curriculum vitae with signature - updated 11.29.16

18
ORGANIZATION YEAR ATTENDED Saudi Council of Engineers – SCE 2014 – 2017 Architectural Engineer Associate Degree (Previous Working Visa Category) United Architects of the Philippines - IAPOA 2012 – Present The Integrated and Accredited Professional Organization of Architects United Architects of the Philippines – Pasig Chapter 2012 – Present The Integrated and Accredited Professional Organization of Architects SCHOOL YEAR ATTENDED TERTIARY/COLLEGE: Polytechnic University of the Philippines (Mabini Campus) 2002 - 2009 Anonas St., Sta. Mesa Manila, Philippines Bachelor of Science in Architecture and Fine Arts *ARCHITECT/DESIGN ASSISTANT Creative + Productive + Hard Working + Multi-Tasking + Observant PRC Reg. No. : 29661 Date Issue : July-06, 2012 Date Expired : October-12, 2019 UAP No. : 25914 PTR No. : 1687924 Place Issue : Pasig City Hall, Pasig City, Metro Manila Philippines Home Address : #0435 Baltazar St., Brgy. Sto. Tomas, Pasig City, Metro Manila, Philippines Contact No. : +63 995 4835988 (Globe) +63 921 4149574 (Smart) Skype Account : mauipogi_101285 E-mail : [email protected] Career Objective: Architect MAURICIO P. CABANILLAS JR. i. AFFILIATION/MEMBERSHIP ORGANIZATION: ii. EDUCATIONAL BACKGROUND:

Upload: arch-mauricio-p-cabanillas-jr

Post on 08-Jan-2017

24 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

ORGANIZATION YEAR ATTENDED

Saudi Council of Engineers – SCE 2014 – 2017Architectural Engineer Associate Degree(Previous Working Visa Category)

United Architects of the Philippines - IAPOA 2012 – PresentThe Integrated and Accredited Professional Organization of Architects

United Architects of the Philippines – Pasig Chapter 2012 – PresentThe Integrated and Accredited Professional Organization of Architects

SCHOOL YEAR ATTENDED

TERTIARY/COLLEGE:Polytechnic University of the Philippines (Mabini Campus) 2002 - 2009Anonas St., Sta. Mesa Manila, Philippines Bachelor of Science in Architecture and Fine Arts

SECONDARY/HIGH SCHOOL:Rizal High School (Main Campus) 1998 - 2002Dr. Sixto Antonio Avenue St., Brgy. Caniogan, Pasig City, Philippines

PRIMARY/ELEMENTARY:Bagong Diwa Elementary School 1992 – 1998#2244 Linceo St. Pandacan Manila, Philippines

*ARCHITECT/DESIGN ASSISTANT Creative + Productive + Hard Working + Multi-Tasking + Observant

PRC Reg. No. : 29661Date Issue : July-06, 2012Date Expired : October-12, 2019UAP No. : 25914PTR No. : 1687924 Place Issue : Pasig City Hall, Pasig City, Metro Manila PhilippinesHome Address : #0435 Baltazar St., Brgy. Sto. Tomas,

Pasig City, Metro Manila, PhilippinesContact No. : +63 995 4835988 (Globe)

+63 921 4149574 (Smart)Skype Account : mauipogi_101285E-mail : [email protected]

Career Objective:“To pursue a professional challenging Architectural & Engineering

working experience in any Architectural/Engineering Firm to help broaden my experience in the related field & enhances my knowledge & professional growth in the world of Architecture, Construction, & Oil & Gas Industry.”

Architect MAURICIO P. CABANILLAS JR.

i. AFFILIATION/MEMBERSHIP ORGANIZATION:

ii. EDUCATIONAL BACKGROUND:

iii. PERSONAL BACKGROUND:

Page 2: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Birthday : October – 12, 1985Birth Place : Giporlos, Eastern Samar, PhilippinesAge : 31Sex : MaleCivil Status : SingleHeight : 5’4” (162 cm)Weight : 145 lbs. (65 kilos)Religion : Roman CatholicNationality : FilipinoLanguage Spoken : English, Tagalog & WarayFather’s Name : Mr. Mauricio O. Cabanillas Occupation : Master Teacher II (Bagong Diwa Elementay School, Pandacan Manila, Philippines) Mother’s Name : Mrs. Winefreda P. Cabanillas Occupation : HousewifeSiblings : Patty P. CabanillasOccupation : Sales Representative (Duty Free Mall - Dubai, United Arab Emirates)

