    CUADRO DE TUB

    SECTOR CANAL Label Length (3D) (m) Start Node Stop Node

    CONDUCCION P-1 28.09 29.16 R-1 J-1 110

    CONDUCCION P-2 82.39 82.78 J-1 H-1 110

    CONDUCCION P-3 43.49 43.54 H-1 J-2 110

    PRINCIPAL 1 P-4 12.24 13.46 R-2 J-3 110

    PRINCIPAL 1 P-5 150.02 150.22 J-3 J-5 90

    PRINCIPAL 1 P-6 25.69 25.75 J-5 H-3 75

    PRINCIPAL 1 P-7 27.09 27.20 H-3 H-4 75

    PRINCIPAL 1 P-8 28.16 28.27 H-4 J-6 75

    PRINCIPAL 1 P-9 11.80 11.83 J-6 H-5 75

    PRINCIPAL 1 P-10 35.78 35.81 H-5 H-6 75

    PRINCIPAL 1 P-11 32.50 32.50 H-6 H-7 75

    PRINCIPAL 1 P-12 13.84 13.85 H-7 J-7 75

    PRINCIPAL 1 P-13 21.44 21.46 J-7 H-8 63

    PRINCIPAL 1 P-14 35.45 35.48 H-8 H-9 63

    PRINCIPAL 1 P-15 25.04 25.46 H-9 H-10 63

    PRINCIPAL 1 P-16 43.14 44.41 H-10 J-9 63

    PRINCIPAL 1 P-17 16.24 17.51 J-9 H-11 50

    PRINCIPAL 1 P-18 11.45 12.02 H-11 CRP TIPO 7-6 50

    PRINCIPAL 1 P-19 32.08 34.49 CRP TIPO 7-6 H-12 50PRINCIPAL 1 P-20 14.44 14.49 H-12 H-13 50

    PRINCIPAL 1 P-21 12.86 13.74 H-13 H-14 50

    PRINCIPAL 1 P-22 16.70 16.97 J-3 J-4 110

    PRINCIPAL 1 P-23 34.62 36.12 J-4 H-15 75

    PRINCIPAL 1 P-24 8.85 9.26 H-15 H-16 75

    PRINCIPAL 1 P-25 32.73 34.10 H-16 J-8 75

    PRINCIPAL 1 P-26 10.06 10.24 J-8 H-17 63

    PRINCIPAL 1 P-27 41.08 41.96 H-17 H-18 63

    PRINCIPAL 1 P-28 71.14 72.37 CRP TIPO 7-2 H-19 63

    Length(Scaled) (m)

    DameterNom! (mm)

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    2/28

    PRINCIPAL 1 P-29 8.04 8.37 H-18 CRP TIPO 7-2 63

    PRINCIPAL 1 P-30 32.26 32.49 H-19 J-10 63

    PRINCIPAL 1 P-31 8.50 8.55 J-10 J-12 50

    PRINCIPAL 1 P-32 30.99 31.42 J-12 H-20 50

    PRINCIPAL 1 P-33 26.14 26.38 H-20 H-21 50

    PRINCIPAL 1 P-34 40.11 40.51 H-21 H-22 50

    PRINCIPAL 1 P-35 21.51 21.65 H-22 H-23 50

    PRINCIPAL 1 P-36 63.62 63.66 H-23 J-61 50

    PRINCIPAL 1 P-37 40.56 44.00 J-4 H-24 90

    PRINCIPAL 1 P-38 37.20 38.08 H-24 H-25 90

    PRINCIPAL 1 P-39 13.52 13.58 H-25 H-26 90

    PRINCIPAL 1 P-40 21.85 23.22 H-26 H-27 90

    PRINCIPAL 1 P-41 31.41 31.87 H-27 H-28 90

    PRINCIPAL 1 P-42 23.36 23.51 H-28 H-29 90

    PRINCIPAL 1 P-43 7.88 8.26 H-29 CRP TIPO 7-1 90

    PRINCIPAL 1 P-44 40.91 41.76 CRP TIPO 7-1 J-11 90

    PRINCIPAL 1 P-45 15.62 16.65 J-11 H-30 50

    PRINCIPAL 1 P-46 29.33 30.46 H-30 H-31 50

    PRINCIPAL 1 P-47 28.09 28.59 H-31 J-14 50

    PRINCIPAL 1 P-48 15.31 18.81 J-14 H-32 50

    PRINCIPAL 1 P-49 46.93 47.61 H-32 H-33 50

    PRINCIPAL 1 P-50 10.66 10.68 H-33 H-34 50

    PRINCIPAL 1 P-51 30.54 30.57 H-34 H-35 50

    LATERAL 1 P-52 33.38 36.43 J-1 H-2 50

    LATERAL 1 P-53 19.92 25.52 J-5 H-36 50

    LATERAL 1 P-54 20.08 26.48 H-36 H-37 50

    LATERAL 1 P-55 23.31 23.71 J-6 H-38 50

    LATERAL 1 P-56 22.38 23.14 H-38 CRP TIPO 7-4 50

    LATERAL 1 P-57 34.37 37.37 CRP TIPO 7-4 H-39 50

    LATERAL 1 P-58 30.60 33.33 H-39 H-40 50

    LATERAL 1 P-59 29.44 30.56 J-7 H-41 50

    LATERAL 1 P-60 36.33 37.67 H-41 H-42 50

    SECTO

    R"

