ddsp stainless steelsp stainless steel ceiling · 2016-04-27 · 2. install a main t-bar with a...
TRANSCRIPT
![Page 1: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/1.jpg)
DSP STAINLESS STEELDSP STAINLESS STEEL
CEILING
Standard Ceiling Perforated Ceiling LED Ceiling
![Page 2: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/2.jpg)
CEILINGCEILINGSTANDARD
Standard Ceiling Perforated Ceiling LED Ceiling
![Page 3: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/3.jpg)
LINEUPSTANDARD CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
FinishDouble Type
Clip-bar Type
M-bar System Clip-bar Systemunit: mm
No. CD3600S
Size 300 x 600
Weight 575 (g)
Construction Method M-bar System
unit: mm
No. CD3600L
Size 300 x 600
Weight 530 (g)
Construction Method M-bar System
unit: mm
No. CCD3600S
Size 300 x 600
Weight 510 (g)
Construction Method
Clip-bar System
Open-hole Type
Ti-GoldSilver Ti-Bronze Ti-Black
Hard Bead blastBA
INOXTA Ceiling
![Page 4: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/4.jpg)
LINEUPSTANDARD CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
Embossed Pattern
unit: mm
Surface VERNOX (Ultra-thin stainless steel)
Surface material thickness 0.06 ~ 0.09
Back material / Thickness ZAM / 0.45
Product size 590 x 590 / 590 x 890 / (H): 10
Weight 1,580 (g)
Construction Method T-bar SystemTi-GoldSilver Ti-Bronze Ti-Black
Brush
Cube
Linen
Fan
Mesh
Snow Flower
Micro Chess
Shine Delta
VERNOX Ceiling
![Page 5: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/5.jpg)
LINEUPSTANDARD CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Standard type Drawing (590x590)
![Page 6: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/6.jpg)
LINEUPSTANDARD CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
Embossed Pattern
unit: mm
Surface VERNOX (Ultra-thin stainless steel)
Surface material thickness 0.06 ~ 0.09
Back material / Thickness ZAM / 0.45
Product size(Model: DSP VG 14) 440 (Installation Size)
460 (Product Size)
Walls
Length: max. 10m
Weight 2,400 (g) per 1 m
Construction Method T-bar System
Ti-GoldSilver Ti-Bronze Ti-Black
Brush
Cube
Linen
Fan
Mesh
Snow Flower
Micro Chess
Shine Delta
The product size will be different after installation, because it requires overlapping parts at the edge.
VERGATE Ceiling
![Page 7: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/7.jpg)
LINEUPSTANDARD CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
VERGATE Ceiling Detail Size
unit: mm
Depth (H) Material thickness (T) Intervals (P) Width (L) Length (B)
14 0.4 40 475 On Demand
![Page 8: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/8.jpg)
IMAGESTANDARD CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
INOXTA Ceiling
![Page 9: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/9.jpg)
IMAGESTANDARD CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
VERNOX Ceiling
![Page 10: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/10.jpg)
IMAGESTANDARD CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
VERGATE Ceiling
![Page 11: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/11.jpg)
Standard Ceiling Perforated Ceiling LED Ceiling
CEILINGCEILINGPERFORATED
![Page 12: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/12.jpg)
LINEUPPERFORATED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
FinishDouble Type
Clip-bar Type
M-bar System Clip-bar System
Open-hole Type
Ti-GoldSilver Ti-Bronze Ti-Black
Hard Bead blastBA
Perforated INOXTA Ceiling (Optional)SOUNDTEX
unit: mm
No. CD3600P
Size 300 x 600ø7.5 Hole
Weight 565 (g)
Construction Method M-bar System
unit: mm
No. CD3600PL
Size 300 x 600ø7.5 Hole
Weight 520 (g)
Construction Method M-bar System
unit: mm
No. CCD3600P
Size 300 x 600ø7.5 Hole
Weight 470 (g)
Construction Method
Clip-bar System
![Page 13: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/13.jpg)
LINEUPPERFORATED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
Embossed Pattern
Ti-GoldSilver Ti-Bronze Ti-Black
Brush
Cube
Linen
Fan
Mesh
Snow Flower
Micro Chess
Shine Delta
(Optional)SOUNDTEX
Perforated VERNOX Ceiling
unit: mm
Surface VERNOX (Ultra-thin stainless steel)
Surface material thickness 0.06 ~ 0.09
Back material / Thickness ZAM / 0.45
Product size 590 x 590 / 590 x 890 / (H): 10 / 3.5ø
Weight 1,270 (g)
Construction Method T-bar System
![Page 14: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/14.jpg)
LINEUPPERFORATED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
ø3.5 x 21% OPEN Perforated Quantity: 7,224
Perforated type Drawing (590x590)
![Page 15: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/15.jpg)
LINEUPPERFORATED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
Embossed Pattern
Ti-GoldSilver Ti-Bronze Ti-Black
Brush
Cube
Linen
Fan
Mesh
Snow Flower
Micro Chess
Shine Delta
The product size will be different after installation, because it requires overlapping parts at the edge.
