8 hour shift capacity for HAVC Asseamb s.no Dept process Number of cycles 1 2 3 4 5 6 7 8 1 HAVC stage -2 119 121 120 119 121 123 122 124 2 stage -3 124 124 123 124 123 125 125 123 3 stage -4 120 120 121 120 121 122 122 121 4 stage -5 116 116 118 117 118 118 117 119 5 stage -6 122 120 122 120 121 122 120 121 6 stage -1 121 121 120 119 120 119 119 120 7 stage-2 120 121 120 119 120 120 119 120 8 stage-3 119 118 118 119 118 119 120 119 9 stage -1 109 108 110 111 109 108 110 110 10 stage-2 108 110 109 110 110 109 110 109 11 stage -1 120 122 119 119 120 119 118 119 12 Gsl F/C 59 60 61 60 59 60 60 60 DSL F/C 73 72 71 72 73 73 72 73 cooling module fan &shroud Blower Assy

Upload: sallin-daz

Post on 26-Jan-2016

231 views

Category:

Documents


6 download

DESCRIPTION

ct

TRANSCRIPT

Page 1: Cycle Time

8 hour shift capacity for HAVC Asseambly

s.no Dept process

Number of cycles

1 2 3 4 5 6 7 8 9 10 Avarage

1

HAV

C

stage -2119 121 120 119 121 123 122 124 124 125 121.8

2stage -3

124 124 123 124 123 125 125 123 123 124 123.8

3stage -4

120 120 121 120 121 122 122 121 121 121 120.9

4stage -5

116 116 118 117 118 118 117 119 117 118 117.4

5stage -6

122 120 122 120 121 122 120 121 120 120 120.8

120.9

6stage -1

121 121 120 119 120 119 119 120 119 120 119.8

7stage-2

120 121 120 119 120 120 119 120 121 120 120.0

8stage-3

119 118 118 119 118 119 120 119 120 119 118.9

119.6

9stage -1

109 108 110 111 109 108 110 110 108 109 109.2

10stage-2

108 110 109 110 110 109 110 109 110 108 109.3

110.0

11 Blower Assystage -1

120 122 119 119 120 119 118 119 120 120 119.6

120

12

fille

r nec

k

Gsl F/C59 60 61 60 59 60 60 60 61 60 60

DSL F/C73 72 71 72 73 73 72 73 71 72 72.2

Hose lower38 36 37 38 36 37 38 37 38 38 37.3

cooling module

fan &shroud

Page 2: Cycle Time

fille

r nec

k

Bracket Assy10 11 10 9 10 11 11 11 11 11 10.5

Page 3: Cycle Time

240

240

262

241

240

480

399

772

8 hour capacity

Page 4: Cycle Time

2743

Page 5: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL

REV NO PART NUMBER COLOUR

SNO CHECK POINTS CHECKING METHOD

Page 6: Cycle Time

DOOWON AUTOMOTIVE SYSTEM INDIA PVT.LTD

NO part name Moulding defect

1

FAN(φ378)