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    3/28

    LATERAL 1 P-61 33.59 34.33 H-42 H-43 50

    LATERAL 1 P-62 3.68 4.21 H-43 CRP TIPO 7-5 50

    LATERAL 1 P-63 17.24 20.27 CRP TIPO 7-5 H-44 50

    LATERAL 1 P-64 18.71 19.60 H-44 H-45 50

    LATERAL 1 P-65 7.37 7.75 H-45 H-46 50

    LATERAL 1 P-66 20.99 21.44 J-9 H-47 50

    LATERAL 1 P-67 19.43 19.48 H-47 H-48 50

    LATERAL 1 P-68 31.96 32.61 J-8 H-49 50

    LATERAL 1 P-69 33.39 34.07 H-49 H-50 50

    LATERAL 1 P-70 44.68 45.19 H-50 H-51 50

    LATERAL 1 P-71 65.41 65.47 J-12 H-52 50

    LATERAL 1 P-72 78.52 79.38 J-10 H-53 50

    LATERAL 1 P-73 18.84 18.96 H-53 H-54 50

    LATERAL 1 P-74 38.48 38.56 H-54 H-55 50

    LATERAL 1 P-75 25.17 25.97 H-55 H-56 50

    LATERAL 1 P-76 20.86 21.07 H-56 H-57 50

    LATERAL 1 P-77 16.98 17.39 H-57 CRP TIPO 7-3 50

    LATERAL 1 P-78 35.19 37.24 CRP TIPO 7-3 H-58 50

    LATERAL 1 P-79 16.58 16.99 H-58 H-59 50

    LATERAL 1 P-80 20.78 21.57 H-59 H-60 50

    LATERAL 1 P-81 32.48 32.50 J-14 H-61 50

    LATERAL 1 P-82 34.10 35.31 H-61 H-62 50

    LATERAL 1 P-83 56.59 56.72 J-11 H-63 75

    LATERAL 1 P-84 45.54 47.22 H-63 H-64 75

    LATERAL 1 P-85 78.77 80.12 H-64 H-65 75

    LATERAL 1 P-86 38.22 38.24 H-65 J-17 75

    LATERAL 1 P-87 21.16 21.16 J-17 H-66 63

    LATERAL 1 P-88 14.72 14.72 H-66 H-67 63

    LATERAL 1 P-89 12.15 12.15 H-67 H-68 63

    LATERAL 1 P-90 7.65 7.66 H-68 J-16 63

    LATERAL 1 P-91 20.56 20.60 J-16 H-69 50

    LATERAL 1 P-92 15.59 15.62 H-69 H-70 50

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    4/28

    LATERAL 1 P-93 30.16 30.82 H-70 H-71 50

    LATERAL 1 P-94 32.45 32.45 H-71 H-72 50

    LATERAL 1 P-95 20.18 20.31 J-17 H-73 50

    LATERAL 1 P-96 19.55 19.86 H-73 H-74 50

    LATERAL 1 P-97 61.79 61.80 J-16 J-15 50

    LATERAL 1 P-98 14.10 14.12 J-15 H-75 50

    LATERAL 1 P-99 18.01 18.01 J-15 H-76 50

    PRINCIPAL 2 P-100 0.40 2.00 R-3 J-18 160

    PRINCIPAL 2 P-101 83.04 83.07 J-18 J-19 110

    PRINCIPAL 2 P-102 45.29 45.30 J-19 J-20 110

    PRINCIPAL 2 P-103 55.66 56.28 J-20 H-77 75

    PRINCIPAL 2 P-104 26.61 26.71 H-77 H-78 75

    PRINCIPAL 2 P-105 18.82 18.96 H-78 H-79 75

    PRINCIPAL 2 P-106 33.23 33.98 H-79 H-80 75

    PRINCIPAL 2 P-107 16.77 16.97 H-80 J-26 75

    PRINCIPAL 2 P-108 17.10 17.17 J-26 H-81 63

    PRINCIPAL 2 P-109 41.07 41.23 H-81 H-82 63

    PRINCIPAL 2 P-110 15.89 15.95 H-82 H-83 63

    PRINCIPAL 2 P-111 15.83 16.46 H-83 CRP TIPO 7-10 63

    PRINCIPAL 2 P-112 31.72 33.62 CRP TIPO 7-10 J-29 63

    PRINCIPAL 2 P-113 66.89 68.08 J-29 H-84 50

    PRINCIPAL 2 P-114 24.49 25.33 H-84 H-85 50

    PRINCIPAL 2 P-115 24.59 25.09 H-85 H-86 50

    PRINCIPAL 2 P-116 26.30 26.34 H-86 H-87 50

    PRINCIPAL 2 P-117 20.81 21.64 H-87 H-88 50

    PRINCIPAL 2 P-118 32.57 32.81 H-88 H-89 50

    PRINCIPAL 2 P-119 70.03 70.04 H-89 H-90 50

    PRINCIPAL 2 P-120 118.61 118.79 J-18 J-21 160

    PRINCIPAL 2 P-121 37.25 37.39 J-21 H-91 160

    PRINCIPAL 2 P-122 19.61 19.68 H-91 J-22 110

    PRINCIPAL 2 P-123 14.05 14.09 J-22 H-92 110

    PRINCIPAL 2 P-124 27.82 27.91 H-92 H-93 110

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    5/28

    PRINCIPAL 2 P-125 3.89 3.92 H-93 J-23 110

    PRINCIPAL 2 P-126 13.49 14.61 J-23 H-94 90

    PRINCIPAL 2 P-127 8.04 8.37 H-94 J-25 90

    PRINCIPAL 2 P-128 11.85 11.93 J-25 H-95 90

    PRINCIPAL 2 P-129 17.89 17.99 H-95 H-96 90

    PRINCIPAL 2 P-130 29.72 29.83 H-96 H-97 90

    PRINCIPAL 2 P-131 8.04 8.07 H-97 J-27 90

    PRINCIPAL 2 P-132 7.14 7.17 J-27 H-98 75

    PRINCIPAL 2 P-133 23.18 23.27 H-98 H-99 75

    PRINCIPAL 2 P-134 23.78 24.03 H-99 H-100 75

    PRINCIPAL 2 P-135 31.64 31.66 H-100 H-101 63

    PRINCIPAL 2 P-136 3.67 3.82 H-101 H-102 63

    PRINCIPAL 2 P-137 36.23 37.39 H-102 H-103 63

    PRINCIPAL 2 P-138 9.15 9.40 H-103 H-104 63

    PRINCIPAL 2 P-139 6.15 6.22 H-104 VRP-01 50

    PRINCIPAL 2 P-140 10.76 10.89 VRP-01 J-30 50

    PRINCIPAL 2 P-141 9.68 9.71 J-30 H-105 50

    PRINCIPAL 2 P-142 29.69 30.41 H-105 H-106 50

    PRINCIPAL 2 P-143 19.70 19.76 H-106 H-107 50

    PRINCIPAL 2 P-144 19.68 20.38 H-107 H-108 50

    PRINCIPAL 2 P-145 28.72 28.73 J-23 H-109 75

    PRINCIPAL 2 P-146 14.52 14.52 H-109 H-110 75

    PRINCIPAL 2 P-147 8.51 8.51 H-110 H-111 75PRINCIPAL 2 P-148 16.42 16.44 H-111 H-112 75

    PRINCIPAL 2 P-149 15.16 15.21 H-112 H-113 75

    PRINCIPAL 2 P-150 19.94 19.94 H-113 J-24 75

    PRINCIPAL 2 P-151 20.87 20.91 J-24 H-114 63

    PRINCIPAL 2 P-152 26.82 28.34 H-114 H-115 63

    PRINCIPAL 2 P-153 17.34 17.46 H-115 H-116 63

    PRINCIPAL 2 P-154 17.32 17.36 H-116 H-117 63

    PRINCIPAL 2 P-155 12.91 13.07 H-117 H-118 63

    PRINCIPAL 2 P-156 3.56 3.69 H-118 J-28 63

    SECT

