Dear FLC-FUN Committee, If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following: Audio NOTE: For audio you MUST dial in on your phone. I will not be enabling the use of computer microphones, as this often causes feedback problems. Conference Number: US (Toll Free): 1-877-860-3058 Participant Code: 556009 URL to additional access numbers: https://www.mymeetingroom.com/cnums.asp?bwebid=8369444&ppc=556009&num=1-719-867-1571 Visual To join the meeting: http://nfpa.adobeconnect.com/jshapiro/ ---------------- If you have never attended an Adobe Connect meeting before: Test your connection: http://nfpa.adobeconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe logo and Adobe Connect are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and/or other countries. Best regards, Janna Shapiro Associate Engineer National Fire Protection Association [email protected] Office: (617)-984-7136 Cell: (617)-990-2827

Upload: others

Post on 31-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Dear FLC-FUN Committee, If you plan to attend the NFPA 30 Second Draft meeting remotely, please use the following: Audio NOTE: For audio you MUST dial in on your phone. I will not be enabling the use of computer microphones, as this often causes feedback problems. Conference Number: US (Toll Free): 1-877-860-3058 Participant Code: 556009 URL to additional access numbers: https://www.mymeetingroom.com/cnums.asp?bwebid=8369444&ppc=556009&num=1-719-867-1571 Visual To join the meeting: http://nfpa.adobeconnect.com/jshapiro/ ---------------- If you have never attended an Adobe Connect meeting before: Test your connection: http://nfpa.adobeconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe logo and Adobe Connect are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and/or other countries. Best regards, Janna Shapiro Associate Engineer National Fire Protection Association [email protected] Office: (617)-984-7136 Cell: (617)-990-2827

Page 2: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

FLCFUN.2016-06 Agenda.doc

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

MEMORANDUM

TO: NFPA 30 Technical Committee on Fundamentals

FROM: R. P. Benedetti

DATE: June 9, 2016

SUBJECT: Agenda for NFPA 30 Second Draft Meeting Wednesday June 22, 2016 — 1:00 PM to 5:00 PM

_________________________________________________________________________________ Ladies and Gentlemen: Attached is the Agenda for the NFPA 30, Flammable and Combustible Liquids Code, Second Draft meeting of the NFPA 30 Technical Committee on Fundamentals, to be held 1:00 PM to 5:00 PM, Wednesday, June 22, 2016, at the Marriott Hotel, Charleston SC. This Agenda will also be posted to the NFPA 30 Document Information Page at http://www.nfpa.org/30 If you have additional items for the Agenda, please bring them with you to the meeting. P.S. The last page of the Agenda is a summary of the motions and actions that can be taken on Public

Comments at the Second Draft Meeting. rpb/ cc FLCC Meeting Folder FLCFUN/NM

Page 3: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

FLCFUN.2016-06 Agenda.doc

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

AGENDA — NFPA 30 Second Draft Meeting

NFPA 30 Technical Committee on Fundamentals

Marriott Hotel, Charleston SC Wednesday, June 22, 2016, 1:00 PM to 5:00 PM

1. Call to Order. 2. Introduction of Attendees. Update of Committee Roster. [Attachment № A1] 3. Approval of Minutes of Last Meeting. (September, 2015, Austin TX) [Attachment № A2] 4. Report of Committee Chair. 5. Report of Staff Liaison.

Staff Presentation Technical Committee Membership Status. [Attachment № A3] Document Revision Schedule for Annual 2014 Cycle. [Attachment № A4]

6. Member Reports on Current Issues. [As Necessary] 7. Review and Act on Public Comments to the First Draft Report for the 2018 edition of NFPA 30.

Encl.: Public Comments - Chapters 1 through 7 & Annexes G and I [Attachment № A5] First Revisions & Committee Inputs [Attachment № A6]

8. Global Comment: Definitions of Container and Intermediate Bulk Container. Deletion of term “portable tank” in certain chapters.

