FIRST STREET TUNNEL
ENVIRONMENTAL ASSESSMENT
DISTRICT OF COLUMBIA
WATER AND SEWER AUTHORITY
DC CLEAN RIVERS PROJ ECT
WELCOME
The purpose of tonights meeting is to present the proposed
project to the public; present project impacts as described in
the Environmental Assessment (EA); and gather public input on
the proposed project and the EA.
PUBLIC MEETING
APRIL 24, 2013
6:30 P.M. 8:30 P.M.
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
2/13
What is a CombinedSewer Overflow or CSO?
DC Waters wastewater collection
system is comprised of 67% "separate"and 33% "combined" sewers.
Separate systems are comprised of twoindependent piping systems: one for"sanitary" sewage (i.e., sewage fromhomes and businesses) and one forstormwater.
Combined sewer systems convey bothsanitary sewage and stormwater in onepiping system.
During dry weather, sanitary wastescollected in the combined sewersystem are diverted to the Blue PlainsAdvanced Wastewater Treatment Plant.
The sanitary wastes are diverted at facilitiescalled regulators.
When the capacity of a combined sewer isexceeded during storms, the excess flow,which is a mixture of sewage andstormwater runoff, is discharged directlyinto the Anacostia and Potomac Rivers,
Rock Creek, or tributary waters.These discharges are referred to asCombined Sewer Overflow (CSO).
Release of this excess flow is necessary toprevent flooding in homes, basements,businesses, and streets.
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
3/13
DC Clean Rivers Project
In 2005, DC Water began implementing the DC Clean Rivers Project to Reduce flooding in the Northeast Boundary Drainage area, which
includes the Bloomingdale and LeDroit Park neighborhoods; and
Control CSOs to the Anacostia River, Potomac River, and Rock
Creek
The DC Clean Rivers Project is required to be completed by 2025 by a
Federal Consent Decree.
The Anacostia River Projects,
part of the DC Clean Rivers
Project, include the construction
of a system of large-diameter
tunnels to store and/or convey
CSOs.
In 2010, the National Park
Service and DC Water prepared
an Environmental Assessment
Report to assess potential
impacts of the Anacostia River
Projects.
Groundbreaking Event for the DC Clean Rivers Project
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
4/13
Four storms caused major flooding on J uly 10, 18, and 19, and September 2,
2012 in the Bloomingdale and LeDroit Park neighborhoods. In August 2012, Mayor Gray assembled the Mayors Task Force on the
Prevention of Flooding in Bloomingdale and LeDroitPark (Task Force),which included residents from the affected communities, governmentofficials, and DC Water representatives.
The Task Force was charged with advising the Mayor on the causes of andpotential actions to prevent flooding in Bloomingdale and LeDroitPark.
The Task Force developed a report submitted to the
Mayor in December 2012 that included a range ofrecommendations that could be implemented over theshort, medium, and long-term to reduce flooding.
Recommendations include:
Short-term Remedial Measures
Backwater Valve Program
Rain Barrel Program
Green Infrastructure Program
Medium-term MitigationStrategies
6 million gallons of CSO Storageat McMillan Sand Filtration Site
6 million gallons of CSO Storagein the First Street, NW Tunnel
Long-term Strategy
DC Clean Rivers Project a
system of tunnels and diversionsewers for the capture of CSOsto Rock Creek and theAnacostia and Potomac Riversfor treatment at DC WatersBlue Plains AdvancedWastewater Treatment Plant.
Mayors Task ForceFlood Relief Plan
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
5/13
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
6/13
PURPOSE: Flood relief for
Bloomingdale and LeDroit Parkneighborhoods.
Approximately 18.5 feet in diameterand 2,700 feet long.
Provide storage for 6 million gallonsof CSO.
40 to160 feet below ground.
Diversion chambers would beconstructed to divert CSOs to thetunnel for storage when the capacityof the existing sewer is exceeded.
Drop shafts would be constructed toconvey CSOs to the tunnel fromexisting sewer above.
CSO would be held in the tunnel untilflows in the existing sewers subside.
Construction of the First Street Tunnel
and related facilities would occur fromOctober 2013 through June 2016.
FIRST STREETTUNNEL
Project Overview
Cross Section of the First Street Tunnel
First Street Tunnel Schematic and Inflows
Hydraulic Profile of the First Street Tunnel
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
7/13
FIRST STREETTUNNEL
Project Benefits
Provide storage for an additional 6 million gallons of CSOto reduce flooding in the Bloomingdale and LeDroitParkneighborhoods.
Reduce the nuisance and economic costs caused byflooding.
Reduce risks to human health.
Prevent deterioration of historic resources from waterdamage caused by flooding.
Reduce untreated wastewater discharges into theAnacostia River.
A significant step toward a permanent solution to flooding inthe area.
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
8/13
FIRST STREETTUNNEL
Environmental Considerations
Parking, traffic, and public transportation would be temporarily
disrupted during construction periods.
Construction activities would generate noise in sensitiveresidential areas.
Vibrations caused by construction activities would be aboveambient levels.
Emissions from construction equipment, fugitive dust, and
numerous vehicular trips to and from construction sites wouldhave effects on local air quality.
Construction may require temporary disconnection of utilitiessuch as water, gas, and electric.
Alteration of the McMillan Sand Filtration Sitewould affect a local historic resource.
McMillan Sand Filtration PlantIngersoll-Rand G290 GeneratorSource: www.mascus.com
Dump TruckSource: www.ritchiewiki.com
Samuel Gompers House2122 First Street, NW, Bloomingdale
Crane-Mounted Drill Rig
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
9/13
FIRST STREETTUNNELConstruction Staging andAlternative Parking Locations
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
10/13
FIRST STREETTUNNEL
Construction Staging Areas
Adams Street Diversion Chamber, Drop Shaft, and Staging Area
Channing Street Mining Shaft and Sewer Connection
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
11/13
FIRST STREETTUNNEL
Construction Staging Areas
Thomas and First Street Temporary Pumping Station and Staging Area
V Street Diversion Chamber, Drop Shaft, and Staging Area
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
12/13
FIRST STREETTUNNEL
Parking and Traffic Study
Traffic Study being completed in coordinationwith DDOT
Alternative Parking identified to offset temporaryparking impacts
DC Fire and EMS will be provided continuousaccess to all residences
City Services (such as Trash Collection, Mail, etc.)will continue
Alternative Parking During Construction(approximately 90 spaces)
-
7/30/2019 DC Water First Street Tunnel Project EA Meeting_Boards 2013 04 24
13/13
FIRST STREETTUNNEL
How to Comment
You can submit your comments several different ways.Choose the one that is easiest for you.
1) Online at http://www.dcwater.com/FirstStreetTunnelEA
2) Email comments to [email protected]
3) Fax comments to (202) 787-2297
4) Mail comments to:
DC Clean Rivers Project
c/o First Street Tunnel Project EADC Water and Sewer Authority
5000 Overlook Ave., SW
Washington, DC 20032
DC Water values and welcomesyour input on this project!
Please be sure to submit your comments no later
than May 15, 2013.