Person to ContactIn Case of Emergency : Mr. Mauricio O. CabanillasRelationship : FatherAddress : #0435 Baltazar St., Brgy. Sto. Tomas Pasig City, PhilippinesContact No’s. : +63 949 7648465 / 7470367

* United Architects of the Philippines – Pasig ChapterThe Integrated and Accredited Professional Organization of ArchitectsPROJECT BLAD: “Blood Letting and Data Banking cum Motorcycle Event”August-26, 2012, Sunday @ Rizal High School (Main Campus) Pasig City

* United Architects of the Philippines – Pasig ChapterThe Integrated and Accredited Professional Organization of ArchitectsINDUCTION OF OFFICERS FY: 2012-2013 & New Member Architects Thanks Giving NightSeptember-20, 2012, Thursday @ CW HOME DEPOT Makati Events Hall

* AUTODESK 3DSMAX 2011 (For Architectural Design) MICROCADD TECHNOLOGIES Co., Inc. Main Branch: CubaoJuly, 2011 (9 hr. /15 hr.) @ 5th Flr., Doña Consolacion Bldg. 602 General Santos Ave., Cubao, Q. C.

* United Architects of the Philippines – Graduate Auxiliary 101 The Duly Recognized Graduate Auxiliary of the United Architects of the PhilippinesBOARDing PASS: “Destination June 2011 ALE”May-08, 2011, Sunday @ Teatro Arkitekto, UAP Headquarters, Scout Rallos, Tomas Morato, Q. C.

* Exploring the Empowering Spirit of Art and Architecture”February-03 & 04, 2009 @ P.U.P. Mabini Campus, Sta. Mesa, Manila

* “Church Architecture in Filipino Settings”Arsobispado, Intramuros, Manila

* “Creative Green Architecture and Design: The Cutting Edge”College of Engineering Theater, University of the Philippines, Diliman, Q.C.

* “The Science of Feng Shui and Architectural Design”January-28, 2004 @ College of Engineering Theater, University of the Philippines, Diliman, Q.C.

* Nestle Nido: “Munting Daliri Father & Child Art Workshop”Batch 1997, @ Museong Pambata, Roxas Boulevard, Taft Manila

* Nestle Nido: “Munting Daliri Mother & Child Art Workshop”Batch 1995, @ Fort Santiago, Intramuros, Manila

iv. TRAININGS & SEMINARS ATTENDED:

Page 3: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

1. Software’s : Auto CAD 2014-2016 VersionSketch-Up 3D Rendering with V-Ray & i-RenderPhotoshop CS5MS Office 2010 Proficient

2. Knowledge : Aviation Facility & Berthing FacilityOil Depot Layout Plan, Bulk Plant Layout Plan, & Bunkering Terminal Layout

PlanLPG Filling Plant Layout Plan with Piping & Instrumentation Diagram (P. & I.

D.)Gasoline Service Station (S/S) Layout PlanBulilit-Station/Micro-Filling Station (MFS) & Dealer-Owned Filling Station

(DOFS)Prepared Construction/Shop Drawings by the following Drafting Disciplines:

* Architectural* Structural* Electrical* Mechanical* Sanitary/Plumbing* Driveway Concreting* Piping & Instrumentation Diagram (P. & I. D.)

Residential Houses Designing and RenderingPrepared Estimate Bill of Materials (BOM) & Bill of Quantity (BOQ)Site Visiting & preparing as-Built PlansDesigning of Roads and Bridges with Typical Sections of Foundation and

Footing DetailsNorthing & Easting of Coordinates & reflect it in Google Earth as KMZ FilesDaily, Weekly & Monthly Cumulative Roads Progress Monitoring

3. Other Skills : Manual Drafting & Rendering, Scale Modeling, Painting, & Mosaic Rendering

4. Self Attributes: Good Oral & Written Communication & Interpersonal SkillsSelf-starter and self-motivatedInitiative and organizedEnsure that project deadlines are met and able to Multi TaskCapable of working under pressure to meet tight submission schedulesWilling to work overtime to meet the schedule completion datesCapable of scheduling and managing own work load plus othersA Team player

Contractor :

2nd Floor Obeikan Bookstore BuildingPrince Sultan Road, Jeddah, Kingdom of Saudi Arabia

Department : Architecture & Building Construction Division – Road Projects Department

Position : QA/QC Department Draftsman

Duration : January-29, 2014 to January-31, 2016 (2 years)

Job Description : Designing of Roads and Bridges with Typical Sections of Foundation and Footing Details for Makkah Second Ring Road Project by the following Drafting Disciplines: Architectural & Structural. Prepares Construction/Shop Drawings of QA/QC Department Mobile Laboratory for the South Border Infrastructure

v. SKILLS:

vi. HISTORY OF EMPLOYMENT & WORKING EXPERIENCE:

Page 4: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Project (SBIP). Provide Weekly Quantities of Road Progress Monitoring Report based on daily Request for Inspection (RFI), Request for Testing (RFT), & Test Report Submittal (TRS), etc. Provide Superpave Hot Mixed Asphalt (HMA) Actual Daily Accomplishment from the Daily QA/QC Report (DQR) of the Site Area & completed some as-builts & other miscellaneous projects.

