DCS Solutions:DCS Solutions:Don JacksonDon Jackson
Chen Kiat YongChen Kiat Yong Sarah Doyle Sarah Doyle
Constructed Wetland Design at Constructed Wetland Design at Sipaulovi VillageSipaulovi Village
ObjectiveObjective
To design a wastewater collection and To design a wastewater collection and treatment facility for the village of treatment facility for the village of Sipaulovi, which meets the regulations Sipaulovi, which meets the regulations provided by Indian Health Service. This provided by Indian Health Service. This system must be able to incorporate the system must be able to incorporate the existing sewers, and create a central existing sewers, and create a central sewer system for the village, which will sewer system for the village, which will be easily incorporated into any new be easily incorporated into any new development within the village.development within the village.
DCS Solutions:DCS Solutions:Who Are We?Who Are We?
Don Jackson – Team LeaderDon Jackson – Team Leader– Main client contactMain client contact– Survey team leaderSurvey team leader– Grading experienceGrading experience
Chen Kiat YongChen Kiat Yong– Main design research Main design research – Permitting & regulationsPermitting & regulations
Sarah DoyleSarah Doyle– Main drafterMain drafter– Deliverable editingDeliverable editing
*All team members will be involved in the development of *All team members will be involved in the development of the final design and supporting calculationsthe final design and supporting calculations
ExperienceExperience
External ConsultantsExternal Consultants
John MeadJohn Mead– Main technical advisorMain technical advisor– Wastewater Technical SpecialistWastewater Technical Specialist– Institute for Tribal Environmental ProfessionalsInstitute for Tribal Environmental Professionals
Paul Gremillion, P.E.Paul Gremillion, P.E.– N.A.U ProfessorN.A.U Professor– Civil & Environmental DepartmentCivil & Environmental Department
Christine Laguna, P.E.Christine Laguna, P.E.– Civil EngineerCivil Engineer– Grading & Drainage SpecialistGrading & Drainage Specialist– CAD advisorCAD advisor
Jason NietoJason Nieto– Certified Plant OperatorCertified Plant Operator– Sipaulovi lagoonsSipaulovi lagoons– Main consultant for existing procedures, and feasibilityMain consultant for existing procedures, and feasibility
Erika Schoen, E.I.T.Erika Schoen, E.I.T.– Environmental EngineerEnvironmental Engineer– Indian Health ServiceIndian Health Service
Carl SeweyestewaCarl Seweyestewa– Land Information Systems SurveyorLand Information Systems Surveyor
IntroductionIntroduction
Problems with current systemProblems with current system– Future growth – population may double Future growth – population may double – Odors from existing facilityOdors from existing facility– No central sewer systemNo central sewer system
Sipaulovi VillageSipaulovi VillageProposed site
Aerial photoAerial photo
What Does The Client What Does The Client Want?Want? Prefers constructed wetland designPrefers constructed wetland design Wants to reuse effluent for non-edible Wants to reuse effluent for non-edible
crops (gourds, livestock fodder, etc…)crops (gourds, livestock fodder, etc…) TreesTrees Would like to attract birds and other Would like to attract birds and other
wildlifewildlife
The Ideal Design:The Ideal Design:
Cost effectiveCost effective– Low maintenanceLow maintenance
TreatmentTreatment– Bar screenBar screen– Flow meter Flow meter – Flow equalization/settling tankFlow equalization/settling tank– AIWPSAIWPS
Effluent disposalEffluent disposal– Constructed wetland Constructed wetland – No dischargeNo discharge
Engineering Cost Engineering Cost Estimate Estimate
Plans for the Future:Plans for the Future:
Site surveySite survey Research – permits & effluent re-Research – permits & effluent re-
useuse Alternative designsAlternative designs
– Is a CW feasible?Is a CW feasible? I.H.S. approvalI.H.S. approval Estimate cost of constructionEstimate cost of construction