daisy4offshore - winddays€¦ · sn002 99565-003-524b1.1 inspection results 12-02-2014 e. de plaa...

13
4OFFSHORE DAISY4OFFSHORE WindDay Conference 14 June 2017

Upload: ngonhan

Post on 25-Apr-2018

221 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

4OFFSHORE

DAISY4OFFSHOREWindDay Conference 14 June 2017

Page 2: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

22

» Wind parks that can be exploited without

subsidies (i.e. better performance @lower cost)

» Integrated control room for O&M

» Independent, open measurement system

» Independent wind turbine cluster

» Predictive performance, maintenance, lifetime

and business case

Dutch windturbine

maintenance cluster

Goal

World Class Wind Turbine Maintenance

Page 3: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

33

Independent, pro-active asset & maintenance management,

driven by knowlegde, experience and real time information on turbine status

fact based continous optimiseing of operations and maintenance

MAINTENANCE

MAINTENANCE &ASSET MANAGEMENT SYSTEEM

Welcome J. Prinsloo

IMMS Android AppAsset Management Specialist Edition

V1.0Welcome J. Prinsloo

WIND TURBINE MANAGEMENT DASHBOARD

Data

Informatie

Data

DATA MANAGEMENT

Data

MAINTENANCE &ASSET MANAGEMENT SYSTEEM

Informatie

IMMS Maintenance ManagerAsset Management Specialist Edition

V1.0Welcome J. Prinsloo

OLAZ IIVestas V47, 660kWSN00299565-003-524B1.1

Inspection results12-02-2014E. de Plaa

Gearbox WG 20140113

Page 4: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

Sensors

OPC and other data

Asset management

Dashboard and reports

Decision support modules

Maintenance Management

4OFFSHORE

Page 5: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

55

Results• 0-measurement with DAISY @

commisioning phase Nordex

• Data in DAISY database

• Monitoring operational performance

• Owners inspections with DAISY

• Real time condition monitoring

• Data in DAISY database

• Monitoring operational performance

• Owners inspections with DAISY

• Asset & maintenance management

Kreekrak

OLAZ

• Real time condition monitoring

• Data in DAISY database

• Monitoring operational performance

• Owners inspections with DAISY

• Asset & maintenance management

EPZ

• Real time condition monitoring

• Data in DAISY database

• Monitoring operational performance

• Owners inspections with DAISY

• Asset & maintenance management

Anna-Mariapolder

performance monitoring

Predictive business case

15% performance improvement

25% lower maintenance costs

Predictive business case

Lower maintenance costs

Higher availability

Predictive business case

Lower maintenance costs

Higher availability

Predictive business case

www.daisy-solutions.com

Page 6: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

66

Lessons Learned

Amalia Windpark Eneco

• Data driven way of working requires a transition, but pays off• New value chain required and new alliances• Fully automated predictive maintenance requires a lot of data, time• Optimising offshore logistics is a challenge, but first steps are made• Human in the loop is needed• Pilots with real turbines can make the difference

Page 7: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …
Page 8: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

The valley of death…

Living Lab

Fieldlab

Page 9: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …
Page 10: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

Aspirant

Aspirant

P

M

I

L

H

Chemelo, Sitech

IFFFUJI

Dow

Sabic

Boskalis

Marine

Tata

Wagenborg

RWS

Strukton

Schiphol

Vanderlande

Thales

ASML

Aviolanda

Nedtrain

Concordia

ProvincieGelderland

WaterschapVechtstromen

Vroon

Alliander/Enexis

M

Towards zero downtime…

ZEPHYROS

Page 11: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

ZEPHYROS

WCM FIELDLAB FOR OPTIMIZED LOGISTICS, OPERATIONS AND MAINTENANCE FOR OFFSHORE WIND PARKS

Page 12: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

ZEPHYROSWCM FIELDLAB FOR OPTIMIZED LOGISTICS, OPERATIONS AND MAINTENANCE FOR OFFSHORE WIND PARKS

DEVELOPMENTS TO BE EXPECTED IN OPERATE & MAINTAIN IMPROVEMENTS IN WEATHER FORECASTING AND ANALYSIS INTRODUCTION OF TURBINE CONDITION-BASED MAINTENANCE STRATEGIES IMPROVEMENTS IN OMS STRATEGY FOR FAR-OFFSHORE WIND FARMS IMPROVEMENTS IN PERSONNEL TRANSFER AND ACCESS INTRODUCTION OF REMOTE AND AUTOMATED MAINTENANCE INTRODUCTION OF WIND FARM-WIDE CONTROL STRATEGIES SUPPLY CHAIN OPPORTUNITIES AND JOB CREATION(IRENA OUTLOOK OFFSHORE WIND 2016)

Page 13: DAISY4OFFSHORE - WindDays€¦ · SN002 99565-003-524B1.1 Inspection results 12-02-2014 E. de Plaa Gearbox WG 20140113. Sensors OPC and other data Asset management Dashboard and …

ZEPHYROSWCM FIELDLAB FOR OPTIMIZED LOGISTICS, OPERATIONS AND MAINTENANCE FOR OFFSHORE WIND PARKS

• OPTIMIZATION BY INTEGRATION (CONTROL TOWER PHILOSOPHY)

• THREE-PRONGED APPROACH (RESEARCH, LIVING LABS, TEACHING & TRAINING)

• TARGET AUDIENCE:• ASSET OWNERS• ASSET MANAGERS• SERVICE PROVIDERS• KNOWLEDGE INSTITUTES• EDUCATIONAL INSTITUTIONS• OEM’S•

Join thisWCM

Fieldlab