(Optional)SOUNDTEX
Perforated VERGATE Ceiling
unit: mm
Surface VERNOX (Ultra-thin stainless steel)
Surface material thickness 0.06 ~ 0.09
Back material / Thickness ZAM / 0.45
Product size(Model: DSP VG 14) 440 (Installation Size)
460 (Product Size)
WallsLength:
max. 10mHole: 3.5ø
Weight 2,310 (g) per 1 m
Construction Method T-bar System
![Page 16: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/16.jpg)
IMAGEPERFORATED CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
Perforated INOXTA Ceiling
![Page 17: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/17.jpg)
IMAGEPERFORATED CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
Perforated VERNOX Ceiling
![Page 18: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/18.jpg)
IMAGEPERFORATED CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
Perforated VERGATE Ceiling
![Page 19: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/19.jpg)
Specifi cation : American Society for Testing Materials(ASTM) C423-90 and ASTME95-93
Material : Acoustic Ceiling Made with Aluminum SheetHole Size : 7.5 mmCavity : 15.748”(400mm)NRC : 0.75
* NRC (Noise Reduction Coeffi cient)
Soundtex made in Germany has a high performance of Sound absorbing.
American Standard1.0
0.8
0.6
0.4
0.2
0.0125
Frequency [Hz]
So
und
ab
sorp
tion
[alp
ha s
]
250 500 1000 2000 4000
[Hz] 125 250 500 1000 2000 4000
alpha s 0.97 0.80 0.64 0.73 0.79 0.83
About Soundtex (Perforated Type Only)
SOUNDTEX
Soun
d ab
sorp
tion
[alp
ha s]
Frequency [Hz]
![Page 20: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/20.jpg)
CEILINGCEILINGLED
Standard Ceiling Perforated Ceiling LED Ceiling
![Page 21: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/21.jpg)
LINEUPLED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
LED LightDouble Type
Specifi cation
LED Light Color
unit: mm
Input Output Electric Power Consumption
220 V / 60 Hz DC 36 V White / 22~25 WWarm White / 22~25 W
Clip-bar Type
White Warm White
LED INOXTA Ceiling
unit: mm
No. LCD3600S
Size 300 x 600
Weight 1155 (g)
Construction Method M-bar System
unit: mm
No. LCCD3600S
Size 300 x 600
Weight 1090 (g)
Construction Method
Clip-bar System
LED 84 holes(ø5).
LED 84 holes(ø5).
![Page 22: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/22.jpg)
LINEUPLED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
LED Detail
Available Color
Finish
M-bar System Clip-bar System
Ti-GoldSilver Ti-Bronze Ti-Black
Hard Bead blastBA
![Page 23: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/23.jpg)
LINEUPLED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
LED Light
Specifi cation
LED Light Color
unit: mm
Input Output Electric Power Consumption
220 V / 60 Hz DC 36 V White / 44~50 WWarm White / 44~50 W
White Warm White
LED VERNOX Ceiling
unit: mm
Surface VERNOX (Ultra-thin stainless steel)
Surface material thickness 0.06 ~ 0.09
Back material / Thickness ZAM / 0.45
Product size 590 x 590 / 590 x 890 / (H): 10
Weight 1,850 (g)
Construction Method T-bar System
![Page 24: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/24.jpg)
LINEUPLED CEILING
LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP
Available Color
Embossed Pattern
Ti-GoldSilver Ti-Bronze Ti-Black
Brush
Cube
Linen
Fan
Mesh
Snow Flower
Micro Chess
Shine Delta
LED Detail
![Page 25: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/25.jpg)
IMAGELED CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
LED INOXTA Ceiling
![Page 26: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/26.jpg)
IMAGELED CEILING
IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE
LED VERNOX Ceiling
![Page 27: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/27.jpg)
Why LED?
