Pacific Gas and Electric Company Semimonthly Status Report No.'4 Diablo Canyon Verification Program August 26, 1983 SUMMARY j t This is PGandE's forty-fourth Semimonthly Status Report which summarizes the progress of the design verification program from August 9, 1983, through August 22, 1983. The Teledyne Engineering Services (TES) Independent Design Verification Program ( Independent Program or IDVP) has identified 328 items to date.'f the 328 items, 313 completion reports (211 Phase I,'02 Phase II and CgA) have been issued, 6 Phase I reports require action by PGandE, and 9 Phase I reports require action by the Independent Program. Starting with this report, Tables 6 and 7 have been included to summarize ITRs that have been issued and EOIs that have been closed, respectively, since June 30, 1983. PGandE's Internal Technical Program has identified a total of 41 open items to date. Twenty-three of the 41 open items have been closed by PGandE. One new open item was identified during this report period. 8309060284 830826. PDR ADOCK OS000275 R PDR 0003L/0005P-(2)

Upload: others

Post on 12-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Pacific Gas and Electric Company

Semimonthly Status Report No.'4Diablo Canyon Verification Program

August 26, 1983

SUMMARY

jt

This is PGandE's forty-fourth Semimonthly Status Report which summarizes the

progress of the design verification program from August 9, 1983, through

August 22, 1983.

The Teledyne Engineering Services (TES) Independent Design VerificationProgram ( Independent Program or IDVP) has identified 328 items to date.'fthe 328 items, 313 completion reports (211 Phase I,'02 Phase II and CgA) have

been issued, 6 Phase I reports require action by PGandE, and 9 Phase I reports

require action by the Independent Program.

Starting with this report, Tables 6 and 7 have been included to summarize ITRs

that have been issued and EOIs that have been closed, respectively, since

June 30, 1983.

PGandE's Internal Technical Program has identified a total of 41 open items to

date. Twenty-three of the 41 open items have been closed by PGandE. One new

open item was identified during this report period.

8309060284 830826.PDR ADOCK OS000275R PDR

0003L/0005P-(2)

l j

STATUS OF INDEPENDENT PROGRAM

This section provides the status of items identified in the Independent

Program.

Status of Inde endent Pro ram

A. Phase I

The items identified by the Independent Program are described in

appropriate Independent Program progress reports. A list of the

Independent Program items is given in Attachment I, together with a

brief indication of the status of each item. A summary of Attachment

I is given in Table 1. In addition, Attachment IA indicates the

Project status, including the expected Project resolution date, foreach of the items that have not been issued as a Completion Report.

B. Phase II and Construction l}uality Assurance

I

The Independent Program has identified certain items related to Phase

II. These items are listed in Attachment II with file numbers in the

„ 6000 and 8000 se'ries. Further, R. F. Reedy has identified certain

items as a result of'its Phase II quality assurance verificationefforts. These items are listed in Attachment II with file numbers

in the 7000 series. In addition, Attachment IIA indicates the

Project status, including the expected Project resolution date, foreach of the items that have not been issued as a Completion Report.

In addition to the Phase I and Phase II efforts, PGandE has

voluntarily undertaken a construction quality assurance (CgA) review

effort. As a result of this effort, CgA items have been identified;they are listed in Attachment II with file numbers in the 9000 series.

A summary of Attachment II is included in Table l.

0003L/0005P-(3)

tq

0

Inde endent Pro ram Re uests For Information

Responses to 1378 out of 1396 requests for information by the

Independent Program have been transmitted to the IDVP. The remaining

18 requests are listed in Attachment III.

0003L/0005P-(4)

STATUS OF INTERNAL TECHNICAL PROGRAM

~ ~

~

~

~ ~ ~

~

This section describes the status of work in PGandE's Internal Technical

Program being performed in addition to the Independent Program.

Status reporting for the piping and pipe support design review is provided in

Table 2. Status reporting for the civil/structural design review is provided

in Table 3. The status of plant modifications is provided in Table 4. A

discussion of the progress of engineering and construction activities is also

provided.

Status of Internal Technical Program

The discussions below summarize the status of work for each area

indicated.

A. Containment and Internals

Confirmatory analysis for the latest pipe support loads iscontinuing. The analytical model of the entire annulus structure iscomplete. Hanger loads are being applied to the model.

B. Auxiliary Buildin

All member evaluations have been reported in the Phase I Report

(June 20, 1983). Additional confirmatory analyses are being

performed.

C. Fuel Handlin Buildin

Design of modifications for the fuel handling building is complete.

The analysis of the building to reflect minor differences between

design and as-built conditions is in progress.

0003L/0005P- (5 )

1

r

P

1l

V)I P

~Tbi 8 iiCh

Member evaluation to account for current Class I pipe support loads

is continuing. All other engineering is'complete.

For the case of the crane loaded and operating, the building analysis

is essentially complete. Member evaluations are in progress.

E. Intake Structure

Engineering for the intake structure is complete.

F. Pi e Ru ture Restraints

The pipe rupture restraint review is nearly complete. Restraintmodifications are currently being issued. Evaluation for restraintswith pipe hanger loads is partially complete. The test program forsplit wedge nuts and couplings is in its final phase.

G. Pi in and Pi e Su orts

The stress analysis work for large bore piping is essentiallycomplete; some minor rework is in progress to address specificsituations, response spectra revisions, or field changes. Large bore

pipe support design work is essentially complete. Some minor work isin progress to recheck designs and make minor modifications as a

result of the latest spectra changes for the annulus and turbine

building.

The stress analysis work for small bore piping is also essentiallycomplete with very little work remaining. Minor modification work

and final review of small bore pipe supports is in progress.

0003L/0005P-(6)

H. E ui ment Seismic Desi n Review

1. Mechanical Equi pment

The seismic design review for all Design Class I mechanical

equipment within the PGandE design scope has been completed

based on nozzle loads and spectra available June 30, 1983. The

review is now being updated as necessary, to incorporate the

latest loads, spectra, and as-built information.

2. Electrical Equipment and Instruments

All PGandE scope equipment reviews are essentially complete.

Minor rechecking for the latest turbine and auxiliary buildingspectra is in progress.

3. Heating, Ventilating, and Air Conditioning Equipment

All Design Class I HVAC equipment is being analyzed or tested tomeet design requirements using the latest spectra.

I. Electrical Racewa Su orts

The previous qualification of raceway supports has been reviewed forthe revised turbine building spectra. Final modifications have been

sent to the field.

J. HVAC Ducts and Su orts

All modifications to the HVAC duct supports required for Step 1 have

been designed and issued for construction.

K. Instrumentation Tubin and Tubin Su orts

All engineering associated with instrumentation tubing and tubing

suppor ts is essentially complete.

0003L/0005P-(7)

t

j h J

Status of ITP Review Activities Associated with IDVP AdditionalVerification

A. Power Supplies for Shared Systems

The Diablo Canyon Project (DCP) has provided all informationrequired by Stone and Webster Engineering Corporation (SWEC).

The IDVP issued ITR-45, Rev. 0, dated May 17; 1983, closing thisarea of additional verification.

B. Selection of System Design Conditions

Pressure, temperature, and pressure differential information forthe main steam and component cooling water systems have been

provided to SWEC. All work associated with the original EOIs,

including construction modifications, has been completed. The

DCP is continuing with pressure/ temperature review of allsystems as indicated in ITR-34, Rev. 1, Section 4.2. The IDVP

issued ITR-46, Rev. 0 dated June 27, 1983 closing this area ofadditional verification.

C. High-energy Line Break Outside Containment

Final results of the analyses for all areas have been sent toSWEC. The IDVP issued ITR-47, Rev. 0 dated June 27, 1983,

closing this area of additional verification.

D. Jet Impingement Analysis Inside Containment

Approximately 95% of the jet impingement review by the DCP has

been completed. SWEC has sampled the work, walked down the

systems, and issued. ITR-48, Rev. 0 dated July 27, 1983,

closing this area of additional verification.

0003L/0005P-(8)

E. Circuit Separation

All circuit separation work has been completed. The IDVP issued

ITR-49, Rev. 0 dated June 23, 1983, closing this area ofadditional verification.

Project Status and Schedule

The status of the Project's work is presented in Tables 3 and4.'n

August 24, 1983, the Project informed the Atomic Safety and

Licensing Appeal Board that fuel loading is now scheduled for October

7, 1983;

IV. 0 en Item Status

To date, a total of 41 open items (OIs) have been identified by

PGandE (Attachment IV); Twenty-three open items generated by the

Internal Technical Program have been closed by PGandE. One new open

item was identified during this report period;

A. ~NO I

Raceway Su ort Boltin Requirements (0 en Item Ho. 41)

This open item involves the adequacy of bolt tighteningrequirements and slip capacity of bolted connections (as statedin the manufacturer's catalog) in the track of galvanized

Superstrut material used to support Class I raceways.

John B. och

Diablo Cany r ojec anager

0003L/0005P-(9)

)I H

4 0

t'

ADDENDUM

WESTINGHOUSE EQUIPMENT SEISMIC REYIEW

To date, all mechanical Design Class I Westinghouse supplied equipment withinits scope of analysis has been requalified except the spray additive tank.Analysis has determined that the spray additive tank requires modification;modification details have been transmitted to the Project for action.

Spectra comparison or requalification of all Westinghouse supplied electricalequipment is complete. For the main control board, modifications have beenmade as a result of revisions to the response spectra.

Analyses of the interaction of adjacent electrical cabinets has determinedthat modifications are required for six cabinets. Modification details forsolid state protection, reactor trip switchgear, nuclear instrumentationsystems, auxiliary safeguards test, process control, and protection cabinetshave been transmitted to the Project for action.

-9-

0003L/0005P-(10)

TABLE 1

SUMMARY OF ATTACHMENTS I 5 II

TYPE OF INDEPENDENT PROGRAM REPORTSNUMBER REPORTED AS NUMBER REPORTED ASOF AUGUST 8, 1983* OF AUGUST 22, 1983*

ase ase ase aseI II A CQA I II A CQA

Open Item Reports

Potential Program Resolution Reports

6 0 6 0

Closed ItemDeviationOpen Item with future action by PGandESubtotal

0 '

0 . 00 00'

300

000

0'rogram

Resolution Reports

Closed Item 0Deviation 0Open Item with future action by PGandE 1

Subtotal T

000

0000'

00

Potential Error Reports

Class A ErrorClass A or B ErrorClass B ErrorClass C ErrorClass D ErrorSubtotal

0001

0T

00000

00000

0,0000

Error Reports

Class A ErrorClass A or B ErrorClass B ErrorClass C ErrorClass D ErrorSubtotal

24000

00000

1

401

0

00000

Completion Reports

TOTAL NUMBER OF REPORTS

209 102 211 102

*Since the Independent Program's reporting period differs from PGandE's, thesenumbers may differ from those reported in the Independent Program's progressreports.

0003L/0005P-(11)

TABLE 2

STATUS OF PIPING REVIEW

Large Bore Piping

Field as-built check

Drawing incorporation of field as-builtcheck results

Establish procedures and criteria

gualification or reanalysis of seismic andthermal problems

Large Bore Pipe Supports

Procedures and criteria

gualification or redesign of pipe supports

Small Bore"Piping

Procedures and criteria

Initial sample selections

Computer analyses review(Includes SAM and TAM Review)

Span criteria sample review

Small Bore Pipe Supports

Procedures and criteria

Initial sample selections

Span criteria sample review

Standard support details review

Code boundaries review

Local pipe stress from lugs review

Percent~Com 1ete

100

100

100

96

100

90

100

100

95

99

100

100

99

100

100

100

0003L/0005P-(12)

TABLE 3

STATUS OF CIVIL/STRUCTURAL REVIEW

CONTAINMENT STRUCTURE

Percent Com lete For*

Task Descri tion

- Seismic criteria- Annulus structure

- Exterior shell

- Interior concrete structure

- Cranes

- Platforms

- Plant vent

FuelLoad

100

100

100

100

100

Low Power~Testis

NA

NA

NA

NA

FullPower

NA

NA

NA

NA

NA

* Refer to PGandE's December 3, 1982 letter to the NRC for definitionof the three step licensing process.

NA - Not Applicable; not required or not identified for this step.

0076L/0093P-1

TABLE 3 (cont'd)

STATUS OF CIVIL/STRUCTURAL REVIEM

AUXILIARYBUILDING

Percent Com lete For

Task Descri tion

- Seismic criteria- Global vertical response spectra

- Vertical floor spectra accounting forflexibi 1 ity

- Horizontal response spectraincluding torsional effects

- Building response due to horizontaland vertical inputs

- Concrete walls and floors

FuelLoad

100

100

100

100

100

95

Low PowerTeaeioq

NA

NA

NA

FullPower

NA

NA

NA

NA

0076L/0093P-, 2

TABLE 3 (cont'd)

STATUS OF CIVIL/STRUCTURAL REVIEM

TURBINE BUILDING

Percent Com 1 etc For

Task Descri tion

- Seismic criteria- Seismic models and analysis

- Revised building response spectra

- Member evaluation

- Turbine pedestal

- Turbine building crane

FuelLoad

100

100

100

100

100

100

Low Power~Testk o

NA

NA .

NA

NA

FullPower

100

100

100

70

100

85

(1) Percentages for Step 1 relate to engineering work for the load case of theturbine building crane parked and unloaded.

(2) Percentages for Step 3 relate to engineering work for the load cases ofthe turbine building crane in its operating modes.

0076L/0093P-4

»pe . '7

TABLE 3 (cont'd)

STATUS OF CIVIL/STRUCTURAL REVIEW

INTAKE STRUCTURE

Percent Com lete For

Task Descri tionFuelLoad

Low Power Ful 1

~Teatime Power

- Seismic criteria- Seismic model

- Intake structure seismic design

- Crane design

- Mave forces on intake structure

- Ship collision study

- Auxiliary saltwater system vent shaftmodification

100

100

100

NA

NA

NA

NA

NA

NA

100

100

100

100

0076L/0093P-5

TABLE 3 (cont'd)

STATUS OF CIVIL/STRUCTURAL REVIEW

RACEWAY SUPPORTS

Percent Complete For

Task Descri tion

- Seismic criteria- Transverse loads

- Longitudinal loads

- Field-originated review of supports

FuelLoad

100

100

100

100

Low Power~Tea tin

NA

Ful 1

Power

NA

NA

NA

HVAC SUPPORTS

- Seismic criteria- Two-over-one supports in containment

- Supports outside containment requiredfor Step 1

- Supports outside containment requiredfor Step 3

100

100

100

NA

NA

NA

NA

NA

0076L/0093P-6

), I

TABLE 3 (cont'd)

STATUS OF CIVIL/STRUCTURAL REVIEW

FUEL HANDLING BUILDING

Percent Com lete For

Task Descri tion

- Seismic criteria- Fuel handling building crane

- Initial analysis of building

- Horizontal and vertical spectraat roof

- Final analysis'of building asmodified

FuelLoad

100

100

NA

Low Power~Tee tfn

NA

NA

FullPower

NA

100

95

0076L/0093P-3

TABLE 3 (cont'd)

STATUS OF CIVIL/STRUCTURAL REVIEM

MISCELLANEOUS

Percent Com 1 etc For

Task Descri tionFuelLoad

Low Power~Testin

Ful 1

Power

- System interaction program inside containment 100

- Systems interaction program outsidecontainment

- Verify computer programs used for analysis of 100safety-related structures

NA NA

NA 80

NA.

