Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenari for the U.S. Eastern Interconnection Dale Osborn 10:30 AM Friday June 12

Upload: christine-thulani

Post on 31-Dec-2015

21 views

Category:

Documents


2 download

DESCRIPTION

Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenario for the U.S. Eastern Interconnection. Dale Osborn 10:30 AM Friday June 12. 2. 3. NREL Eastern Wind Integration Transmission Study Data. 4. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Dale Osborn 10:30 AM Friday June 12

Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenario

for the U.S. Eastern Interconnection

Dale Osborn

10:30 AM Friday June 12

Page 2: Dale Osborn 10:30 AM Friday June 12

2

Page 3: Dale Osborn 10:30 AM Friday June 12

3

Page 4: Dale Osborn 10:30 AM Friday June 12

4

NREL Eastern Wind Integration Transmission Study Data

Page 5: Dale Osborn 10:30 AM Friday June 12

• Transmission planning to date has been focused on meeting National Electric Reliability Corp. reliability standards. Deterministic criteria based on the loss of lines and resources ( generators).– Minimum capital for transmission– Not necessarily the minimum cost to the customer

• Energy markets added constraints that allow mainly gas generation to provide reliable service by relieving constraints by locating in higher priced areas

• Wind energy and other types of generation generally need transmission to gain access to higher priced areas and be able to compete.

Reliability (Capacity) vs. Economic Transmission Expansion

5

Page 6: Dale Osborn 10:30 AM Friday June 12

6

Page 7: Dale Osborn 10:30 AM Friday June 12

7

Page 8: Dale Osborn 10:30 AM Friday June 12

20% Wind Energy Scenario

Without and With the JCSP

Overlay

Annual Generator Location Marginal Prices

8

Page 9: Dale Osborn 10:30 AM Friday June 12

JCSP PROMOD outputs - July 22, 2008

11

9

Page 10: Dale Osborn 10:30 AM Friday June 12

Potential BenefitsAdjusted Production Costs

$35B/Yr

PJM14%

MISO10%

SERCNI25%

ISO-NE10%

NYISO13%

E_CAN12%

IMO3%

MHEB3%

SPP4%

TVASUB6%

MAPP0%

10

Page 11: Dale Osborn 10:30 AM Friday June 12

11

Page 12: Dale Osborn 10:30 AM Friday June 12

Joint Coordinated System Plan Overlay

12

Page 13: Dale Osborn 10:30 AM Friday June 12

20% Wind Energy Scenario

Without and With the JCSP

Overlay

Annual Generator Location Marginal Prices

13

Page 14: Dale Osborn 10:30 AM Friday June 12

14