[Attachment № A7] 9. Planning for Next Edition of NFPA 30: Annual 2020 Revision Cycle / NFPA 30-2021. [Public Input Closing Date is June 27, 2018] 10. Old Business. [NONE] 11. New Business. [NONE] 12. Schedule Next Meeting(s). 13. Adjournment.

Page 4: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Address List No PhoneFundamentals FLC-FUN

Flammable and Combustible Liquids

Robert P. Benedetti04/27/2016

FLC-FUN

Christopher J. Wieczorek

ChairFM Global1151 Boston-Providence TurnpikePO Box 9102Norwood, MA 02062-9102Alternate: John A. LeBlanc

I 1/14/2005FLC-FUN

Robert P. Benedetti

Secretary (Staff-Nonvoting)National Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

1/1/1994

FLC-FUN

Peter R. Apostoluk

PrincipalGreif Inc.366 Greif ParkwayDelaware, OH 43015

M 1/12/2000FLC-FUN

Jonathan R. Barber

PrincipalRCP Inc.801 Louisiana, Suite 200Houston, TX 77002

SE 8/2/2010

FLC-FUN

Gregory C. Brennecke

PrincipalLiberty Mutual Insurance1191 Second Avenue, Suite 900Seattle, WA 98101-2997Alternate: Todd Lalley

I 10/20/2010FLC-FUN

Anthony R. Cole

PrincipalAman Fire Engineering226 Stable WayNicholasville, KY 40356-8046

SE 12/08/2015

FLC-FUN

William V. F. Cosey

PrincipalSavannah River Nuclear Solutions, LLC2705 Roses RunAiken, SC 29803-7634

U 03/03/2014FLC-FUN

Curtis W. Crumholt

PrincipalTakasago International Corporation4 Volvo DriveRockleigh, NJ 07647

M 3/4/2008

FLC-FUN

Claire V. De Taeye

PrincipalTravelers Insurance Company75 Town Centre DriveRochester, NY 14623Alternate: Timothy S. Murphy

I 3/1/2011FLC-FUN

Carl M. Drechsel

PrincipalUS Department of the Air ForceHQ Air Combat Command Civil Engineering A701L129 Andrews Street, Suite 102Langley AFB, VA 23665

U 3/4/2008

FLC-FUN

Felix J. Garfunkel

PrincipalParsons Corporation100 High StreetBoston, MA 02110-1713

SE 10/20/2010FLC-FUN

Dwight H. Havens

PrincipalBechtel Marine Propulsion Corporation20 Bellflower RoadMalta, NY 12020-4431

U 7/24/1997

FLC-FUN

Jay J. Jablonski

PrincipalHSB PLC1 State Street, 9th FloorHartford, CT 06103-3199Alternate: David Upchurch

I 7/24/1997FLC-FUN

Alwin A Kelly

PrincipalJENSEN HUGHES3610 Commerce Dr Ste 817Baltimore, MD 21227Alternate: John J. Foley

SE 08/11/2014

1

bbenedetti
Text Box
Attachment No. A1
Page 5: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Address List No PhoneFundamentals FLC-FUN

Flammable and Combustible Liquids

Robert P. Benedetti04/27/2016

FLC-FUN

John W. King

PrincipalFederated Mutual Insurance Company121 East Park SquareOwatonna, MN 55060

I 1/14/2005FLC-FUN

Richard S. Kraus

PrincipalAPI/Petroleum Safety Consultants210 East Fairfax Street, Apt. 600Falls Church, VA 22046-2909American Petroleum InstituteAlternate: Clark D. Shepard

M 1/1/1990

FLC-FUN

Bob D. Morgan

PrincipalFort Worth Fire Department1000 Throckmorton StreetFort Worth, TX 76102

E 3/21/2006FLC-FUN

David P. Nugent

PrincipalGlobal Risk Consultants2037 Clover RoadNorthbrook, IL 60062-6422

SE 10/27/2009

FLC-FUN

Alfredo M. Ramirez

PrincipalUL LLC333 Pfingsten RoadNorthbrook, IL 60062-2096Alternate: Roland A. Riegel

RT 4/15/2004FLC-FUN

John W. Richmond, Sr.