- Heavy loads (NUREG-0612)

- Review G-line anchor

- Review pipe rupture restraints

- Review pipeway structure 97

NA

NA

99

85

96

NA

0076L/0093P-7

TABLE 4

STATUS OF PLANT MODIFICATIONS(As of August 19, 1983)

I. INSIDE CONTAINMENT

A. Large Bore Pipe Supports

Total ForecastDesign ReleaseConstruction Complete

B. Small Bore Supports

Total ForecastDesign ReleaseConstruction Complete

C. HVAC Supports

Total ForecastDesign ReleaseConstruction Complete

D. Raceway Supports

Total ForecastDesign ReleaseConstruction Complete

E. Annulus Steel Connections

Total ForecastDesign ReleaseConstruction Complete

F. Platform Connections

Total ForecastDesign ReleaseConstruction Complete

G. Polar Crane

Design ReleaseConstruction Complete

STEP 1

Fuel Load

10301026

941

610605600

727272

263263248

760760760

430430430

100%85% ~

STEP 2Low Power Testin

None

None

88&

None

00

00

None

* Some minor connection reinforcement will potentially be required uponcompletion of the confirmatory analysis with final piping loads.

0003L/0005P-(19)

TABLE 4 (Cont'd)

STATUS OF PLANT MODIFICATIONS(As of August 19, 1983)

II. OUTSIDE CONTAINMENT

A. Large Bore Pipe Supports

Total ForecastDesign ReleaseConstruction Complete

B. Small Bore Supports

Total ForecastDesign ReleaseConstruction Complete

C. HVAC Supports

Total ForecastDesign ReleaseConstruction Complete

D. Raceway Supports

Total ForecastDesign ReleaseConstruction Complete

E. Fuel Handling Building Connections

Total ForecastDesign ReleaseConstruction Complete

F. Hot Shop Steel Connections

Total ForecastDesign ReleaseConstruction Complete

G. Equipment Modifications

Total ForecastDesign ReleaseConstruction Complete

STEP 1

Fuel Load

130012941029

452452372

619619610

166816681548

345345345

276276276

5430

0

STEP 2Low Power Testin

11201013

794

255250196

None

None

None

None

414141

0003L/0005P»(20)

e

TABLE 4 (Cont'd)

STATUS OF PLANT MODIFICATIONS(As of August 19, 1983)

II. OUTSIDE CONTAINMENT (Cont'd)

H. Intake Structure

Design ReleaseConstruction Complete

I. Turbine Building

Design ReleaseConstruction Complete

NOTES:

STEP 1

Fuel Load

100%100%

100%85K

STEP 2Low Power Testin

None

None

Total Forecast: The predicted number of required modifications based onreviews and evaluations to date.

Design Release: The number (or percent) of modifications completed byengineering and released to the field for construction.

Construction Complete: The number (or percent) of modifications wherethe construction work is physically complete and the work isawaiting appropriate quality assurance inspection and engineeringapproval of as-built conditions.

If additional plant modifications are identified for Step 3, Full Power,they will be included in this table.

0003L/0005P-(21)

TABLE 5

THREE-STEP LICENSING REPORTING RE(}UIREMENTS

Re uirement

A. ~F1 L d fE

Phase I

Phase II

DCP As-builts

ITP guality AssuranceProgram

Construction gualityAssurance

PGandE/WestinghouseInterface

Hosgri Spectra

Non-Hosgri Spectra

Verification of ITP

IDVP

Final Report6/30/83

Final Report6/30/83

N/A

Final ReportSections 4.2.1 5 4.2.3ITR-2, 6/23/82ITR-42, 4/13/83

Final ReportSection 4.2.4ITR-36 and 385/27/83

Final ReportSection 4.1.3ITR-1 1

11/2/82

Final ReportSection 4.3.2ITR-1 010/29/82

Final ReportSection 4.3.36/30/82

Final ReportSection 7.06/30/82

Project

Final Report*6/21/83

Status Report3/11/83

Supplement6/24/83

N/A

N/A

N/A

N/A

N/A

N/A

*DCP's Phase I Final Report has been submitted in installments sinceSeptembter 1, 1982; the final installment was submitted on June 21, 1983.

0076L/0093P-8

TABLE 5 (Cont'd)

THREE-STEP LICENSING REPORTING REQUIREMENTS

Re uirement

B. Low Power (Step 2)

Phase I

Phase II

DCP As-builts

Verification of ITP

IDVP

Final Report6/30/83

Final Report6/30/83

N/A

Final ReportSection 7.06/30/83

Project

Supplement6/21/83

N/A

Supplement6/24/83

N/A

C. Full Power (Ste 3)

Phase II

DCP As-builts

ITP Quality AssuranceConstruction QANon-Hosgri Spectra

Verification of ITP

Final Report6/30/83

N/A

Final ReportSection 7.06/30/83

Final Report6/13/83

Supplement6/24/83

N/A

N/A

*These final reports were originally defined for Step 3, but weresubsequently removed from this step by the IDVP and were includedas part of Step 1.

0076L/0093P-9

TABLE 5 (Cont'd)

COMMISSION ORDER

Re uirement

1. Provi de Information

a. — Pre-1978 Seismic Service(IDVP)

1) guality Assurance Program

2) Design Chain

3) gual ity AssuranceImplementation

4) Program Criteria

5) Sample Criteria

b. Cause, Significance, andImpact

c. Effectiveness of the IDVP

d. Schedule for Modifications

IDVP

Final Reportand ITRs

Final ReportSection 4.2ITR-26/23/82

Final ReportSection 4.1ITR-58/19/82

Final ReportSection 4.2ITR-26/23/82

Final ReportSection 3.5

Final ReportSection 3.5ITR 1

10/22/82

Final ReportSection 6.0

N/A

N/A

Project

N/A

N/A

N/A

N/A

N/A

N/A

Phase IFinal ReportSection 1.8

Phase IFinal ReportSupplement6/21/83

Phase IFinal ReportSection 1.9

2. Propose Independent Companies N/A PGAE Proposal3/12/82

0076L/0093P-10

TABLE 5 (Cont'd)

COMMISSION ORDER

Re uirement

3. Program Plan

IDVP

Phase I ProgramPlan4/2/82

Project

Overall PlanRev. 1

4/6/82

4. Status Reports Semimonthly Semimonthly

5. NRC Review N/A N/A

0076L/0093P-11

TABLE 5 (Cont'd)

NRC STAFF LETTER

Re uirement

1. Pre-1978 Non-seismic

a. Service Contractors(Enclosure A)

1) gA Program

2) Design Chain

3) gA implementation

4) Program Criteria

5) Sample Criteria

b. Cause, Significance,and Impact

c. Effectiveness of the IDYP

d. Schedule for Modifications

IDVP

Final Reportand ITRs

Final ReportSection 4.2ITR-424/28/83

Final ReportSection 4.1ITR-291/1 7/83

Final ReportSection 4.2ITR-424/28/83

Final ReportSection 3.5

Final ReportSection 3.5

Final ReportSection 6.0

N/A

N/A

ProJect

N/A

N/A

N/A

N/A

N/A

N/A

Phase IIFinal ReportSection 3.06/13/83

Phase IIFinal Report

Phase IIFinal ReportSection 4.06/13/83

'076L/0093P-12

TABLE 5 (Cont'd)

NRC STAFF LETTER

Re uirement

2. PGSE Internal Design

a. Design Activities(Enclosure B)

1) l}A Program

2) Design Chain

3) gA Implementation

4) Program Criteria

5) Sample Criteria

b. Cause, Significance, andImpact

c. Effectiveness of the IDVP

d. Schedule for Modifications

IDVP

Final Reportand ITRs

Final ReportSection 4.2ITR-424/28/83

Final ReportSection 4.1ITR-291/17/83

Final ReportSection 4.2ITR-424/28/83

Final ReportSection 3.5

Final ReportSection 3.5

Final ReportSection 6.0

N/A

N/A

Project

N/A

N/A

N/A

N/A

N/A

N/A

Phase IIFinal ReportSection 3.06/13/83

Phase IIFinal Report

Phase IIFinal ReportSection 4.06/13/83

0076L/0093P-13

TABLE 5 (Cont'd)

NRC STAFF LETTER

Re uirement

3. Post-1978 Services

a. Service Contractors(Enclosure C)

1) QA Program

2) Design Chain

3) QA Implementation

4) Program Criteria

5) Sample Criteria

b. Cause, Significance, andImpact

c. Effectiveness of IDVP

IDVP

Final Reportand ITRs

Final ReportSection 4.2 .,

ITR-424/28/83

Final ReportSection 4.1ITR-291/17/83

Final ReportSection 4.2ITR-424/28/83

Final ReportSection 3.5

Final ReportSection 3.5

Final ReportSection 6.0

N/A

Project

N/A

N/A

N/A

N/A

N/A

N/A

Phase IIFinal ReportSection 3.06/13/83

Phase I IFinal Report

d. Schedule for Modifications

4. Propose Independent Companies

5. Program Plan

N/A

N/A

Phase IIProgram Plan6/18/82

Phase IIFinal ReportSection 4.06/13/83

PG&E Proposal1/l3/82

Overall PlanRev. 1

4/6/82

0076L/0093P-14

0

TABLE 6

ITRs ISSUED AFTER JUNE 30, 1983

ITR No.

14, Rev. 2

Title

Verification of the pressure, temperature, humidity,and submergence environments used for safety-relatedequipment specification outside containment for theAFW system and the CRVP system

DateIssued

07-25-83

20, Rev. 2 Verification of the mechanical/nuclear design of theCRVP system

07-22-83

22, Rev. 2

27, Rev. 2

28, Rev. 2

31, Rev. 1

48, Rev. 0

50, Rev. 0

Verification of the mechanical/nuclear portion of theAFW system

Verification of the instrument and control design ofthe AFW system

Verification of the instrument and control design ofthe CRVP system

HVAC components

Additional verification of jet impingement effects-Effects of postulated pipe rupture inside containment

Containment annulus structure vertical seismicevaluation

07-25-83

07-25-83

07-25-83

08-04-83

07-27-83

07-22-83

67, Rev. 0 Equipment

57, Rev. 0 Fuel handling building

58, Rev. 0 Intake structure

59, Rev. 0 Large bore Piping

60, Rev. 0 Large and small bore pipe supports

08-01-83

08-08-83

08-18-83

08-17-83

08-12-83

0076L/0093P-15

TABLE 7

EOIs CLOSED AFTER JUNE 30, 1983

E01 No.

950

1003

1022

1069

1122

1123

1124.

1128

1133

1135

1136

1137

1139

Title

FCY 95 plate thickness

4KV switchgear room HVAC duct support

Intake structure seismic review

LCVs -113 and -115 supports

LB pipe support frequencies (10-70SL)

Instrument tubing support

Auxiliary building spectra generation

Station battery rack structural bolt

LB piping analysis valve modeling (9003A)

LB piping analysis LCVs -113 and -115

CCW surge tank bolt and shell stresses

LB piping analysis 4-101, valve weight

Small bore pipe support 2159/2 calculation

DateC1osed

07-15-83

08-01-83

07-26-83

07-15-83

08-02-83

07-13-83

07-25-83

08-18-83

07-06-83

07-06-83

07-07-83

07-06-83

08-09-83

0076L/0093P-16

LEGEOO

ATTACHMENTS I, IA, II, IIA

STATUS OF IDVP ITEMS

(Phase I - I, IA)(Phase II and CQA - II, IIA)

Asterisk denotes revision or addition since last report.

1. FILE NO: The file number assigned to each item by the IDVP.

2. SUBJECT: Sel f-explanatory. Detailed description of the concern identifiedfor each item is available in Revision 0 of the Open Item Report associatedwith the same file number.

3. REV. 0 DATE: Date issue initially identified by Open Item Report, Revision0.

4. LATEST REV. NO: Latest revision number received by PGandE.

5. LATEST REV. DATE: Date latest revision received by PGandE.

6. STATUS: Status is indicated by the type of classification of latest reportreceived by PGandE:

OIRPPRRPRRPERERCR

CIDEVOIPAB

C

D

Open Item ReportPotential Program Resolution ReportProgram Resolution ReportPo ienti al Error ReportError ReportCompletion ReportClosed ItemDeviationOpen Item with future action by PGandEClass A ErrorClass B ErrorClass C ErrorClass D Error

Details of current actions related to each item are described in the latestrevision of the referenced report with the same file number.

7. ACTION REQ'D BY: Indicates whether action on an item is needed by eitherIDVP or PGandE. Closed means IDVP Completion Report has been received.

8.

9.

PHY MODS: Physical modifications required to resolve the issue. Blankentry indicates that modification has not been determined.

PGandE TASK NO: PGandE task number assigned for tracking. Task numbersare not necessarily sequential.

0003L/0005P-(22)

AttPage

STATUS Of'HASE I IDVP ITEHS

FILENO.

910

920

SUBJECT

930 RACEWAY CRITERIA

931 VALVE 9001A

932

933

934

935

936

937

SUPPORT 5&S-23R DIRECTION

LINE 110 DIHENSION

SUPPORT 72-11R DIRECTION

LINE 931 CONNECTION TO LINE 1971

LINE 1971 DIHENSION

LINE 44 FLANGE

938* VALVE ORIENTATION (1ncludes f1le ll05)939

940

941

942

943

944

945

946

SUPPORT 73-72R DIRECTION

LINE 103 DIHENSION

SUPPORT 18-4R DIRECTION

SUPPORT 18-7R LOCATION

SUPPORT 5006V LOCATION

SUPPORT 5003V LOCATION

SUPPORT 55S-20R DIRECTION 8( LOCATION

LINE 1980 DIMENSION

947 VALVE 8821A ORIENTATION

948 SUPPORT 13-23SL DIRECTION

949 HAIN ANNUNCIATOR CABINET RIGIDITY 5 FREQUENCY

RACEWAY SUPPORTS INSTALLATION VARIANCE

AUX BLDG FLOOR RESPONSE SPECTRA DIFFERENCES

RFV. 0DATE

01-05-82

01-06-82

01-05-82

'LATESTREV. NO.

