cv hints

4
Skills Able to point out failures within the network. Knowledge of current and emerging telecommunications technologies. The ability to work in small teams and meet deadlines. Strong experience in telecommunications. Resolve technical issues with respect to Telecommunication system design link budget calculations Knowledge of vendor transmission technology and solutions provided at the market, Knowledge of Office Suite software. - Install new microwave links such as { ( 1+0 ),( 1+1 ),( XPIC 2+0 ), ( XPIC 2+2 ),( XPIC 4+0 ) and Space Diversity Links }. - Installation and upgrading of microwave transmission system. - Antenna alignment and assembly with different size(0.3m, 0.6m, 1m , 1.2m). Requirements Test MW Link Performance: - Obtain Designed RSL. - Test BER using BER Tester or SDH Analyzer. - Connect Data source (E1 Source or MUX) to transmission equipment efficiently. - E1's Performance - Test E1's using E1 analyzer. - Solve E1's BER problems along the E1's route till BSC. NEC Equipment Experience: - Paso link V4 - Paso link Neo CPV - Pasolink MX - Pasolink Neo Standard - Pasolink Neo + Lan. - Ipaso 200 & 400 & 1000. •Analyze preventive/corrective maintenance implementation data and checklists to identify the problems and recommend solutions. Follow up on implementation of the proposed solutions •periodically analyze the network element’s events, alarms data to anticipate the network problem and suggest preventive measures •Perform root cause analysis for the network outages and recommend preventive measures to avoid the repetition of the faults.

Upload: jacob-mcfadden

Post on 26-Sep-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Skills

Able to point out failures within the network. Knowledge of current and emerging telecommunications technologies. The ability to work in small teams and meet deadlines. Strong experience in telecommunications.

Resolve technical issues with respect to Telecommunication system design

link budget calculations

Knowledge of vendor transmission technology and solutions provided at the market, Knowledge of Office Suite software.

- Install new microwave links such as { ( 1+0 ),( 1+1 ),( XPIC 2+0 ),( XPIC 2+2 ),( XPIC 4+0 ) and Space Diversity Links }.- Installation and upgrading of microwave transmission system.- Antenna alignment and assembly with different size(0.3m, 0.6m, 1m , 1.2m).

Requirements

Test MW Link Performance:- Obtain Designed RSL.- Test BER using BER Tester or SDH Analyzer.- Connect Data source (E1 Source or MUX) to transmission equipment efficiently.- E1's Performance- Test E1's using E1 analyzer.- Solve E1's BER problems along the E1's route till BSC.NEC Equipment Experience:- Paso link V4- Paso link Neo CPV- Pasolink MX- Pasolink Neo Standard- Pasolink Neo + Lan.- Ipaso 200 & 400 & 1000.

Analyze preventive/corrective maintenance implementation data and checklists to identify the problems and recommend solutions. Follow up on implementation of the proposed solutionsperiodically analyze the network elements events, alarms data to anticipate the network problem and suggest preventive measuresPerform root cause analysis for the network outages and recommend preventive measures to avoid the repetition of the faults.Monitor and follow up implementation, results and effectiveness of the preventive and corrective measures. also Prepare reports.

I have almost 6 years hands-on experience as transmission & BSS expert on HUAWEIs 3G NodeB HSPA+ BTS3900 & DBS3900 ( IBS sites) and OPTIX RTN600. Expertise involves Installation, Commissioning, Integration, troubleshooting and Fault Management FLM. Providing on site and remote support for BSS/RAN/Transmission. Strong expertise on iManager T2000 & M2000, planning and implementation.I have been involved in coordination/managing the roll-outs like Installation/Integration, Commissioning, Testing, O & M and planning ofBSS (Ericsson RBS 2216, 2116,2206,2207,2106 & 2107, BSC/TRC)Microwave Systems (Ericsson Mini-Link E Classic, Traffic Node & High Caps)Specialties: PNMT for NEC Pasolink .PNMTj for NEC Pasolink NEO.Hyper Terminal for PasolinkNCTj for PNMS.WEB LCT for Huawei RTN 600.LOCAL MAINTENANCE TERMINAL for Huawei BTS 3900.Huawei iManager M2000 for Huawei BSC 6000.MAP INFOGPS , BERT ,SITE MASTER

ExperienceBO Transmission ExpertHuawei Technology Afghanistan

September 2010 Present (4 years 7 months)