PrincipalEastman Chemical CompanyPO Box 511 (B-54)Kingsport, TN 37662

M 7/29/2005

FLC-FUN

Peter M. Shank

PrincipalNuclear Service Organization1201 Market Street, Suite 1100Wilmington, DE 19801

I 4/15/2004FLC-FUN

Warren G. Stocker

PrincipalThe Albertson Companies5918 Stoneridge Mall RoadPleasanton, CA 94588

U 7/29/2005

FLC-FUN

Scott M. Tyler

PrincipalSasol North America1716 N. Woodland Forest DriveLake Charles, LA 70611Edison Electric Institute

U 12/08/2015FLC-FUN

Robert Upson

PrincipalNational Fire Sprinkler Association40 Jon Barrett RoadPatterson, NY 12563-2164National Fire Sprinkler Association

M 1/10/2008

FLC-FUN

Paul Wagner

PrincipalLeber/Rubes Inc. (LRI)2300 Yonge Street, Suite 2100Toronto, ON M4P 1E4 Canada

SE 10/20/2010FLC-FUN

Qingsheng Wang

PrincipalOklahoma State University494 Cordell SouthStillwater, OK 74078-8016

SE 10/23/2013

FLC-FUN

David B. Wechsler

PrincipalConsultant27706 Dalton Bluff CourtKaty, TX 77494-2729American Chemistry Council

U 10/27/2009FLC-FUN

Robert P. Wethington

PrincipalDow Corning Corporation760 Hodgenville RoadElizabethtown, KY 42701Alternate: Jeramie W. Morris

M 10/18/2011

2

Page 6: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Address List No PhoneFundamentals FLC-FUN

Flammable and Combustible Liquids

Robert P. Benedetti04/27/2016

FLC-FUN

John J. Foley

AlternateJENSEN HUGHES3500 Piedmont Road, Suite 750Atlanta, GA 30305-1559Principal: Alwin A Kelly

SE 7/14/2004FLC-FUN

Todd Lalley

AlternateLiberty Mutual Insurance10213 N Navaho DrSpokane, WA 99208 UsPrincipal: Gregory C. Brennecke

I 04/05/2016

FLC-FUN

John A. LeBlanc

AlternateFM Global1151 Boston-Providence TurnpikePO Box 9102Norwood, MA 02062-9102Principal: Christopher J. Wieczorek

I 1/14/2005FLC-FUN

Jeramie W. Morris

AlternateThe Dow Chemical CompanyMichigan Operations1790 Building Office 241Midland, MI 48667Principal: Robert P. Wethington

M 03/03/2014

FLC-FUN

Timothy S. Murphy

AlternateTravelers Insurance Company1000 Windward ConcourseAlpharetta, GA 30005-2052Principal: Claire V. De Taeye

I 03/03/2014FLC-FUN

Roland A. Riegel

AlternateUL LLC1285 Walt Whitman RoadMelville, NY 11747-3085Principal: Alfredo M. Ramirez

RT 4/15/2004

FLC-FUN

Clark D. Shepard

AlternateExxonMobil CorporationResearch & Engineering3225 Gallows Road, Room 3A2111Fairfax, VA 22037American Petroleum InstitutePrincipal: Richard S. Kraus

M 7/19/2002FLC-FUN

David Upchurch

AlternateHSB PLCPO Box 1088Cornelia, GA 30531Principal: Jay J. Jablonski

I 10/29/2012

FLC-FUN

Jeffrey J. Wanko

Nonvoting MemberUS Department of LaborOccupational Safety & Health Administration200 Constitution Ave. NW, Room N3119Washington, DC 20210

