1 ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web page JRA1 web page http://www.unizar.es/ilias http://www.unizar.es/ilias Present status Present status Work in progress Work in progress JRA1. LBT-DUSL JRA1. LBT-DUSL Low background techniques for Low background techniques for deep underground sciences deep underground sciences

Upload: graham-pittman

Post on 01-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

JRA1. LBT-DUSL Low background techniques for deep underground sciences. Present status Work in progress. Key objectives. WP 1. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Present status  Work in progress

11ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

• Present statusPresent status

• Work in progressWork in progress

JRA1. LBT-DUSLJRA1. LBT-DUSLLow background techniques for deep Low background techniques for deep underground sciencesunderground sciences

Page 2: Present status  Work in progress

22ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 1.WP 1.

Key objectivesKey objectives

To measure the environmental background components (neutrons, gammas, muons, Rn contamination in the air and in the water ...) in the four underground sites in a coherent and coordinated way. The joint research effort should optimise the know-how of the different participants.

This is extremely important for the interpretation of data and for planning future experiments.

Page 3: Present status  Work in progress

33ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 2.WP 2.

Key objectivesKey objectives

To produce a reliable Monte Carlo library of simulation codes to identify and quantify the backgrounds in the EU underground sites in a variety of experimental conditions for the interpretation of data and for planning future experiments.

The joint research effort should optimise the know-how of the different participants.

Experimental results from Task 1 will be useful as the input of the simulations.

Page 4: Present status  Work in progress

44ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 3.WP 3.

Key objectivesKey objectives

-Construction and upgrading of ultra low background facilities (ULBF) in the four underground labs forming an EU-coordinated service for applications in rare event physics and other fields of world-wide value.

-Implementation of new techniques to deal with the background: active and passive shielding, veto systems, particle discrimination techniques, fragmentation of calorimeter detectors, control and suppression of radon levels...

-Study of the feasibility of fabrication of detectors and materials underground.

Page 5: Present status  Work in progress

55ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 4.WP 4.

Key objectivesKey objectives

-Collect new (and old) data on radioactive contamination and cosmogenic activation of materials used in rare-event physics experiments and ultra-low background instrumentation, using the new capabilities offered by the R&D and facilities of WP 3.

-Development and test of purification techniques to improve the radio-purity of materials.

Page 6: Present status  Work in progress

66ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

ManagementManagement structure of JRA1 structure of JRA1

Activity coordinatorActivity coordinatorJulio Morales/José M. Carmona (LSC)Julio Morales/José M. Carmona (LSC)Deputy coordinatorDeputy coordinator Nicola Ferrari (LNGS)Nicola Ferrari (LNGS)

WP1. Background measurements in the deep underground sites:WP1. Background measurements in the deep underground sites:CoordinatorCoordinator Nicola Ferrari (LNGS)Nicola Ferrari (LNGS)Deputy coordinatorsDeputy coordinators Marisa Sarsa/Gloria Luzón (LSC)Marisa Sarsa/Gloria Luzón (LSC)

WP2. Background simulations:WP2. Background simulations:CoordinatorCoordinator Gloria Luzón/Susana Cebrián (LSC)Gloria Luzón/Susana Cebrián (LSC)Deputy coordinatorDeputy coordinator Vitaly Kudriavtsev (IUS)Vitaly Kudriavtsev (IUS)

WP3. Low background facilities: WP3. Low background facilities: CoordinatorCoordinator Matthias Laubenstein (LNGS)Matthias Laubenstein (LNGS)Deputy coordinatorDeputy coordinator Jean Louis Reyss (LSM)Jean Louis Reyss (LSM)

WP4 . Radiopurity of the materials:WP4 . Radiopurity of the materials:Coordinator:Coordinator: Pia Loaiza (LSM)Pia Loaiza (LSM)Deputy coordinator:Deputy coordinator: Lino Miramonti (LNGS)Lino Miramonti (LNGS)