Project-in-Charge : Engr. Nabeel H. Abu SadahQA/QC Manager for Road Projects Department

Year : 2014 Projects* QA/QC Department Mobile Laboratory for South Border Infrastructure

ProjectAsphalt/Aggregates Sections & Concrete/Soil Sections (Construction

Drawings)- March-11, 2014

* QA/QC Department Mobile Laboratory for South Border Infrastructure Project with Metal Curing Tank Room (Proposed Layout Plan) - August-05, 2014

* Makkah Second Ring Road Project (Zoning, Foundation Plan, Footings, & Typical Road Section Details) - June-28, 2014

* South Border Infrastructure Project (Kingdom of Saudi Arabia) Road Progress Monitoring Report – Weekly & Monthly Cumulative & Combined Summary of Roads & Fence Activity (Microsoft Excel Files) - August-31, 2014 to the January-31, 2016.

i. Area-1 (JIZAN) Regionii. Area-2 (ASEER) Region

iii. Area-3A (NAJRAN) Region

iv. Area-3B (SHARURAH) Regionv. Area-4A (D. POINT) Regionvi. Area-4B (ARADAH) Region

* Abu Sadah Property Proposed Commercial Complex: Restaurant, Rentable Warehouses, Medical Doctor Clinic/Offices, Proposed Showroom, & Proposed Hotel2224 Ann Arbor, Oklahoma City, USA(Proposed Conceptual Land Use Plan & Proposed Conceptual Site Development Plan)- May-11, 2014

Project-in-Charge : Engr. Eric M. Guillermo, MSEPlanning Manager for Road Projects Department

Year : 2014 Projects* ±721.04 SQ. M. South Border Infrastructure Project Office As-Built Layout Plan &

Organizational Chart - April-23, 2014

Project-in-Charge : Dr. Alyass HosinTechnical Manager for Road Projects Department

Year : 2014 Projects* Kingdom of Saudi Arabia Ministry of Communications Standard Reinforced

Concrete Box Culvert (R.C.B.C.) - April-05, 2014 i. Standard Single Cell Reinforced Concrete Box Culvert (R.C.B.C.)ii. Standard Double Cell Reinforced Concrete Box Culvert (R.C.B.C.)iii. Standard Reinforced Concrete Box Culvert (R.C.B.C.) Inlet/Outlet

Project-in-Charge : Engr. Bader Maskoun, M. Sc. CSLA, USATendering Division for Road Projects Department

Page 5: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Year : 2014 Projects* Makkah Mass Rail Transit Project Line-B & Line–C (UG Structural Layout)

(Zoning of Tunnel Type using AutoCAD & Google Earth software) - June-04, 2014

* Makkah Public Transport Program (MPTP) (Quantitative Analysis for Volume of Excavation using Excel software) - June-24, 2014

* Makkah Metro Rail Transit Line-B & Line-C Architectural Finishes - November-03, 2014

i. MMRTC-SYS-00302-SY-417_Material Specifications for Underground Stations & ii. MMRTC-SYS-00302-SY-416_Material Specifications for Elevated & At Grade Stationsiii. MMRT-PRB-DOC-CAR-ESTA-SY-90065-B Elevated Stations Architectural Drawingsiv. MMRT-PRB-DOC-CAR-USTA-SY-90062-A Underground Stations Arch’l. Drawings - A3v. STATION TYPE-1 C03-N UNDERGROUND

* MPTP PHASE 1 – STATIONS Makkah Metro Line B & Line C Section - 1 (Architectural Design, Fit-Out & Signage Material Specifications) - November-03, 2014

i. Makkah Metro Line B* B02-E (Underground)* B01b-E(Underground)* B01-E (Elevated + Viaduct)* B01-W (At Grade)* B04-W (Underground)

ii. Makkah Metro Line C* C05-N (TBM)* C04-N (Underground)* C03-N (Underground)* C02-N (Interchange)* C01-N (Underground)* C01-S (Ramp + Viaduct)