E 4/15/2004FLC-FUN

Jack Woycheese

Member Emeritus1649 Constable StreetPrescott, AZ 86301

SE 1/1/1994

FLC-FUN

Robert P. Benedetti

Staff LiaisonNational Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

1/1/1994

3

Page 7: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

Minutes of NFPA 30 First Draft Meeting

NFPA 30 Technical Committee on Fundamentals

Crowne Plaza Hotel, Austin TX Thursday, September 10, 2015, 1:00 PM to 5:00 PM

I. Participation J. R. Barber, RCP Incorporated

G. C. Brennecke, Liberty Mutual Insurance (via web conference) W. V. F. Cosey, Savannah River Nuclear Solutions, LLC C. V. De Taeye, Travelers Insurance Company (via web conference) J. J. Foley, JENSEN HUGHES (Alternate to A. A. Kelly) D. H. Havens, Bechtel Marine Propulsion Corporation

J. J. Jablonski, HSB PLC A. A. Kelly, JENSEN HUGHES J. W. King, Federated Mutual Insurance Company R. S. Kraus, Petroleum Safety Consultants (Rep. American Petroleum Institute)

J. A. LeBlanc, FM Global (Alternate to C. J. Wieczorek) B. D. Morgan, Fort Worth TX Fire Department (via web conference) T. S. Murphy, Travelers Insurance Company (Alternate to C. V. De Taeye) D. P. Nugent, Global Risk Consultants A. M. Ramirez, UL LLC J. W. Richmond, Sr., Eastman Chemical Company R. A. Riegel, UL LLC (Alternate to A. M. Ramirez) W. G. Stocker, The Albertson Companies R. Upson, National Fire Sprinkler Association

P. Wagner, Leber/Rubes Inc. (via web conference) J. J. Wanko, U. S. Occupational Safety and Health Administration (Nonvoting Member) R. P. Wethington, Dow Corning Corporation (via web conference) R. P. Benedetti, National Fire Protection Association, STAFF LIAISON & SECRETARY J. Shapiro, National Fire Protection Association, STAFF LIAISON GUESTS: S. Allwein, Morrison Brothers Company T. Blackford, Chevron Energy Technology Company G. Carter, Justrite Manufacturing Company LLC J. V. Cignatta, Datanet Engineering Inc. A. R. Cole, Aman Fire Engineering W. Geyer, Steel Tank Institute S. W. Haines, Haines Fire & Risk Consulting Corporation G. Hart, U.S. Chemical Storage P. E. Myers, PEMY Consulting LLC R. G. Schaffhauser, PPG Industries, Inc. J. M. Shapiro, International Code Consultants S. M. Tyler, Sasol North America D. B. Wechsler, Katy TX (Rep. American Chemistry Council) R. Young, Petroleum Equipment Institute

bbenedetti
Text Box
Attachment No. A2
Page 8: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Members Unable to Attend P. R. Apostoluk, Greif Incorporated

C. W. Crumholt, Takasago International Corporation C. M. Drechsel, U. S. Department of the Air Force – HQ Air Combat Command F. J. Garfunkel, Parsons Corporation

J. W. Morris, The Dow Chemical Company (Alternate to R. P. Wethington) P. M. Shank, Nuclear Service Organization

C. D. Shepard, ExxonMobil Corporation (Alternate to R. S. Kraus - Rep. American Petroleum Institute) D. Upchurch, HSB PLC (Alternate to J. J. Jablonski)

Q. Wang, Oklahoma State University C. J. Wieczorek, FM Global, CHAIR II. Minutes 1. The meeting was called to order at 1:40 PM on September 10, 2015 by Technical Committee

Chair pro Tempore John LeBlanc. 2. Attendees introduced themselves. The Technical Committee roster was corrected as needed. 3. The Minutes of the last meeting (June 2013, San Antonio TX) were unanimously approved as

submitted. 4. Technical Committee Chair had nothing to report. 5. The Staff Liaison reported on the following:

Scopes of Technical Correlating Committee and Technical Committees. The proposed amendments to the Committee scope statement were agreed upon. The Staff Liaison was directed to ballot the new scope statement.

Membership Status. The Staff Liaison reported on recent changes to committee membership and on the balance of interests on the committees.

Document Revision Schedule for NFPA 30-2018. The Staff Liaison reviewed the revision schedule for the Annual 2017 revision schedule.