2

SHROUD11

Havc case12

1

CASE-LOWER spray mark , short mould ,Warpage ,flash

2

CASE-INTAKE

short mould , weld line , burn mark , warpage, insert ofset

short mould , weld line , burn mark , warpage,

spray mark , short mould ,Warpage ,lock broken ,flash

spray mark , short mould ,Warpage ,lock broken ,flash

Page 7: Cycle Time

DOOWON AUTOMOTIVE SYSTEM INDIA PVT.LTD

1

DUCT-SHOWER, LH

2

DUCT-SHOWER, RH

3

IMPELLER

1

DOOR-INTAKE spray mark , short mould , burn mark ,flash

2

DOOR-MIX

spray mark , short mould ,Warpage ,lock broken ,flash

spray mark , short mould ,Warpage ,lock broken ,flash

spray mark , short mould ,Warpage ,lock broken ,flash, Run out

spray mark , short mould , burn mark ,flash, rib damage

Page 8: Cycle Time

DOOWON AUTOMOTIVE SYSTEM INDIA PVT.LTD

3 DOOR-VENT

4 DOOR-DEF

5 DOOR-FOOT

6 COVER-EVAP. COREspray mark , short mould ,flash, rib damage

7 COVER-HTR PIPEspray mark , short mould ,flash, rib damage

1 LEVER-SUB DEFspray mark , short mould ,flash, rib damage

2 LEVER-SUB VENTspray mark , short mould ,flash, rib damage

3 LEVER-SUB FOOTspray mark , short mould ,flash, rib damage

4 LEVER-MODE MAIN (M)spray mark , short mould ,flash, rib damage

5 LEVER-MIX MAIN (M)spray mark , short mould ,flash, rib damage

6 CLIP-EVA. FLANGEspray mark , short mould ,flash, rib damage

7 LEVER-SUB DEFspray mark , short mould ,flash, rib damage

8 LEVER-SUB VENTspray mark , short mould ,flash, rib damage

9 LEVER-SUB FOOTspray mark , short mould ,flash, rib damage

spray mark , short mould , burn mark ,flash, rib damage

spray mark , short mould , burn mark ,flash, rib damage

spray mark , short mould , burn mark ,flash, rib damage

Page 9: Cycle Time

DOOWON AUTOMOTIVE SYSTEM INDIA PVT.LTD

13 LEVER-MIX DOORspray mark , short mould ,flash, rib damage

14 CLIP-HTR PIPEspray mark , short mould ,flash, rib damage

15 COVER-FILTERspray mark , short mould ,flash, rib damage

16 HOSE COOL BOX spray mark , short mould ,flash, rib damage

Page 10: Cycle Time

DOOWON AUTOMOTIVE SYSTEM INDIA PVT.LTD

Injection moulding cappacity plan for Augest-09

NO M/C PART NAME PART NUMBER MATERIAL

1

850#1

A/C FAN(φ378) F42023 - 0400 5% 0.365 60 2 120 2640 1848 5.7 10500

19.2 422.6 26.42 SHROUD F47053 - 0920 5% 0.61 65 2 111 2437 1706 6.2 105003

N-A/C FAN(φ340) F42023 - 0320 5% 0.315 60 2 120 2640 1848 0.8 1500

4 SHROUD F47053 - 0930 5% PP-GF30% 0.424 65 2 111 2437 1706 0.9 15001

850#2

LHD

A/CON

D S LC/BOX

10%

PP-T20%

2.505 100 1 36 792 554 10.8

6000 18.9 416.7 26.0

2 NON C/BOX

3G S L

C/BOX

4 NON C/BOX

5NON-A/C

D S L

6 G S L

7

RHD

A/CON

D S LC/BOX

10% 2.485 100 1 36 792 554 8.1 4500

8 NON C/BOX

9G S L

C/BOX

10 NON C/BOX

11NON-A/C

D S L

12 G S L

1

850#3

LHD CASE-LOWER H40893 - 3720 15% 0.305 60 2 120 2640 1848 3.2 6000

20.3 445.8 27.9

2 CASE-INTAKE B40893 - 3740 / 375 15% 0.555 65 1 55 1218 853 7.0 60003

RHD CASE-LOWER H40893 - 3810 15% 0.293 60 2 120 2640 1848 2.4 4500

4 CASE-INTAKE B40893 - 3830 / 384 15% 0.55 65 1 55 1218 853 5.3 4500

1

550

LHD

DUCT-SHOWER, LH H41223 - 0800 15% 0.115 60 1 60 1320 4.56000

2 DUCT-SHOWER, RH H41223 - 0791 15% 0.105 6000

3 IMPELLER B43232 - 0100 0% PP-T10%(N) 0.122 70 4 206 4526 3168 1.3 6000

8.0 175.0 10.9

4

RHD

DUCT-SHOWER, LH H41223 - 0840 15% PP-T20%

0.1 60 1 60 1320 3.44500

5 DUCT-SHOWER, RH H41223 - 0850 15% 0.115 4500

6 IMPELLER B43232 - 0070 0% PP-10%(B) 0.123 70 4 206 4526 3168 1.4 4500

1

450

LHD

DOOR-INTAKE H41243 - 2010 10%

PP-T40% (N)