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    6/28

    PRINCIPAL 2 P-157 10.79 11.23 J-28 H-119 50

    PRINCIPAL 2 P-158 23.81 24.75 H-119 H-120 50

    PRINCIPAL 2 P-159 13.61 14.16 H-120 H-121 50

    PRINCIPAL 2 P-160 13.68 14.22 H-121 H-122 50

    PRINCIPAL 2 P-161 17.20 17.45 H-122 H-123 50

    LATERAL 2 P-162 30.26 31.02 J-19 H-124 50

    LATERAL 2 P-163 15.00 16.64 J-20 H-125 50

    LATERAL 2 P-164 6.45 7.53 H-125 H-126 50

    LATERAL 2 P-165 9.07 9.91 H-126 H-127 50

    LATERAL 2 P-166 9.48 10.36 H-127 H-128 50

    LATERAL 2 P-167 26.04 29.93 J-26 H-129 50

    LATERAL 2 P-168 14.52 16.38 H-129 H-130 50

    LATERAL 2 P-169 16.87 18.17 H-130 CRP TIPO 7-9 50

    LATERAL 2 P-170 26.80 33.06 CRP TIPO 7-9 H-131 50

    LATERAL 2 P-171 16.84 18.69 J-29 H-132 50

    LATERAL 2 P-172 14.10 16.83 H-132 H-133 50

    LATERAL 2 P-173 17.87 18.73 H-133 H-134 50

    LATERAL 2 P-174 23.32 24.27 H-134 H-135 50

    LATERAL 2 P-175 20.27 21.47 H-135 H-136 50

    OR#

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    7/28

    LATERAL 2 P-176 16.05 16.86 J-21 H-137 50

    LATERAL 2 P-177 21.08 25.04 J-22 H-138 50

    LATERAL 2 P-178 17.86 19.36 H-138 H-139 50

    LATERAL 2 P-179 27.99 28.85 H-139 H-140 50

    LATERAL 2 P-180 13.33 14.99 H-140 H-141 50

    LATERAL 2 P-181 10.44 11.69 H-141 CRP TIPO 7-7 50

    LATERAL 2 P-182 19.30 21.41 CRP TIPO 7-7 J-31 50

    LATERAL 2 P-183 24.77 28.08 J-31 H-142 50

    LATERAL 2 P-184 31.24 32.88 J-31 H-143 50

    LATERAL 2 P-185 12.65 12.75 H-143 H-144 50

    LATERAL 2 P-186 26.09 26.28 H-144 H-145 50

    LATERAL 2 P-187 18.47 20.91 J-25 H-146 50

    LATERAL 2 P-188 19.33 21.31 H-146 H-147 50

    LATERAL 2 P-189 16.89 17.89 H-147 H-148 50

    LATERAL 2 P-190 23.76 24.93 J-27 H-149 50

    LATERAL 2 P-191 24.27 26.13 H-149 H-150 50

    LATERAL 2 P-192 35.31 35.90 H-150 H-151 50

    LATERAL 2 P-193 35.49 36.36 H-100 H-152 50

    LATERAL 2 P-194 32.57 32.93 H-152 H-153 50

    LATERAL 2 P-195 8.05 8.78 H-153 CRP TIPO 7-8 50

    LATERAL 2 P-196 27.10 29.29 CRP TIPO 7-8 H-154 50

    LATERAL 2 P-197 16.46 19.45 H-154 H-155 50

    LATERAL 2 P-198 9.83 10.48 H-155 J-32 50LATERAL 2 P-199 28.61 35.36 J-32 H-156 50

    LATERAL 2 P-200 14.36 15.27 J-32 H-157 50

    LATERAL 2 P-201 35.63 35.63 H-157 H-158 50

    LATERAL 2 P-202 36.62 37.33 H-158 H-159 50

    LATERAL 2 P-203 10.78 10.93 H-160 J-30 50

    LATERAL 2 P-204 41.86 42.11 H-161 H-160 50

    LATERAL 2 P-205 28.61 28.76 H-161 H-162 50

    LATERAL 2 P-206 29.21 29.52 H-162 H-163 50

    LATERAL 2 P-207 19.45 19.61 J-24 H-164 50

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    8/28

    LATERAL 2 P-208 16.77 17.31 H-164 H-165 50

    LATERAL 2 P-209 14.40 14.88 H-165 H-166 50

    LATERAL 2 P-210 29.31 30.30 H-166 H-167 50

    LATERAL 2 P-211 10.95 10.95 J-28 H-168 50

    LATERAL 2 P-212 22.48 22.48 H-168 H-169 50

    LATERAL 2 P-213 16.42 16.46 H-169 H-170 50

    TOTAL $%$"3!&' $%'!3

    " SECT

    RESU+EN CONDUCCION

    50 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 3%#3$!0 0.00

    63 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 '$$!' 0.00

    75 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 1&1!1" 0.00

    90 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 '$!30 0.00

    110 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 31!&& 155.48

    160 LON-ITUD DE TUBERIA .D/E /N "0 NT/ #1 "$&!"& 0.00

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    9/28

    ERIAS

    +ateral

    HDPE 150 8.00 0.84 3,437.40 3,437.23

    HDPE 150 7.63 0.80 3,437.23 3,436.77

    HDPE 150 7.27 0.76 3,436.77 3,436.55

    HDPE 150 27.13 2.86 3,420.00 3,419.29

    HDPE 150 9.17 1.44 3,419.29 3,416.17

    HDPE 150 8.43 1.91 3,416.17 3,415.06

    HDPE 150 8.07 1.83 3,415.06 3,413.97

    HDPE 150 7.70 1.74 3,413.97 3,412.95

    HDPE 150 6.60 1.49 3,412.95 3,412.62

    HDPE 150 6.23 1.41 3,412.62 3,411.74

    HDPE 150 5.87 1.33 3,411.74 3,411.02

    HDPE 150 5.50 1.24 3,411.02 3,410.75

    HDPE 150 3.30 1.06 3,410.75 3,410.36

    HDPE 150 2.93 0.94 3,410.36 3,409.86

    HDPE 150 2.57 0.82 3,409.86 3,409.58

    HDPE 150 2.20 0.71 3,409.58 3,409.21

    HDPE 150 1.47 0.75 3,409.21 3,409.01

    HDPE 150 1.10 0.56 3,409.01 3,408.93

    HDPE 150 1.10 0.56 3,369.36 3,369.13HDPE 150 0.73 0.37 3,369.13 3,369.08

    HDPE 150 0.37 0.19 3,369.08 3,369.07

    HDPE 150 17.97 1.89 3,419.29 3,418.83

    HDPE 150 7.70 1.74 3,418.83 3,417.57

    HDPE 150 7.33 1.66 3,417.57 3,417.27

    HDPE 150 6.97 1.58 3,417.27 3,416.27

    HDPE 150 5.87 1.88 3,416.27 3,415.75

    HDPE 150 5.50 1.76 3,415.75 3,413.87

    HDPE 150 5.13 1.65 3,375.98 3,373.11

    .a4en56llam7 C

    8lo9(Ab7ol:te)

    (L;7)

