daily report 27-04-2011
TRANSCRIPT
-
8/2/2019 Daily Report 27-04-2011
1/9
TO DATE:
From
Gross Oil
BPD
Net Oil
BOPDBS&W % Salt PTB
* Included 653 STB Cond. Prod. + Cond. separated from gas plant V-501 (317 STB/D tested on 20-04-2011) + 98 STB recovered from API.
0.0514554 41.60 88900.58163672 8894
Safety Score since last
ocuptional LTA
2.1-Production & Shipping Figures:-
BWPD
Flared gas
MMSCFD
AchievedPercentage
%Closin
W.C.%
Safety Equipment Down
OpeningStock
STB
Date: 27/04
DAPETCO
Daily Site Report For SD Field Activities
END REPORT AT 05:00 HRS.
27-Apr-2011: OPERATIONS GENERAL MANAGERS
: FIELD MANAGER
Dapetco :- 175 Day
54206
1- HSE:-
9466
Accident in 24 Hrs.
Contractor :- 464 Days
8885.13
Gas Divertedto G.C.
MMSCFD
5.6
Oil Shipped To AL-HamraDrained Water
2- Production & Wells Changes:-
10800
Gross Fluid
Prod. BFPD
EGPC April
APP. Plan
* Net Oil Prod.
STB
7000
8000
9000
10000
11000
W.C%
BOPD
Field Production Performance
-
8/2/2019 Daily Report 27-04-2011
2/9
Serial WellFlow
Hrs.
Choke
1/64"WHFP psi FLP psi FLT OC BS&W % Salt PTB
Last test
net oil
Last test
gas rate
Last test
GOR
1 SD1/11 24 56 85 60 21 6 - 60 0.969 16295
2 SD1/14 24 32 198 150 59 85 >400 225 NA NA
3 SD1/22 24 Open 12 10 - 0.6 >400 175 0.481 2761
4 SD1/23 24 36 405 105-110 57 - - 110 NA NA
5 SD2/1 24 32 215 100 28 7 >400 41 1.064 26340
7 SD2/3 0 32 (SI) 260 - - - - 11 1.666 149331
8 SD2/5 24 36 240 120 22 23 >400 40 1.237 308479 SD2/8 0 - - - - - - 148 0.179 1207
10 SD2/17 24 24 140 100 24 47 - 16 0.194 22502
11 SD3/22 0 24 - - - - - - - -
12 SD3/26 0 28 170 (S.I) - - - - - - 4428
13 SD3/31 24 48 53 34 56 93 >400 71 NA NA
14 SD3/35 24 56 47 33 22 90 >400 103 NA NA
15 SD3/67 24 28 110 50 57 70 >400 222 N.A N.A
Serial WellFlowHrs.
Choke1/64"
WHFP psi FLP psi FLT OC BS&W % Salt PTBLast test
net oilLast testgas rate
Last testGOR
1 SD2/2 24 16 960 350 21 - - 17 1.267 74474
2 SD2/4 0 16 (SI) 2000 - - -
3 SD2/6 24 16 1020 295 6 - - 21 1.600 77420
4 SD2/9 24 16 1210 305 21 2 >400 25 1.621 64647
5 SD2/13 24 16 1140 300 22 - - - - -
6 SD2/14 24 16 1155 300 10 - - 42 1.692 40458
7 SD2/15 24 16 1010 300 11 - - 29 1.722 67040
% Date
1 SD2/7 24 32 1540 1350 46 0
2 SD2/10 24 28 1440 1350 30 0
3 SD9/1 0 24 - - - -
4 SD9/3 0 24 - - - -
Serial
25-Apr-11
S.I for pressure bu
WHFP psiLast test
net oil
Under W
26-Feb-11
4.2- High Pressure Gas Wells
Casing
Press. psiWell
FlowHrs.
