daily work status _sahil.xls

Upload: lokesh-dahiya

Post on 14-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Daily Work Status _Sahil.xls

    1/21

    DATE5-Jan

    6-Jan

    7-Jan

    9-Jan

    10-Jan

    11-Jan

    12-Jan

    13-Jan

    14-Jan

    16-Jan

    17-Jan

    18-Jan

    19-Jan

    20-Jan

    RECON visit with sir

    work on tackle 1 started in RECON

    (dimensions+improvement+part design)

    briefing of P.E DESIGN department

    started with CATIA (sketcher)

    started product. Created specimen 1

    IBF visit for pallet of rear axle(brake actuator)

    vice assembly created

    practiced product

    IBF visit for process study

    practice of sketcher and part

    DAILY W

    TAbriefing session on tata motors (presentations)

    department allocation done

    studied PFD and SOP from Q star

    work on tackle 6 started(RECON)

    preparation of excel and flow chart of process study

    manufacturing department visit

    briefing of tanaka machine+machining+heat treatment

    drafting done of tackle for lifting 6BT cylinder head

    learnt welding command , mass calculation by applying material

    understanding of notes of tackle in drawing sheet done

    (dimensioning+improvements+product)

    started drafting (literature study)

    PFD study complete

    Modified tackle for lifting 6BT cylinder head(center distance)read Indian Standards for short link chain

    Created work plan for RECON tackles for standardisation

    Visit to the suggestion fair for cost reduction in assembly hall

    RECON VISIT .

    Started work on tackle for lifting gearbox 600(dimensioning + modifications input

    created parts in CATIA for tackle (GB 600)

    21-Jan

    COMPLETED PRODUCT OF TACKLE GB 600

    STARTED WITH SKETCHING.

  • 7/29/2019 Daily Work Status _Sahil.xls

    2/21

    23-Jan

    COMPLETED DRAWING OF LIFTING TACKLE FOR RECON.

    COMPLETED DRAFTING OF TACKLE GB 600.

    24-Jan

    learnt to call product from PLM

    learnt to copy notes in sheet

    released drawing of tackle GB 600 as 130420391000

    started project in IBF regarding flexibility of line for LCV'S

    work started on stand for 6BT engine

    31-Jan

    concept of guideway made in CAD

    IBF VISIT : 3 FIXTURE STUDY(2 DTC , 1 HI DECK)

    AXLE TILT PROBLEM IN IBF LINE

    work on flexible fixture started

    1-FebDRAWING OF LOCKING ARR COMPLETEDFLEXIBLE FIXTURE W I P

    25-Jan

    IBF PROJECT STARTED

    DIFFERENCE IN FACILITIES IDENTIFIED FOR DIFFERENT LCV'S

    STATION WISE FACILITIES IDENTIFIED FOR LCV 407

    30-Jan

    IBF VISIT FOR FRAME STUDY OF LP 407

    AIM :FIXTURE OF 407 AND 909 TO BE MADE SAME

    FIXTURE DEVELOPMENT STARTED

    4-Feb

    drawing of stand assy made

    MAIN FIXTURE CREATED(FLEXIBLE)

    6-Feb

    roller guideways studied

    work starts on this fixture from step 0:base assy

    visit of heft fixture

    2-Feb

    base assy of flex. Fixture done

    clamping arrangement done

    3-Feb created main fixture (front and rear table)

    9-Feb

    rail guideway model finalled EGH 35 CA

    BASE ASSY MADE AGAIN , NOW WITH CHANNEL SECTION AND PLATE (1

    10-Feb

    satish sir visit till lunch - went to eastern

    base plate fitted on base

    guideway made in CAD

    7-Feb

    selection b/w sq. tube and two channel sections made

    base assy completed 1500x1000

    8-Feb

    base plate levelling discussed

    rail guideway varieties found AND STUDIED THE PDF

    cariiage work in progress

    11-Feb

    guideway fitted on base

    toggles and last clamp fitted

    levelling done and plates connected

    13-Feb

    base assy completed finally(with guides)

    carriage work started

  • 7/29/2019 Daily Work Status _Sahil.xls

    3/21

    14-Feb

    heft visit - for carriage

    15-Feb

    completed base assy again as it got deleted

    carriage work in progress

    main fixture work started

    18-Feb

    cranking portion completed

    overhang part done

    20-Feb

    skewness part done (locking arrg.)