0.7 55 2 131 2880 2016 3.0 6000

2 DOOR-MIX H41243 - 1970 10% 0.109 70 4 206 4526 3168 1.9 6000

18.8 412.5 25.8

3 DOOR-VENT H41243 - 2000 10% 0.105 70 4 206 4526 3168 1.9 6000

4 DOOR-DEF H41243 - 1990 10% 0.093 70 4 206 4526 3168 3.3 10500

5 DOOR-FOOT H41243 - 1980 10% 0.115 70 4 206 4526 3168 3.3 10500

6 COVER-EVAP. CORE H40853 - 1930 15%

PP-T20%

0.04 58 4 248 5462 3823 1.6 6000

7 COVER-HTR PIPE H40853 - 1920 15% 0.029 58 4 248 5462 3823 1.6 6000

8

RHD

COVER-EVAP. CORE B41243 - 2100 15% 0.029 58 4 248 5462 3823 1.2 4500

9 COVER-HTR PIPE H41243 - 2040 15% 0.04 58 4 248 5462 3823 1.2 4500

Resycle using

persentagepart weight

cycle time

Active cavity

Hourly target

per day 22hrs

22 hr 70% efficiency

requierddays

monthly plan

Required days

Required man hour

As per 16 hrs a day

PA66-GF17%+M21

H40893 - 3680 / 3700

H40893 - 3770 / 3790

Page 11: Cycle Time

DOOWON AUTOMOTIVE SYSTEM INDIA PVT.LTD

10

450

RHD DOOR INTAKE H41243 - 2050 15% PP-T40% (B)

0.074 55 2 131 2880 2016 2.2 4500

18.8 412.5 25.8

11 DOOR-MIX H40583 - 1960 15% 0.105 70 4 206 4526 3168 1.4 4500

12 DOOR-VENT H40583 - 1950 15% 0.107 70 4 206 4526 3168 1.4 4500

13.7 301.1 18.8

1

220

LHD

LEVER-SUB DEF H44423 - 3880 15% PP-T30% (N)

0.01 40 4 360 7920 5544 1.1 6000

2 LEVER-SUB VENT H44423 - 3860 15% 0.006 40 4 360 7920 5544 1.9 10600

3 LEVER-SUB FOOT H44423 - 3870 15% 0.009 38 4 379 8337 5836 1.8 10600

4 LEVER-MODE MAIN (M) H44423 - 3900 10% POM (N)

0.033 50 2 144 3168 2218 2.7 6000

5 LEVER-MIX MAIN (M) H44423 - 3920 10% 0.016 50 2 144 3168 2218 2.7 6000

6 CLIP-EVA. FLANGE H40883 - 2140 15% PP-T20% 0.011 38 4 379 8337 5836 1.0 6000

7

RHD

LEVER-SUB DEF H44423 - 3990 15% PP-T30% (B)

0.01 40 4 360 7920 5544 0.8 4500

8 LEVER-SUB VENT H44423 - 3980 15% 0.006 40 4 360 7920 5544 0.8 4500

9 LEVER-SUB FOOT H44423 - 4000 15% 0.0085 40 4 360 7920 5544 0.8 4500

10

170

LEVER-MODE MAIN (M) H44423 - 3900 10% POM (B)

0.03 50 2 144 3168 2218 2.0 4500

11 LEVER-MIX MAIN (M) H44423 - 4030 10% 0.0155 50 2 144 3168 2218 2.0 4500

7.7 169.8 10.6

12 CLIP-EVA. FLANGE H40883 - 2150 15% PP-T20% 0.011 38 4 379 8337 5836 0.8 4500

13

ALL

LEVER-MIX DOOR H44423 - 3890 15% PP-T30%(N) 0.002 40 4 360 7920 5544 1.9 10500

14 CLIP-HTR PIPE H40883 - 1560 15% PP-T20%

0.0055 38 4 379 8337 5836 1.8 10500

15 COVER-FILTER H40853 - 1910 15% 0.0295 40 4 360 7920 5544 1.9 10500

16 HOSE COOL BOX H48473 - 0010 15% 0.011 45 4 320 7040 4928 2.1 10500

5946 4919 34464554 722 694

200

Page 12: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL

REV NO PART NUMBER COLOURinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area By visual