6. There were no current issues to report to the Technical Correlating Committee. 7. The Technical Committee reviewed and took action on all public inputs to amend those chapters of

the 2015 edition of NFPA 30 that are under this Technical Committee’s jurisdiction. These included Public Inputs to Chapters 2, 3, 6, 7, and Annexes G and I, as well as two Global Inputs (low pressure dispensing containers; referenced standards). These resulted in 8 First Revisions and 3 Committee Inputs. With respect to the Global Input on low pressure dispensing containers, the Technical Committee determined that these were beyond the scope of NFPA 30 and should be dealt with under another Technical Committee project. The Staff Liaison was directed to proceed with the First Draft ballot.

8. There was no recent correspondence requiring the Technical Correlating Committee’s attention. 9. Under “Old Business”:

- The subject of inconsistencies between Chapter 7 of NFPA 30 and NFPA 497 will require establishing a joint task group, said task group likely to include representatives from Code Making Panel 14 of the National Electrical Code.

Page 9: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

- The subject of differences in liquid classification between NFPA 30 and the OSHA Globally Harmonized System was discussed and the Technical Committee determined to defer any consideration on the topic until there is some demonstrated need.

10. There was no new business requiring the Technical Committee’s attention. 11. The Technical Committee deferred to the Correlating Committee on scheduling the 2nd Draft

Meeting. 12. The meeting adjourned at 6:45 PM.

Page 10: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

FLCC Scope Statements & Member Balance.doc - 5/3/2016

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

COMMITTEE MEMBERSHIP BALANCE

TCC on Flammable & Combustible Liquids - FLC-AAC Principals: 12 M: 2 (17%)* U: 4 (33%) Voting Alternates: 0 I/M: 0 L/C: 0 Alternates: 4 R/T: 1 (8%) E: 0 Non-Voting: 5 I: 1 (8%) SE: 4 (33%) Emeritus: 3

Task Group: 0 Hold List: 1 Balance: OK

*(containers: 0 liquids: 2)

T/C on Fundamentals of Flammable & Combustible Liquids - FLC-FUN Principals: 27 M: 6 (22%)* U: 6 (22%)** Voting Alternates: 0 I/M: 0 L/C: 0 Alternates: 8 R/T: 1 (4%) E: 1 (4%) Non-Voting: 1 I: 6 (22%) SE: 7 (26%)

Emeritus: 1 Task Group: 0 Hold List: 6 Balance: OK

*(containers: 1 fire suppression equipment: 1 liquids: 4 tanks: 0) **(end user: 3 warehousing: 1)

T/C on Operations - FLC-OPS Principals: 30 M: 8 (27%)* U: 8 (27%) Voting Alternates: 0 I/M: 0 L/C: 0 Alternates: 15 R/T: 1 (3%) E: 0 Non-Voting: 1 I: 7 (23%) SE: 6 (20%) Emeritus: 1

Task Group: 0 Hold List: 5 Balance: OK

*(liquid handling equipment: 1 liquids: 7)

bbenedetti
Text Box
Attachment No. A3
Page 11: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

FLCC Scope Statements & Member Balance.doc - 5/3/2016

T/C on Storage & Warehousing of Containers & Portable Tanks - FLC-SWC

Principals: 29 M: 6 (21%)* U: 7 (25%) Voting Alternates: 0 I/M: 2 (4%)** L/C: 0 Alternates: 14 R/T: 1 (4%) E: 0 Non-Voting: 0 I: 7 (25%) SE: 6 (21%)

Emeritus: 1 Task Group: 0 Hold List: 4 Balance: OK

*(containers: 1 fire suppression systems: 1 liquids: 3 safety cabinets & cans: 1) **(fire suppression systems: 2)

T/C on Tank Storage & Piping Systems - FLC-TAN Principals: 27 M: 5 (18%)* U: 8 (30%) Voting Alternates: 0 I/M: 0 L/C: 0 Alternates: 13 R/T: 1 (4%) E: 1 (4%) Non-Voting: 1 I: 3 (11%) SE: 9 (33%) Emeritus: 4

Task Group: 0 Hold List: 4 Balance: OK

*(fire suppression systems: 0 liquid handling equipment: 2 tanks: 2

tank appurtenances: 1)

Page 12: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

2017 ANNUAL REVISION CYCLE *Public Input Dates may vary according to standards and schedules for Revision Cycles may change.  Please check the NFPA Website for the most up‐to‐date information on Public Input Closing Dates and schedules at 

www.nfpa.org/document # (i.e. www.nfpa.org/101) and click on the Next Edition tab. 