* MPTP PHASE 1 – STATIONS Makkah Metro Line C Section - 2 (Architectural Design, Fit-Out & Signage Material Specifications) - November-03, 2014

i. Makkah Metro Line B* C02-S (Elevated)* C03-S (Elevated)* C03b-S (Elevated)* C04-S (Elevated)* C05-S (Elevated)* C06-S (Elevated)* C07-S (Elevated)* C07b-S (Elevated)* C08-S (Elevated)

Project-in-Charge : Engr. Talal TouqanProject Director for Road Projects Department

Year : 2014 Projects* ±19.78 SQ. M. South Border Infrastructure Project Conference Room As-Built Layout Plan - April-23, 2014

Year : 2015 Projects* ±193.82 SQ. M. Saudi Bin Ladin Group – Architecture & Building Construction Division: Roads & Bridges Department As-Built Office Floor Layout Plan - February-02, 2014

Page 6: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

* ±193.82 SQ. M. Saudi Bin Ladin Group – Architecture & Building Construction Division: Roads & Bridges Department Proposed Office Floor Layout Plan (Scheme-1 & Scheme-2)- February-02, 2014

Project-in-Charge : Engr. Ashraf AbedContract Manager for Road Projects Department

Year : 2014 Projects* ±276 SQ. M. 4-Storey Family Apartment Proposed layout Plan (Scheme-1) - March-05, 2014

* ±312.5 SQ. M. TYPE-A: 2-Storey Residential with Roof Deck Proposed layout Plan(Option-1 & Option-2) - March-05, 2014

***** E N D *****

Sub-Contractor : E. T. QUIAMBAO ENGINEERING SERVICES#1 Wallnut Road, SPH Telephone No. (02) 948-6214Makiling Street, Hacienda Heights Cellphone No. 09173195087Brgy. Concepcion 2, Marikina City, Philippines

Department : Petron CTESG Design & Construction Group – Plant Engineering

Position : Design Assistant/AutoCAD Operator

Duration : July-25, 2011 to January-31, 2013

Job Description : Prepares Construction/Working Drawings of Oil Depot, Bulk Plant, & Bunkering Terminal by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, Driveway Concreting Plan, & Piping & Instrumentation Diagram (P. & I.D.) with necessary Bill of Quantity (BoQ) & Bill of Materials (BoM). Conduct site visit & provide as-Built Plans.

Company/Client :

#151 Archen Technologies Building,Brgy. Wack-Wack, Mandaluyong CityPhilippines (T 886-3888)

Project-in-Charge : Engr. Conrado C. AdorableProject Engineer

Year : 2013 Projects* Rosario Terminal as-Built Plans Project Consolidation 1998-2012

(PowerPoint Files)– February-01, 2013

* Rosario Terminal Project Directory 1998-2012 (Excel Files) – January-17, 2013

Year : 2012 Projects* Limay Depot Proposed New Bay-KL Tank Truck Loading Rack Expansion

– October-05, 2012* Limay Depot Updated Layout Plan of ADO Product Tank 625, 623, 619, &

611- October-03, 2012

* Limay Depot Proposed New Bay-KL & Bay-A1 Tank Truck Loading Rack Expansion

Page 7: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

- November-20, 2013* Navotas Depot Proposed New Tank Truck Loading Rack (TTLR) – August-25,

2012* Abra de Ilog Depot Proposed Layout Plan – August-24, 2012* Limay Depot Proposed New Tank Truck Loading Rack Canopy Extension –

July-30, 2012* Limay Depot Proposed New 20MB Tank-408 Receiving Nozzle & Pad

Construction – July-24, 2012

* Limay Depot Proposed New Ethanol Pump & Pump Slab Extension – July-19, 2012

* LimayDepot Proposed Jet A-1 Bottom Loading Layout Plan – July-16, 2012* Limay Depot Proposed Driveway Concreting Layout Plan – July-16, 2012* Iloilo Depot Proposed Upgrading of Fire-Fighting Facility – April-30, 2012* Tagum Davao EEI Power Plant Proposed New Generic Depot – April-25, 2012* Amlan Depot Proposed Layout Plan – February-08, 2012* Bawing Depot Proposed Supervisor’s Residence – March-02, 2012* Limay Depot Proposed New 5-Bay Tank Truck Loading Rack – February-02,

2012* Bawing Depot Proposed Oil Depot Expansion – January-18, 2012* Limay Depot Proposed New 5-Bay Tank Truck Loading Rack – January-10,

2012* Limay Bulk Plant Proposed New 6-Bay Tank Truck Loading Rack – January-

05, 2012

Year : 2011 Projects* Davao Depot Proposed General Plant Layout for 2012 Construction –