Page 7: Present status  Work in progress

77ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

ParticipantsParticipantsWP LNGS LSM LSC Boulby

WP1- Background measurements and monitoring in the deep underground sites

N. FerrariA. IanniC. BrogginiC. CattadoriW. PlastinoC. VignoliG.L. RaselliA. Cesana J. Kisiel

G. GerbierD. Lalanne

G. Luzon J.M. CarmonaJ. MoralesM.L. SarsaA. OrtizJ. Ruz

V. KudryavtsevJ. McMillanJ. LewinB. CamanziE. Tziaferi

WP2- Background simulations

L. PandolaS. Parlati

P. Loaiza G. GerbierM. De JesusF. Piquemal

S. CebriánG. Luzon J.M. CarmonaM. MartinezB. Beltran

V. KudryavtsevJ. DaviesB. CamanziC. Bungau

WP3- Low background facilities

M. LaubensteinN. FerrariC. TomeiM. BalataS. Shoenert H. Simgen

J.L. ReyssPh. HubertD. Lalanne

J.A. VillarJ. AmareM.L. SarsaJ.M. CarmonaM. MartinezJ. Ruz

S. PalingR. LuscherN. SmithC. BungauJ. McMillan

WP4- Radiopurity of the materials

L. Miramonti A. IanniB. CaccianigaM. Laubenstein C. TomeiJ. Kisiel

P. LoaizaC. GoldbachP. HubertR GurriaranC. Marquet

J. PuimedonM.L. SarsaJ.M. CarmonaL. Torres

S. PalingJ. McMillanJ. LewinB. Camanzi

Page 8: Present status  Work in progress

88ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

First JRA1 General MeetingFirst JRA1 General Meeting

Held in Held in September 10September 10, in Edinburgh, in Edinburgh

Participants:Participants: LNGSLNGS Nicola Ferrari, Claudia Tomei, Lino Miramonti, Nicola Ferrari, Claudia Tomei, Lino Miramonti,

Matthias LaubensteinMatthias Laubenstein IUSIUS Neil Spooner, Vitaly Kudryavtsev, Alex MurphyNeil Spooner, Vitaly Kudryavtsev, Alex Murphy LSMLSM Gilles Gerbier, Pia LoaizaGilles Gerbier, Pia Loaiza LSCLSC Julio Morales, José Manuel Carmona, Gloria Luzón, Julio Morales, José Manuel Carmona, Gloria Luzón,

Susana Cebrián, María Martínez, Lidia Torres,Susana Cebrián, María Martínez, Lidia Torres,Igor G. IrastorzaIgor G. Irastorza

ReviewReview of JRA1 goals of JRA1 goals

WP WP presentationspresentations by coordinators of the activities by coordinators of the activities Set-up of the working groupsSet-up of the working groups Review of present status of the JRA1 activitiesReview of present status of the JRA1 activities Review of the goals for each WPReview of the goals for each WP Proposed actionsProposed actions

Page 9: Present status  Work in progress

99ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

JRA1: status of the activityJRA1: status of the activity

The official web page of the JRA1 activity has been The official web page of the JRA1 activity has been set-up. It contains:set-up. It contains:

A description of the JRA1 activity and general documentsA description of the JRA1 activity and general documents JRA1 list of participantsJRA1 list of participants Information on next and previous meetingsInformation on next and previous meetings Working group pagesWorking group pages: participants, documents, evolution : participants, documents, evolution

of the activities…of the activities…

http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 10: Present status  Work in progress

1010ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 11: Present status  Work in progress

1111ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 12: Present status  Work in progress

1212ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 13: Present status  Work in progress

1313ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP´s activitiesWP´s activities

Page 14: Present status  Work in progress

1414ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP1 activitiesWP1 activities((Background measurements in the deep Background measurements in the deep

underground sites)underground sites) Completed & undergoing activitiesCompleted & undergoing activities

• Collecting existing data from each laboratory onCollecting existing data from each laboratory on

neutron background, environmental gammas, radio neutron background, environmental gammas, radio purity of rock, concrete, etc…, radon monitoring (in air, water, …), purity of rock, concrete, etc…, radon monitoring (in air, water, …), muon fluxesmuon fluxes

• Reports on these measurements are being collected by WP1 Reports on these measurements are being collected by WP1 coordinatorcoordinator

• Prepare contents for WP1 web page to be located on the main web Prepare contents for WP1 web page to be located on the main web page of JRA1 at LSCpage of JRA1 at LSC

• Survey of environmental gamma-ray background (all labs; Survey of environmental gamma-ray background (all labs; undergoing at LNGS, and undergoing at LNGS, and Boulby with TARI project)Boulby with TARI project)

• Measurement of radiopurity of rock, concrete, etc... (all labs; Measurement of radiopurity of rock, concrete, etc... (all labs; undergoing at LNGS, LSC, ---)undergoing at LNGS, LSC, ---)