LATESTREV. DATE

07-23-82

07-22-82

07-23-&2

05-24-82

05-10-82

STATUS

CR

CR

CR

CR

CR

CR

CR

CR

CR

6

01-06-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

3 05-24-82

05-24-82

04-09-82

05-24-82

07-08-82

08-22-83

07-08-82

07-08-82

05-24-82

CR

PPRR/CI

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

3 '5-24-8205-24-82

05-24-82

05-24-82

05-24-82

05-24-82

05-24-823

5 05-23-83 CR

01-06-82 "3

ACTIONR Et( ' BY

CLOSED

CLOSED

CLOSFO

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

IDVP

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

PHY.HODS

YES

NO

YES

NO

YES

NO

NO

NO

NO

NO

YES

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

YES

PGhETASK NO.

70000

70001

70002

70003

70004

70005

70006

70007

70008

70009

70010

70011

70012

70013

70014

70015

70016

70017

70018

70019

70020

70021

000&L/0018P — 1

Att nt IPage 2

STATUS OF PHASE I IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTIONREIE'0 BY

PHY.MOOS

PGKETASK NO.

950 VALVE FCV 95 PLATE THICKNESS

951 LINE 593 DIMENSION

952 LINE 593 DIMENSION

953 SUPPORT 58S-69R DIRECTION

954 LINE 574 DIMENSION

955 SUPPORT 55S-57R IDENTIFICATION

956 LINE 574 DIMENSION

957 LINES 577 5 578 INSULATION

958 SUPPORT 58S-55V LOCATION

959 SUPPORT 11-49SL LOCATION

960 LINE 19 DIMENSION

961 SUPPORT 1 1 -59SL DIRECTION

962 SUPPORT 48-44R DIRECTION

963 SUPPORT 58S-32R DIRECTION

964 LINE 2519 SUPPORT IDENTIFICATION

965 SUPPORT 55S LOCATION

966 SUPPORT 14-33SL LOCATION

967 INTAKE STRUCTURE ACCELERATIONS

968 . HARDING LANSON ASSOCIATES QA FINDING

969 HARDING LAHSON ASSOCIATES QA FINDING

970 HARDING LANSQN ASSOCIATES qA FINDING

01-28-82

01-29-82

01-29-82

Ql-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-30-82

01-30-82

01-30-82

01-30-82

14

3

3

3

3

2

3

6

5

3

3

6

3

10

4

4

3

6

2

2

2

07-15-83

05-24-82

05-24-82

07-08-82

07-08-82

04-09-82

05-24-82

07-23-82

CR

CR

CR

CR

CR

CR

CR

CR

06-28-82

05-24-82

09-21-82

06-21-82

10-29-82

12-01-82

06-19-82

05-24-82

Q9-10-82

05-24-82

05-24-82

05-24-82

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

07-08-82 CR

CLOSEQ

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLQSEQ

CLOSED

CLOSED

CLOSED

YES

NO

NO

NO

NO

NO

NO

YES

NO

NO

NO

NO

NO

YES

NO

NO

NO

NO

NO

NO

NO

70022

70023

70024

70025

70026

70027

70D28

70029

70030

70031

70032

70033

70034

70035

70036

70037

70038

70039

70040

70041

70042

0008L/0018P — 2

AttPage

STATUS OF PHASE I IDVP ITEMS

FILENO. SUBJECT

971 EDS NUCLEAR QA OBSERVATION

972 EDS NUCLEAR QA OBSERVATION

973 EDS NUCLEAR QA OBSERVATION

974 EOS NUCLEAR QA OBSERVATION

975 EOS NUCLEAR QA OBSERVATION

976 EXTERIOR CONTAINMENT SPECTRA SUPERSEDED

977 ANNULUS AREA REEVALUATION

978 REGENERATIVE HEAT EXCHANGER SPECTRA

979 OTHER EQUIPMENT IN CONTAINMENT NOT REVIEWED

980 ASWP COMPARTMENTS QUALIFICATION DOCUMENTATION

981 BURIED PIPELINE IS TO AB QUALIFICATION

982 TURB BLDG BLUME TRANSMITTALS

9834 RACEWAY SUPPORT REEVALUATION(1ncludes f1les 910 and 930)

984 TURB BLDG INTERFACE PROCEDURES

985 AUX BLDG WEIGHTS

986 CONTROL ROOM SPECTRA

987 AUX BLDG QUALIFICATION DETAILED REVIEW

988 INTAKE STRUCTURE CRANE REVIEW

989 TURB BLDG CRANE REVIEW

990 FH BLDG CRANE DESIGN INFO

REV. 0DATE

01-30-82

01-30-82

01-30-82

01-30-82

01-30-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-02

02-05-82

02-05-82

02-05-82

02-05-82

LATESTREV. NO.

2

6

3

2

2

3

6

4

LATESTREV. DATE

04-09-82

04-09-82

04-09-82

04-09-82

04-09-82

04-17-82

09-10-82

06-21-82

04-17-82

04-17-82

05-11-82

07-23-82

08-22-83

STATUS

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

PPRR/CI

6 . 07-23-82 CR

2 04-17-82 CR

6 07-22-82 CR

2 04-17-82 CR

6 09-10-82 CR

6 07-23-82 CR

6 07-23-82 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

IOVP

NO 70043

NO 70044

NO 70045

NO 70046

NO 70047

NO 70048

NO 70049

NO 70050

NO 70051

NO 70052

NO 70053

NO 70054

YES 70055

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO 70056

NO 70057

NO 70058

NO 70059

NO 70060

NO 70061

NO 70062

ACTION PHY. PGIm E

~RE '0 BY BOOS TASK NO.

0008L/0018P — 3

I

AttPage

nt I

STATUS OF PHASE I IDVP ITEHS

l ILENO.

991

992

993

994

995

996

997

998

999

1000

1001

1002

1003

SUBJECT

F'H BLDG CRANE HODIFICATIONS

OD WATER TANK DESIGN INI 0

OD WATER TANK DESIGN INF'0(includes file 992)

PIPING CONSULTANT INTERFACE

EES TRANSMITTAL COVER. SHEETS

BLUHE PIPING CORRESPONDENCE

VALVES TRANSHITTALS TO EES

VALVES TRANSHITTALS TO EDS

VALVES TRANSHITTALS TO EDS

VALVES TRANSHITTALS TO WESTINGHOUSE

VALVES VERIF ICATION OF'CCELERATIONS

SUPPLY FANS S67, 68 8c 69 INPUT

4 KV- SW RH HVAC DUCT SUPPORT

REV. 0DATE

02-05-82

02-05-82

02-05-82

02-06-82

02-06-82

02-06-82

02-06-82

02-06-82

02-06-82

02-05-82

02-05-82

02-05-82

02-05-82

2 04-09-82 CR

2 04-09-82 CR

3 05-10-82 CR

2 04-09-82 CR

2 04-09-82 CR

2 04-09-82 CR

2 04-17-82 CR

2 04-17-82 CR

9 03-22-83 CR

9 08-01-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

LATEST LATEST ACTION PHY.REV. ND. REV. DATE STATUS REIE'D BY NDDS

6 07-23-82 CR CLOSED NO

6 09-09-82 CR CLOSED NO

9 06-27-83 CR CLOSED NO

PGhETASK NO.

70063

70064

70065

70066 .

70067

70068

70069

70070

70071

70072

70073

70074

70075

1004

'1005

1006

1007

( includes f11e 1077)

WESTINGHOUSE CONTAINHENT ELLC EQUIP

WYLC LABS TRANSHITTALS OI SPECTRA

ELEC EQUIP OUALIF IEO BY ANALYSIS

ELEC EQUIP TRANSHITTAL OI INI 0

1008 HAIN ANNUNCIATOR CABINET SPECTRA

1009 CONTAINHENT INTERIOR ABOVE 140 SPECTRA

1010 TURB BLDG ABOVE 140 SPECTRA

02-05-02

02-05-82

02-05-82

02-05-82

02-09-82

02-09-82

02-09-82

6 06-22-82 CR

2 04-17-82 CR

2 04-21-82 CR

2 04-21-82 CR

3 10-10-82 CR

6 09-10-82 CR

6 07-23-82 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO

NO

NO

NO

NO

NO

NO

70076

70077

70078

70079

70080

70081

70082

0008L/0018P - 4

AttPage

STATUS OF PHASE I IDVP ITEHS

FILENO.

1011

1012

1013

1014

1015

1016

1017

1018

1019

1020

1021

1022

1023

1024

1025

SUBJECT

1026 TURBINE BUILDING SEISHIC REVIEW (includesfiles 982, 984, 989, 1010, and 1025)

1027 FUEL. HANDLING CRANE SUPPORT

1028

1029

1030

AUX BLDG HORIZONTAL ACCELERATION

AUX BLDG HODEL DISCREPANCIES

BORIC ACID TANK ANALYSES

DG OIL PRIHING TANK SPECTRA

DG OIL PRIHING TANK 155 OIFI ERENCE

WYLE LAB SPECTRA

CONTAINHENT SEISHIC REVIEW(includes files 977, 1009, 3006, 3007,and 3008)

DG OIL PRIHING TANK DAHPING

ANCHOR ALLOWABLES

OG OIL PRIHING TANK SG WEIGHT

SUPPLY FAN S-31 SUPPORT

CVCS SYSTEH SEPARATOR/STABILIZER DOCUHENTATION

AUX SALTWATER PUHP PRELIH SPECTRA

CCWHX ANALYSIS AS RIGID ANCHOR

INTAKE STRUCTURE SEISHIC REVIEW(includes files 967 and 988)3" VELAN VALVE OOCUHENTATION

PIPE SUPPORT NOMENCLATURE

VERTICAL SPECTRA FOR TURB BLDG ELEV

104'EV.

0DATE

02-09-82

02-09-82

02-09-82

02-09-02

02-11-82

02-11-82

02-11-82

02-18-82

02-18-82

02-18-82

02-18-82

02-18-82

02-19-82

02-20-82

02-20-82

02-20-82

02-23-02

02-23-82

02-25-82

02-25-82

LATESTREV. NO.

LATESTREV. DATE

3

1

ll9

07-09-82

04-21-82

05-04-83

01-05-83

CR

CR

CR

ER/AB

CLOSED NO

CLOSED NO

CLOSED NO

PGKE YES

70083

70084

70085

70086

2 04-17-82 - CR

4 02-10-83 CR

3 07-09-82 CR

3 07-13-82 CR

2 04-09-82 CR

3 06-29-82 CR

6 09-21-82 CR

9 07-26-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO 70087

NO 70088

NO 70089

NO 70110

NO 70090

NO 70091

NO 70092

NO 70093

6 07-17-82 CR

3 06-07-82 CR

6 07-23-82 CR

5 07-23-82 ER/AB

CLOSED NO

CLOSED NO

CLOSED NO

PGKE NO

70094

70095

70096

70097

6 07-23-.82 CR

6 03-09-83 OIR

3 07-22-82 CR

3 07-09-82 CR

CLOSED NO 70111

IDVP NO 70112

CLOSED NO 70113

CLOSED NO 70114

ACTION PHY. PGhESTATUS REIE'D BY MDDS TASK ND.

0008L/0018P — 5

AtPage

nt I

STATUS OF PHASE I IOVP ITEHS

FILENO. SUBJECT

REV. 0DATE

VALVES FCV-37 AND LCV-115 DOCUHENTATION

PIPE SUPPORT 73/70R DIRECTION

EES (CYGNA) QA OBSERVATIONS

1031

1032

1033

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

. 03-02-82

03-08-82

03-08-82

03-08-82

03-08-82

, 03-08-82

03-08-82

03-08-82

03-08-82

03-08-82

03-09-82

PING 03-09-82

EES (CYGNA) QA OBSERVATIONS

EES (CYGNA) QA OBSERVATIONS

EES (CYGNA) QA OBSERVATIONS

1034

1035

1036

1037

1038

EES (CYGNA) QA OBSERVATIONS

EES (CYGNA) QA OBSERVATIONS

EES (CYGNA) QA OBSERVATIONS

EES (CYGNA) QA FINDINGS

1039

1040

EES (CYGNA) QA FINDINGS

ANCO QA FINDINGS

PIPE SUPPORTS 512/7R 8I 512/6R LOCATION

SHALL BORE LINES LOCATION

SUPPORT. 99/9R DIRECTION

SUPPORTS 99/7R 5 99/9R DIHENSION

SMALL BORE LINES LOCATION

1041

1042

1043

1044

1045

1046

1047

1048 SUPPORT 99/101R LOCATION

1049 . HAIN ANNUNCIATOR TYPEWRITER SPECTRA

1050

1051

1052

1053

0008L/0018P — 6

LINE 279-8 INSULATION

INSULATION SPEC FOR LINES 264-8 8( 2519-8

WYLE LABORATORIES QA FINDINGS

DIESEL GEN STARTING AIR RECEIVER TANK DAH

LATESTREV. NO.

7

5

2

2

2

2

2

2

2

2

2

2

6

6

6

6

6

3

9

3

3

.23

LATESTREV. DATE STATUS

07-17-82 CR

07-07-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

07-28-82 CR

08-11-82 CR

07-28-82 CR

07-28-82 CR

10-06-82 CR

06-10-82 CR

07-23-82 CR

07-08-82 CR

06-07-82 CR

05-24-82 CR

07-09-82 CR

ACTIONR EIE

' BY

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

PHY.HODS

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

PGKE

TASK NO.

70115

70116

70117

70118

70119

70120

70121

70122

70123

70124

70125

70126

70129

70130

70131

70122

70133

70134

70135

70136

70137

70138

70139

At nt IPage 7

STATUS OF PHASE I IDVP ITEHS

FILEND. SUBJECT

REV. 0DATE

LATEST LATESTREV. NO. REV. DATE STATUS

ACTIONREIE'0 BY

PHY.HODS

PG&E

TASK NO.