FLP psiBS&W Last test
GORFLT OC
21-Nov-10
Choke1/64"
Last test gas
rateTest date
24-Apr-11
21-Jan-11
23-Apr-11
26-Apr-11
S.I for pressure bui
22-Oct-10
3-Apr-11
19-Feb-11
23-Jan-11
5-Jan-09
S.I for press. build
4-Oct-10
Rem
S.I for press. build
4- Wells Status:-
4.1.1- low press. Wells:-
Rem
4.1- Natural Producing Wells:-
26-Apr-11
Test date
20-Jan-11
4.1.2- Medium press. Wells:-
ceased to flow &
Test date
-
3-Jan-11
-
22-Apr-11
21-Feb-11
-
8/2/2019 Daily Report 27-04-2011
3/9
Serial FlowHrs.
WHFP psi FLP p si FLT OC Annulus Press. Psi Average AMP. Last test net oil Last test GOR Test date BS&W % Last P.M Date No. of Restart
1 24 235 135 60 140 9 311 NA 18-Apr-11 82 10-Apr-11 10
2 23.5 255 180 - 180 11 221 N.A 10-Apr-11 79 29
3 23.5 195 185 32 185 8 115 NA 17-Dec-10 83 106
4 0 - - - - - 189 N.A 27-Dec-10 81 24-Jan-11 43
5 24 100 90 - 55 16 75 NA 17-Jan-11 92 12-Apr-11 111
6 24 170 165 64 167 9 82 NA 11-Apr-11 95 13-Apr-11 417 24 100 95 50 52 15 73 N.A 28-Dec-10 83 179
8 24 60 55 - 30 16 56 N.A 29-Dec-10 84 177
9 0 - - - - - 39 NA 26-Mar-10 75 11-Jun-10 63
10 24 155 155 56 155 22 646 NA 13-Apr-11 55 14-Apr-11 30
11 24 170 165 50 115 24 146 NA 28-Dec-10 69 15-Apr-11 72
12 24 400 160 62 155 21 201 NA 14-Apr-11 91 16-Apr-11 89
13 0 - - - - - 188 N.A 2-Mar-11 - 6-Apr-11 16
14 24 180 165 77 20 22 166 NA 28-Feb-11 88 9-Apr-11 76
Serial Operating Date Flow Hrs.Sam Est.
gross BFPDLast test net
oilLast test GOR Test date BS&W % FLP psi Gen. Amp.
Beam pumpunit
1 4-Sep-09 12.5 63 63 N.A 17-Feb-11 0.5 140 C-320D
2 4-Aug-06 9 106 115 NA 31-Jan-11 5 135 35-60 C-640D
3 7-Mar-10 24 127 44 N.A 13-Feb-11 50 130 - C-456D
4 18-May-10 0 - 38 NA 31-Dec-10 - - - C-640D
5 22-Aug-08 13 69 26 NA 15-Feb-11 72 100-160 - C-640D
6 20-Apr-10 0 - 14 N.A 15-Jun-10 - - - C-456D
7 18-May-10 10.5 62 33 N.A 14-Feb-11 77 140 - C-456D
8 27-Jan-10 24 31 10 NA 21-Apr-11 94 130 - C-640D
9 6-Apr-10 24 158 27 N.A 17-Feb-11 76 140 - C-320D
10 16-Apr-10 6 20 24 NA 5-Mar-11 20 130-170 - C-320D
11 31-Jul-07 9 50 40 NA 6-Mar-11 18 145 35-50 C-320D
12 19-Aug-07 5.5 21 22 NA 18-Feb-11 NA 155 - C-320D
1.5", SPM 4.8, L 144", Sh 7", D4000'
1.75", SPM 7, L 144", Sh 10", D4241'
1.5", SPM 7, L 144", Sh 8", D3767'
1.5", SPM 7, L 106", Sh 10", D4250'
1.75"DV", SPM 7, L 120", Sh 10",D 4358'
1.5", SPM 6.46, L 120", Sh 9", D3877'
36/6
