curriculum action team
DESCRIPTION
Industrial & Engineering Technology. Curriculum Action Team. October 12, 2011 4:00-6:00 p.m. ISC - Room 1301. Agenda. “Visualizing Our Vision” Curriculum Priorities Reports & Updates. Pretty Good. Visualizing Our Vision. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/1.jpg)
Industrial & Engineering Technology
October 12, 20114:00-6:00 p.m.ISC - Room 1301
![Page 2: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/2.jpg)
“Visualizing Our Vision”Curriculum PrioritiesReports & Updates
![Page 3: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/3.jpg)
PrettPretty y
GoodGood
![Page 4: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/4.jpg)
If there were no obstacles at all, what would I love to see happen to the Technology & Engineering Program in Parkway?
What would I love to see my students doing? What would it look like? What would it sound like?
What is my ideal scenario?What do I want this program to be remembered or known for? How do I want people to describe our program and our student’s work?
What must happen in our program to achieve the mission of the Parkway School District?
![Page 6: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/6.jpg)
Stage 2: Assessment Evidence
Science, Technology, Engineering and
Mathematics
Architecture and
Construction
Manufacturing Transportation, Distribution and Logistics
• PLTW Introduction to Engineering Design
• PLTW Principles of Engineering
• PLTW Digital Electronics• PLTW Civil Engineering
and Architecture• PLTW Computer
Integrated Manufacturing• PLTW Biotechnical
Engineering• Robotics Technology • Design and Technology 1,
2
• Construction Technology
• Advanced Construction Technology
• Drafting• Civil
Engineering and Architecture
• Computer Integrated Manufacturing
• Robotics Technology
• Power, Energy and Transportation 1
• Power, Energy, and Transportation 2
Stage 3: Learning Plan
Stage 1: Identify Desired Results
![Page 7: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/7.jpg)
What Do We Need to Stop Doing?
What Do We Need to Start Doing?
![Page 8: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/8.jpg)
Determine CTE program/pathway transfer goals and determine which goals belong within each CTE course.
Update Stage 1 curriculum to include explicitly stated transfer goals.
Align curriculum to Parkway M/V. Create/revise assessments to align
with Stage 1.
![Page 9: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/9.jpg)
__________________ is a priority course in Technology & Engineering because _________________________.
![Page 10: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/10.jpg)
PLTW PLTW Re-Re-
CertificatiCertificationon
![Page 11: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/11.jpg)
November 2, 2011 Curriculum Action Team Meeting Focus: Priority Non-PLTW Courses as
identified at October 12 meeting.November 4, 2011
Curriculum Action Team Work Continues…
![Page 12: Curriculum Action Team](https://reader036.vdocument.in/reader036/viewer/2022070409/5681446e550346895db0ffcb/html5/thumbnails/12.jpg)
• PLTW Re-Certification and Self Assessments• Energy & the Environment• Recruitment and Retention Plan• Boeing Women in Engineering Conference• 2012 PLTW EOC Exam Competencies and Protocols• PLTW EOC's online TOTALLY for POE and CIM - both A and C with 1 hour time limits for all testing unless IEP/504 plans are submitted in a timely fashion to PLTW.• VEX components and programming with the PIC controller vs. version 3.0• How ROBOTC affects the VEX PIC Controller