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    10/28

    HDPE 150 5.13 1.65 3,413.87 3,413.55

    HDPE 150 4.77 1.53 3,373.11 3,371.97

    HDPE 150 1.83 0.93 3,371.97 3,371.81

    HDPE 150 1.47 0.75 3,371.81 3,371.43

    HDPE 150 1.10 0.56 3,371.43 3,371.25

    HDPE 150 0.73 0.37 3,371.25 3,371.11

    HDPE 150 0.37 0.19 3,371.11 3,371.09

    HDPE 150 0.00 0.00 3,371.09 3,371.09

    HDPE 150 10.27 1.61 3,418.83 3,417.79

    HDPE 150 9.90 1.56 3,417.79 3,416.90

    HDPE 150 9.53 1.50 3,416.90 3,416.60

    HDPE 150 9.17 1.44 3,416.60 3,416.14

    HDPE 150 8.80 1.38 3,416.14 3,415.54

    HDPE 150 8.43 1.33 3,415.54 3,415.12

    HDPE 150 8.07 1.27 3,415.12 3,414.99

    HDPE 150 8.07 1.27 3,366.50 3,365.83

    HDPE 150 2.93 1.49 3,365.83 3,365.14

    HDPE 150 2.57 1.31 3,365.14 3,364.13

    HDPE 150 2.20 1.12 3,364.13 3,363.40

    HDPE 150 1.47 0.75 3,363.40 3,363.22

    HDPE 150 1.10 0.56 3,363.22 3,362.88

    HDPE 150 0.73 0.37 3,362.88 3,362.84

    HDPE 150 0.37 0.19 3,362.84 3,362.81HDPE 150 0.37 0.19 3,437.23 3,437.20

    HDPE 150 0.73 0.37 3,416.17 3,416.10

    HDPE 150 0.37 0.19 3,416.10 3,416.08

    HDPE 150 1.10 0.56 3,412.95 3,412.78

    HDPE 150 0.73 0.37 3,412.78 3,412.70

    HDPE 150 0.73 0.37 3,389.77 3,389.65

    HDPE 150 0.37 0.19 3,389.65 3,389.62

    HDPE 150 2.20 1.12 3,410.75 3,409.98

    HDPE 150 1.83 0.93 3,409.98 3,409.31

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    11/28

    HDPE 150 1.47 0.75 3,409.31 3,408.90

    HDPE 150 1.10 0.56 3,408.90 3,408.87

    HDPE 150 1.10 0.56 3,369.58 3,369.46

    HDPE 150 0.73 0.37 3,369.46 3,369.39

    HDPE 150 0.37 0.19 3,369.39 3,369.39

    HDPE 150 0.73 0.37 3,409.21 3,409.14

    HDPE 150 0.37 0.19 3,409.14 3,409.12

    HDPE 150 1.10 0.56 3,416.27 3,416.05

    HDPE 150 0.73 0.37 3,416.05 3,415.93

    HDPE 150 0.37 0.19 3,415.93 3,415.89

    HDPE 150 0.37 0.19 3,371.81 3,371.75

    HDPE 150 2.93 1.49 3,371.97 3,368.50

    HDPE 150 2.57 1.31 3,368.50 3,367.86

    HDPE 150 2.20 1.12 3,367.86 3,366.86

    HDPE 150 1.83 0.93 3,366.86 3,366.39

    HDPE 150 1.47 0.75 3,366.39 3,366.14

    HDPE 150 1.10 0.56 3,366.14 3,366.02

    HDPE 150 1.10 0.56 3,329.38 3,329.13

    HDPE 150 0.73 0.37 3,329.13 3,329.07

    HDPE 150 0.37 0.19 3,329.07 3,329.05

    HDPE 150 0.73 0.37 3,363.40 3,363.29

    HDPE 150 0.37 0.19 3,363.29 3,363.26

    HDPE 150 5.13 1.16 3,365.83 3,364.85HDPE 150 4.77 1.08 3,364.85 3,364.17

    HDPE 150 4.40 1.00 3,364.17 3,363.15

    HDPE 150 4.03 0.91 3,363.15 3,362.72

    HDPE 150 3.30 1.06 3,362.72 3,362.35

    HDPE 150 2.93 0.94 3,362.35 3,362.14

    HDPE 150 2.57 0.82 3,362.14 3,362.00

    HDPE 150 2.20 0.71 3,362.00 3,361.94

    HDPE 150 1.47 0.75 3,361.94 3,361.69

    HDPE 150 1.10 0.56 3,361.69 3,361.57

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    12/28

    HDPE 150 0.73 0.37 3,361.57 3,361.47

    HDPE 150 0.37 0.19 3,361.47 3,361.44

    HDPE 150 0.73 0.37 3,362.72 3,362.66

    HDPE 150 0.37 0.19 3,362.66 3,362.64

    HDPE 150 0.73 0.37 3,361.94 3,361.73

    HDPE 150 0.37 0.19 3,361.73 3,361.71

    HDPE 150 0.37 0.19 3,361.73 3,361.71

    HDPE 150 34.76 1.73 3,340.00 3,339.99

    HDPE 150 9.90 1.04 3,339.99 3,339.25

    HDPE 150 9.53 1.00 3,339.25 3,338.86

    HDPE 150 8.07 1.83 3,338.86 3,336.64

    HDPE 150 7.70 1.74 3,336.64 3,335.67

    HDPE 150 7.33 1.66 3,335.67 3,335.04

    HDPE 150 6.97 1.58 3,335.04 3,334.03

    HDPE 150 6.60 1.49 3,334.03 3,333.57

    HDPE 150 5.50 1.76 3,333.57 3,332.79

    HDPE 150 5.13 1.65 3,332.79 3,331.13

    HDPE 150 4.77 1.53 3,331.13 3,330.57

    HDPE 150 4.40 1.41 3,330.57 3,330.09

    HDPE 150 4.40 1.41 3,301.15 3,300.19

    HDPE 150 2.57 1.31 3,300.19 3,297.89

    HDPE 150 2.20 1.12 3,297.89 3,297.25

    HDPE 150 1.83 0.93 3,297.25 3,296.80HDPE 150 1.47 0.75 3,296.80 3,296.48

    HDPE 150 1.10 0.56 3,296.48 3,296.33

    HDPE 150 0.73 0.37 3,296.33 3,296.22

    HDPE 150 0.37 0.19 3,296.22 3,296.15

    HDPE 150 24.86 1.24 3,339.99 3,339.05

    HDPE 150 24.49 1.22 3,339.05 3,338.76

    HDPE 150 24.12 2.54 3,338.76 3,337.84

    HDPE 150 21.19 2.23 3,337.84 3,337.32

    HDPE 150 20.82 2.19 3,337.32 3,336.32

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    13/28

    HDPE 150 20.46 2.15 3,336.32 3,336.19

    HDPE 150 12.10 1.90 3,336.19 3,335.72

    HDPE 150 11.73 1.84 3,335.72 3,335.45

    HDPE 150 10.63 1.67 3,335.45 3,335.13

    HDPE 150 10.27 1.61 3,335.13 3,334.67

    HDPE 150 9.90 1.56 3,334.67 3,333.96

    HDPE 150 9.53 1.50 3,333.96 3,333.78

    HDPE 150 8.43 1.91 3,333.78 3,333.47

    HDPE 150 8.07 1.83 3,333.47 3,332.55

    HDPE 150 7.70 1.74 3,332.55 3,331.68

    HDPE 150 4.40 1.41 3,331.68 3,330.72

    HDPE 150 4.03 1.29 3,330.72 3,330.62

    HDPE 150 3.67 1.18 3,330.62 3,329.84

    HDPE 150 3.30 1.06 3,329.84 3,329.67

    HDPE 150 2.93 1.49 3,329.67 3,329.40

    HDPE 150 2.93 1.49 3,298.00 3,297.52

    HDPE 150 1.47 0.75 3,297.52 3,297.40

    HDPE 150 1.10 0.56 3,297.40 3,297.19

    HDPE 150 0.73 0.37 3,297.19 3,297.12