    mapping done

    frames analysed in detail

    16-Feb

    carriage work done

    base assy completed after checking from sir

    17-Feb

    frames procured from plm

    fixture discussed with avinash sir , amendments made

    23-Feb

    mapping of frames done and locking positions decided

    locking to prevent skewness assy made dia.35 for all

    overall ht. of resting pads inc. by 25

    24-Feb

    holes made in base plates for locking of guiderails(after calling each stand assy

    locking holes of dia. 35 assy made

    locking arrangement complete

    fixture complete from my side

    21-Feb

    resting for end cross member done for all frames

    resting of end cranked part done for all frames

    toggle sliding revised again

    22-Feb

    frames placede on fixture and interference seen

    amendments made

    28-Feb

    hinge part done of resting assy

    side stopping assy made again

    trolley amendment done from my side

    29-Feb

    trolley discussed with shailesh sir

    shortcomings rectified

    hinge mechanism modified

    25-Feb

    trolley project started

    visit of cv-cx line for trolley for frame from shop to line

    ibf visit -- trolley seen dtc rear module

    27-Feb

    trolley modification started

    ibf visit for handle problem

    ht. of resting pad increased; handle problem eliminated

    locking arrg. Adjusted

    cad data of various parts for pending facilities at ibf downloaded from PLM

    1-Mar

    another alternative modification started and completedall rectifications done

    both modifications complete

    ppt. started

    2-Mar

    ppt. completed

    amendments made

    pending facilities at ibf project

  • 7/29/2019 Daily Work Status _Sahil.xls

    4/21

    3-Mar

    npi deptt. Visit for getting part nos.

    lp 909 parts completed

    5-Mar

    PLM Parts obtained of other LCV's

    CNG cylinder tackle almost done-modelling

    13-Mar

    IBF VISIT FOR SEEING BATTERY , RADIATOR

    CAD DATA OBTAINED FROM PLM

    CYL. TACKLE WORK STARTED AGAIN

    14-Mar

    cyl. Tackle modified and discussed with ashish sir

    amendments made

    license problem

    6-MarTACKLE MOD. COMPLETEDDRAFTING DONE

    12-Mar

    IBF VISIT FOR STG. GEARBOX

    CAD DATA FROM PLM

    TACKLE CONCEPTS DISCUSSED

    17-Mar

    drawing discussed with ashish sir

    after amendments;drawing released

    ppt for review started

    19-Mar ppt work (REVIEW)

    15-Mar

    cyl. Tackle modified

    amendments made

    16-Mar

    drafting started of tackle

    done from my side

    22-Mar

    ibf visit for radiator tackle

    rad. Tackle on hold b'coz concept rejected due to lack of strength

    battey tackle started

    23-Mar

    battery tackle almost complete wid drafting

    my concept rejected b'coz it tilts

    another concept made

    20-Mar

    tackle for radiator started

    ibf visit for exact model

    modelling done

    21-Mar

    amendments in model made

    ibf visit for 1:1 profile checking

    27-Mar

    IBF visit for stg GB with ashish sir

    new concept of tackle from hook made in CAD

    DRG. RELEASED OF STG. GB

    SOP MADE

    24-Mar

    tackle drafting complete

    drg. Released

    tackle for stg. Gb started

    26-Mar

    IBF visit for stg. Gb

    5 concepts made

    2 drawn in cad

  • 7/29/2019 Daily Work Status _Sahil.xls

    5/21

    2-Apr

    my concept of trolley very heavy

    new hinge concept thought of

    modelling of new concept done3-Apr

    another concept 3 thought of(sliding channel in vertical channels)