November-16, 2011* Bawing Depot Oil Depot Expansion for 2013 Construction – October-05, 2011* Romblon Depot Proposed Piping & Instrumentation Diagram – September-

23, 2011

Project-in-Charge : Engr. Paul A. CabreraProject Engineer

Year : 2012 Projects* Laguindigan Airport Proposed Aviation Facility - December-27, 2012* Proposed New Generator Room & MCC Shed Generic Standard - November-

05, 2012* Manila North Harbor Proposed Interim Bunkering Terminal Revision

(Scheme-5)- October-08, 2012

* Manila North Harbor Proposed Interim Bunkering Terminal - June-27, 2012* Palawan Depot Proposed New Generator Room & MCC Shed Relocation -

August-23, 2012* Palawan Depot New Generator Room & MCC Shed - April-25, 2012* Palawan Depot Proposed Single Line Diagram - April-17, 2012* Iligan Depot Proposed Office Building & Tank Track Inspection Platform -

March-07, 2012

Year : 2011 Projects* Palawan Depot Proposed LPG Receiving Line - November-09, 2011* Navotas Depot Proposed Fire Hydrant Layout Plan - October-05, 2011* Navotas Depot Proposed New MCC Shed - September-15, 2011* Navotas Depot Existing & Proposed Layout Plan - September-15, 2011* Tagoloan Depot Proposed MCC Shed Expansion - July-18, 2011

Project-in-Charge : Engr. Catherine D. JoseProject Engineer

Page 8: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Year : 2012 Projects* San Fernando Depot Installation of New CCTV System - July-20, 2012* Batangas Terminal Proposed New Oil Spill Equipment Shed Renovation -

May-02, 2012* Batangas Terminal Proposed Sprinkler Layout Plan - March-01, 2012* Batangas Terminal Proposed Filling Plant Power & Lighting Layout Plan -

March-01, 2012* Batangas Terminal Proposed P. & I. D. for Fire Protection System -

February-16, 2012* Poro Depot Proposed P. & I. D. for Fire Protection System - February-15,

2012* Poro Depot Proposed Sprinkler Layout Plan - February-15, 2012* Poro Depot Proposed tank Truck Loading Rack Power & Lighting Layout

Plan- February-15, 2012

* Subic Techno Park Petron Refinery Proposed QC laboratory Room Renovation

- January-25, 2012* Subic Techno Park Petron Refinery Proposed Driver's Lounge - January-25,

2012* Subic Techno Park Petron Refinery Proposed ISO Tank Loading Canopy

Extension- January-21, 2012

* Subic Techno Park Petron Refinery Proposed Drum Filling Area Canopy Extension

- January-21, 2012* Gasul Pasig Terminal Installation of New CCTV System - January-02, 2012

Year : 2011 Projects* Jocasp Depot Installation of New CCTV System - September-22, 2011

Project-in-Charge : Engr. Ricardo R. Daclan Jr.Project Engineer

Year : 2012 Projects* Aparri Depot Proposed P. & I. D. for Mini-LPG Filling Plant - February-17,

2012

Year : 2011 Projects* Calbeg, Malasiqui Pangasinan Proposed Mini-LPG Refilling Plant - October-

19, 2011* San Vicente, San Pedro Laguna Proposed Mini- LPG Refilling Plant -

October-18, 2011* Solano, Nueva Vizcaya Proposed Mini-LPG Refilling Plant - September-29,

2011

Project-in-Charge : Jason D. SoberanoProject Engineer

Year : 2012 Projects* Bawing Depot Proposed Fire Hydrant R/S Pipeline Layout Plan - February-

16, 2012

Year : 2011 Projects* Davao Depot Proposed General Plant Layout - November-16, 2011

Project-in-Charge : Jhomar G. AzarconProject Engineer

Year : 2012 Projects* Navotas Depot Proposed New 3-Bay Concrete Tank Truck Loading Rack -

March-29, 2012

Page 9: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Project-in-Charge : Engr. Edelino T. QuiambaoProprietor

Year : 2013 Projects* Site Inspection at Various Service Stations 2013 (P-Shop Pharma Plus) -

March-11, 2013i. Alma Aquino Service Station: Commonwealth Ave., North Fairview, Q.

C.ii.Corral Service Station: East Ave., Cor. BIR Road, Piñaha, Q. C.iii. Dizon Service Station: #53 Kamuning Cor., Scout Ybardolaza,

Kamuning, Q. C. iv. Favila Service Station: Cong. Ave., Cor. Virginia St., Proj. 6, Brgy.