    HDPE 150 0.37 0.19 3,297.12 3,297.11

    HDPE 150 8.36 1.89 3,336.19 3,334.96

    HDPE 150 7.99 1.81 3,334.96 3,334.40

    HDPE 150 7.62 1.73 3,334.40 3,334.09HDPE 150 7.26 1.64 3,334.09 3,333.55

    HDPE 150 6.89 1.56 3,333.55 3,333.10

    HDPE 150 6.52 1.48 3,333.10 3,332.56

    HDPE 150 4.77 1.53 3,332.56 3,331.83

    HDPE 150 4.40 1.41 3,331.83 3,331.02

    HDPE 150 4.03 1.29 3,331.02 3,330.57

    HDPE 150 3.67 1.18 3,330.57 3,330.19

    HDPE 150 3.30 1.06 3,330.19 3,329.96

    HDPE 150 2.93 0.94 3,329.96 3,329.91

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    14/28

    HDPE 150 1.83 0.93 3,329.91 3,329.71

    HDPE 150 1.47 0.75 3,329.71 3,329.42

    HDPE 150 1.10 0.56 3,329.42 3,329.32

    HDPE 150 0.73 0.37 3,329.32 3,329.28

    HDPE 150 0.37 0.19 3,329.28 3,329.26

    HDPE 150 0.37 0.19 3,339.25 3,339.22

    HDPE 150 1.47 0.75 3,338.86 3,338.68

    HDPE 150 1.10 0.56 3,338.68 3,338.63

    HDPE 150 0.73 0.37 3,338.63 3,338.60

    HDPE 150 0.37 0.19 3,338.60 3,338.59

    HDPE 150 1.10 0.56 3,333.57 3,333.38

    HDPE 150 0.73 0.37 3,333.38 3,333.34

    HDPE 150 0.37 0.19 3,333.34 3,333.32

    HDPE 150 0.37 0.19 3,283.17 3,283.14

    HDPE 150 1.83 0.93 3,300.19 3,299.88

    HDPE 150 1.47 0.75 3,299.88 3,299.71

    HDPE 150 1.10 0.56 3,299.71 3,299.58

    HDPE 150 0.73 0.37 3,299.58 3,299.50

    HDPE 150 0.37 0.19 3,299.50 3,299.48

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    15/28

    HDPE 150 0.37 0.19 3,339.05 3,339.03

    HDPE 150 2.93 1.49 3,337.84 3,336.90

    HDPE 150 2.57 1.31 3,336.90 3,336.29

    HDPE 150 2.20 1.12 3,336.29 3,335.56

    HDPE 150 1.83 0.93 3,335.56 3,335.32

    HDPE 150 1.47 0.75 3,335.32 3,335.19

    HDPE 150 1.47 0.75 3,286.49 3,286.26

    HDPE 150 0.37 0.19 3,286.26 3,286.24

    HDPE 150 1.10 0.56 3,286.26 3,286.03

    HDPE 150 0.73 0.37 3,286.03 3,285.99

    HDPE 150 0.37 0.19 3,285.99 3,285.97

    HDPE 150 1.10 0.56 3,335.45 3,335.32

    HDPE 150 0.73 0.37 3,335.32 3,335.26

    HDPE 150 0.37 0.19 3,335.26 3,335.24

    HDPE 150 1.10 0.56 3,333.78 3,333.61

    HDPE 150 0.73 0.37 3,333.61 3,333.53

    HDPE 150 0.37 0.19 3,333.53 3,333.49

    HDPE 150 2.93 1.49 3,331.68 3,330.11

    HDPE 150 2.57 1.31 3,330.11 3,328.99

    HDPE 150 2.20 1.12 3,328.99 3,328.78

    HDPE 150 2.20 1.12 3,285.91 3,285.21

    HDPE 150 1.83 0.93 3,285.21 3,284.90

    HDPE 150 1.47 0.75 3,284.90 3,284.78HDPE 150 0.37 0.19 3,284.78 3,284.76

    HDPE 150 1.10 0.56 3,284.78 3,284.68

    HDPE 150 0.73 0.37 3,284.68 3,284.56

    HDPE 150 0.37 0.19 3,284.56 3,284.53

    HDPE 150 1.47 0.75 3,297.39 3,297.52

    HDPE 150 1.10 0.56 3,297.09 3,297.39

    HDPE 150 0.73 0.37 3,297.09 3,296.99

    HDPE 150 0.37 0.19 3,296.99 3,296.97

    HDPE 150 1.47 0.75 3,332.56 3,332.33

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    16/28

    HDPE 150 1.10 0.56 3,332.33 3,332.21

    HDPE 150 0.73 0.37 3,332.21 3,332.16

    HDPE 150 0.37 0.19 3,332.16 3,332.13

    HDPE 150 1.10 0.56 3,329.91 3,329.83

    HDPE 150 0.73 0.37 3,329.83 3,329.76

    HDPE 150 0.37 0.19 3,329.76 3,329.74

    R* SECTOR +U,UN # SECTOR* SECTOR ULL/I

    /RINCI/AL " LATERAL " CONDUCCION /RINCI/AL # LATERAL #

    467.79 1,157.16 0.00 448.51 1,162.44

    292.24 55.69 0.00 307.53 0.00

    254.69 222.30 0.00 310.72 0.00

    374.50 0.00 0.00 90.80 0.00

    30.43 0.00 0.00 193.97 0.00

    0.00 0.00 0.00 158.18 0.00

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    17/28

    CUADRO DE .IDRANTES

    SECTOR Label Ele>aton (m) Demand (L;7)

    H-1 3,421.60 0.367 3,436.77

    H-2 3,415.00 0.367 3,437.20

    H-3 3,404.89 0.367 3,415.06

    H-4 3,402.48 0.367 3,413.97

    H-5 3,399.10 0.367 3,412.62

    H-6 3,397.68 0.367 3,411.74

    H-7 3,397.16 0.367 3,411.02

    H-8 3,396.07 0.367 3,410.36

    H-9 3,394.71 0.367 3,409.86

    H-10 3,390.09 0.367 3,409.58

    H-11 3,373.02 0.367 3,409.01

    H-12 3,356.69 0.367 3,369.13

    H-13 3,355.57 0.367 3,369.08

    H-14 3,350.72 0.367 3,369.07

    H-15 3,401.09 0.367 3,417.57

    H-16 3,398.35 0.367 3,417.27

    H-17 3,386.88 0.367 3,415.75

    H-18 3,378.30 0.367 3,413.87

    H-19 3,362.69 0.367 3,373.11

    H-20 3,352.56 0.367 3,371.43

    H-21 3,349.04 0.367 3,371.25

    H-22 3,343.39 0.367 3,371.11

    H-23 3,340.90 0.367 3,371.09

    H-24 3,394.31 0.367 3,417.79

    H-25 3,386.20 0.367 3,416.90

    H-26 3,384.93 0.367 3,416.60

    H-27 3,377.07 0.367 3,416.14

    H-28 3,371.69 0.367 3,415.54

    H-29 3,369.00 0.367 3,415.12

    H-30 3,352.36 0.367 3,365.14

    H-31 3,344.12 0.367 3,364.13

    H-32 3,327.89 0.367 3,363.22H-33 3,319.90 0.367 3,362.88

    H-34 3,319.31 0.367 3,362.84

    H-35 3,318.00 0.367 3,362.81

    H-36 3,390.72 0.367 3,416.10

    H-37 3,373.45 0.367 3,416.08

    H-38 3,395.65 0.367 3,412.78

    H-39 3,375.12 0.367 3,389.65

    H-40 3,361.91 0.367 3,389.62

    H-41 3,388.64 0.367 3,409.98

    H-42 3,378.69 0.367 3,409.31H-43 3,371.61 0.367 3,408.90

    H-44 3,358.92 0.367 3,369.46

    .=dra:lc -rade(m)