    modelling done of this

    ppt. made of all the three concepts-given to avinash sir

    4-Apr

    work on trolley for SFC 407(load body) started

    IBF visit for the same

    old trolley for 407 taken in cad-sfc model fitted on it5-Apr

    done modelling of trolley-my concept

    modelling with simulatuion complete from my side

    28-Mar

    DRAFTING DONE OF GAUGE-130440883000

    SOP also made of battery tackle

    concept of tackle picking from hook rejected

    31-Mar

    29-Mar

    my tackle for stg. GB rejected

    IBF visit for SOP training of tack welding fixture

    stg. GB tackle old one (1996) approved

    30-Mar

    modelling done of old LCV LP 909 tackle

    drafting also complete

    work started on trolley for cng bank LP 909

    IBF visit for trolley for CNG bank assy

    concepts discussed and PDF obtained of bank assy

    modelling started

    strengthening done of trolley from my side

    tackle of stg. GB made again-modelling and 90% drafting done from my side14-Apr

    simulation of all 3 cyl. Models done on trolley

    modelling almost done, strengthening and handle left

    IBF visit for trial of previous trolley for load body SFC 407

    13-Apr

    IBF Visit for commonising SFC 407 CNG Bank;trolley for load body SFC 407

    new work started on special tool-middle structure working plateform for hybrid9-Apr

    modelling complete and drawing made

    IBF visit for actual seeing platform10-Apr

    work on commonising trolley for SFC 407 going on

    modelling of various concepts done11-Apr

    modifications done in stg. GB after discussions with sir

    amendments made in trolley and concept sent to IBF

    work started again on tackle for stg. GB12-Apr

  • 7/29/2019 Daily Work Status _Sahil.xls

    6/21

    HIRA point of hingable stopper indiscussed with ashish sir

    radiator tackle discu25-Apr

    hinge type mo

    concept 1 re

    discussed wit

    hinge type preferred3-May

    IBF visit for stand for loadstand for load

    modelling i2-May

    various amendments made in

    model almo

    bee sting --21-Apr

    radiator tac

    drafting complete

    load body modi

    drafting c27-Apr

    modelling complete f

    drafting a

    but then; concept reje

    plate on23-Apr

    concept of handle in

    drafting done

    drg. Released

    26-Apr

    modelling complete

    IBF visit for physical dimensioning of the radiat

    modelling changed correspondi24-Apr

    work on tackle for radiator done

    trolley for load body - modelling almost complete

    IBF visit for dimensioning of stopper in trolley - ashish sir17-Apr

    12 MM GAP TOOL DONE

    WORK ON RADIATOR TACKLE20-Apr

    modelling complete o

    draftin

    work started on hinga18-AprIBF visit for hin

    trial done on trolley a

    work on hingabl

    work startred on sp.19-Apr

    drafting done

    drawing finally released16-Apr

  • 7/29/2019 Daily Work Status _Sahil.xls

    7/21

    simulation of both

    discussed with avinas4-May

    modelling done wit

    discussed wit

    amends m

    drafting5-May

    Drafting almost complet

    drafting also started for troll7-May

    modelling in pr

    learnt surfaci12-May

    DRAFTING COMPLETE OF TROLL

    TACKLE FOR ENGINE DROPPI

    MODELLING M8-May

    amends made in draftin

    modelling complete

    drafting sta9-May

    Drafting complete for ta

    MARCOPOLO VISIT

    IBF VISIT FOR ENGI10-May

    work started on BIW fixt

    BIW visit for physical dimensio

    modelling sta11-May

    modelling in process of

    BIW visit for some dime

    14-May

    amends made in

    modelling alm

    simulation of roof d15-May

    simulation done

    shimming of back part16-May

    shimming modified of various resting

    front resting made fr29-May

    front resting set agai

    shimmings adjusted acc.