High Efficiency
Long LED Life span
Eco Friendly
Environment Friendly
Economic
" Conversion rate of electric energy to light."
“ The numbers are in and they’re better than we thought.“
" Contain no mercury, 90% of material recyclable."
" Less Maintenance and Save Electricity."
"Emit less heat""Attract less insects""No UV or harmful electro wave"
90% 40%
LED FlorescentLight
LED FluorescentLight
8,000 h
50,000 h
LED
Lamp
2 years 4 years 6 years
More than 10 years
8 years
Replace Lamp
No UV Less Heat
UV
![Page 28: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/28.jpg)
LED Lamp's economy
DSP LED Ceiling light saves approximately $23 per year.
Using 12hrs per day, electricity bill $0.1/kwh. Assuming fluorescent light needs replacement 2 times per year, but DSP LED Ceiling light replacement is not necessary.
Depending on product price and using condition, upper content may have difference.
DSP LED Ceiling light saves approximately $270 for 10 years.
Providing high-reliability product under strict quality control system can be used more than 10 years without replacement so it can save the cost.
DSP LED Lamp
50,000hrs
Annual maintenance costs (Unit: $) Comparison of the amount for 10 years (Unit: $)
Fluorescent light(36W)
DSP LED Lamp(100 W)
$9
$32
Electricity bill
$23
72%
Fluorescent light(36W)
DSP LED Lamp(100 W)
Total cost in 2-10 years
Total first year cost
61%$270
$396
$44
$89$81
![Page 29: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/29.jpg)
DSP CEILINGDSP CEILING
INSTALLATION
M-bar System-
-
-
Clip-bar System
T-bar System(VERNOX)
T-bar System(VERGATE)
![Page 30: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/30.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNNSTALLATIONNSTALLATIONM-BAR
Hanger Bolt ø9(Interval 900-1200)
Hanger H100
Carrying Channel
STS Ceiling
M-bar
![Page 31: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/31.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNNSTALLATIONNSTALLATIONM-BAR
Construction drawings
1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor. Then, fi x a carrying channel using hanger pins or bolts.
2. Install an M-bar with a carrying channel placed vertically and spaced at 30 cm apart.
3. Fix the M-bar and carrying channel using an M-bar clip.
4. After M-bar is installed, fi x the DSP Ceiling to the M-bar using the screw from the baseline.
![Page 32: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/32.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONINSTALLATIONCLIP-BAR
Hanger bolt ø9(Interval 900-1200)
Hanger H100
Carrying Channel
Clip-bar
STS Ceiling
![Page 33: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/33.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONINSTALLATIONCLIP-BAR
Construction drawings
1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor. Then, fi x a carrying channel using hanger pins or bolts.
2. Install a Clip-bar with a carrying channel placed vertically and spaced at 30 cm apart.
3. Fix the Clip-bar and a carrying channel using a Clip-bar clip.
4. After Clip-bar is installed, fi x the DSP Ceiling to the Clip-Bar furrow on the embossed area of the baseline.
![Page 34: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/34.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERNOX
Hanger bolt ø9(Interval 900-1200)
Hanger H100
Carrying Channel
VERNOX Ceiling
T-BAR
![Page 35: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/35.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERNOX
Construction drawings
1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor.
2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart.
3. Fix the main T-bar and a carrying channel using a C/T clip.
4. Install a main T-bar with a cross T-bar placed vertically and spaced at 60 cm apart.
5. After all T-bar is installed, place DSP Ceiling on T-bar wings to complete the installation.
![Page 36: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/36.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERGATE
Hanger bolt ø9(Interval 900-1200)
Hanger H100
VERGATE Ceiling
Carrying Channel
T-BAR
![Page 37: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar](https://reader034.vdocument.in/reader034/viewer/2022050212/5f5e5cbd090ea209641adcdb/html5/thumbnails/37.jpg)
INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERGATE
Construction drawings
1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor.
2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart.
3. Fix the main T-bar and a carrying channel using a C/T clip.
4. Install a main T-bar with a cross T-bar placed vertically and spaced at 60 cm apart.
5. After all T-bar is installed, place DSP Ceiling on T-bar wings to complete the installation.