    SECTOR"

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    18/28

    CUADRO DE .IDRANTES

    SECTOR Label Ele>aton (m) Demand (L;7).=dra:lc -rade

    (m)

    H-45 3,353.09 0.367 3,369.39

    H-46 3,350.70 0.367 3,369.39

    H-47 3,375.20 0.367 3,409.14

    H-48 3,373.88 0.367 3,409.12

    H-49 3,382.33 0.367 3,416.05

    H-50 3,375.54 0.367 3,415.93

    H-51 3,368.77 0.367 3,415.89

    H-52 3,354.97 0.367 3,371.75

    H-53 3,347.10 0.367 3,368.50

    H-54 3,344.99 0.367 3,367.86

    H-55 3,342.57 0.367 3,366.86

    H-56 3,336.14 0.367 3,366.39

    H-57 3,333.15 0.367 3,366.14

    H-58 3,317.20 0.367 3,329.13

    H-59 3,313.49 0.367 3,329.07

    H-60 3,307.71 0.367 3,329.05

    H-61 3,339.91 0.367 3,363.29

    H-62 3,330.75 0.367 3,363.26

    H-63 3,354.26 0.367 3,364.85

    H-64 3,341.75 0.367 3,364.17

    H-65 3,327.12 0.367 3,363.15

    H-66 3,328.60 0.367 3,362.35

    H-67 3,328.96 0.367 3,362.14

    H-68 3,329.20 0.367 3,362.00

    H-69 3,327.90 0.367 3,361.69

    H-70 3,326.97 0.367 3,361.57

    H-71 3,320.60 0.367 3,361.47

    H-72 3,321.00 0.367 3,361.44

    H-73 3,326.00 0.367 3,362.66

    H-74 3,322.49 0.367 3,362.64

    H-75 3,329.30 0.367 3,361.71

    H-76 3,329.76 0.367 3,361.71H-77 3,326.50 0.367 3,336.64

    H-78 3,324.24 0.367 3,335.67

    H-79 3,321.99 0.367 3,335.04

    H-80 3,314.88 0.367 3,334.03

    H-81 3,310.68 0.367 3,332.79

    H-82 3,307.10 0.367 3,331.13

    H-83 3,305.69 0.367 3,330.57

    H-84 3,277.35 0.367 3,297.89

    H-85 3,270.86 0.367 3,297.25

    H-86 3,265.90 0.367 3,296.80H-87 3,264.60 0.367 3,296.48

    H-88 3,258.68 0.367 3,296.33

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    19/28

    CUADRO DE .IDRANTES

    SECTOR Label Ele>aton (m) Demand (L;7).=dra:lc -rade

    (m)

    H-89 3,254.78 0.367 3,296.22

    H-90 3,253.20 0.367 3,296.15

    H-91 3,328.30 0.367 3,338.76

    H-92 3,325.54 0.367 3,337.32

    H-93 3,323.31 0.367 3,336.32

    H-94 3,317.18 0.367 3,335.72

    H-95 3,313.50 0.367 3,335.13

    H-96 3,311.60 0.367 3,334.67

    H-97 3,309.00 0.367 3,333.96

    H-98 3,307.69 0.367 3,333.47

    H-99 3,305.69 0.367 3,332.55

    H-100 3,302.23 0.367 3,331.68

    H-101 3,301.34 0.367 3,330.72

    H-102 3,300.29 0.367 3,330.62

    H-103 3,291.08 0.367 3,329.84

    H-104 3,288.89 0.367 3,329.67

    H-105 3,285.70 0.367 3,297.40

    H-106 3,279.13 0.367 3,297.19

    H-107 3,277.56 0.367 3,297.12

    H-108 3,272.28 0.367 3,297.11

    H-109 3,323.68 0.367 3,334.96

    H-110 3,323.60 0.367 3,334.40

    H-111 3,323.40 0.367 3,334.09

    H-112 3,322.53 0.367 3,333.55

    H-113 3,321.39 0.367 3,333.10

    H-114 3,319.67 0.367 3,331.83

    H-115 3,310.49 0.367 3,331.02

    H-116 3,308.44 0.367 3,330.57

    H-117 3,307.37 0.367 3,330.19

    H-118 3,305.34 0.367 3,329.96

    H-119 3,301.29 0.367 3,329.71

    H-120 3,294.50 0.367 3,329.42H-121 3,290.62 0.367 3,329.32

    H-122 3,286.71 0.367 3,329.28

    H-123 3,283.80 0.367 3,329.26

    H-124 3,329.00 0.367 3,339.22

    H-125 3,327.63 0.367 3,338.68

    H-126 3,323.75 0.367 3,338.63

    H-127 3,319.76 0.367 3,338.60

    H-128 3,315.59 0.367 3,338.59

    H-129 3,297.49 0.367 3,333.38

    H-130 3,289.91 0.367 3,333.34H-131 3,263.82 0.367 3,283.14

    H-132 3,281.90 0.367 3,299.88

    SECTOR#

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    20/28

    CUADRO DE .IDRANTES

    SECTOR Label Ele>aton (m) Demand (L;7).=dra:lc -rade

    (m)

    H-133 3,272.70 0.367 3,299.71

    H-134 3,267.09 0.367 3,299.58

    H-135 3,260.36 0.367 3,299.50

    H-136 3,253.26 0.367 3,299.48

    H-137 3,326.28 0.367 3,339.03

    H-138 3,313.15 0.367 3,336.90

    H-139 3,305.66 0.367 3,336.29

    H-140 3,298.64 0.367 3,335.56

    H-141 3,291.77 0.367 3,335.32

    H-142 3,264.01 0.367 3,286.24

    H-143 3,266.96 0.367 3,286.03

    H-144 3,265.38 0.367 3,285.99

    H-145 3,262.26 0.367 3,285.97

    H-146 3,305.05 0.367 3,335.32

    H-147 3,296.08 0.367 3,335.26

    H-148 3,290.20 0.367 3,335.24

    H-149 3,300.78 0.367 3,333.61

    H-150 3,291.10 0.367 3,333.53

    H-151 3,284.62 0.367 3,333.49

    H-152 3,294.28 0.367 3,330.11

    H-153 3,289.42 0.367 3,328.99

    H-154 3,274.80 0.367 3,285.21

    H-155 3,264.43 0.367 3,284.90

    H-156 3,240.02 0.367 3,284.76

    H-157 3,255.60 0.367 3,284.68

    H-158 3,255.40 0.367 3,284.56

    H-159 3,248.14 0.367 3,284.53

    H-160 3,284.54 0.367 3,297.39

    H-161 3,279.99 0.367 3,297.09

    H-162 3,277.05 0.367 3,296.99

    H-163 3,272.76 0.367 3,296.97

    H-164 3,318.54 0.367 3,332.33H-165 3,314.24 0.367 3,332.21

    H-166 3,310.49 0.367 3,332.16

    H-167 3,302.80 0.367 3,332.13

    H-168 3,304.71 0.367 3,329.83

    H-169 3,304.11 0.367 3,329.76

    H-170 3,302.90 0.367 3,329.74

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    21/28

    ? (m) @ (m)