1054 DIESEL GEN STARTING AIR RECEIVER TANK ANALYSIS

1055 CONTAINHENT ANNULUS SPECTRA

1056 NO SIGNATURES ON SEVERAL PG&E CALCULATIONS

1057 ANALYSIS 106 DIFFER FROH T}IE PG&E ANALYSIS

1058 SHALL BORE PIPING LUG DESIGN

1059 SHALL BORE PIPE REPORT OVERSTRESS

1060 PIPESD AND ADLPIPE CODES

1061 HVAC FAN S31 FABRICATION DRAMING

1062 RLCA PIPING ANALYSIS 100-STRESS DIFFERENCE

1063 RLCA PIPING ANALYSIS 107-STRESS DIFFERENCE

1064 PG&E, QA FINDINGS

1065 PG&E, QA FINDINGS

1066 PG&E, QA FINDINGS

1067 URS/BLUHE QA FINDINGS

1068 URS/BLUHE QA FINDINGS

1069 VALVES LCM 113 AND LCV 115 UNSUPPORTED

1070 HORIZONTAL SOIL SPRING CALC DIFFER BY 505

1071 RLCA PIPING ANALYSIS 109-OVERSTRESS

1072. TURBINE-DRIVEN AUX FEEDMATER PUHP

1073 AUX SALTHATER PUMP BOLT STRESSES

1074 RLCA PIPING ANALYSIS 101-STRESS DIFFERENCE

1075 SUPPORTS 5007-R & 18-5R DIRECTION

1076 SUPPORT 55S-3R DIRECTION

03-09-82

03-10-82

03-10-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-23-82

D3-23-82

03-23-82

03-23-82

03-31-82

03-30-82

6

4

3

4

3

1

1

1

1

1

9

3

4

3

3

6

3

3

06-22-82

05-24-82

05-24-82

04-17-82

09-21-82

09-21-82

09-21-82

05-11-82

11-08-82

11-08-82

05-24-82

05-24-82

05-24-82

05-24-82

05-24-82

07-15-83

07-22-82

09-09-82

09-10-82

07-08-82

01-05-83

06-19-82

05-24-82

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CLOSED

CLOSED

CLOSED

CLDSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

YES

NO

NO

NO

NO

NO

NO

NO

70140

70149

70150

70151

70152

70153

70154

70155

7.0156

70157

70158

70159

701 60

70162

70163

70164

70165

70166

70167

70168

70169

70170

70171

0008L/0018P - 7

AttPage

STATUS OF PHASE I IDVP ITENS

FILENO.

1077

1078

1079

1080

1081

1082

1083

1084

1085

1.086

1087

1088

1089

1090

1091

REV. 0DATE

04-06-82

04-19-82

04-19-82

04-22-82

04-22-82

04-22-82

04-22-82

05-14-82

05-14-82

05-14-82

05-14-82

05-14-82

05-21-82

05-21-82

05-21-82

1092

1093

FUEL HANDLING BUILDING REEVALUATION(includes f1les 990, 991, 1027, 1079, and 109

AUX BLDG — FAN RH AND VENTILATION RH

06-11-821)

06-18-82

1094 INTAKE STRUCTURE SOILS REVIEW

1095 . AUX BLDG — FLOOR RESPONSE SPECTRA

1096

1097

SUPPLY FAN S-31

AUXILIARY BUILDING SEISHIC REEVALUATION(includes f11es 920, 986, 1029, 1070,1093, and 1132)

07-07-82

07-09-82

07-09-82

07-13-82

SUBJECT

HVAC DUCT SUPPORT

VENTILATION SYSTEM LOGIC PANEL POV1, POV2

AUX BLDG — FUEL HANDLING STRUCTURE

RLCA PIPING ANALYSIS 103 — STRESS DIFFERENCE

RLCA PIPING ANALYSIS 104 — STRESS DIFFERENCE

VALVE FCV-95 ANALYSIS

HVAC VOLUHE DAMPER 7A

RLCA PIPING ANALYSIS 102

RLCA PIPING ANALYSIS 105

RLCA PIPING ANALYSIS 108

HOT SHUTDOWN REHOTE CONTROL PANEL

COHPONENT CLG WATER HEAT EXCHANGER

PIPE SUPPORT 3/30A

PIPE SUPPORT 11/92SL

AUX BLDG — FUEL HANDLING BUILDING

LATESTREV. NO.

8

3

6

3'

3

5

4

4

3

8

3

3

6

6

LATESTREV. DATE

10-22-82

07-13-82

07-23-82

02-15-83

02-15-83

07-01-82

09-10-82

02-15-83

02-15-83

02-15-83

06-23-82

04-14-83

06-19-82

06-19-82

08-10-82

08-10-82

STATUS

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

ER/A

6 07-22-82 CR

7 12-20-82 CR

6 03-08-83 CR

6 02-25-83 CR

5 06-25-83 ER/AB

ACTION~RE '0 BY

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

PG&E

PHY.NODS

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

CLOSED NO

CLOSED NO

CLOSED NO

CLOSED NO

PG&E NO

PG&ETASK NO.

70173

70177

70178

70179

70180

70181

70182

70187

70188

70189

70190

70191

70199

70200

70201

70204

70205

70206

70207

70208

70209

0008L/0018P — 8

AttPage

STATUS OF PHASE I IOVP ITEHS

f'ILENO. SUBJECT

REV. 0 LATEST LATESTDATE REV. NO. REV. DATE

ACTION PHY. PGSIESTATUS REIE'0 BY BOOS TASK NO.

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

llll

1112

1113

1114

PIPING SEISHIC REEVALUATION(includes files 961, 1021, 1058, 1059, 1060,1104, 1115, 1126, 1137, 6001, and 6002)

CCW HX FIELD INSPECTION OEf'ICIENCY

HLA SOILS REVIEW — OD WATER STORAGE TANKS

HLA SOILS REVIEW - OD WATER STORAGE TANKS

HVAC DAHPER 7A

PIPE SUPPORTS ATTACHED TO AUXILIARYSTEEL

RLCA PIPING ANALYSIS 110 LINES 4260 ANO 3078

RLCA PIPING ANALYSIS 103 VALVES 8724A,8726A, and 8728A

PIPING SAMPLES-NOZZLE LOADS AND VALVEACCELERATIONS (includes file 1109)

PIPING ADDITIONAL SAHPLE 110

PIPING SAMPLE 110 DESIGN ANALYSIS 7-1

ADDITIONAL SAMPLE DESIGN ANALYSISNOZZLE LOADS

CLASS 1 HVAC DUCT f RON FAN S-69 TO 4KV SWGR

PHASE II INDEPENDENT CALCULATIONS — PIPINGAND PIPE SUPPORTS (This Phase II EOI wasissued with an incorrect file number.f'ile No. 1111 will be closed out and the EOIwill be issued with a 6000 series file number)

SOILS-INTAKE STRUCTURE

CCW PUHP VERIf ICATION ANALYSIS

ASW-VIRTUAL WATER MASS CONSTRIBUTION

08-04-82

08-16-82

08-16-82

08-19-82

00-31-82

09-03-82

10-13-82

6 02-25-83 CR

3 . 11-11-82 CR

6 12-03-82 CR

7 02-25-83 CR

9 04-15-83 CR

3 09-22-82 CR

3 10-18-82 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO 70211

NO 70215

NO 70216

NO 70217

NO 70218

YES 70219

NO 70242

11-01-82 8 06-23-83 CR CLOSED YES 70285

11-23-82

12-07-82

12-07-82

9 06-07-83 CR

7 03-17-83 CR

3 12-10-82 CR

CLOSED YFS 70319

CLOSED NO 70324

CLOSED NO 70325

12-08-82

12-21-82

6 03-18-83 CR

5 01-20-83 CR

CLOSED NO 70326

CLOSED NO 70328

12-29-82

02-01-83

02-15-83

6 02-22-83 CR

3 02-04-83 CR

3 03-14-83 CR

CLOSED NO 70329

CLOSED NO 70331

CLOSED NO 70335

07-14-82 9 07-06-83 ER/AB IDVP YES 70210

0008L/0018P — 9

0

At ent IPage 10

STATUS OF PHASE I IDVP ITEMS

F ILENO. SUBJECT

REV. 0DATE

LATEST LATESTREV. NO. REV. DATE STATUS

ACTION~RE '0 BY

PHY.MODS

PG&E

TASK NO.

1115 PHASE I IND. CALCS-CLASS I LARGE BORE PIPESUPPORTS

1116 MAIN STEAM ISOLATION VALVE FCV-41

1117 INSTRUMENT AC POWER PANEL NATURAL FREQUENCY

1118 SHAKE TABLE TESTING-480V VITAL LOAD CENTER

1119 SHAKE TABLE TESTING-DC DISTRIBUTION PANEL

1120 CONDENSER CR-35 MOUNTING BOLTS

1121 HVAC COMPONENT-FILTER UNIT 39 ANCHOR BOLT

1122 LARGE BORE PIPE SUPPORTS 10/70SL FREQUENCIES

1123 INSTRUMENT TUBING SUPPORT

1124 AUXILIARYBUILDING SPECTRA GENERATION

1125 HVAC COMPRESSOR CP35, 36 VERTICAL SPECTRA

1126 PIPING — SIF APPLICATION

1127 HVAC SUPPLY FANS S-1, 2 FREQUENCY

1128* STATION BATTERY RACK STRUCTURAL BOLT

1129 LARGE BORE PIPE SUPPORT 56S/3A

1130 COMPONENT COOLING WATER LUBE OIL FILTER

1131 LARGE BORE PIPE SUPPORTS 58S/16V AND 63/26V1132* AUXILIARYBUILDING MEMBER EVALUATIONS

1133 LARGE BORE PIPING ANALYSIS — VALVE 9003AMODELING

1134* HVAC DUCT AND DUCT SUPPORT FREQUENCY

02-16-83

02-18-83

03-16-83

03-19-83

03-19-83

03-22-83

05-06-83

05-12-83

05-13-83

05-14-83

05-20-83

05-20-83

05-25-83

05-31-83

06-03-83

06-03-83

06-06-83

06-06-83

06-13-83

06-15-83

02-25-83 CR CLOSED

02-22-83

04-19-83

04-15-83

04-15-83

05-07-83

06-10-83

08-02-83

07-13-83

07-25-83

06-09-83

06-25-83

06-16-83

08-18-83

06-28-83

06-30-83

06-24-83

06-27-83

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

07-06-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

08-22-83 PPRR/CI IDVP

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

70336

70337

70339

70341

70342

70343

70346

70347

70348

70349

70350

70351

70352

70353

70354

70355

70356

70357

70359

70360

0008L/0018P — 10

0

0

AttPage

nt I 0STATUS OF PHASE I IDVP ITEMS

FILENO. SUBJECT

REV. 0 LATEST LATEST ACTION PHY. PGIt ERATE REV. NO. REV. RATE STATUS REIE'0 OY MOOS TASK NO.

1135 LARGE BORE PIPING ANALYSIS — VALVES LCV-113,115

1136 COMPONENT COOLING WATER SURGE TANK BOLTAND SHELL STRESSES

1137 LARGE BORE PIPING ANALYSIS 4-101,VALVE WEIGHT

1138 LARGE BORE PIPING ANALYSIS 9-108, SIF1139% SMALL BORE PIPE SUPPORT 2159/2, CALCULATION

1140% FIRE PUMP CORRECTIVE ACTION PROGRAM ANALYSISSQE-7.1

1141 SMALL AND LARGE BORE PIPING PROCEDURE P-11

1142» SMALL BORE SUPPORT S1-8R, M-40 CALCULATION6-301H

1143* HVAC DUCT SUPPORT CALCULATION HV-88

3000 HARDING LAWSON ASSOCIATES QA REPORT

3001 EES (CYGNA) QA REPORT

3002 ANCO QA REPORT

3003 WYLE LABORATORIES QA REPORT

3004 PGLE QA REPORT

3005 URS/BLUME QA REPORT

3006 'ONTAINMENT ANNULUS STRUCTURE

3007 CONTAINMENT ANNULUS STRUCTURE

3008 CONTAINMENT ANNULUS STRUCTURE-WELO UNDERSIZED

30094 CONTAINMENT INTERIOR STRUCTURE-HOSGRI REPONSE

0008L/0018P — 11

06-16-83

06-16-83

06-21-83

07-25-83

07-26-83

07-29-83

08-02-83

08-09-83

08-16-83

05-24-82

05-24-82

05-24-82

05-24-82

05-24-82

05-24-82

10-05-82

10-05-82

11-23-82

08-16-83

3 07-07-83 CR

3 07-06-83 CR

CLOSED NO 70362

CLOSED NO 70363

0 07-25-83 OIR

3 08-09-83 CR

3 08-12-83 ER/C

IDVP NO 70365

CLOSED NO 70366

PG&E YES 70367

0 08-02-83 OIR

0 08-09-83 OIR

IDVP NO 70368

IDVP YES 70369

0 08-16-83 OIR

2 06-22-82 CR

2 06-22-82 CR

2 06-22-82 CR

2 06-22-82 CR

2 06-22-82 CR

2 06-22-82 CR

2 11-03-82 CR

2 11-03-82 CR

2 12-22-82 CR

0 08-16-83 OIR

IOVP

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

TBD 70370

NO 70192

NO 70193

NO 70194

NO 70195

:NO 70196

NO 70197

YES 70236

YES 70237

YES 70317

IOVP TBD 70371

3 07-06-83 CR CLOSED NO 70361

0

Atta t IAPage

EOIFILE NO. TITLE

STATUS OF OPEN PHASE I EOIsIDENTIFIED BY THE IDVP

IDVPACTION REPORTRE 'D STATUS

DCP ESTIMATED DELIVERYDATE

RESOLUTION COMPLETIONPACKAGE PACKAGE

938» Valve Orientation (includes file 1105)

983* Raceway Support Reevaluation(includes files 910 and 930)

IDVP

IDVP

PPRR/CI DONE

PPRR/CI DONE

DONE

DONE

1014 Containment Seismic Review(includes files 977, 1009, 3006, 3007, and 3008)

Pro]ect ER/AB DONE DONE

1092

1097

Fuel Handling Building Reevaluation(includes files 990, 991, 1027, 1079, and 1091)

Auxiliary Building Seismic Reevaluation(includes files 920, 986, 1029, 1070, 1093,and 1132)

1026 Turbine Building Seismic Review(includes files 982, 984, 989, 1010, and 1025)

1028 Auxiliary Building Horizontal Acceleration

Pro]ect ER/AB

I0VP OIR

Pro] ect E.$ /A

Pro]ect ER/AB

DONE

DONE

DONE

DONE

DONE

DONE

DONE

DONE

1098 Piping Seismic Reevaluation(includes files 961, 1021, 1058, 1059, 1060,1104, 1115, 6001, 6002, 1126, and 1137)

Pro]ect ER/AB DONE DONE

LEGEND

TBD = To Be Determined

0009L/0018P — 1

AttaPage

EOIFILE NO.