2 short mould & burn mark By visual

3 weld line and short mould By visual

4 weld line and short mould By visual

5 burn mark & warpage By visual

REMARK:

1. After check the all check points 'OK" means put the marking and date and shift

2

1

3

4

5

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

Page 13: Cycle Time

400

Page 14: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL

REV NO PART NUMBER COLOURinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area visual

2 short mould & burn mark visual

3 weld line and short mould visual

4 weld line and short mould visual

5 burn mark & warpage visual

REMARK:

1. After check the all check points 'OK" means put the marking writing the date &shift operator code

3

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

Page 15: Cycle Time

400

Page 16: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL

REV NO PART NUMBER COLOURinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area By visual

2 short mould & burn mark, weld line By visual

3 metal insert position checking By visual

4 weld line and short mould , silver steaks By visual

REMARK:

1. After check the all check points 'OK" means put the marking and date and shift

3

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 17: Cycle Time

400

Page 18: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL

REV NO PART NUMBER COLOURinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area By visual

2 short mould & warpage By visual

3 weld line and short mould By visual

4 weld line and short mould By visual

REMARK:

1. After check the all check points 'OK" means put the marking and write a date and shift

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 19: Cycle Time

400

Page 20: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME Lower case LH/RH MATERIAL PP+T20 %

REV NO PART NUMBER H40893-3720/3810 COLOUR blackinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area By visual

2 short mould & warpage By visual

3 war page ,short mould By visual

4 rip catching mark, short mould By visual

5 silver streaks , short moul By visual

REMARK:

1. After check the all check points 'OK" means put the marking and date and shift

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

4

1

2

3

5

Page 21: Cycle Time

400

Page 22: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE 20.07.09 PART NAME shower duct LH/RH MATERIAL PP+T20 %

REV NO 0 PART NUMBER COLOUR Blackinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area visual

2 short mould & flash visual

3 weld line and short mould , locking checking visual

4 weld line and short mould , flash visual

5 bubles, silver streeks visual

REMARK:

1. After check the all check points 'OK" means put the marking and writing the date & shift operator code

H41223-0790/0800/0810/0820

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2 3

4

5

Page 23: Cycle Time

400

Page 24: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME Impeller LH/RH

MATERIALPP+T10%

REV NO0

PART NUMBERB43232-0070/0100

COLOURBlack/natural

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould visual

2 short mould & burn mark visual

3 weld line and short mould visual

4 over all checking a Run out problem visual

5 check the Rip's short fill visual

chek carefully with out struss and tight during packing

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

Page 25: Cycle Time

400

Page 26: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME Door vent LH/RH MATERIAL PP+T40%

REV NO PART NUMBER H41243-2000/2050 COLOUR Black/naturalinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area visual

2 short mould & burn mark visual

3 weld line and short mould visual

4 check deformation(Bend) visual

REMARK:

1. After check the all check points 'OK" means put the marking in locating area

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 27: Cycle Time

400

Page 28: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME Door DEFF MATERIAL PP+T40%

REV NO PART NUMBER H41243-1990 COLOUR naturalinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area visual

2 short mould & burn mark visual

3 check the deformation(Bend) visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1 2

3

Page 29: Cycle Time

400

Page 30: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME DOOR-INTAKE LH/RH MATERIAL PP+T40%

REV NO PART NUMBER B41243-2010/2000 COLOURnatural

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area visual

2 short mould & burn mark visual

3 weld line and short mould visual

REMARK:

1. After check the all check points 'OK" means put the marking writing the date &shift operator code

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

2 1

3

Page 31: Cycle Time

400

Page 32: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME DOOR-MIX LH/RH MATERIAL PP+T40%