    15.14 262,819.64 8,941,506.18

    22.15 262,844.65 8,941,442.74

    10.15 262,780.98 8,941,722.80

    11.47 262,787.22 8,941,748.44

    13.49 262,805.00 8,941,770.00

    14.02 262,790.58 8,941,802.39

    13.83 262,782.13 8,941,833.72

    14.27 262,768.90 8,941,865.82

    15.12 262,751.74 8,941,896.74

    19.45 262,744.01 8,941,920.55

    35.92 262,701.84 8,941,953.80

    12.41 262,658.70 8,941,949.16

    13.49 262,648.06 8,941,939.39

    18.31 262,643.47 8,941,927.38

    16.44 262,763.04 8,941,587.03

    18.88 262,760.35 8,941,595.46

    28.82 262,739.20 8,941,624.42

    35.50 262,739.17 8,941,662.22

    10.40 262,727.14 8,941,736.90

    18.84 262,658.61 8,941,756.21

    22.16 262,632.53 8,941,758.04

    27.67 262,593.61 8,941,767.22

    30.13 262,575.19 8,941,778.25

    23.43 262,745.69 8,941,574.00

    30.64 262,710.04 8,941,584.61

    31.61 262,698.72 8,941,591.69

    39.00 262,677.12 8,941,594.98

    43.76 262,646.74 8,941,602.94

    46.03 262,632.45 8,941,621.42

    12.76 262,596.77 8,941,671.79

    19.97 262,575.57 8,941,691.91

    35.26 262,544.08 8,941,721.6342.89 262,502.78 8,941,743.49

    43.45 262,493.28 8,941,748.33

    44.72 262,466.19 8,941,762.42

    25.33 262,763.19 8,941,701.89

    42.54 262,743.70 8,941,706.73

    17.09 262,787.34 8,941,767.97

    14.50 262,734.20 8,941,787.21

    27.66 262,704.21 8,941,793.25

    21.30 262,748.12 8,941,849.10

    30.56 262,713.45 8,941,859.7037.21 262,682.72 8,941,873.13

    10.52 262,663.95 8,941,882.37

    /re77:re(m .#O)

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    22/28

    ? (m) @ (m)/re77:re(m .#O)

    16.27 262,645.46 8,941,885.05

    18.65 262,638.71 8,941,882.09

    33.87 262,708.11 8,941,971.93

    35.18 262,698.60 8,941,988.86

    33.65 262,706.82 8,941,628.62

    40.32 262,673.44 8,941,628.68

    47.02 262,670.71 8,941,673.27

    16.74 262,650.80 8,941,706.76

    21.36 262,655.35 8,941,810.80

    22.82 262,640.02 8,941,821.59

    24.24 262,613.14 8,941,848.51

    30.19 262,594.76 8,941,863.44

    32.92 262,586.81 8,941,882.28

    11.90 262,554.68 8,941,921.51

    15.55 262,543.28 8,941,931.42

    21.30 262,547.24 8,941,951.48

    23.33 262,535.76 8,941,684.63

    32.44 262,505.16 8,941,699.50

    10.57 262,615.10 8,941,700.94

    22.37 262,577.61 8,941,726.74

    35.95 262,505.39 8,941,758.19

    33.68 262,502.24 8,941,813.63

    33.11 262,490.46 8,941,822.45

    32.74 262,483.83 8,941,832.64

    33.72 262,463.33 8,941,850.32

    34.54 262,447.98 8,941,853.00

    40.79 262,417.85 8,941,851.88

    40.36 262,385.44 8,941,850.16

    36.58 262,493.05 8,941,794.29

    40.07 262,473.54 8,941,793.10

    32.35 262,452.21 8,941,907.20

    31.89 262,433.40 8,941,888.8610.12 262,650.80 8,941,977.01

    11.40 262,657.17 8,942,002.85

    13.03 262,654.10 8,942,021.35

    19.11 262,639.10 8,942,050.54

    22.07 262,619.63 8,942,077.48

    23.98 262,589.03 8,942,104.27

    24.83 262,575.83 8,942,113.10

    20.50 262,503.33 8,942,197.62

    26.34 262,483.26 8,942,211.49

    30.84 262,464.08 8,942,226.5731.81 262,439.29 8,942,233.42

    37.57 262,419.41 8,942,227.34

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    23/28

    ? (m) @ (m)/re77:re(m .#O)

    41.35 262,394.93 8,942,248.77

    42.86 262,334.80 8,942,284.67

    10.44 262,509.28 8,941,922.71

    11.75 262,487.87 8,941,942.00

    12.99 262,460.88 8,941,946.61

    18.50 262,448.38 8,941,954.09

    21.59 262,428.80 8,941,955.26

    23.02 262,411.78 8,941,960.77

    24.91 262,392.35 8,941,983.13

    25.73 262,378.00 8,941,988.02

    26.80 262,355.44 8,941,990.20

    29.39 262,336.19 8,942,003.87

    29.32 262,308.78 8,941,988.47

    30.27 262,305.51 8,941,990.14

    38.68 262,282.76 8,942,014.67

    40.71 262,274.95 8,942,019.39

    11.68 262,292.82 8,942,038.52

    18.02 262,289.05 8,942,067.74

    19.53 262,280.59 8,942,085.49

    24.77 262,270.66 8,942,102.48

    11.26 262,433.02 8,941,934.58

    10.77 262,418.77 8,941,936.56

    10.67 262,410.30 8,941,936.05

    11.00 262,395.40 8,941,930.16

    11.68 262,381.48 8,941,935.69

    12.14 262,351.04 8,941,914.85

    20.48 262,328.35 8,941,925.48

    22.08 262,313.73 8,941,934.80

    22.78 262,299.35 8,941,944.45

    24.57 262,289.95 8,941,951.67

    28.37 262,275.90 8,941,954.62

    34.85 262,259.11 8,941,969.2538.63 262,251.25 8,941,980.36

    42.48 262,243.42 8,941,991.57

    45.37 262,233.12 8,942,005.35

    10.2 262,593.39 8,941,919.28

    11.03 262,599.66 8,941,945.25

    14.85 262,593.59 8,941,947.44

    18.8 262,585.08 8,941,950.58

    22.96 262,576.22 8,941,953.96

    35.82 262,601.08 8,942,065.48

    43.33 262,586.62 8,942,066.8719.28 262,543.31 8,942,072.26

    17.95 262,525.10 8,942,148.74

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    24/28

    ? (m) @ (m)/re77:re(m .#O)