Bahay Toro, Q. C.v. Casares Service Station: West Avenue, Cor. Del Monte, Q. C.vi. Calalay Service Station: Timog Morato Cor. Tomas Morato, Q.C.

Company/Client : PETROTECH MPJ, Incorporated

"Bridging Gaps Between You and Your Markets" No. 22 VRCC Rd. Veterans Center, Western Bicutan, Taguig City

Tel. No. 839-2117 Fax No. 839-2094

Project-in-Charge : Engr. Edelino T. QuiambaoProprietor

Year : 2012 Projects* Consolacion Cebu Proposed Oil Depot - July-27, 2012* Linao, Ormoc Leyte Proposed Mini Oil Depot Layout Plan - July-13, 2012* Taytay Palawan EON Petroleum Inc. Proposed Mini Oil Depot - January-09,

2012

Company/Client : Rubite Trading & General Services 9 10-A Provincial Road Matungao, Bulakan, Bulacan Telefax (044) 7922521 Tel (044) 7922889

Project-in-Charge : Engr. Edelino T. QuiambaoProprietor

Year : 2012 Projects* Navotas Depot Proposed New Service Pipeline Layout Plan - August-22,

2012

Company/Client : SAVIOR CONSTRUCTIONOFFICES: 251 TUMANA, STA. MARIA, BULACANCELL NO.: (0916) 939-6660TELEFAX: (044) 641-1729E-MAIL: [email protected]

Project-in-Charge : Engr. Edelino T. QuiambaoProprietor

Year : 2013 Projects* As-Built Plans of Car Tricycle Awning Pump Island - June-03, 2013* Iligan Depot Conversion of Tank-6 (ADO) as-Built Plans - May-28, 2013* Bawing Depot as-Built Plans of Tank-1 (X-93), Tank-2 (Kero), & Tank-3 (X-

93) - February-18, 2013

Year : 2012 Projects* Ormoc Bulk Plant as-Built Plans of 10,000 USG Ethanol Tank - December-17,

2012

Page 10: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

***** E N D *****

Sub-Contractor : BJ & G Consultancy Inc.San Isidro, Baao, Camarines Sur, PhilippinesContact No.: 09274736531E-mail Address: [email protected]

Department : Petron CTESG Design & Construction Group – Plant Engineering

Position : Design Assistant/AutoCAD Operator

Duration : July-25, 2012 to January-31, 2013

Job Description : Prepares Construction/Working Drawings of Mini-LPG Refilling Plant by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, Driveway Concreting Plan, & Piping & Instrumentation Diagram (P. & I.D.) with necessary Bill of Quantity (BoQ) & Bill of Materials (BoM). Conduct site visit & provide as-Built Plans.

Company/Client :

#151 Archen Technologies Building,Brgy. Wack-Wack, Mandaluyong CityPhilippines (T 886-3888)

Project-in-Charge : Mr. Gabriel M. AdanProprietor

Year : 2012 Projects* Manila Harbor Centre Proposed New Administration Building - March-31,

2012

Year : 2011 Projects* El Nido Palawan Proposed Mini-LPG Refilling Plant - October-24, 2011

Company/Client : PTT Philippines Corporation

32nd Floor LKG Bldg., Ayala Avenue, Makati City Tel. Nos. 884-81-55 Fax No. 884-81-50

Department : Engineering Department

Position : Design Assistant/AutoCAD Operator

Duration : August-01, 2012 to February-28, 2013

Job Description : Prepares Construction/Working Drawings of PTT Gasoline Station by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, & Driveway Concreting Plan.

Project-in-Charge : Engr. Joel M. Tolosa Project Engineer

Mr. Gabriel M. AdanProprietor

Year : 2013 Projects* PTT Mabalacat Proposed Gasoline Station - February-11, 2013* PTT Clark Proposed Trellis Details - January-21, 2011* PTT Regalado Proposed Gasoline Station - January-07, 2013* PTT Molino-2 Proposed Extension - January-04, 2013

Year : 2012 Projects

Page 11: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

* PTT Cabanatuan Revision-1 - December-05, 2012* PTT Bulacan Proposed Gasoline Station - October-27, 2012* PTT Villasis Proposed Gasoline Station - October-15, 2012* PTT San Marcelino Proposed Gasoline Station - September-25, 2012* PTT Taytay Proposed BSLO Layout Plan - September-25, 2012* PTT KM 18 East Service Road Proposed Gasoline Station - September-13, 2013* PTT Clark Proposed Gasoline Station - August-27, 2013* PTT San Jose Proposed Road Shoulder - August-25, 2012* PTT Magalang Proposed BSLO Layout Plan (Sch.-2) - August-16, 2012* PTT Concepcion Proposed BSLO Layout Plan (Sch.-2) - August-15, 2012* PTT Congressional Avenue Proposed BSLO Layout Plan (Sch.-2) - August-14, 2012* PTT Bantayan-2 Proposed Gasoline Station - August-08, 2012