Pump Specs
13-Apr-11
Stopped
2.25", SPM 7, L 106", Sh 10", D4249'
32/64" choke
SD3/37
SD1/5
SD1/17
SD1/6
SD1/18
SD3/23
Stopped sincmo
Stopped sinc
SD4/2
SD3/42
SD4/6
WSD1/1X 1.5", SPM 5.37, L 126", Sh 7", D3740'
Well
4.3.3- S/R Pump :-
SD3/33
SD3/38
2.25", SPM 7, L 102", Sh 10", D42137'
SD3/36
SD3/32
SD3/49
SD3/47
SD3/3426-Apr-11
32/64
4.3.2- ESP Pump:-
SD3/39
Well
SD1/13
SD3/30
SD3/48
1.5"DV, SPM 5.7, L 106", Sh 7",D 3701'
2.25"DV", SPM 6, L 106", Sh 8",D 4075'
1.5", SPM 5.4, L 144", Sh 7", D3850'
SD1/3
SD1/20
SD1/19
SD3/41
SD1/4A
-
8/2/2019 Daily Report 27-04-2011
4/9
Gross Net
A 223 0 0 0 0 0 0 0 223
B 0 0 0 0 0 0 0 0 0
C 226 0 0 0 0 0 0 0 226
D 230 0 0 0 0 0 0 0 230
E 229 653 0 0 353 0 302 302 227 4 0.05 35.4
F 227 663 0 133 548 0 0 0 475
G 347 0 133 0 0 133 0 0 347
H 505 0 0 0 1 0 279 279 225 9 0.05 35.5
I 171 0 0 0 0 0 0 0 171
1A 0 0 0 0 0 0 0 0 0
1B 2259 3263 0 0 1949 0 1363 1362 2210 8 0.05 35.5
2A 5294 6785 0 0 2891 0 6950 6947 2238 5 0.05 37.0
2B 1762 5495 0 682 2437 0 0 0 5502
2C 0 0 0 0 0 0 0 0 0
2D 0 0 0 0 0 0 0 0 0
200A 1879 0 0 0 0 682 0 0 1197
200B 1202 653 0 0 0 0 0 0 1855
Total 14554 17512 133 815 8179 815 8894 8890 15126
Salt PTB BS&W % API
2C 6404 9 0.05 35.6
2D 2105 - - -
Total 8509
0 5733
See the attached calculation sheet of Agiba crude (page No. 6)
3628
27
Opening Stock
STB
Oil Shipped To AL-
Hamra STB
00
A- SD Crude:-
Opening StockSTB
Oil Shipped To AL-Hamra STB
B- Agiba Crude:-
3628
BS&W % Remarks
8264
API
D
3844
ClosingStock STB
5- Movement Through SD Tanks:-
3846
Salt PTBOff spec.oilTK Prod. STB Recoveredoil
Recycled oilfor treatment
DrainBBLs
Closing Stock STB
253138440 27 3846
TK
Net
Gross Oil Received From
Raml STBWater Drained BBLs
Gross
-
8/2/2019 Daily Report 27-04-2011
5/9
No.
2
1
1
4
1
1
1
1
1
30
o (test
es)
int
endy
L)
ane
dou
er c
efor
y ex
vice
ies
9.2- Service and Sister Companies:-
5138 15460
TotalCatering (New Prosper)
Oil Truck Released on 17-03-2011
Alaa EL-Gendy
DAPETCO
Stand-by.
5
Remarks
9.1- Field Man Power:-
Slick Line Unit
26 Operated + 4 Stand by
Operated.
Service &
Sister
Companies
HBS
Crane Mova
Asfour
SDVisitors
Sapesco Operated
OperatedWells SD1/1X,3,6,20
Diesel truck
Wells SD1/4A,13, 18, SD3/23, (30&34), 33, 36,
37, (38,39), 41, 47, 48,49, 55, 56, 57, 58, 59, 61,
62, 64, SD4/1, 2,6, 7 + 3 new camp + 1 ABB
camp + 1 GZ Plant.