IA

TITLE

STATUS OF OPEN PHASE I EOIsIDENTIFIED BY THE IDVP

IOVPACTION REPORTRE 'D STATUS

OCP ESTIHATED DELIVERYDATE

RESOLUTION COHPLETIONPACKAGE PACKAGE

1134* HVAC Duct and Duct Supports — Frequency

1138* Large Bore Piping Analysts 9-108, SIF

IDVP

IDVP

PPRR/CI

OIR

DONE

DONE

DONE

DONE

1140')re Pump Correct1ve Act1on Program Analysis SQE-7.1 Pro]ect ER/C DONE DONE

1141» Small and Large Bore P1plng Procedure P-ll IDVP OIR DONE DONE

1142» Small Bore Support Sl-BR, N-40 Calculation 6-301H

1143* HVAC Duct Support Calculat1on HV-88

3009'onta1nment Inter1or Structure -'osgri Response

IDVP

IOVP

IDVP

OIR

OIR

OIR

DONE DONE

08/26/83 . 08/26/83

08/26/83 08/26/83

0009L/0018P — 2

Att nt IIPage 1

STATUS OF PHASE II IDVP ITEHS

FILENO. SUBJECT

REV. 0 LATEST LATESTDATE REV. NO. REV. DATE

ACTION PHY. PG&ESTATUS REIE'O BY NOUS TASK NO.

6001

6002

7001

7002

7003

7004

7005

7006

8001

8002

8003

8004

8005

PHASE II INDEPENDENT CALCULATIONS - PIPINGAND PIPE SUPPORTS

REANALYSIS OF RUPTURE RESTRAINTS

GEZ QA AUDIT & REVIEW REPORT — HVAC SYSTEH

PG&E QA AUDIT & REVIEW REPORT — CONTAINMENTCOHPONENT

PG&E QA AUDIT & REVIEW REPORT — CONTAINMENTISOLATION SYSTEH

QUADREX/PG&E QA AUDIT & REVIEW REPORT-THERHAL HYDRAULIC ANALYSIS

QUADREX QA AUDIT & REVIEW REPORT—EQUIP OUTSIDE CONTAINHENT ENVIR QUALIF

PG&E/RRA QA AUDIT & REVIEW REPORT-RADIATION DOSAGE ANALYSIS

NSC ENVIRONHENTS — COMPUTER CODE

( 1ncludes f11es 7004, 7005, 8003, 8006,8033, and 8034)

NSC MASS-ENERGY RELEASE CALCULATIONENTRAINHENT

NSC VALUE OF BLOWDOWN ENTHALPY FORPRESSURE AND TEHPERATURE ANALYSIS

NSC INITIAL TEMPERATURES FOR PRESSUREAND TEHPERATURE ANALYSIS

ASSUHPTIONS FOR SUBHERGENCE ANALYSIS

02-04-83

10-11-82

10-11-82

3 02-25-83 CR

2 02-02-83 CR

6 08-02-83 CR

CLOSED NO 70334

CLOSED NO 70262

CLOSED NO 70263

11-23-82

11-29-82

11-29-82

11-29-82

09-09-82

6 03-09-83 CR

5 02-04-83 CR

5 02-04-83 CR

2 02-02-83 CR

7 06-02-83 CR

CLOSED NO 70320

CLOSED NO 70321

CLOSED NO 70322

CLOSED NO 70323

CLOSED NO 70220

09-09-82

09-09-82

09-09-82

09-09-82

13 02-25-83 CR

9 02-22-83 CR

13 02-25-83 CR

10 02-10-83 CR

CLOSED NO, 70221

CLOSED NO 70222

CLOSED NO 70223

CLOSED NO 70224

01-10-83 3 01-13-83 CR CLOSED NO 70330

0008L/0018P - 12

0

AttPage

STATUS OF PHASE II IOVP ITEHS

FILENO. SUBJECT

REV. 0 LATEST LATESTDATE REV. NO. REV. DATE

ACTION PHY.STATUS ~RE 'D BY BUDS

PGhETASK NO.

8006

8007

8008

8009

8010

8011

8012

8013

8014

8015

8016

8017

NSC PRESSURE AND TEHPERATURE ANALYSISINPUT DATA

PIPE RESTRAINT 1030 — 14RT LOCATION

PIPE RESTRAINT 1031-11RT LOCATION

AFMS DISCHARGE PIPING DESIGN PRESSURE

AFM TURBINE THROTTLE VALVE

ELECTRICAL CABLE ENVIRONHENT QUALIFICATION

POWER SUPPLIES TO CRVP EQUI PHENT

EHERGENCY DIESEL GEN TEST DATA

AFM SYSTEH CONTROL VALVE PIPE BRE'AK

PROTECTION

AFM SYSTEH FLOW HEASUREHENT

POWER SUPPLIES TO CRVP EQUIPHENT

HVAC CONTROL TRANSFER SMITCH ELECTRICALSEPARATION

09-13-82

09-13-82

09-13-82

09-13-82

09-23-82

09-23-82

09-23-82

09-23-82

6 03-10-83 CR

6 03-10-83 CR

ll 06-03-83 CR

12 06-02-83 CR

6 02-25-83 CR

ll 06-24-83 CR

10 03-11-83 CR

10 04-06-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO

NO

YES

YES

NO

YES

NO

NO

09-27-82

09-27-82

10-04-82

10 02-25-83 CR

9 03-28-83 CR

9 06-03-83 CR

CLOSED NO

CLOSED NO

CLOSED YES

09-09-82 9 01-24-83 CR CLOSED NO 70225

70226

70227

70228

70229

70230

70231

70232

70233

70234

70235

70238

8018

8019

8020

8021

8022

8023

8024

CLASS 1 QUALIFICATION OF FCV 37 AND FCV 38

EQUIP FOR AFW PUHPS IN SAHE FIRE ZONE 3-Q-2

FIRE PROTECTION/SEPARATION CRVP SYSTEH

FIRE PROTECTION/SEPARATION AFM SYSTEH

KA SIZING OF 4KV CKT BREAKERS

480V UNDER VOLTAGE FOR LOCA

480V UNDER VOLTAGE FOR NORHAL OPERATION

10-04-83

10-05-82

10-04-82

10-13-82

10-12-82

10-12-82

10-12-82

8 03-09-83 CR

6 02-25-83 CR

6 04-07-83 CR

15 06-03-83 CR

10 04-12-83 CR

6 03-16-83 CR

6 03-16-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO

NO

NO

NO

NO

NO

NO

70239

70240

70241

70243

70244

70245

70246

0008L/0018P — 13

Att nt IIPage

STATUS OF PHASE II IDVP ITEMS

FILENO. SUBJECT

8025 4KV AND 480V UNDER VOLTAGE AFTER LOCA

8026 480V UNDER VOLTAGE FOR FULL LOAD

8027 AFW STEAM TRAP DESIGN CHANGE

8028 HELB EFFECTS ON AFW PUMP MOTORS

8029 HELB EFFECTS ON AFWS PT-434 AND PUMPS

8030 HELB EFFECTS ON AFWS PT-433 AND PUMPS

8031 HELB EFFECTS ON AFWS LCV113 ANO LCV115

8032 LOSS OF HSP CNTL OF LCV 110,111,113,115DUE TO FIRE

8033 HELB SG BLOWDOWN MODEL NON CONSERVATIVE

METHOD

8034 HELB PT ANAL FOR AREA GE

8035 SMOKE DETECTORS IN CRVP INTAKE DUCTS

8036 H2 LINE ENCLOSURES

8037 GAP IN AFWS FIRE BARRIER DAMPER FD-24 .

8038 FIRE ZONE 3-Q-2 COMMUNICATION WITH FIREZONE 3-R-

8039 FIRE ZONES 12-A,B,C COMMUNICATION WITHFIRE ZONES 13-A,B,C

8040 SG WATER INVENTORY ASSUMPTION FORSUBMERGENCE ANALYSIS

8041 CRVP POWER TRANSFER SWITCH SEPARATION

8042 AFWS & CRVP 120VAC SOURCE SEPARATION

REV. 0DATE

10-12-82

10-12-82

10-13-82

10-14-82

10-14-82

10-14-82

10-14-82

10-13-82

10-14-82

10-14-82

10-14-82

10-14-82

10-14-82

10-14-82

10-14-82

10-22-82

10-22-82

10-22-82

LATESTREV. NO.

LATESTREV. DATE

03-16-83

03-16-83

02-11-83

03-09-83

03-09-83

03-09-83

03-09-83

06-03-83

STATUS

CR

CR

'CR

CR

CR

CR

CR

CR

6 02-25-83 CR

6 02-25-83 CR

8 02-22-83 CR

8 03-11-83 CR

8 02-09-83 CR

8 02-25-83 CR

9 04-07-83 CR

6 02-25-83 CR

6 12-02-82 CR

6 02-25-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO 70247

NO 70248

NO 70249

NO 70250

NO 70251

NO 70252

NO 70253

YES 70254

CLOSED NO 70255

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO 70256

YES 70257

NO 70258

NO 70259

NO 70260

CLOSED NO '0261

CLOSED NO 70264

CLOSED NO 70265

CLOSED NO 70266

ACTION PHY. PGhE~RE 'O BY BOOS TASK NO.

OOOBL/0018P — 14

AttPage

STATUS OF PHASE II IDVP ITEHS

FILENO. SUBJECT

8043 AFWS REDUNDANT POWER SUPPLY SEPARATION

8044 AFWS CABLE SPLICES IN CONTROL CIRCUITS

8045 DIESEL GEN CONTROL CIRCUIT SEPARATION

8046 CRVP FANS: POWER AND CONTROL CIRCUITSUPPLIES

8047 STEAH GENERATOR BLOWDOWN VALVES CLOSURE— RELAY 3AFWP

8048 AFW HOSE STATION DESIGN CHANGE

8049 AFW SYSTEH-PIPE BREAK IN LINE 594

8050 CRVP SYSTEH HODERATE ENERGY LINE BREAKS

8051 AFW SYSTEH-PRESSURE TRANSHITTER PT-432CLASSIFICATION

8052 AFWS CLASS 1E INSTRUHENTS ENVIRONHENTQUALIFICATION

8053 CRVP SYSTEH RADIATION HONITORSCLASSIFICATION

8054 AFWS CABLE CODING AND SEPARATION

8055 AFW PUHP DISCH PRESS INO.PI-52A. PI-53ASEPARATION

8056 CRVP SYSTEH — EQUIPHENT ENVIRONHENTQUALIFICATION

8057 AFW, CRVP CONTROL PANELS SEPARATION

REV. 0DATE

10-22-82

10-22-82

10-22-82

10-22-82

10-22-82

10-25-82

10-25-82

10-25-82

10-25-82

10-25-82

10-25-82

10-25-82

10-25-82

10-25-82

10-25-82

LATESTREV. NO.

8

10

8

6

LATESTREV. DATE STATUS

02-25-83 CR

04-07-83 CR

02-09-83 CR

03-15-83 CR

6 04-07-83 CR

6 02-25-83 CR

7 02-25-83 CR

6 03-15-83 CR

6 03-11-83 CR

6 02-25-83 CR

06-24-83 CR

6 02-11-83 CR

16 05-09-83 CR

6 03-15-83 CR

6 03-09-83 CR

CLOSED

CLOSED

CLOSED

CLOSED

NO 70267

NO 70268

NO 70269

NO 70270

CLOSED NO. 70271

CLOSED NO 70272

CLOSED NO 70273

CLOSED NO 70274

CLOSED NO 70275

CLOSED NO 70276

CLOSED NO 70277

CLOSED NO 70278

CLOSED NO 70279

CLOSED NO 70280

CLOSED YES 70281

ACTION PHY. PGKEREIE'0 BY BOOS TASK NO.

0008L/0018P - 15

0

Att nt IIPage 5

STATUS OF PHASE II IDVP ITEHS

FILENO. SUBJECT

8058 AFWS LCVS ENVIRONMENT QUALIFICATION

8059 AFWS AND CRVP CLASS 1E CIRCUIT SEPARATION

8060 AFW PUHP FLOW LIHITING CONTROL

8061 AFM 8I CRVP HOTORS STARTING CAPABILITYOF BOX VOLTAGE

8062 AFW CONTROL VALVES HAX. DIFF. PRESSURE

8063 AFW PUHP OVERCURRENT RELAY SETTINGS

8064 AFM SYSTEH COHPONENTS POH 110, ill, 113,AND 115 ENVIRONHENT QUALIFICATION

8065 JET IHPINGEHENT REVIEW DISCREPANCY

9001 BOTTOH HOUNTED INSTR. WELD DEFICIENCIES

9002 BOTTOH HOUNTED INSTR. WELD SIZING APPROVAL

9003 SEAL TABLE FILLET WELD UNDERSIZING

9004 THIMBLE GUIDE TUBES ULTRASONIC TESTING

9005 WELDING PROCEDURES-WELDER'S REQUALIFICATION

9006 SEAL LEAK DETECTION TUBING HATERIALDESCRIPTIONS

9007 BOTTOH HOUNTED INSTR. FILLET MELOUNOERSI ZING

9008 CONTAINHENT EXTERIOR CONCRETE SURFACE FINISH

9009 BHI-VESSEL CONNECTION RADIOGRAPH REVIEWS

9010 DOCUHENTATION OF WELDING PROCEDURE REVIEWS

9011 RC PIPING TRAVELER, VISUAL EXAHINATION

REV. 0DATE

10-29-82

10-29-82

10-29-82

11-09-82

11-18-82

11-22-82

02-15-83

06-08-83

11-02-82

11-02-82

11-02-82

11-02-82

1 1-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

LATESTREV. NO.

LATESTREV. DATE

03-09-83

04-07-83

03-15-83

10 03-15-83

STATUS

CR

CR

CR

CR

,33

07-20-83

02-22-83

02-09-83

01-17-83

01-17-83

01-17-83

02-22-83

CR

CR

CR

CR

CR

CR

CR

3 02-25-83 CR

3 01-17-83 CR

3 01-17-83 CR

3 01-17-83 CR

3 01-17-83 CR

9 06-02-83 CR

9 04-12-83 CR

6 04-07-83 CR

ACTIONRE(E'0 BY

CLOSED

CLOSED

CLOSED

CLOSED

PHY.HODS

NO

NO

NO

NO

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO

NO

NO

NO

NO

NO

NO

CLOSED NO

CLOSED NO

CLOSED NO

CLOSED NO

CLOSED NO

CLOSED YES

CLOSED NO

CLOSED NO

PG8ETASK NO.

70282

70283

70284

70307

70314

70318

70338

70358

70286

70287

70288

70289

70290

70291

70292

70293

70294

70295

70296

0008L/0018P — 16

AttPage

STATUS OF PHASE II IDVP ITEHS

FILENO. SUBJECT

REV. 0 LATESTDATE REV. NO.

LATESTREV. DATE STATUS

ACTION PHY. PGKEREIE'D BY BOOS TASK NO.