Good expertise and hands on experience on on BTS3900, BTS3900A, DBS3900 & BSC6000Good expertise and hands on experience on M2000 and reports collection and analysis for network performance,traffic statsResponsible for Network Outage Control and outage reasons analysisPreventive and Corrective Maintenance on all cell sites that includes BSS entities(Huawei BTS 3900) and MW equipment(NEC pasolink NEO and Huawei RTN 600).Fault Rectification and maintenance of NEC Microwave,Huawei RTN 600,Huawei BTS equipment.Preventive & Corrective Maintenance of Huawei BTS 3900 and BSC6000.Responsible to meet Network Maintenance targets in terms of OMT.Implementing the transmission connectivity of the GSM network by using differenttransmission technologies as PDH, SDH.Managed the indoor and out installation of microwave links.Installation, commissioning and alignment of NEC PDH, SDH and XPIC links.NEC Pasolink V3/V4/Paso+/Paso NEO PDH hop capacity up-gradation and shifting of traffic from PDH to SDH.Worked on different configurations like HS/HS, HS/SD, and capacities like 4x2 up to 155Mbps (STM-1, XPIC).Installation,commissioning and alignment of Huawei microwave RTN 600 PDH links.Operation and maintenance of Huawei RTN 600.Have superb skills in trouble shooting of NEC PDH, SDH and XPIC links.Worked in QA/QC for installation of MW links.End to End MW media patching for commissioning(First call) of new sitesLink Upgradation and Traffic shifting from old links to upgraded links.Monitoring the Network through NMSEnsure good communication and working relationships with the field maintenance teamsManage the day-to-day maintenance of all sitesCoordinate with Field Engineers for handling the work orders and Service affecting alarms.Responsible for all BSS activities of BTS installation, commissioningTroubleshooting of hardware and software alarms during BTS integration, MW alignment commissioning a

(Open)1 project

Transmission and Implementation EngineerHayat Communications

December 2009September 2010(10 months)

Transmission Expert 2G/3G ( Huawei RTN MW,Huawei )RAN/BSS Expert 2G/3G BTS(3012,3012A / WCDMA HSPA+ BTS) Huawei RNC.Responsible for Implementation for the SWAP and Expansion HSPA+ Project for the DU telecom in all over the UAE.Responsible for all MW O&M activities of FLM.Responsible for all field related technical issues from NOC.Responsible for NOC routine activities.Responsible for the daily PM activities.Supervising the microwave link installation (0.3, 0.6 and 1.2 dish antenna).Supervising the installation of Huawei transmission rack RTN620.Performing the configuration and commissioning of Huawei RTN620.Installed and aligned STM1 link using Dual polarization for 0.6,1.2 and 1.8 Microwave Dish.Performing the troubleshooting of RTN620.Supervising the installation of multiband outdoor Antennas, Triplexers and TMA.Performing Integration, commissioning and troubleshooting the HUAWEI 3G BTS3900 and supervise the Installation activity of Huawei NODE B.Responsible for installation, commissioning and integration of Huawei 3G-NodeB (3G BTS) and RTN MW with RNC using IP transmission.Also creation of NodeB configuration file and configuring the RNC for the NodeB integration.External alarms and Rectifier alarms Patching in DDF.Microwave and BTS E1 patching.

BSS EngineerNCI TELECOM

August 2007September 2009(2 years 2 months)

Supervising BTS cell site installation activity for ERICSSON PAKISTAN for their project with WARIDTELECOM.Quality inspection For Ericsson /Warid Telecom Phase-4 and phase-5 and Phase 6,6.1,6.2 project Pakistan, Checking Installation of Ericsson Radio Base Station RBS2000 family (RBS2106i, RBS2107,2206,2207) BBS 8500 Installation BBU 9500. Ericsson Minilink using MSM 6.5. Checking modem equipment, transmitter receiver equipments, (0.3, 0.6, 0.8, 1.2) meter dish installations, trouble shooting of Modems. Checking Installation of Outdoor/Indoor Equipment such as GSM, MINI-LINK antenna, and feeder system. Traffic Node Installation & configuration. Complete knowledge of Ericsson SMR, SID & SDD. Performing Feeder Testing( VSWR and DTF Tests) by using Site Master SA-6000-EX BIRD & Anritsu S333iD Integrating RBS 2106i, 2107 2206, 2207. PAT of sites to Al-Warid Telecom,