    shimmings fi30-May

    shimming done of re

    front resting made fr28-May

  • 7/29/2019 Daily Work Status _Sahil.xls

    8/21

    locator

    rear shimming

    BIW visit for measurin2-Jun

    pneumatic cylinder o

    cylinder fitted on to the4-Jun

    SHIMMING DONE O

    PNEUMATIC CLAMPS M

    SHIMMIMG DONE OF31-May

    fixture discusse

    modifiacations maall shimmings bolte1-Jun

    made ppt. for to

    review done

    7-Jun

    8-Jun

    simulation done of pneumatic claran in gre5-Jun

    started with ppt as sir

    learnt photosc6-Jun

  • 7/29/2019 Daily Work Status _Sahil.xls

    9/21

    RK

    K

    s given)

  • 7/29/2019 Daily Work Status _Sahil.xls

    10/21

    5X65)

  • 7/29/2019 Daily Work Status _Sahil.xls

    11/21

    again separately)

  • 7/29/2019 Daily Work Status _Sahil.xls

    12/21

  • 7/29/2019 Daily Work Status _Sahil.xls

    13/21

  • 7/29/2019 Daily Work Status _Sahil.xls

    14/21

    rolley done - modelling completeand amendments made

    sed with avinash sir

    el completed

    dy of stand

    h avinash sir

    by sir - work started

    body and CNG cylindersbody started

    n process

    the model for radiator tackle

    t complete

    MEDICAL

    le modified

    ; drg. Released

    fications done

    omplete

    or tackle for stg. GB

    lso done

    ted b'coz its rod type

    started

    radiator tackle done

    f HIRA point

    of HIRA point

    f tackle (plate type)

    r( CD and 12 mm plate fitting into the radiator)

    ngly ; discussed with ashish sir

    ; DRAWING RELEASED

    STARTED AGAIN- MODELLING

    trolley for load body

    done

    ble stopper in trolleygable stopper

    fter rotating module

    e stopper done

    Tool - 12 mm gap

  • 7/29/2019 Daily Work Status _Sahil.xls

    15/21

    load bodies done

    h sir - amends made

    amends for stand

    h avinash sir

    ade again

    started

    of stand for load body

    y for cng bank - ashish sir

    cess of fixture

    ng in CATIA

    EY FOR CNG BANK - ASHISH SIR

    NG FOUND FROM TRACINGS

    ADE OF THIS

    of trolley for cng bank

    or tackle for engine

    ted for this

    kle for engine dropping

    WITH ASHISH SIR

    E TACKLE DETAILS

    re for roof spot welding

    ning of the fixture all day long

    ted of fixture

    ixture-almost complete

    sions and clamps detail

    model of fixture

    ost complete

    one approximately

    of sleeper part

    done in two directions

    points after discussion with uday sir

    om surfacing again

    acc. To cab profile

    o 10mm back and forth

    ed on fixture

    aining resting parts

    om surfacing again

  • 7/29/2019 Daily Work Status _Sahil.xls

    16/21

    odified

    bolted again

    pneumatic cylinders

    tained from smc CD

    clamp on a new basis

    TOGGLE CLAMPS

    ADE AGAIN(MODIFIED)

    NEUMATIC CLAMPS

    d with uday sir

    e in various partsinstead of welding

    morrow review

    by satish sir

    p after constraining in a new wayenathon

    oming on 08/06/2012

    pe(animation)

  • 7/29/2019 Daily Work Status _Sahil.xls

    17/21

  • 7/29/2019 Daily Work Status _Sahil.xls

    18/21

  • 7/29/2019 Daily Work Status _Sahil.xls

    19/21

  • 7/29/2019 Daily Work Status _Sahil.xls

    20/21

  • 7/29/2019 Daily Work Status _Sahil.xls

    21/21

    s

    S