***** E N D *****

Company/Client : EON PETROLEUM INCORPORATED 2207 TYCOON CENTER BUIILDING, PEARL DRIVE ORTIGAS, PASIG CITY

Project-in-Charge : Mr. Gabriel M. AdanProprietor

Year : 2013 Projects* EON Lite Prototype Bulilit Station (PowerPoint Files) - January-07, 2013

Year : 2012 Projects* EON Muñoz Nueva Ecija Proposed New Service Station - September-15, 2012

Client : Mr. Gigi Santos

Project-in-Charge : Mr. Gabriel M. AdanProprietor

Year : 2012 Projects* 2-Storey Residential as-Built Layout Plan - September-13, 2012

***** E N D *****

Sub-Contractor : C. JANSENTECHNICAL SERVICESMarina Ave., St. Joseph Subdivision, Bayan, Orani, Bataan – 2112 PhilippinesCP: 09999904720

Department : Petron CTESG Design & Construction Group – Design Group

Position : Junior Architect/AutoCAD Operator

Duration : March-05, 2010 to May-31, 2011

Job Description : Prepares Construction/Working Drawings of Petron Service Station, Micro-Filling Station (MFS), & Dealer-Owned Filling Station (DOFS) by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, & Driveway Concreting Plan with Site Visiting & provide as-Built Plans.

Company/Client :

#151 Archen Technologies Building,Brgy. Wack-Wack, Mandaluyong CityPhilippines (T 886-3888)

Page 12: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Project-in-Charge : Arch. Enrico M. SantosHead Architect

Year : 2011 Projects* Proposed Axcess Sports Bar & KTV - July-08, 2011* PEC-1 Proposed Expansion (Phase-2) Lakbay Alalay - March-31, 2011* RLT's Residences Proposed Guest Room & Bedroom-1 Renovation -

February-02, 2011

Project-in-Charge : Arch. Dreyden B. VillosoArchitect

Year : 2011 Projects

* Proposed Service Station Building Layout (Generic) - April-14, 2011* PEC-1 NLEX Northbound Proposed Expansion - March-25, 2011

Project-in-Charge : Arch. Jane Q. RamirezArchitect

Year : 2011 Projects* Micro-Filling Station (Petron Bulilit) report 2011(Excel Files) – April-30, 2011* Proposed COSS Mendoza Office & Sales Room Layout, Cebu City - April-20,

2010* Proposed New Dealer-Owned Filling Station: M. Highway, Quezon - April-

14, 2011* Proposed New Dealer-Owned Filling Station: San Roque, Pasay City - April-

14, 2011* Proposed New Dealer-Owned Filling Station: San Antonio, Quezon - April-

14, 2011* Proposed New Dealer-Owned Filling Station: Meycauyan, Bulacan - April-

05, 2011* Proposed Dealer-Owned Filling Station: Urdaneta Pangasinan - April-04,

2011* Proposed New Dealer-Owned Filling Station: R & E Taxi - March-14, 2011* Proposed Dealer-Owned Filling Station: Regalado, Quezon City - February-

24, 2011* Proposed CODO BSLO Request: Evangelista, Teodoro - February-23, 2011

Year : 2010 Projects* Proposed New Dealer-Owned Filling Station: Baguio City - November-30,

2010* Proposed New Single Pump Island Station: Calaca, Batangas - November-

19, 2010* Proposed New Service Station PMC Wachovia Angeles, Pampanga -

November-03, 2010* Proposed New Work Bench Details - November-02, 2010* Proposed New Dealer-Owned Filling Station: Binalonan, Pangasinan -

October-20, 2010* Proposed New Dealer-Owned Filling Station: San Juan, La Union -

September-13, 2010* Proposed Petron Clinic San Miguel Corporation, Mandaluyong City -

September-09, 2010* Proposed New Two Pump Island Filling Station: Nabua, Camarines Sur -

August-25, 2010* Proposed Micro-Filling Station (Petron Bulilit) Gasbar Generic - July-24,

2010* Proposed Service Station Major Rehab, Intramuros, Manila - July-23, 2010* Proposed New Dealer-Owned Filling Station: San Carlos, Pangasinan -