9- Administration:-
Dapetco Surface Pumping Unit (J.P)
8.4 Mobilized triplex pump motor # D to Cairo for repairing on 25-03-2011.
Dapetco
Mobile Test Package
Fixed Test Package
Operated @ EDC rig # 92.
1 Stand-by + 1 Out of service
Equipment Company
30 Ton Truck Stand-by.
Elhami
EL-Sherief
Sapesco Operated
Halliburton S/L
EMC
Date: 27/04/2011
8- Maintenance Activities and Rental Equipment:-
8.1 Ajax compressors # B is on stand-by & Ajax compressors # A is out of service due to lubricator switch installed on gas
compressor # A.
8.2 Gas turbine # B is running, Gas turbine # C on stand by, Gas turbine # A is out of service due to the defected lube oil tank
pressure switch (Waiting spare parts MR SDMA 2/2011 Dated on 11/01/2011).
8.3 Received a new UPS unit for EPF control room, not installed yet as the power connector part is missing.
-
8/2/2019 Daily Report 27-04-2011
6/9
-
8/2/2019 Daily Report 27-04-2011
7/9
Date: 27
Pa
Start Time
End Time
6:00 63 2118.50 74 72 74 0.9933 1.00017 2105
4:00 198 5786.45 80 54 77 0.9905 1.00021 5733
Tank No. Time Dip.cm Table vol. BBLsOil Temp
oF
Ambient
Tempo
F
Shell
Tempo
F
Oil Temp corr.Factor
Shell corr. Factor Final Vol. Water Drained
Start Time
End Time
6:00 221 6434.49 79 52 76 0.9909 1.00020 6377
9:10 78 2549.18 75 73 75 0.9928 1.00019 2531
3628 27
3846 0.05
3844
Signature :Signature :
BS&W % =
Dapetco Rep. :
Signature :
Agiba Rep. : Dapetco Shift Eng. :
Name : Tarek Abdelfattah Name : Salah Eldeen
3628
Total Crude Pumped EL-Hamra (BBLs) =
GrossOilReceived
NetStockAfter
Drain
2
Oil Temp corr.
FactorDip.cm
Name : A. Attia
2D
6434.492212C
Shell corr. Factor
Total Net Oil pumped to EL-Hamra (STB) =
Total Crude Received From Agiba (BBLs) =
27
Movement of Oil Tanks Didicated to Agiba Crude
Measured values:
6377
From 05:00 AM on 26/04/2011 To 05:00 AM on 27/04/2011
Final Vol.Ambient
TempoF
796:00
Ticket no.: 838
Dip.cmTank No.Shell
TempoF
Field: Raml
Table vol. BBLsOil Temp
oF
Oil Temp corr.
FactorShell corr. Factor
3846
Gross Vol.Final Vol.
1.00020
Gross Vol.
Ambient
TempoF
52 76
Water in crude oil
BBLs
0.9909
Salt PTB
Shell
TempoF
Tank No.
35.6
Oil TempoF
Total water drained (BBLs) =
BS&W
%
Table vol. BBLs
API
2C
9
OilPumpedtoEL-
Hamra
0.05
-
8/2/2019 Daily Report 27-04-2011
8/9
27-04-2011
Page 7 of 8
WELL TEST DATA REPORT.