9012

9013

9014

9015

9016

9017

9018

9019

9020

9021

9022

9023

9024

9025

9026

9027

9028

9029

WELDING PROC., INTERPASS TEHP. HONITORING

BHI SUPPORTS DISCREPANCIES

DOC. OF HALOGEN CONTENT OF PENETRANT

BATCH PLANT CERT. DATE, CONCRETE STRENGTHREG

ALUHINUH USED IN CONTAINHENT GROUT

RC CROSSOVER RESTRAINT BOLT HATERIAL .8c LOCKWASHER

WELDERS QUALIFICATIONS PER CODE REQUIREHENT

DOCUHENTATION OF EXAHS PERFORHED ON WELDS

INACCURATE INFO ON RADIOGRAPHIC INSP. REPORT

CONTAINHENT INTERIOR CONCRETE SURFACE DEFECTS

BHI TUBING WELDS-WELD PROCEDURES NOT HET

RCS-WELD PROCEDURES NOT HET

RCS-RECORD OF FERRITE READINGS

BHI TUBING SUPPORTS ORILLEO HOLES

RCS-LIQUIB PENETRANT EXAH DOCUMENTATION

BHI TUBING-LIQUID PENETRANT DOCUMENTATION

WELD DOCUHENTATION-WELDER IDENTIFICATION

RCS-DEFICIENT CONDITIONS ON PIPING

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-02-82

11-10-82

11-10-82

11-10-82

11-10-82

11-10-82

11-10-82

11-19-82

11-19-82

01-17-83

01-17-83

CR

CR

01-17-83

02-25-83

01-17-83

01-17-83

02-10-83

01-17-83

02-22-83

02-09-83

03-09-83

01-17-83

01-17-83

02-25-83

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

'CR

CR

01-17-83 CR

02-22-83 CR

01-17-83 CR

01-17-83 CR.

CLOSED NO

CLOSED NO

CLOSED NO

CLOSED NO

70297

70298

70299

70300

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

NO 70303

NO 70304

NO 70305

NO 70306

NO 70308

NO 70309

NO 70310

NO 70311

NO 70312

NO 70313

NO 70315

NO 70316

CLOSED NO 70301

CLOSED NO 70302

0008L/0018P — 1 7

ATTACHMENT III

OUTSTANDING

IDVP REQUESTS FOR INFORMATION

LEGEND

* One asterisk denotes a revision since the last report.

Two asterisks denote an addition since the last report.

0003L/OOOSP-(23)

Att t IIIPage .

OUTSTANDING IDVP RE UESTS FOR INFORHATION

REQUESTNO.

DATE OFR EIEU EST DESCRIPTION OF RE UEST

EST IHATEDDELIVERY DATE

RESPONSIBLEGROUP

RLCA-1012» 07-18-83 Copy of response to TES RFI 0295 (ITR-55)

RLCA-1023* 07-22-83 Clarification of calculation 300C-2 (ITR-54)

RLCA-1025* 07-25-83 Listed FHB calculations and index (ITR-57)

TBD

TBD

09/09/83

CIVIL

CIVIL

CIVIL

RLCA-1054* 08-02-83

RLCA-1059* 08-03-83

Clarification of stresses LCV-110 andfire pumps (ITR-67)

Clarification of Hosgri licensing criteria(ITR-56)

TBD

TBD

HECH

CIVIL

RLCA-1060* 08-03-83 List of modifications, turbine building (ITR-56) TBD CIVIL

RLCA-1065 08-03-83 List of modifications, SBP ( ITR-61)

RLCA-1072* 08-04-83'larification of soils analysis

TBD

08/26/83

PIPING

CIVIL

RLCA-1078 08-05-83 Clarification of stresses, CCW lube oil cooler(ITR-67)

TBD HECH

RLCA-1089%* 08-19-83 Calculation S-330 for rupture restraint1046-11RT (-2) ( ITR-65)

RLCA-'1090~* 08-22-83 Cover sheets for listed calculations (ITR-54)

RLCA-1081*~ 08-16-83 Copies of listed calculations (ITR-55)

RLCA-1086*'8-19-83 Listed rupture restraint drawings ( ITR-65)

RLCA-1087*'8-19-83 Copy of response to TES-RFI 5511-280 ( ITR-54)

TBD

'8/25/83

08/26/83

08/29/83

08/25/83

CIVIL

CIVIL

CIVIL

CIVIL

CIVIL

0008L/0018P — 18

At t IIIPag

OUTSTANDING IDVP RE UESTS FOR INFORHATION

REQUESTNO.

DATE OF~RE VEST DESCRIPTION OF RE UEST

EST IRATE0DELIVERy DATE

RESPONSIBLEGROUP

RLCA-1091»* 08-22-83 Cover sheets for listed calculat1ons (ITR-55) 08/26/83 CIVIL

RLCA-1092*» 08-22-83 Clar1f1cat1on of spectra compar1son plots(ITR-61)

TBD PIPING

TES-0280» 06-29-83 Clarl f1cat1on of conta1nment model frequenc1es 08/26/83and peak responses

CIVIL

TES-0295* 07-15-83 Clar1f1cat1on of 11sted aux111ary bu1ld1ng1tems for Phase I f1nal report (RLCA-1012)

TBD CIVIL

0008L/0018P — 19

ATTACHMENT IV

OPEN ITEMS

LEGEND

* Asterisk denotes item with revisions this reporting period.

Status of piping issues in general are reflected in Tables 2 and .4.

*~ Status of civil/structural issues in general are reflected inTables 3 and 4.

2.

TASK: The number assigned by PGandE for tracking.

INITIATING DOCUMENT: The document which first identified the openitem to the IDYP.

3. IDENT DATE: The date the problem was identified (year-month-day).

4. ECD: Estimated completion date.

Note 1: Task numbers are not necessarily sequential for this listing.All 70000 series task numbers are dedicated to IDVP items orOIs.

Note 2: The error class and percent complete for modifications are nolonger applicable for the open item noted. The physicalmodifications are correlated with Open Item No. 37.

0003L/0005P-(24)

Attachment IVPage l

INITIATING IOEHTTASK DOCUNENT DATE ECO DESCRIPTION

STATUS OF PGandE OPFN ITEHS

STAI US

DESCRIPTION OF RESOLUTION

CONCLUSIVESIA'IEHENT

OF RESOLUTION

REFERENCE TO ERROR X 'A HODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IOVP CONPLETE COHPLETE

70098 Sem1monthlyStatus ReportNo. 7

Other F1ndings,Item I

820212 830i06CLOSED

PG&E Open Item:Nodeling of all annulus areavalves was reviewed. Six werefound to be modeledincorrectly.

The 1n1tial concernaddressed 1nappropriatemodel1ng of valveeccentr1c masses at thep1pe center 11ne and allanalyses were rev1ewed tolocate modeling errors ofthis type. The InternalTechn1cal Program 1ncludesreview and reanalysis, asnecessary, for othervalve modeling 1ssuessuch as extendedstructure stiffness,valve we1ghts andlocation of the extendedmass center of gravity.

New pipinganalyses havebeen performed.These analysesused the as-builtconfigurat1on as1nput,and thevalves weremodeled in accor-dance with OCP

Procedure P-ll.All p1pe stressesare w1thin allow-able values.This OI 1sclosed; valvemodel1ng forpiping reevalu-ation is address-ed in OI 37.

Section Note 22.2.1,2.2.1.3.3.2,2.2.22.2.2.3.1.2

100 NA

70099 SemimonthlyStatus ReportNo. 7Other F1nd'ings,Item 2

820212 820521CLOSED

PG&E Open Item:The digitization of theeast-west translational Hosgrispectra for the llO ft elevationin the aux111ary building hasbeen found to contain anerror.

All p1ping analyseswere rev1ewed to identifyaffected p1p1ng. Oneanalysis was found toneed reanalys1s. Thispip1ng analysis was rerun.

Reanalysis 1scomplete, andsupport redesignand qualificationare complete.This 1tem 1sclosed.

Section2.7.2

A 100 100

AttachmPage 2

INITIATINGTASK OOCUHENT

IDENTDATE ECO DESCRIPTION

STATUS Of PGandE OPEN ITEHS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESTATLHENT

OF RESOLUTION

REFERENCE TO ERROR 'X X HODIFI-ITP PHASE I CLASS ANALYSIS CATIOHSFINAL REPORT PER IOVP COHPLETE COHPLETE

10100'emimonthlyStatus ReportHo. 1

Other Findings,Item 3

820212 830902 PGKE Open Item:The method used to calculateraceway weights may haveresulted ln an underestimation- of the weights of somecondults. A thoroughreverification programfor all raceway supports willbe conducted.

A review of all safety-class raceway supports lsbeing conducted. Thesupports either will bequalified by analysis orwill be modified.

Section A or 82.4

70101 SemimonthlyStatusNo. 7Other Findings,Item 4

10102 SemimonthlyStatus ReportNo. 7

Other Flndlngs,Item 5

820212

820212

820315 POTE Open Item:CLOSED Review of all Unit l small

bore piping has identified42 supports requiringvertical restraint where onlya single rod was utilized.Hodlfication of these supportswill be made.

8305li POSE Open Item:CLOSED One valve list ln the

Hosgrl report was not updatedas required by a licensingconmitment .

All small bore pipingsingle rod supportsrequired to function asvertical restraints willbe ldentlfled andmodified to providerestraint to both upwardand downward movement.

A complete listing of allDesign Class I activevalves will be preparedand reviewed to ensurethat the valves arequalified.

Forty-two single Sectionrod supports were 2.2.i.l.lfound lnlocations whichrequired verticalrestraint andthese supportshave beenmodlf led to pre-vent uplift. ThisItem ls closed.

DCH H-58 has been Sectionprepared and 2.2.1issued which 2.2.1.3.Iidentifies all 2.2.2.3.2.2active valves tobe selsmlcallyquallf led as wellas correspondingallowable acceler-ations andnatural frequen-cies. This OIis closed; thequalification ofthe valves lsaddressed lnOI37.

A 100 100

Aor8 100

0001L/0018P-2

Attachment IVPage 3

IN I1 IAT I NG

TASK OOCUHEHTIDENTDATE ECO DESCRIPTION

STA1US OF PGandE OPEN 11ENS

STA1USDESCRIPTION OF RESOLUTION

CONCLUSIVESTATENENT

OF RESOLUTION

REFERENCE TO ERROR X II NODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFERAL REPORT PER TORO CONPLETE CONPLETE

70103 SemimonthlyStatus ReportHo. 1

Other Findings,Item 6

820212 820i20 PGEE Open Item:CLOSED Certain small bore piping

spans have been ldentl fledas deviating From seismiccrlterla. Review and analysiswill be performed to determineextent and s ignif lcance.

A large sample of smallbore piping has beenreviewed and overspansldentlfled. Analysis hasbeen completed toidentify those spanswhich may incur seismicstresses exceedingallowables. The percent-age of spans ln thisclass relative to thetotal population ls 0.19KDesign instructions toadd supports which wouldeliminate piping over-stress were issued.Verlflcatlon of supportqual 1 f 1 ca t 1 on s

associated with overspansls complete and allsupports reviewed werefound to comply with theoriginal acceptancecr 1 teria.

This item lsclosed for thespecific issue1 dent 1 fled.However, thegeneric issue ofsmall bore plplngoverspans lsaddressed ln theInternalTechnicalProgram.

Section2 2 2.2 2 2 3 3.2.2.i,2.2.4.3.2.2

A 100 100

AttachmPage l

INITIATINGTASK OOCUHENT

IDENT~OAT /CO DESCRIPTION

STATUS OF PGandE OPEN ITEHS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESTATEHENT

OF RESOLUTION

REFERENCE TO ERROR X X HODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IDVP COHPLETE COHPLETE

70104 SemimonthlyStatus ReportNo. 7Other Findings,Item 7

820212 830l06 PG&E Open Item:CLOSED Piping review of the annulus

revealed two thermal analyseswh1ch used 1ncorrect model1ngof supports.

The two thermal analyseshave been rerun andsupports qual1f1ed. Also,all thermal analyses arebe1ng reviewed as part ofthe Internal Techn1calProgram and those found toconta1n support model1ngerrors are being rerun andassoc1ated supports arebeing requal1fied.

New designanalyses havebeen performed.These analysesused the as-builtconfigurat1on as1nput. Allstresses arewith1n allowablevalues. Th1s OI1s closed; thereview of allother thermalanalyses for thep1ping evaluation1s addressed inDI 37.

Section2.2.1,2.2.1.3.2.l,2 2 2.2.2.2.3.2.l2.2.2.3.3

Note 2 100 NA

70105~ Sem1monthlyStatus ReportNo. 7Other F1ndings,Item 8

820212 830902 PG&E Open Item:Pip1ng with supports attachedto the containment internalstructure above elevat1on 110 ftwere dynamically analyzed usingIIO ft conta1nment 1nteriorspectra. In add1t1on, p1p1ng,electrical raceways and supportsattached to containment exter1orp1peway were analyzed usingconta1nment exterior spectra.—Further analys1s 1s be1ngperformed to verify appro-priateness of theseassumptions.

Appropriate spectra havebeen developed. The newspectra are beingcompared to spectra usedin the previous qual1fi-cat1ons. Where qual1fy1ngspectra do not envelopethe new spectra, analyseswill be performed toqualify piping systemsand electrical raceway tocriter1a. Hodificat1onsw111 be performed, asrequired.

The appropriatespectra have beendeveloped. OCH

C-17 1ncludesHosgri spectrafor the conta1n-ment 1nteriorabove El.

140'nd

for thepipeway. DCHsC-25 and C-30include DDE andOE spectra forthe 1nteriorstructure aboveEl. liO'. TheDDE and OE spec-tra for the con-tainment exter1or1n OCHs C-25 andC-30 are to beused for thepipeway.

Sect1on2.2.1,2.2.7.3.2.2,2.2.2. ~

2.2.2.3.2.1,2.2.2.3.32.4

Aor8 80 50(non- (non-pip1ng) p1ping)100

(piping)

oooaL/0018p-i

0

AttachmenPage 5

INI I IAT INGTASK DOCUMENT

IDEHIDATE KCD DKSCRI PTION

STATUS OF PGandE OPEN lIENS

STATUSOESCRIPTIOH OF RESOLUTION

CONCLUSIVESI ATE.MENT

OF RESOLUTION

REFERENCE TO ERROR X X NODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IDVP COMPLETE COMPLETE

70106 SemimonthlyStatus ReportNo. 7

Other Flndlngs,Item 9

820212 830(06 POLE Open Item:CLOSED One case of a pipe support

design with fewer pipe lugsthan required by designcriteria, resulting 1n localpipe overstress, has beenidentified.