    26.95 262,511.10 8,942,150.40

    32.42 262,493.31 8,942,152.17

    39.06 262,470.05 8,942,153.80

    46.13 262,449.80 8,942,154.20

    12.72 262,530.91 8,941,902.40

    23.71 262,513.01 8,941,958.44

    30.57 262,525.85 8,941,970.66

    36.85 262,511.61 8,941,992.36

    43.46 262,513.65 8,942,005.53

    22.18 262,541.57 8,942,049.43

    19.03 262,508.82 8,942,052.24

    20.57 262,497.16 8,942,057.11

    23.66 262,476.38 8,942,072.74

    30.21 262,448.02 8,941,973.08

    39.1 262,454.98 8,941,991.09

    44.95 262,461.92 8,942,006.49

    32.76 262,397.39 8,942,005.42

    42.34 262,414.16 8,942,022.95

    48.77 262,444.85 8,942,034.45

    35.75 262,363.39 8,942,026.65

    39.49 262,389.89 8,942,045.47

    10.39 262,376.50 8,942,076.72

    20.43 262,383.72 8,942,091.51

    44.65 262,376.78 8,942,129.09

    29.02 262,397.97 8,942,103.00

    29.1 262,432.40 8,942,094.22

    36.31 262,468.44 8,942,098.31

    12.83 262,276.95 8,942,040.48

    17.07 262,245.77 8,942,068.22

    19.9 262,229.26 8,942,091.56

    24.16 262,212.87 8,942,115.70

    13.76 262,356.13 8,941,947.2117.93 262,343.03 8,941,957.67

    21.62 262,331.77 8,941,966.65

    29.27 262,303.54 8,941,974.56

    25.08 262,278.30 8,941,945.28

    25.6 262,268.86 8,941,925.11

    26.78 262,265.36 8,941,909.07

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    25/28

    CUADRO DE NODOS

    Label Ele>aton (m) Demand (L;7)

    J-1 3,429.60 0.00 3,437.23 7.61

    J-2 3,419.60 7.27 3,436.55 16.91

    J-3 3,414.40 0.00 3,417.73 3.32

    J-4 3,411.37 0.00 3,417.40 6.03

    J-5 3,406.66 0.00 3,416.03 9.35

    J-6 3,400.00 0.00 3,414.18 14.15

    J-7 3,396.85 0.00 3,412.77 15.88

    J-8 3,388.80 0.00 3,415.30 26.44

    J-9 3,379.57 0.00 3,411.49 31.85

    J-10 3,358.76 0.00 3,372.99 14.2

    J-11 3,358.14 0.00 3,366.04 7.88

    J-12 3,357.80 0.00 3,372.88 15.05

    J-13 3,340.90 0.00 3,372.42 31.45

    J-14 3,338.82 0.00 3,364.69 25.82

    J-15 3,330.08 0.00 3,362.38 32.23

    J-16 3,329.07 0.00 3,362.59 33.45

    J-17 3,328.28 0.00 3,363.37 35.02

    J-18 3,338.04 0.00 3,339.70 1.65

    J-19 3,335.83 0.00 3,339.27 3.43

    J-20 3,334.82 0.00 3,339.05 4.23

    J-21 3,331.46 0.00 3,339.10 7.62

    J-22 3,326.66 0.00 3,338.35 11.67

    J-23 3,322.80 0.00 3,337.28 14.46

    J-24 3,321.00 0.29 3,335.12 14.09

    J-25 3,314.87 0.00 3,336.82 21.9

    J-26 3,312.25 0.00 3,336.43 24.13

    J-27 3,308.33 0.00 3,335.75 27.37

    J-28 3,304.40 0.00 3,333.80 29.34

    J-29 3,290.00 0.00 3,300.70 10.68

    J-30 3,286.33 0.00 3,297.80 11.44

    J-31 3,277.22 0.00 3,286.36 9.12

    J-32 3,260.80 0.00 3,285.39 24.54

    .=dra:lc -rade(m)

    /re77:re(m .#O)

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    26/28

    ? (m) @ (m)

    262,877.43 8,941,449.06

    262,813.84 8,941,548.99

    262,799.49 8,941,555.37

    262,783.34 8,941,559.41

    262,782.55 8,941,697.16

    262,808.78 8,941,758.82

    262,777.32 8,941,846.71

    262,735.72 8,941,614.98

    262,718.07 8,941,953.49

    262,697.16 8,941,747.88

    262,602.44 8,941,657.24

    262,688.78 8,941,749.28

    262,575.19 8,941,778.25

    262,554.63 8,941,710.56

    262,450.89 8,941,893.17

    262,480.96 8,941,839.73

    262,513.18 8,941,795.58

    262,611.12 8,941,828.53

    262,616.66 8,941,899.94

    262,614.26 8,941,941.78

    262,520.70 8,941,890.02

    262,501.84 8,941,940.57

    262,457.00 8,941,946.36

    262,364.51 8,941,930.68

    262,440.61 8,941,956.17

    262,626.86 8,942,062.00

    262,384.85 8,941,986.02

    262,286.47 8,941,952.43

    262,541.68 8,942,145.82

    262,284.80 8,942,033.08

    262,526.32 8,942,032.40

    262,383.71 8,942,101.34

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    27/28

    CUADRO DE CA+ARA RO+/E/

    Label Ele>aton (m) 8lo9 (L;7)

    CRP TIPO 7-1 3,366.50 90 0.00 6.600

    CRP TIPO 7-2 3,375.98 63 0.00 4.400

    CRP TIPO 7-3 3,329.38 50 0.00 1.100

    CRP TIPO 7-4 3,389.77 50 0.00 0.733

    CRP TIPO 7-5 3,369.58 50 0.00 1.100

    CRP TIPO 7-6 3,369.36 50 0.00 1.100

    CRP TIPO 7-7 3,286.50 50 0.00 1.100

    CRP TIPO 7-8 3,285.91 50 0.00 1.467

    CRP TIPO 7-9 3,283.17 50 0.00 0.367

    CRP TIPO 7-10 3,301.15 63 0.00 2.933

    VRP-01 3,287.97 50 10.00 1.833

    Dameter Interno(e) (mm)

    /re77:re Settng(Intal) (m .#O)

  • 7/25/2019 CUADROS DE WATERCAD VISTA ALEGRE - copia.xlsx

    28/28

    ESION

    .eadlo77 (m)

    3,414.85 3,366.50 48.35

    3,413.20 3,375.98 37.23

    3,367.79 3,329.38 38.41

    3,414.02 3,389.77 24.26

    3,411.11 3,369.58 41.53

    3,411.21 3,369.36 41.85

    3,337.05 3,286.49 50.55

    3,333.24 3,285.91 47.33

    3,336.27 3,283.17 53.1

    3,334.58 3,301.15 33.43

    3,333.39 3,298.00 35.39

    .=dra:lc -rade(8rom) (m)

    .=dra:lc -rade(To) (m)