June-28, 2010* Proposed New Service Station EDSA-NIA, Quezon City - May-24, 2010* Micro Filling Station (Petron Bulilit) Enhancement - April-21, 2010

i. MFS Type - 1: MFS-1a & MFS-1bii. MFS Type - 2: MFS-2a & MFS-2biii. MFS Type - 3: MFS-3a & MFS-3biv. MFS Type - 4zv. MFS Type - 5vi. MFS Type - 6vii. MFS Type - Gasbar

***** E N D *****

Page 13: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Consultant : ALEJANDRO SO MANOTA & ASSOCIATESARCHITECTS CONSULTANTSBLK. 8 LOT 31, SAN PEDRO SUBDIVISION 7 TEL. 4261379SAN BARTOLOME, NOVALICHES, Q.C. PHILS. CELL. 0920-5965347

Department : In-House Design Office Address:Blk. 8 Lot-31, San Pedro Subdivision 7, San Bartolome, Novaliches, Q.C.

Philippines

Position : AutoCAD Operator

Duration : August, 2009 to January, 2010

Job Description : Prepares Construction/Working Drawings of Standard Bank Layout Plan of Banco de Oro (BDO), Bank of the Philippine Island (BPI), & EastWest Bank by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, & Sanitary. Conduct site visit & provide as-Built Plans.

Company/Client : BDO Corporate Center7899 Makati Avenue,Makati City, Philippines

Project-in-Charge : Arch. Alejandro So ManotaArchitect/Proprietor

Year : 2010 Projects* BDO - San Pablo Branch Interior Renovation - January, 2010

Year : 2009 Projects* BDO - Marikina Branch (Transfer Site), Conception Marikina - November-22,

2009* BDO - Ayala Alabang Madrigal Branch, Zapote Rd., Muntinlupa, City -

November, 2009* BDO - Libis Branch, Acropolis, Libis, Quezon City - July-13, 2009

Company/Client : 6768Ayala Avenue Cor. Paseo de Roxas Ave.,Makati Central Business District, Makati City,Metro Manila, Philippines

Project-in-Charge : Arch. Alejandro So ManotaArchitect/Proprietor

Year : 2009 Projects* BPI - Cainta Saint Anthony, Ortigas Ave. Ext., Cainta, Rizal - November,

2009

Company/Client : 20/F PBCom Tower, 6795 Ayala Avenue Cor. V.A. Rufino St.,Salcedo Village, Makati City,Metro Manila, Philippines

Project-in-Charge : Arch. Alejandro So ManotaArchitect/Proprietor

Year : 2009 Projects* EastWest Bank West Avenue Branch Iterior Renovation - August-10, 2009* EastWest Bank T. Alonzo Branch Interior Construction - June, 2009

Company/Client : Mr. & Mrs. Fortaleza

Year : 2009 Projects* Two Storey Residence Renovation & Expansion - August, 2009

Page 14: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

***** E N D *****

Reference No.1 :

2nd Floor Obeikan Bookstore BuildingPrince Sultan Road, Jeddah, Kingdom of Saudi Arabia

Contact Person : Engr. Nabeel H. Abu SadahQA/QC Manager for Road Projects DepartmentP.O. Boxn11789 Jeddah 21463 Saudi ArabiaTel.: 6927105 Ext.Fax: 6922198Mobile: +966 540925900E-mail: [email protected] & [email protected]

Contact Person : Engr. Eric M. Guillermo, MSEPlanning Manager for Road Projects DepartmentP.O. Box 11789 Jeddah 21463 Saudi ArabiaTel.: 012-6927105 Ext. 256Fax: 012-6163979 Ext. 8135Mobile: +966 569056350E-mail: [email protected]

Reference No.2 : E. T. QUIAMBAO ENGINEERING SERVICES#1 Wallnut Road, SPH Telephone No. (02) 948-6214Makiling Street, Hacienda Heights Cellphone No. 09173195087Brgy. Concepcion 2, Marikina City, Philippines

Contact Person : Engr. Edelino T. QuiambaoProprietor/Owner

Reference No.3 : BJ & G Consultancy Inc.San Isidro, Baao, Camarines Sur, PhillipinesContact No.: 09274736531E-mail Address: [email protected]

Contact Person : Mr. Gabriel M. AdanProprietor/Owner

vii. CHARACTER REFERENCES:

Page 15: CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16

Reference No.4 : C. JANSENTECHNICAL SERVICESMarina Ave., St. Joseph Subdivision, Bayan, Orani, Bataan – 2112 PhilippinesCP: 09999904720

Contact Person : Mr. Rex A. PeñaProprietor/Owner

"I hereby certify that the above information is true and correct.To the best of my personality and to the extent of my knowledge and belief"

Arch. Mauricio P. Cabanillas Jr.Signature