REV NO PART NUMBER H41243-1970/2040 COLOURnatural

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in rip area visual

2 short mould & burn mark visual

3 check the deformation(Bend) visual

4 short mould & flash visual

visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 33: Cycle Time

400

Page 34: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME COVER-HTR PIPE LH/RH MATERIAL PP+T20 %

REV NO PART NUMBER H40583-1950/1920 COLOUR Blackinspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in Hole Area visual

2 short mould & flash visual

3 weld line and short mould in lock area visual

4 weld line and short mould in lock area visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation12

3

4

Page 35: Cycle Time

400

Page 36: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME COVER-EVAP. CORE LH/RH MATERIAL PP+T20 %

REV NO PART NUMBER H40853-1930/1960 COLOUR Black

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & flash in Hole area visual

2 short mould & flash visual

3 weld line and short mould & Rib dameage visual

4 Flash and short mould visual

5 short ,Flash & warpage visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

3

4

2

5

Page 37: Cycle Time

400

Page 38: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME LEVER-SUB VENT LH/RH MATERIAL PP+T30 %

REV NO PART NUMBER H44423-3860/3980 COLOUR Black

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & burn mark visual

2 short mould & flash visual

3 weld line , gate point projection & Rib dameage visual

4 Flash and short mould , silver streeks visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 39: Cycle Time

400

Page 40: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME LEVER-SUB Food LH/RH MATERIAL PP+T30 %

REV NO PART NUMBER H44423-4000/3880 COLOUR Black/Natureal

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & burn mark visual

2 short mould & flash visual

3 weld line , gate point projection & Rib dameage visual

4 Flash and Rib short mould , silver streeks visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 41: Cycle Time

400

Page 42: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME CLIP-EVA. LH/RH MATERIAL PP+T20 %

REV NO PART NUMBER H40883-2140/2150 COLOUR Black/Natureal

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & burn mark visual

2 short mould & flash visual

3 weld line , gate point projection & Rib dameage visual

4 Flash and Rib short mould , silver streeks visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation12

3

Page 43: Cycle Time

400

Page 44: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL pom(F20-03)

REV NO PART NUMBER H44423-3900/4010 COLOUR Black/Natureal

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & Flash visual

2 weld line , gate point projection & Rib dameage visual

3 short mould & flow line visual

4 silver streeks , flow mark visual

REMARK:

1. After check the all check points 'OK" means put the marking

LEVER-MODE MAIN (M)

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1

2

3

4

Page 45: Cycle Time

400

Page 46: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME MATERIAL pom(F20-03)

REV NO PART NUMBER H44423-4030/3920 COLOUR Black/Natureal

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & Flash, lock gape checking visual

2 visual

3 short mould & flow line visual

4 short mould visual

5 silver streeks , flow mark visual

REMARK:

1. After check the all check points 'OK" means put the marking

LEVER-MIX MAIN (M)

weld line , gate point projection & Rib dameage, mounting hole checking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation1

2

34

5

Page 47: Cycle Time

400

Page 48: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME CLIP-HTR PIPE MATERIAL PP+T20%

REV NO PART NUMBER H40883-0670 COLOUR Black

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & Flash, Hole. gape checking visual

2 short fill blow hole visual

3 short fill blow hole visual

4

5

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

12 3

Page 49: Cycle Time

c

400

Page 50: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME COVER-FILTER MATERIAL PP+T20%

REV NO PART NUMBER H40853-1910 COLOUR Black

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & Flash, lock area checking visual

2 short mould checking visual

3 short mould & flow line , silver streeks visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

1 2

3

Page 51: Cycle Time

400

Page 52: Cycle Time

APPEARANCE INSTRUCTION SHEETPREPARED CHECKED APPROVED

DATE PART NAME HOSE COOL BOX MATERIAL PP+T20%

REV NO PART NUMBER H48473-0010 COLOUR Black

inspection process

SNO CHECK POINTS CHECKING METHOD

1 short mould & Flash, lock area checking visual

2 short mould & flow line , silver streeks visual

REMARK:

1. After check the all check points 'OK" means put the marking

INSPECTION

ok

not ok

REJ

scrap

packing

isolation

12

Page 53: Cycle Time

400