DABAA
STATUS :
Reference Conditions 14.73 Psi and 60 F
DATE HOKE SEP. Water GROSS
TIME ID PRESSOIL T. Mtr red. Mtr Inc. Gr. BS&WOil rate rate Oil&H2O Sp.Gr. Hw GAS T. Orif. Id Gas rate GOR Remarks
HH:MM 64th" psig psig psig F bbls bbls API % STB/D bbls/d STB/D Air =1 "H2O F in. MMscft/d Scft/STB
5:00 OP. 10 8 4 60 0.0 INITIAL
6:00 OP. 10 8 4 62 7.5 0.3 179.3 0.5 179.8 0.966 28 52 2.000 0.482 2687.704
7:00 OP. 10 8 4 66 7.6 0.2 181.6 0.4 182.0 0.966 28 56 2.000 0.480 2643.455
8:00 OP. 10 8 4 70 7.4 0.5 176.0 0.9 176.9 0.966 28 60 2.000 0.478 2716.778
9:00 OP. 10 8 4 74 7.5 0.3 178.5 0.5 179.0 0.966 28 64 2.000 0.476 2669.069
10:00 OP. 10 8 4 76 7.2 0.2 171.4 0 .3 171.7 0.966 28 66 2 .000 0.475 2774.356
11:00 OP. 10 8 4 84 7.3 0.5 172.7 0 .9 173.5 0.966 29 74 2 .000 0.481 2785.321
12:00 OP. 10 8 4 90 7.5 0.3 177.3 0 .5 177.9 0.966 30 80 2 .000 0.487 2747.389
13:00 OP. 10 8 4 92 7.4 0.2 175.0 0 .4 175.4 0.966 30 82 2 .000 0.486 2778.758
14:00 OP. 10 8 4 96 7.6 0.5 178.9 0 .9 179.8 0.966 30 86 2 .000 0.485 2708.066
15:00 OP. 10 8 4 96 7.4 0.2 174.7 0 .4 175.1 0.966 30 86 2 .000 0.485 2772.897
16:00 OP. 10 8 4 90 7.5 0.5 177.0 0 .9 177.9 0.966 30 80 2 .000 0.487 2752.911
17:00 OP. 10 8 4 88 7.3 0.7 172.1 1 .2 173.3 0.966 29 78 2 .000 0.479 2784.872
18:00 OP. 10 8 4 84 7.6 0.9 179.0 1 .6 180.7 0.966 28 74 2 .000 0.472 2635.171
19:00 OP. 10 8 4 80 7.4 0.6 175.1 1 .1 176.2 0.966 28 70 2 .000 0.474 2704.180
20:00 OP. 10 8 4 78 7.5 1.0 176.9 1 .8 178.7 0.966 28 68 2 .000 0.475 2681.891
21:00 OP. 10 8 4 74 7.5 0.8 177.6 1 .4 179.0 0.966 28 64 2 .000 0.476 2682.522
22:00 OP. 10 8 4 70 7.4 1.0 175.1 1 .8 176.9 0.966 28 60 2 .000 0.478 2730.499
23:00 OP. 10 8 4 70 7.3 0.9 172.9 1 .6 174.5 0.966 28 60 2 .000 0.478 2765.110
0:00 OP. 10 8 4 70 7.4 1.0 175.1 1.8 176.9 0.966 28 60 2.000 0.478 2730.499 4/27/2011
1:00 OP. 10 8 4 70 7.1 0.9 168.2 1.5 169.7 0.966 29 60 2.000 0.487 2898.025
2:00 OP. 10 8 4 70 7.1 0.8 168.4 1.4 169.7 0.966 29 60 2.000 0.487 2895.103
3:00 OP. 10 8 4 68 7.2 0.9 170.7 1.6 172.2 0.966 29 58 2.000 0.488 2861.0784:00 OP. 10 8 4 68 7.0 1.0 165.8 1.7 167.5 0.966 29 58 2.000 0.488 2945.796
5:00 OP. 10 8 4 68 7.1 1.0 168.2 1.7 169.9 0.966 29 58 2.000 0.488 2904.306
AVE. 10 8 4 77 0.6 174.5 1.1 175.6 0.481 2760.7
CLIENT : DATE . 4/26/2011
FIELD : SD 1 CLIENT REP . Eng.
WELL : SD 1- 22 SAPESCO REP. :Mohamed Ibrahim
Test Duration = 24 Hrs.
Gas Meter Run Size = 5.761"
WHP DSPOIL RATE CAL. GAS RATE CAL.