Page 15: Present status  Work in progress

1515ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP1 activitiesWP1 activities((Background measurements in the deep Background measurements in the deep

underground sites)underground sites)

Neutron monitoring at the underground laboratoriesNeutron monitoring at the underground laboratories

• At LNGS a new measurement will be started by a Pavia INFN group in At LNGS a new measurement will be started by a Pavia INFN group in the next monthsthe next months

• A group from Baksan is interested to start a collaboration with ILIAS A group from Baksan is interested to start a collaboration with ILIAS for the measurement of neutron backgrounds with 3He liquid scintillator for the measurement of neutron backgrounds with 3He liquid scintillator detectordetector

• The same measurements will follows for other labs (TARI)The same measurements will follows for other labs (TARI)

• Collecting existing data from each laboratory onCollecting existing data from each laboratory on

neutron background, environmental gammas, radio neutron background, environmental gammas, radio purity of rock, concrete, etc…, radon monitoring (in air, water, …), purity of rock, concrete, etc…, radon monitoring (in air, water, …), muon fluxesmuon fluxes

• Rn monitoring in the air and water (ongoing since a few years at Rn monitoring in the air and water (ongoing since a few years at LNGS; soon at LSM, LSC, IUS)LNGS; soon at LSM, LSC, IUS)

Page 16: Present status  Work in progress

1616ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP2 activitiesWP2 activities((Background simulations)Background simulations)

Completed & undergoing activitiesCompleted & undergoing activities

• At IDM04 a At IDM04 a joint meetingjoint meeting of of N3N3 BSNS and BSNS and JRA1JRA1 WP2 activities was WP2 activities was held, and work by every group presented and discussedheld, and work by every group presented and discussed

• A A mailing distribution listmailing distribution list has been created to optimize exchange of has been created to optimize exchange of ideas (info: ideas (info: http://webmail.unizar.es/mailman/listinfo/montecarlohttp://webmail.unizar.es/mailman/listinfo/montecarlo))

• An An FTP repositoryFTP repository for codes with (restricted) access through main for codes with (restricted) access through main JRA1 web page has been created (info: JRA1 web page has been created (info: [email protected]@unizar.es))

•Groups have been asked by WP coordinators to elaborate a Groups have been asked by WP coordinators to elaborate a reportreport on on the simulation codes they are using (comments, …)the simulation codes they are using (comments, …)

Next projectsNext projects

• Comparison of codes; problems, bug and open questions detectedComparison of codes; problems, bug and open questions detected

• Preparation of a first set of Monte Carlo libraries for background Preparation of a first set of Monte Carlo libraries for background simulationssimulations

• Design of strategies to compare results with experimental dataDesign of strategies to compare results with experimental data

Page 17: Present status  Work in progress

1717ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP3 activitiesWP3 activities((Low background facilities)Low background facilities)

Completed & undergoing activitiesCompleted & undergoing activities

• LNGS operates very low background Ge detectors developed by a LNGS operates very low background Ge detectors developed by a collaboration between MPI and Canberracollaboration between MPI and Canberra

• A facility for electroforming copper at LSC is under developmentA facility for electroforming copper at LSC is under development

• Reports on low background facilities at each underground laboratory Reports on low background facilities at each underground laboratory are in preparationare in preparation

• The laboratory for low-level radioactivity measurements at LNGS was The laboratory for low-level radioactivity measurements at LNGS was presented by M. Laubenstein (see JRA1 web page)presented by M. Laubenstein (see JRA1 web page)

Next projectsNext projects

•To initiate the development of ultra-low background detectors, with the To initiate the development of ultra-low background detectors, with the establishment of a prototype for the growth of detector crystalsestablishment of a prototype for the growth of detector crystals

• A program of A program of cross calibrationcross calibration of the Ge detectors in the different labs of the Ge detectors in the different labs is under consideration through an exchange of reference materials. The is under consideration through an exchange of reference materials. The consistency of data on radioactive contamination obtained by the consistency of data on radioactive contamination obtained by the different labs will then be checked.different labs will then be checked.

Page 18: Present status  Work in progress

1818ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Completed & undergoing activitiesCompleted & undergoing activities

• A web page (A web page (http://www-lsm.in2p3.fr/ilias/ilias.htmlhttp://www-lsm.in2p3.fr/ilias/ilias.html) has been set-up to ) has been set-up to contain a data base on radio-purity of materials. It will be linked to the JRA1 contain a data base on radio-purity of materials. It will be linked to the JRA1 main site.main site.

