Page 1: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

New Trend of Power Distribution and Monitoring System in Data Centers

Data Center Solutions Day, 5 July 2013, by NS Koh

From Mainboard to Racks

Page 2: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

Data Center - Power OutageFrom Mainboard to Racks

In data centre, the power or system availability usually has to be guaranteed on a permanent basis. System downtime represents a high financial loss.According to Gartner Research, costs associated to downtime are:

Productivity lossRevenue lossDamaged reputationImpaired financial performanceOther expenses

Page 3: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11. Juli 2013 | Slide 3

PDU is a centralize concept for power distribution to data rack

Massive cabling work b/t PDU & data rack.

Two source are required for redundancy with integrated BCM

New cabling work is required for data rack expansion

Uncertainty & great challenge to perform shutdown at rack level & it is time consuming for maintenance & upgrading.

From Mainboard to RacksData Center – Facts Related to Power Distribution

Page 4: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11. Juli 2013 | Slide 4

Distributed PDU concept with more than 2 source to each data rack for resilience & redundancy

No cabling work or shut down required for additional data racks at any location inside the data hall.

Free choice of MCBs or RCBOs with trip signal contact at each data rack and integrated BCM.

No additional cost impact

The solution is : Smissline TP BusbarTrunking system.

From Mainboard to RacksData Center – New Trend

Page 5: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Overview : Smissline TP

Devices with a busbar system8 busbar system with 3-phase, 2-neutral, 1-earth & 2-signal busbar

MCB, RCCB/RCBO, Isolator, Motor starter, Surge arrester,

CMS Branch Circuit Monitoring system

Page 6: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11 July 2013 | Slide 6

SMISSLINE, everything is possible:1, 2, 3 and 4-pole devices with or without auxiliary/signal contacts can be arranged in any sequence.

In Comparison to DIN rail mounting

DIN rail: It is important to know which device is being fitted on which busbar

The order of the devices is determined by the busbar

The length of the busbar is limited

From Mainboard to Racks Installation - Mix-phase Installation

Page 7: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11 July 2013 | Slide 7

Flexible installation length with or without starter kits possible from 6-module to 220-module (4 meter)

SMISSLINE TPFlexibility with 2 m length busbar

From Mainboard to Racks Mounting - 4 meter Long Busbar

Page 8: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11. Juli 2013 | Slide 8

Plug contacts can be moved easily between L1, L2 and L3 for load balancing

Facilitate mix pole installation

Allow zone protection devices to install at designated location.

From Mainboard to Racks Load Balancing - Adjustable Contact & Phase Indicator

Page 9: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11. Juli 2013 | Slide 9

Time and cost-efficient

Wiring is already integrated in the plug-in socket system

Clear view of arrangement in the control cabinet because no Incoming wiring and no less terminals

No other system has an integrated signalling busbar system.

LA

LB

From Mainboard to Racks Signalling – Signal Busbars

Page 10: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Sub-assemble - LEGO Concept

Page 11: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Safety – Hotswap

SMISSLINE TPConventional

Page 12: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Safety Certificate : BG ETEM & electro suisse

Page 13: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11. Juli 2013 | Slide 13

CMS1P, 1P+N, 2P, 3P or 3P+N at 1 meter

Current rating up to 160A

Very Low cost

Normally not type tested

Not for mix phase with auxiliary/signal contact or accessories installation

Air insulated 2 mm clearance between busbars.

Performance very much depend on the skill of the installer.

From Mainboard to RacksBCM – Branch Circuit Monitoring

Page 14: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

~2 mm Creepage(clearance) distance too close (flashover)

© ABB Group 11. Juli 2013 | Slide 14

Comb Busbar1P, 1P+N, 2P, 3P or 3P+N at 1 meter

Current rating up to 160A

Very Low cost

Normally not type tested

Not for mix phase with auxiliary/signal contact or accessories installation

Air insulated 2 mm clearance between busbars.

Performance very much depend on the skill of the installer.

From Mainboard to Racks Conventional – Busbar System

Page 15: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11. Juli 2013 | Slide 15

Load Centre or Fishbone busbar1P+N, 3P and 3P+N, up to 250A

May have type tested

Vertical mounting with limited connection ways

Single feed/incoming only

Not for mix phase installation with auxiliary/signal contact or accessories

Air insulated range from 5 to 8 mm clearance between busbars.

Better performance than comb busbar

From Mainboard to Racks Conventional – Busbar System

5 to 8 mm clearance

Page 16: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks New Trend – Busbar System

Smissline TP• Multi-phase 8 busbar system for any

phase & accessories combination. • IP20 Touch Proof • Up to 200A current rating• 2-signal busbar for control signal• 13mm clearance b/t Line busbar with

Individual compartment to prevent busbar flashover.

Solid Insulation Wall

Page 17: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

© ABB Group 11 July 2013 | Slide 17

© ABB Group 11 July 2013 | Slide 17

From Mainboard to Racks PDU Test Certificate – 50KA to IEC61439-2

Data centre, UPS Systems

Healthcare (Hospital, Labs, …)

Education (University, …)

Marine Industry

Banking & Finance

Insurance company

Internet & Telecom

Radio and TV transmission

Shopping mall

Airports

Page 18: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Conventional Distribution

Page 19: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

Incoming feeder box

Individual Tap Off

From Mainboard to Racks New Trend of Distribution

Page 20: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

Incoming feeder box

From Mainboard to Racks Smissline TP Busbar Trunking

AB

A

B

Page 21: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Smissline Busbar Trunking

Conventional Design for 6 PDUNo. of Rack : 360No. of Circuit : 720No. of Cable : 2160 (4mm2 L,N,E)PDU Size : 3.0m

Busbar Truncking System for 6 PDUNo. of Rack : 360No. of Circuit : 36No. of Cable : 144 (35mm2 , L,N,E)PDU Size : 0.80mBusbar Trunking : 210m (A+B

source)

Total saving: Upto 25% installation cost

Page 22: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

From Mainboard to Racks Smissline TP Busbar Trunking

Single & Multi Source Busbar system

Integrated Branch Circuit Monitoring

Hot Swap & pluggable

Superior in Availability & Agility

Cost Saving in Cable work

1.20 meter (Standard) to 4 meter long

18mm Tapoff Space, 7 to 20 modules

Up to 200A, 230/400V, 250DC

Page 23: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From

Smissline TP Busbar Truncking Live Demo

Page 24: Data Center Solutions Day, 5 July 2013, by NS Koh …...New Trend of Power Distribution and Monitoring System in Data Centers Data Center Solutions Day, 5 July 2013, by NS Koh From