local needs of infrastructure for RE implementa;on
Local needs of infrastructure for RE implementa;on
Local needs of infrastructure for RE implementa;on
20/01/15 8
CRTEn
Main objec;ves : Ø R&D in RE systems and integra5on in economic world
Ø Science & Technology survey Ø Training of competencies
Local needs of infrastructure for RE implementa;on
9
Creation 2005
R&D Structure
3 Laboratories
Laboratory of Wind Power Control and Energy Valorization
of Waste (LMEEVED)
Photovoltaic Laboratory (LPV)
Thermal Processes Laboratory (LPT)
Renewable Energies, EE
Staff: 200 Technology Transfer
OfLice (TTO)
Brie%ly the CRTEn
Training of experts, able to give fast answers to the national energy requirements in short and medium terms.
Development and exploitation of renewable energies (thermal, photovoltaic and wind) and other forms of clean energies by searching low cost solution.
Technological survey, development, characterization and application of advanced materials having high added value in energy management and power consumption.
The creation of adequate synergies between R&D in the Lield of energy and the structures of Technology Transfer and Innovation in the Ecopark.
The creation of a good R&D environment, favorable to the attraction of foreign investors and their establishment in the Ecopark …
RECEMIS Preparatory Meeting Barcelona May 5th 2014
RECEMIS Preparatory Meeting Barcelona May 5th 2014
Butt Offer
Our partners/Network
RECEMIS Preparatory Meeting Barcelona May 5th 2014
20/01/15 14
Three laboratories cons;tute CRTEn
-‐ Laboratory of Thermal process LPT;
-‐ Laboratory of photovoltaic LPV;
The Laboratory of Wind Power Control and Energy Valoriza;on of Waste;
Local needs of infrastructure for RE implementa;on
Laboratory of Thermal Process (LPT) facili;es
20/01/15 15
• Solar thermal conversion
• Energy storage and recupera;on • Modeling and numerical simula;on of HMT
• Energy efficiency in building
• Fluid-‐solid separa;on • Condi;oning of agricultural greenhouses
Local needs of infrastructure for RE implementa;on
Local needs of infrastructure for RE implementa;on
Material Component System
• Absorber • HTFluid •PCM •Storage Medium • Insulation • Glass • Mirror
•Flat plate solar collectot •Air collector •PTC / Fresnel •Solar •Tower/receiver •Storage tank • Sun tracker / Heliostat
•SDHW •Solar dryer • CSP plant • A/C solar driven •Thermal Desalination unit •Process heat unit
PARABOLIC TROUGH CONCENTRATOR Collector length /module 5.970 mm Number of modules 3 Aperture 2.300 mm Focal length 800 mm Concentra5on factor C= 20 Temperature range 100 ….200 °C Medium Water / Thermal oil Traking type One axis Reflector Coated Aluminium
Photogrammetry
Local needs of infrastructure for RE implementa;on
20/01/15 18 Contribution to the control of solar concentration technology
Local needs of infrastructure for RE implementa;on
19
Solar collector test facility
- Performance test of solar thermal collectors : NT 67-04 equivalent to EN 12975. - Determination of the heat loss rate of hot water stores : NT 167-08. - Performance test of solar thermal systems : ISO 9459-5 (DST-method).
Local needs of infrastructure for RE implementa;on
Not Available: - Test facility for testing the durability and reliability of solar thermal collectors
20/01/15 20
Local needs of infrastructure for RE implementa;on
Photovoltaic Laboratory (LPV)
ü silicon based materials and devices.
ü Technologies of photovoltaic solar cells . ü Development of PV systems applied to ligh;ng, water
pumping, desalina;on and grid
ü Study and development of gas sensors and photonic
devices.
ü Development of new organic and inorganic nano
composites for solar photocatalysis.
Local needs of infrastructure for RE implementa;on
Material Component System
Silicon (# types) •nano composite (organic non org.) •Oxides •Thin films
• Solar cell • PV panels •Batteries •Controls •Inverters
• PV power generator •PV pumping station • PV lighting
�Laboratory of Photovoltaic: � R&D related to PV materials and technologies�
Local needs of infrastructure for RE implementa;on
�Laboratory of Photovoltaic: � R&D related to PV materials and technologies�
Local needs of infrastructure for RE implementa;on
�Laboratory of Photovoltaic: � R&D related to PV materials and technologies�
Local needs of infrastructure for RE implementa;on
�Laboratory of Photovoltaic: � R&D related to PV materials and technologies�
Local needs of infrastructure for RE implementa;on
Laboratory of Wind Energy and Energe;c Valoriza;on of Waste
20/01/15 26
Local needs of infrastructure for RE implementa;on
• Design, realiza;on and experimenta;on of the small power
wind turbine and accessories
• Study of the systems of high power wind turbine
• Conversion of biogases for power produc;on of electricity • Thermo-‐chemical valoriza;on of solid waste
• Produc;on of fuels star;ng from used oils and fats
Local needs of infrastructure for RE implementa;on
Material Component System
• Blades • Turbine • Shaft • pilons •Batteries •Controls •Inverters
• Composite • # metals
• Wind farms
28
Wind tunnel facility
Characteris5cs Vmax = 30m/s
Vein =1 m x 800 cm²
Local needs of infrastructure for RE implementa;on
Features - PIV
- Ta
- Open/close loop
Wind tunnel facility
Local needs of infrastructure for RE implementa;on
L’intitulé de ce projet :
Renforcement de l’infrastructure qualité pour l’énergie solaire aux
pays du Maghreb
§ A été lancé en Février 2012 à Casablanca
§ En Avril 2013 la soufflerie du CRTEn a été choisi pour être accrédité dans ce projet
• The technology platform
• A set of equipment and test tools to
• Technological platform where will be housed the large equipment CRTEn
• Support the research Labs activities
• Support companies operating in advanced energy technologies
• Support the training centers
Planned R&D and test infrastructure
Local needs of infrastructure for RE implementa;on
General considera;ons: na;onal level
20/01/15 32
• Need of mapping exis;ng equipment
• Need of sharing equipment
• Need of cer;fica;on bodies for RE EE equipment
• Take into account O&M for R&D equipment
Local needs of infrastructure for RE implementa;on
General considera;ons : mul;lateral level
20/01/15 33
• Agreements for mul;lateral use of heavy equipment
• Implementa;on of projects for staff exchange using exis;ng
equipment
Local needs of infrastructure for RE implementa;on
20/01/15 34
Local needs of infrastructure for RE implementa;on