Al1 welded pipe a ttach-ment designs are beingreviewed and qualifiedor redesigned. Includedin this review are localpipe stress effects.

lhe pipe supportidentified hasbeen modlf ledto reflect thecurrent pipinganal ys is. Thl sOI is closed; therev1ew of allpipe supportsagainst pipe lugdesign criter1afor the pipingreevaluation lsaddressed 'inOI 37.

Section2.2 '.2.2.3.3.1,2.2.I2.2.4.3.1.4

Hote 2 100 HA

70107 SemimonthlyStatus ReportNo. 7Other F1ndlngs,Item 10

820212 830i06 PGSE Open Item:CLOSED Seven analyses were identified

for which the spectra sets usedwere not enveloped by theappropriate revised reorientedspectra.

The seven analyses havebeen rerun using appro-priate spectra sets andall remaining pip'inganalyses are being re-viewed to assure use ofappropriate spectra.Where required, analysesare be1ng rerun. Hodlfl-cat1on are being performedas requ1red.

Hew design analy-ses have beenperformed. Thecurrent designanalyses used theappropr1atespectra in accor-dance with OCP

Procedures P-lland P-29. ThisOI 1s closed', therev1ew of theremaining analysesand quallf icationof the associatedpipe supportsfor the pipingreevaluation areaddressed inOI 37.

Section2.2.1,2.2.1.3.2.2,2.2.22.2.2.3.2.12.2.2.3.3

Note 2 100 HA

70108 SemimonthlyStatus ReportNo. 7Other F1ndings,Item ll

820212 820910 PGEE Open Item:CLOSKD Dynamic properties used 'in the

se1sm1c qualification of theplant exhaust vent will bereviewed.

The plant vent des1gn waswas reviewed. Anappropriate model wasdeveloped. A dynam'icanalysis was performed.

A dynamicanalysts of the.plant vent hasbeen completed.The vent and itssupports havebeen determinedto meet criteria.1his item isclosed.

None 100 NA

AttachPage 6

INITIATING IDENTTASK DOCUHEHT DATE ECO DESCRIPT ION

STATUS Of PGandE OPEN ITEHS

STATUSDESCRIPTIOH Of RESOLUTION

CONCLUSIVESTATEHEHT

Or RESOLUTION

REFERENCE TO ERROR X 'A HODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL OEPOOT PEO lOUP COIIPLETE C~ONPLET

10109'emimonthly 820212 830916Status ReportHo. 1

Other findingsItem 12

TOlhl Semimonthly 820127 830h06Status Report CLOSEDNo. 8Open Item 13

PGGE Open Item:Some masses were representedincorrectly ln the formulationof the vertical dynamic modelof the containment interiorstructure. An investigationwill be made to determine thesign'lflcance of this matter.

PGLE Dpen Item:Numerous discrepancies havebeen identified between theas-built piping configurationsand the plplng isometricdrawings.

A design review of thevertical dynamic modelhas been made to deter-mine the slgnlflcance forthe containment inter lorstructure. Revised floorresponse spectra havebeen generated for threeframes: frame 2 and 3at elevation 101 ft, andframe 5 at elevation lh0ft of the model. Pipingand equipment will be re-lewed for the effect ofthese spectra changes andwhere required, reanalysiswill be performed.

Audits, drawing revisionsand, as necessary, plantmodlf lcatlons are beingperformed. field as-bullt checks are beingconducted to verifydesign information.

Piping analyseswere found to beunaffected by thespectra changes.qualifying spec-tra are found toenvelope the newspectra. Thisitem ls closedfor plplng(82060h). Equip-ment review lscontlnulng aspart of the In-ternal TechnicalProgram.

This OI lsclosed. Theconcerns relatedto as-builtpiping conf lgu-ratlons for thepiping reevalu-ation are addres-sed ln the DCP

Corrective ActionProgram forpiping and lnOI 37.

Section2.1.1

Section . kate 22.2.1,2.2.1.3.2.1,2 2 2.2.2.2.3.2.1,2.2.2.3.3

100 HA(forpiping)

100 HA

000hL/0018P-6

Attachment IVPage 7

INITIATINGtaSX OOCUNENT

IGENT

OATE ECO OESCRIPT ION

STATUS OF PGandE OPEN IlENS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESTATEHENT

OF RESOLUTION

REFERENCE TO ERROR 'X X NODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFTRRL REPORT PER TOVP CORPLETE C~ORPLET

70112 SemimonthlyStatus ReportNo. 8Open Item Ti

701 l3 SemimonthlyStatus ReportNo. 9Open Item 15

820224 820421CLOSEO

820309 830I06CLOSEO

PGdE Open Item:A def1ciency in the small boreseismic anchor movement des1gncriter'la document was foundduring rev1ew G requalificationof small bore p1p1ng forattached large bore p1p1ngrev1sed seismic di splacements.The instruction for pro)ectionof skewed 11nes into effectivelengths For the appropriateplanes resulted 1n greater- spanlengths than the true pro)ectedlength. The instruct1on willbe rev1sed and all small borep1ping rev1ewed and qual1fied.

PGGE Open Item:Oocumentation for qual1ficat1onof certa1n small bore p1pingsupport standard deta1ls forbidirectional loading cannot belocated. The ex ist ing s tandarddetails will be requal1f1ed.

The 1nstruction wascorrected. Small borep1plng attached todynam'Ically analyzed largebore piping was reviewedand reanalyzed usingcorrect pro)ected spanlengths.

The standard support de-ta1ls have been qual1f1edand modificat1ons will beperformed, 1f required.The effects of spectrarevisions and insula t1onweight was included inthe rev1ew.

Small bore pipingattached todynam1ca 1 lyanalyzed largebore piping hasbeen reviewed andanalyzed. Nomodi f icationswere found to berequired. Th1s1tem is closed.

The load capacityrating for smallbore pipe supportstandard detailshas been per-formed. This Ol1s closed; theacceptance ofinstallat1on ofsmall bore pipingfor the p1pingreevaluat1on isaddressed 1nOI 37.

Section C 100 NA2.2.2

Section Note 2 100 NA2.2.4,2.2.4.3.1.1

AttachPage 8

INITIATINGTASK OOCUNENT

IOENTOATE ECO OESCR IPT ION

STATUS Of PGandE OPEN ITENS

STATUSOESCRIPTION OF RESOLUTION

CONCLUSIVESTATEHEHT

Oj RESOLUTION

REFERENCE TO ERROR X 7( NOOIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IOPP CORPLETE CORPLETE

70144 Sem1monthlyStatus ReportHo. 9Open Item 16

70l45 SemimonthlyStatus ReportNo. 9Open Item 17

820309 830406 PGLE Open Item:CLOSED The ex1st1ng f1le 44.Hosqr1

hor'izontal seismic coef flcientfor the aux111ary buildingat elevat1on 163 ft is 5 ft.It should be 8.5.

820309 830406 PGGE Open Item:CLOSEO Seismic anchor movement (SAH)

eFfects were not addressed Forlarge bore PGGE des1gn Class I11nes that were installed byspan criteria and attached tocomputer analyzed lines.

The file 44 horizontaland vert1cal se1smiccoeffic1ents have beenverif1ed for consistencywith current spectra.Changes are be1ng rev1ewedfor effect on design andmod1ficat1ons performed,1f required.

All large bore pip1nghave been analyzed bycomputer. The effectsof SAH has beenconsidered.

The horizontaland verticalseismic coeffi-cients have beenverified for con-sistency withcurrent spectraand the pert1nentOCN. This OI 1sclosed: thequalification ofthe affectedp'Iping and pipesupports for thep1p1ng reevalu-ation 1s ad-dressed 1n OI 37.

All large boreClass I lineshave been 1dent1-fled and reana-lyzed by computerdynamic analysistechniques, wh1ch1nclude the SAHeffects. The OI1s closed; therequalificationoF pipe supportsfor the p1p1ngreevaluation isaddressed 1n OI37.

Section2.2.4,2.2.4.3.l.l,2.2.4.3.2.2

Section2.2.1,2.2.1.3.l.l

Note 2 100 HA

Note 2 100 HA

70146'em1monthly 820309 830916 PG&E Open Item:Status Report Class I equ1pment for theHo. 9 aux1liary saltwater systemOpen Item 18 1n the 1ntake structure were

qual1f1ed to the Hosgri groundresponse spectra 1nstead of thefloor response spectra.

Seism1c analyses forauxiliary saltwatersystem pip1ng and electri-cal condu1t are rev1ewed toassure that qua 1 1 ficat ionis ma1ntained. Qual if1-cation has been demon-strated for the aux171arysaltwater

pumps'orrect

floorresponse spectrahave beendeveloped. Qual-ification hasbeen demonstratedfor the aux111arysaltwater pumps.

Sect1on2.2.l,2.2.1.3.2.2,2.3.2.4,2.5

Aor 8 100(ASMpumpsonly)

HA(ASMpumps)

0004L/0018P-8

0

AttachPage 9

INITIATINGTASK OOCUHEHT

IDENTDATE ECO DESCRIPTION

STATUS OF PGandE OPEN ITEHS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESTATEKENT

OF RESOLUTIOH

REFERENCE TO ERROR 'A X KOOIFI-ITP PHASE I CLASS ANALYSIS CATIOHSFTIIRL REPORT PER TOVP CORPLETE CORPLETE

10148 SemimonthlyStatus ReportHo. 9Open Item 19

701 IT'emimonthlyStatus ReportHo. 9Open Item 20

820309 830808 PGdE Open Item:CLOSED The NRC considers that the 3D

analysis of the containmentpolar crane sho~s that theresults of the 2D non-linearanalysis included ln the Hosgrlreport are not conservative.

820309 830930 PGdE Open Item:The seismic analysis of thecontainment dome service craneutilized some results of the30 nonlinear polar craneanalysis. These analyses havenot yet been submitted for NRCreview.

The polar crane has beenreanalyzed to assure thatdesign compiles withseismic criteria. The 30analysis has identifiedareas that require stren-gthlng. Kodi f lcatlons havebeen designed and issuedfor construction.

The dome service crane lsbeing reanalyzed, usinginput from the polar craneanalysis.

The 3D analysisof the polarcrane has result-ed in

modificat-

ionss which arecomplete andacceptance lsunderway.

The dome servicecrane ls beingreanalyzed. Kod-lflcatlons arerequired.

Section2.1.1.5

Section2.1.1.5

A or 8 100

or 8 1ll 1jk

10161'emimonthly .820322 830916 PGdE Open Item:Status Report Calculat'lons made by EDS for liNo. 10 'In. HVAC duct support loadlngsOpen Item 21 used incorrect seismic response

spectra ln some cases. This mayhave resulted because thespectra provided by the DCP

(shown ln Appendix A of the EDScalculation file) inadvertentlyomitted des'Ignatlng the eleva-tion 163 ft spectra as pertain-ing to the auxiliary buildingonly. Apparently, EOS personnelmistakenly assumed that 'thosespectra could be used forseism'Ic loading at elevation163 ft ln the turbine bulldlng.

Hew response spectra atelevation 163 ft ln theturbine bulldlng havebeen developed by the DCP.The HVAC duct and ltssupports are being re-analyzed for these newspectra. The turbinebulldlng ls being checkedfor the new support loadsresulting from thereanalyzed HVAC ductsupports.

Section 82.5.3

OOOIL/0018P-9

Attachment IVPage 10

STATUS OF PGandE OPEN ITENS

TASKINITIATIHG

DOCUNEHTIDENT

~DAT ECD OESCRIPTIOHSTATUS

DESCRIPTIOH OF RESOLUTIOH .

CONCLUSIVESTATENENT

OF RESOLUTIO

REFERENCE TO ERROR ii iI NODIFI-ITP PHASE I CLASS ANALYSIS CATIOHSFIKRL REPORT PER IOTP COKPI~E ~COKPLET

101 12. Semimonthly 820<05 830106Status Report CLOSEDHo. llOpen Item 22

PGGE Open Item:The reactor coolant systempressur1zer supports and thecomponent cool1ng water heatexchanger were modeled 1n thepiping analyses as rig1d.Rigid model1ng may not beappropriate.

Rev1ew oF the pressurizersupport determined thest1ffness to be 2.04 x108 lb/in., wh1ch 1sconsistent with the01ablo Canyon criteria

. for modeling as rigid.The analys1s of pipingwith the actual componentcool1ng water heatexchanger stiffnessresulted 1n support load1ncreases but acceptablepipe stress. Act1ons are1n progress to 1dentifyall equipment that doesnot qual1fy for rigidmodel1ng and to performreanalys1s as required.

The stiffness ofthe pressurizersupports 1s con-sistent w1th theDCP criteria formodel1ng asrigid. The cur-rent des1gnanalys1s con-s1dered thef1ex1b111ty ofthe CCM heat ex-changer by apply-1ng the d1splace-ments of the HXat the nozzlein the seismicanchor movementanalysis. Allpip1ng stressesare w1thin allow-able values.Th1s OI 1sclosed; the addi-tional analysesand requal1fica-t1on of asso-ciated pipingsystems anchoredby equipment pre-viously modeledas r1gid for thep1ping reevalu-at1on are ad-dressed in OI 3TR

Sect1on2.2.1,2.2.1.3.3.2,2 ' 2.2.2.2.3.2.1

Hote 2 100 HA

e

Attact V

Page

INITIATING%ASK DOCUNEHT

IDEHTDATE ECO DESCRI PT ION

STATUS OF PGandE OPEH ITENS

STATUSDESCRIPTIOH OF RESOLUTIOH

CONCLUSIVESTATENEHT

OF RESOLUTIOH

REFEREHCE TO ERROR 'A X NOOIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IOTP C~ORPLET CONPLETE

7017I SemimonthlyStatus ReportHo. 12Open Item 23

820112 830108 PGLE Open Item:CLOSED The Blume Internal Review has

determ'ined that several computeranalyses were performed beforeit was required that allcomputer analyses be OAverified. Each such programls being investigated thoroughly.

OA veri fication was eitherconfirmed or provided forall runs of all programsused by URS/Blume forsafety-related structures.

Slx out of 86lcomputer runsneeded further OAveri f1cat ion.The small dif-ferences betweenthe results ofthe original s1xruns and thecorrespond1ngveri fication runswere 1nsignlf 1-cant. This itemis closed.

Appendix lA Deviation 100 NA

70175'emimonthlyStatus ReportHo. 12Open Item 2i

70176* SemimonthlyStatus ReportNo. 12Open Item 25

820III 830902 PGdE Open Item:The Blume Internal Review hasidentified several questionsconcerning the turbine buildinganalysis. These quest1ons arerelated to the mathematicalmodeling and computer analys1sof the bu1lding and to theeffect of some of the Hosgrland post-THI modif1cat1ons onthe bu1ldlng response.