• Coordinators from each lab will collect data from measured materialsCoordinators from each lab will collect data from measured materials

0.001 0.001 ± ± 0.0000.00099

0.03 0.03 ± ± 0.010.01

<0.2<0.2<0.3<0.3<0.12<0.12< 0.3< 0.3VA VA 00105001056363

OFHCOFHCCooperCooper

5454MnMn5757CoCo6060CoCo4040KK137137CsCs210210PbPb235235UU208208TlTl212212PbPb228228AcAc214214BiBi214214PbPb234234Th Th

232232Th seriesTh series 238238U seriesU series

Radionuclide concentration in dpm/kg Radionuclide concentration in dpm/kg

ProvideProviderr

and and RefRef

TypeTypeMateriMaterialal

Mea

sure

d by

ED

EL

WE

ISS

Typ

e of

de

tect

or

Ge,

typ

e n

, 2

00

cc

@ L

SM

WP4 activitiesWP4 activities((Radio-purity of the materials)Radio-purity of the materials)

Page 19: Present status  Work in progress

1919ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

JRA1- LBT-DUS: Low Background Techniques for Deep Underground Science

Total Duration : 48 months quantities are in K€

#1&2 #3 #4 #5LSM LNGS LSC IUS All Labs

Travel & subs Task 1 9 32 5 7 53Travel & subs Task 2 5 8 9 4 26Travel & subs Task 3 3 5 3 3 14Travel & subs Task 4 3 5 3 3 14Consumables for Task 1, Task 3, and Task 4 0 0 0 0 0New Equipment for Task 1 15 10 12 10 47Upgrade computing infrastructures Task 2 10 10 6 5 31Install/upgrade ULBF task 3 - Durable equipement 135 150 132 25 442Install/upgrade ULBF task 3 - Prototypes 0 0 0 15 15Post doc fellowship for Task 1 0 120 0 0 120Post doc fellowship for Task 2 0 0 120 0 120Post doc fellowship for Task 3 0 80 0 0 80Post doc fellowships for Task 4 120 0 0 120 240Technical support Task 1, Task2 and Task 4 0 0 0 0 0Technical support Task 3 0 0 62 0 62JRA1 EB meetings 5 6 6 4 21General LBT-DUS meetings 12 27 12 12 63

TOTAL 317 453 370 208 1348Overheads (mainly administration) 28 90 73 41 232

Total costs 345 543 443 249 1580

Page 20: Present status  Work in progress

2020ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

JRA1- LBT-DUS: Low Background Techniques for Deep Underground Science

BUDGET by LAB and year

LSM LNGS LSC IUS1 2 3 4 Tot 1 2 3 4 Tot 1 2 3 4 Tot 1 2 3 4 Tot

Travel & subs Task 1 2,0 3,5 3,5 0,0 9,0 6,0 12,0 12,0 2,0 32,0 1,0 2,0 2,0 0,0 5,0 2,0 2,5 2,5 0,0 7,0Travel & subs Task 2 1,0 2,0 2,0 0,0 5,0 2,0 3,0 3,0 0,0 8,0 2,0 3,5 3,5 0,0 9,0 1,0 1,5 1,5 0,0 4,0Travel & subs Task 3 1,0 1,0 1,0 0,0 3,0 1,0 2,0 2,0 0,0 5,0 1,0 1,0 1,0 0,0 3,0 1,0 1,0 1,0 0,0 3,0Travel & subs Task 4 1,0 1,0 1,0 0,0 3,0 1,0 2,0 2,0 0,0 5,0 1,0 1,0 1,0 0,0 3,0 1,0 1,0 1,0 0,0 3,0Consumables for Task 1, Task 3, and Task 4 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0New Equipment for Task 1 10,0 5,0 0,0 0,0 15,0 5,0 5,0 0,0 0,0 10,0 6,0 6,0 0,0 0,0 12,0 5,0 5,0 0,0 0,0 10,0Upgrade computing infrastructures Task 2 5,0 5,0 0,0 0,0 10,0 5,0 5,0 0,0 0,0 10,0 3,0 3,0 0,0 0,0 6,0 5,0 0,0 0,0 0,0 5,0Install/upgrade ULBF task 3 - Durable equipement 50,0 50,0 35,0 0,0 135,0 50,0 50,0 50,0 0,0 150,0 50,0 50,0 32,0 0,0 132,0 7,5 7,5 10,0 0,0 25,0Install/upgrade ULBF task 3 - Prototypes 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 7,5 7,5 0,0 0,0 15,0Post doc fellowship for Task 1 0,0 0,0 0,0 0,0 0,0 20,0 40,0 40,0 20,0 120,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0Post doc fellowship for Task 2 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 20,0 40,0 40,0 20,0 120,0 0,0 0,0 0,0 0,0 0,0Post doc fellowship for Task 3 0,0 0,0 0,0 0,0 0,0 0,0 40,0 40,0 0,0 80,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0Post doc fellowships for Task 4 20,0 40,0 40,0 20,0 120,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 20,0 40,0 40,0 20,0 120,0Technical support Task 1, Task2 and Task 4 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 30,0 32,0 0,0 0,0 62,0 0,0 0,0 0,0 0,0 0,0Technical support Task 3 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0JRA1 EB meetings 1,5 1,5 1,0 1,0 5,0 2,0 2,0 1,0 1,0 6,0 2,0 2,0 1,0 1,0 6,0 1,0 1,0 1,0 1,0 4,0General LBT-DUS meetings 4,0 4,0 4,0 0,0 12,0 9,0 9,0 9,0 0,0 27,0 4,0 4,0 4,0 0,0 12,0 4,0 4,0 4,0 0,0 12,0