-
8/2/2019 Daily Report 27-04-2011
9/9
27-04-2011
Page 8 of 8
WELL TEST DATA REPORT.
DABAA
STATUS : Natural
Reference Conditions 14.73 Psi and 60 F
DATE HOKE SEP. Water GROSS
TIME ID PRESSOIL T. Mtr red. Mtr Inc. Gr. BS&WOil rate rate Oil&H2O Sp.Gr. Hw GAS T. Orif. Id Gas rate GOR Remarks
HH:MM 64th" psig psig psig F bbls bbls API % STB/D bbls/d STB/D Air = 1 "H2O F in. MMscft/d Scft/STB
The trailers arrived @ well site, start rig up.
Finish rig up.
Divert flow to separator.
11:30 16/64 1210 315 310 70 INITIAL TANK
12:00 16/64 1210 315 310 70 0.7 4.0 32.1 1.3 33.5 0.680 34 60 1.500 1.512 47062.918
13:00 16/64 1210 315 310 70 1.0 2.0 23.4 0.5 23.9 0.680 35 60 1.500 1.534 65486.964
14:00 16/64 1210 315 310 70 1.1 3.0 25.5 0.8 26.3 0.680 34 60 1.500 1.512 59280.752
15:00 16/64 1210 315 310 70 1.2 3.0 27.8 0.9 28.7 0.680 35 60 1.500 1.534 55135.073
16:00 16/64 1210 315 310 70 1.0 2.0 23.4 0.5 23.9 0.680 36 60 1.500 1.556 66417.165
17:00 16/64 1210 315 310 70 1.2 2.0 28.1 0.6 28.7 0.680 37 60 1.500 1.577 56112.155
18:00 16/64 1210 315 310 70 1.2 2.0 28.1 0.6 28.7 0.680 38 60 1.500 1.599 56866.453
19:00 16/64 1210 315 310 70 1.0 2.0 23.4 0.5 23.9 0.680 40 60 1.500 1.640 70015.160
20:00 16/64 1210 315 310 70 1.2 2.0 28.1 0.6 28.7 0.680 40 60 1.500 1.640 58345.966
21:00 16/64 1210 315 310 70 1.0 3.0 23.2 0.7 23.9 0.680 40 60 1.500 1.640 70736.966
22:00 16/64 1210 315 310 70 0.9 2.0 21.1 0.4 21.5 0.680 42 60 1.500 1.681 79718.795
23:00 16/64 1210 315 310 70 0.9 2.0 21.1 0.4 21.5 0.680 41 60 1.500 1.661 78762.548
0:00 16/64 1210 315 310 68 1.1 2.0 25.8 0.5 26.3 0.680 42 58 1.500 1.685 65331.141 4/27/2011
1:00 16/64 1210 315 310 68 1.1 2.0 25.8 0.5 26.3 0.680 42 58 1.500 1.685 65331.141
2:00 16/64 1210 315 310 68 1.2 3.0 27.8 0.9 28.7 0.680 42 58 1.500 1.685 60504.270
3:00 16/64 1210 315 310 66 1.0 2.0 23.5 0.5 23.9 0.680 41 56 1.500 1.669 71119.546
4:00 16/64 1210 315 310 66 1.0 2.0 23.5 0.5 23.9 0.680 42 56 1.500 1.689 71983.001
5:00 16/64 1210 315 310 66 1.1 2.0 25.8 0.5 26.3 0.680 42 56 1.500 1.689 65439.092
AVE. 1210 315 310 69 2.3 25.4 0.6 26.0 1.621 64647.2
CLIENT : DATE . 4/26/2011
FIELD : SD 2 CLIENT REP . Eng.
WELL : SD 2 -9 SAPESCO REP. Eng.Osama Aly
Test Duration =17 Hrs.
Gas Meter Run Size = 2.9"
WHP DSPOIL RATE CAL. GAS RATE CAL.