820I20 830916 POKE Open Item:The Blume Internal Rev'lew has1dentlf'led questions related tothe selsm'Ic analysis of thecontainment interior. Thesequestions are lnsuf flclentlyaddressed ln the existingdocumentation of the analyses,and relate to the mass, shearvalues, stiffness, and to thecenters of mass and r1gidity ofthe model as well as to theinterpretation of some of theresults.

The DCP is reviewingeach area of concern todetermine its resolution.In addit1on, the DCP lsper form1ng parametr1cstud1es cons1derednecessary to ensure thatqualification lsmaintained.

The DCP ls reviewingeach area of concern.In addition, the OCP isperforming parametricstud1es considerednecessary to ensure thatquali fication Ismaintained.

Sect1on2.1.4

Section2.1.1

Open item

Open Item

000iL/0018P-11

<i

AttachmePage 12

INITIATINGTASK OOCUHEHT

IDENTDATE ECD DESCRIPTION

STAlus OF PGandE OPI,N IIENS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESl AlEHENI

OF RESOLUTION

REIEREHCE TO ERROR X X NODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IOTP COIIPLETE CONPLETE

70183 SemimonthlyStatus ReportNo. 13Open Item.26

70184 SemimonthlyStatus ReportNo. 13Open Item 27

820504 820611 PG8E Open Item:CLOSED The Blume Internal Review has

requested URS/Blume to revisethe auxiliary building reportto reflect the actual timeh1story used in the analysis(20 rather than 24 secbndslong) and to supplement thecalculations to demonstratethe appropr1ateness of thetruncated time-history.

820503 830418 PGEE Open Item:CLOSED The Blume Internal Review has

identif1ed a possible discrep-ancy 1n the correlat1on betweenintake structure 1nput spectrumand floor response spectra.Th1s may affect the intakestructure crane analysis. Itwas also noted that the intakestructure seism1c analysis d'Idnot include the effects of atsunami after possible se1sm1cdamage to the 1ntake flowd1vider walls.

lhe aux111ary buildingreport, '01ablo CanyonNuclear Power Plant,Aux111ary Build1ngOynam1c Seismic AnalysisFor the 7.5N HosgriEarthquake', has to berev1sed to reflect theactual t1me-history used1n the analysis performedby URS/Blume (20 ratherthan 24 seconds long).Calculat1ons to determ1nethe appropriateness of thetruncated time-historywere performed. Theanalysis was rerun us1ngthe 24-second timehistory. The resultsbetween the 24- and the20- second t1me-h1stor1eswere compared and foundto be 1dentical.

The DCP has developedfloor response spectrafor the 1ntake structureand has analyzedthe 1ntake structurecrane w1th these spectra.The effects of a tsunamion the 1ntake structurehave been reviewedand no modif1cat1onsare needed for tsunami.

'Ihe report hasbeen revised toreflect theactual time-history used.Calculations havebeen 1ncluded 1nrev1sion 1 of thecalculat1on f1leswh1ch demonstratethat the trun-cated t1me-h1story producesan identical re-sponse spectrumto that of theor1g1nal t1me-h1story. Th1s1tem is closed.

The 1ntake cranehas been qual1-fied with thecorrect floorresponse spectraand the intakestructure hasbeen rev1ewed forthe effects oftsunam1 forces.No mod1ficationswere needed as aresult of th1sopen item.

Section2.1.2

Sect1on2.1.5

C 100 HA

100 NA

0004L/0018P-12

Attachment IVPage 13

INITIATINGTASK OOCUHENT

IDENT~DAT )CO DESCR PT OH

STATUS OF PGandE OPEN ITENS

STATUSDESCRIPTIOH OF RESOLUTION

CONCLUSIVESTATEHENT

OF RESOLUTIOH

REFEREHCE TO ERROR X X HODIFI-ITP PHASE I CLASS ANALYSIS CATIDNSPERIL REPORT ~PER OTP C~ORPL T C~ORPLET

70185 SemimonthlyStatus ReportNo. 13Open Item 28

830131 830I18 PGKE Open Item:CLOSED An electr1cal design review has

found that 1ncorrect c1rcuitbreakers were supplied forcerta1n l25 VOC circuits.20,000 amp 1nterruptingcapacity breakers werespecified, however 10,000amp breakers were received.

20,000 amp interruptingcapac1ty breakers wereprocured and w111 be1nstalled.

Replacementbreakers havebeen 1nstalledthat meet spec1f-1cat1ons.

Hone A 100 100

70186 Sem1monthlyStatus ReportNo. 13Open Item 29

820507 830I06 PGdE Open Item:CLOSED P1pe support spacing tables for

noncomputer analyzed p1p1ng donot include (I) the effect ofpipe 1nsulation we1ght, or(2) piping greater than 1 1n.diameter.

New spacing tables wh1chcons1der the we1ght ofinsulation have beenprepared and the effecton pip1ng and supportdes1gn 1s be1ng deter-mined. Large bore pip1ngwill be reanalyzed bycomputer. Hodif1cat1ons,if requ1red, are beingmade.

The p1pe supportspacing tablesfor non-computeranalyzed Class Ismall bore p1p1ng(2'nd smaller)have been ver1-fied and theappropr1ate OCH

1ssued. Largebore pipe is com-puter analyzed asdictated by OCP

procedure. ThisOI is closed;qualificationof pipe supports,includ1ng theeffect of insu-lat1on weight, 1saddressed inOI 37.

Sect1on2.2.1,2 2 2.2 ~ 2 2 3 3 ~

2.2.4.3.2.2

Note 2 100 NA

70198 SemimonthlyStatus ReportHo. liOpen Item 30

820521 830207 PGGE Open Item:CLOSED During the add1t1on 1n 1979

of the control room pressur1-zat1on system, the vitalelectr1cal power supply tothe redundant control roomheating, vent1lation, and a1rconditioning (HVAC) system foreach unit was changed. Thischange defeated the ability ofthe Unit 1 control room HVACsystem to meet the singlefailure criteria if Un1t 2 werenot operating.

Transfer switches will beadded which will allowsystem components to besupplied from eitherUnit 1 or Un1t 2 powersources.

Th1s item 1sclosed on thebas1s that theconcern reportedand addressed inEOI File 8012 1sthe same concernreported 1n F1leOI 30.

Hone NA HA

AttacPage 1

INITIATINGTASV, 'DOCUHENT

IOEHTBATE ECO DESCRIPT ION

STATUS OF PGandE OPEN ITEH5

STATUSOESCRIPTIOH OF RESOLUTION

CONCLUSIVESTATEHEHT

OF RESOLUTION

REFERENCE TO ERROR 'A X HODIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IOVP COHPLETE COHPLETE

70202 SemimonthlyStatus ReportNo. 15Open Item 31

820601 830518 PG&E Open Item:CLOSED The 81ume Internal Review has

1dent1fied certain items whichrequire Further investigationto verify the acceptabilityoF welded pipe attachments atthe main steam and feedwaterpiping anchor. The anchor islocated on column 11ne G.

Reanalysis of the ma1nsteam and feedwaterpiping anchor pipeattachments and weldswill be performed. Thep1pe attachments andwe1ds designs will bereviewed to determinecompliance to seismiccr1teria. Hod1f1cat1onswill be performed, 1fnecessary.

The as-builtstructural eval-uation of themain steam andfeedwater G-11neanchor has beenperformed andconcludes thatthe support isacceptable with-out. modification.

Section A or 8 100 NA2 '.3.2.2.3.3.1

70203'em1monthlyStatus ReportHo. 15Open item 32

820607 830902 PG&E Open Item:Node'is and assumpt1ons used 1nthe analyses for the seismicqualif1cation of the fue1handling building steelsuperstructure may haveresulted 1n des1gns which donot totally satisfy allapplicable criter1a ~

A study has beenperformed to determinewhat modifications areneeded. The structure,with modif ications, hasbeen reanalyzed to assureconformance to criteria.Hodifications have beendes1gned and issued forconstruct1on.

OCH No. DCl-EC-3602 has been1ssued for modl-F1cat1on of thefuel handl1ngbuild1ng. The

'odifications

vill include ad-di t1ona1 brac1ng1n the walls androof, withstronger connec-tions throughoutthe bu11ding. Af1nal veri F ica-tion w111 bedone when modi-ficat1ons arecomplete and as-bullt information1s available.

Section2.1.3

les

000~u0018P-Ii

AttachmPage 15

tasvIN IT IATIHG

DOCUHEHTIDENTDATE ECO DESCRIPTION

STATUS Of PGandE OPEN ITEHS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESTATEHENT

OF RESOLUTIOH

REFERENCE TO ERROR 'A 'A NOOIFI-ITP PHASE I CLASS ANALYSIS CATIONSFINAL REPORT PER IOVP COHPLETE COHPLETE

70212'emimonthlyStatus ReportNo. 19Open Item 33

70327'emimonthlyStatus ReportHo. 28Open Item 3i

820813 830916 PGKE Open Item:A review of the Mosgri qualifi-cation calculations for Class IHVAC duct supports identifieda generic support type whichapparently does not satisfy theapplicable criteria.

821213 8309I6 PGLE Open Item:It has been postulated thatunder certain assumed failuremodes the CCM system may notmeet its licensing criteria.

A review of all Class 1

HVAC duct support designsis underway to determinetheir seismic adequacy.Nodlficattons will beperformed where necessary.

The OCP has provided in-Formation to the NRCpertaining to seismicqualification, basis for6io ocean temperature,and maximum flow/singlefailure analysis re-quest by the Staff.

The NRC is isexpected to issueSSER No. 16 onAugust 26, 1983.

Section2.5.I

4 or 8 1>> kkk

Open Item 99 0

70332'emimonthlyStatus ReportNo. 31Open Item 35

830207 830902 PGLE Open Item: The deficiencies in STRUOL-OeFiciencies have been identified II are being evaluated toin the PGKE STRUDL-11 computer determ'ine the impact onprogram. This general purpose analyses that have beenprogram is used in applications performed us'ing thissuch as platforms, base plates. computer program.pipe support frames, and race-way supports.

H/A

70333~ SemimonthlyStatus ReportNo. 31

Open Item 36

830207 830902 PGSE Open Item:A discrepancy has been identi-fied between recently compiledheat loads for the iOOV ac and125V dc switchgear areas andloads used in the original designoF the Class 1 ventilation systemserving these areas.

The system will bemodified so that the re-quired environmentalconditions will be met.In addition, all Class IHVAC systems are beingreviewed for adequatedocumentation oF heatloads.

New fans havebeen procured andwill be installedto ensure thatenvironmentalconditions meetthe design basis.

90

OOOIL/0018P-15

AttachPage 1

INITIATINGTASK DOCUHENT

IDENTDATE ECO DESCRIPTION

STATUS OF PGa OPLN IIEHS

STATUSDESCRIPTION OF RESOLUTION

CONCLUSIVESTATEHENT

OF RESOLUTIOH

REFERENCE TO ERROR X X HODIFI-ITP PHASE I CLASS ANALVSIS CATIOMSTIMAL IIEPORT PER TIIPP CORPLETE C~ORPLET

703' Sem1monthlyStatus ReportNo. 35Open Item 37

70341'emimonthlyStatus ReportNo. 36Open Item 38

70315'emimonthlyStatus ReportNo. 37Open Item 39

ODOIL/0018P-16

830106 830930 This 1s an administrative openitem to document and trackaspects of the piping reviewprogram. These aspects 1ncludethe gener1c portions of discre-panc1es covered by the er1st1ngopen items (Ols) and any otherdiscrepancies not explicitlycovered by existing EOIs. Alld1screpancies 1n the originalpiping designs have beenaddressed by the Diablo CanyonPro)ect Corrective Action Program(CAP) 1mplemented in August 1982.

This OI has been initiatedto document and track genericaspects of 41screpanc1es founddur1ng the course of the p1p'Ingreview work, and to track theresolut1on and completion of theent1re OCP CAP for piping. Itis the 1ntent1on of the DCP toclose each of the other pip'ing-related Ols (OI No. I, 5, 7, 9,10, 13, 15, 16, 17, 22, and 29)when resolution of the specific1ssues in each OI 1s completed.Hhen the p1ping review programis complete, OI No. 37 will beclosed.

830ll2 831031 Two radiation monitors for thefuel handling bu1ld1ng vent11-at1on system do not fully complywith Regulatory Guide 1.52.

830509 830902 Er1sting PGandE calculat1ons1ndicate that some rupturerestra1nt crushable bumpers1ns1de the conta1nment maynot be of suff1cient length toperform the1r 1ntended des1gnfunct1on.

The following piping-related OIs are consideredclosed because resolut1onof the specific 1ssues inthese OIs 1s completed:OI Nos. 1, 5, 7, 9, 10, 13,15, 16, 17, 22, and 29.

Instrumentation needsto be seismically qual1-f1ed, and w1r1ng needsto be separated toto comply with theregulatory guide.

The DCP 1s reevaluatingpipe rupture loads andthe capac1ty of piperupture restra1nts includ-1ng the crushable bumpers.Hinor hardware mod1f 1-cat1ons have beenidentified.

New instrumentloops thatcomply w1thRegulatory Gu1de1.52 will beinstalled. This1s not'a fuelload requirement.

Sections2.2.12.2.22.2.32.2.4

fO ~14

100 0

AttacPage 11

I HIT I AT IHGTASK DDCUNEHT

IDENTDATE ECO DESCRIPTION

STATUS OF PGandE OPEN ITENS

STATUSOESCRIPTIOH OF RESOLUTIOH

CONCLUSIVESTATEHEHT

OF RESOLUTIOH

REFERENCE TO ERROR A 5 MODIFI-ITP PHASE I CLASS ANALYSIS CATIOHSFINAL REPORT PER IDVP COHPLETF. CONPLETE

10361'emimonthlyStatus ReportHo. ilOpen Item 40

70372'emimonthlyStatus ReportNo. IlOpen Item ll

830627 831031 A revle~ of all saFety-relatedair-operated valves Identifiedfour (FCV-36',-365,-602, and-603) which do not entirelysatisfy funct'lonal criteria.Specifically, upon loss ofinstrument air, the valvesshould fail 'ln position'ndbe operable for a limitedtime.

830822 831021 This open item Involves theadequacy of bolt tighteningrequirements and slip capacityof bolted connections (as statedln the manufacturer's catalog)ln the track of galvanizedSuperstrut material used lnsupport of Class I raceways.

The review of all safety-related air-operatedvalves has been completed.Nodlflcatlons for thefour valves will beperformed.

Class I backupair supply isbeing added forfour valves.This ls not afuel loadrequirement.

A 100 0

Open Item

ODOIL/0018P-I 1