TOTAL 95,5 113,0 87,5 21,0 317,0 102,0 172,0 162,0 27,0 453,0 120,0 144,5 84,5 21,0 370,0 56,0 73,0 64,0 25,0 208,0Overheads (mainly administration) 8,0 9,5 8,5 2,0 28,0 20,0 34,0 31,5 4,5 90,0 24,0 28,5 16,5 4,0 73,0 11,0 14,0 12,0 4,0 41,0

Total costs 103,5 122,5 96,0 23,0 345,0 122,0 206,0 193,5 31,5 543,0 144,0 173,0 101,0 25,0 443,0 67,0 87,0 76,0 29,0 249,0

Page 21: Present status  Work in progress

2121ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Expected cost before Apr 2005Expected cost before Apr 2005

INFN used money (Sept-04)INFN used money (Sept-04)INFN Budget Used Available Travels 21000 1000 20000 Equipment, consummables and prototypes 60000 12000 48000 Total 81000 13000 68000

Travels Topical workshops on separate WP Background measurements at LNGS

5000 10000

Equipment, consummables and prototypes

Large Crystal for gamma ray background monitoring (Costs for installation of “Baksan” neutron detector at LNGS) Electronics and consummables for n and gamma ray detectors System for 3H enrichment Multiparametric DAQ for Ge/NaI

25000 (15000)

4000 15000 9000

Total 68000 Personnel 3 years post doc position C. Tomei (expected start Nov-04) 15000

Page 22: Present status  Work in progress

2222ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

LSC Budget Used Available Travels 11,000 3,400 7,600 Equipment, consummables and prototypes 59,000 0 59,000 Total 70,000 66,600 Personnel 50,000 0 50,000

Travels Topical workshops on separate WP Background measurements at LNGS (participation)

4,000 3,000

Equipment, consummables and prototypes

Upgrade computing facilities for Task 2 Complete ULBF at LSC (2 HpGe + 1 NaI + ACQ sys + shield)

6,000 54,000

Total 67,000 Personnel 1st. year post doc position (expected start Jan-Mar 05) 40,000 1st. year post tech. support (expected start Jan-Mar 05)? 30,000 Total 70,000

Expected cost before Apr 2005Expected cost before Apr 2005

LSC used money (Sept-04)LSC used money (Sept-04)

Page 23: Present status  Work in progress

2323ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

LSM expected cost before Apr 2005LSM expected cost before Apr 2005

Total available CEA+CNRS : Total available CEA+CNRS : 129 k€129 k€Projected expenses : Projected expenses : 129 k€129 k€

•post doc post doc 30 k€ 30 k€

•support for one techsupport for one tech 11 k€ 11 k€

•equipment to buy :equipment to buy : anti-radon system (can be done asap if anti-radon system (can be done asap if OK)OK) 42 k€ 42 k€ planar Germaniumplanar Germanium

24 k€ 24 k€ •consumables (electronics, acquisition...)consumables (electronics, acquisition...)

16 k€ 16 k€•T&S (about 15 travels of .4 k€ in France T&S (about 15 travels of .4 k€ in France and out)and out) 6 k€ 6 k€