Process Stage 

 

Process Step  

Dates for TC 

Dates forTC with 

CC   Public Input Closing Date*  7/6/15  7/6/15 

  Final Date for TC First Draft Meeting  12/14/15  9/14/15 

Public Input  Posting of First Draft and TC Ballot  2/1/16  10/26/15 

Stage  Final date for Receipt of TC First Draft ballot  2/22/16  11/16/15 

`(First Draft)  Final date for Receipt of TC First Draft ballot ‐ recirc  2/29/16  11/23/15 

  Posting of First Draft for CC Meeting    11/30/15 

  Final date for CC First Draft Meeting    1/11/16 

  Posting of First Draft and CC Ballot    2/1/16 

  Final date for Receipt of CC First Draft ballot    2/22/16 

  Final date for Receipt of CC First Draft ballot ‐ recirc    2/29/16 

  Post First Draft Report for Public Comment  3/7/16  3/7/16 

 

  Public Comment closing date   5/16/16  5/16/16 

  Final Date to Publish Notice of Consent Standards (Standards that received no Comments) 

5/30/16  5/30/16 

  Appeal Closing Date for Consent Standards (Standards that received no Comments) 

6/13/16  6/13/16 

  Final date for TC Second Draft Meeting  10/31/16  7/25/16 

Comment  Posting of Second Draft and TC Ballot  12/12/16  9/5/16 

Stage    Final date for Receipt of TC Second Draft ballot  1/2/17  9/26/16 

(Second  Final date for receipt of TC Second Draft ballot ‐ recirc  1/9/17  10/3/16 

Draft)  Posting of Second Draft for CC Meeting    10/10/16 

  Final date for CC Second Draft Meeting    11/21/16 

  Posting of Second Draft for CC Ballot    12/12/16 

  Final date for Receipt of CC Second Draft ballot    1/2/17 

  Final date for Receipt of CC Second Draft ballot ‐ recirc    1/9/17 

  Post Second Draft Report for NITMAM Review  1/16/17  1/16/17 

 

Tech Session  Notice of Intent to Make a Motion (NITMAM) Closing Date  2/20/17  2/20/17 

Preparation  Posting of Certified Amending Motions (CAMs) and Consent Standards 

4/17/17  4/17/17 

(& Issuance)  Appeal Closing Date for Consent Standards   5/2/17  5/2/17 

  SC Issuance Date for Consent Standards   5/12/17  5/12/17 

 

Tech Session  Association Meeting for Standards with CAMs  6/4‐7/2017  6/4‐7/2017 

 

Appeals and  Appeal Closing Date for Standards with CAMs  6/27/17  6/27/17 

Issuance  SC  Issuance Date for Standards with CAMs  8/10/17  8/10/17 

 

Approved:  October 30, 2012                                                       Revised________________________ 

bbenedetti
Text Box
Attachment No. A4
Page 13: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 56-NFPA 30-2016 [ Global Input ]

These definitions of Protected and Unprotected Storage are intended for inclusion in Sections 9.2,10.2, 11.2, 13.2 and 16.2. The current definitions in Sections 9.3.4, 12.3.4 and 16.2.2 should bedeleted.

Protected: For the purposes of this chapter, this term shall apply to the storage of containers and IBCs thatmeet the appropriate provisions of Chapter 16 or alternate provisions that have been approved by theauthority having jurisdiction (See Sections 16.3.5 and 16.9).

Unprotected: For the purposes of this chapter, this term shall apply to the storage of containers and IBCsthat do not meet the criteria to be considered protected, as defined in section x.x.x

Annex for protected: The term protected indicates that the fire risk is managed so as to control the fire andprevent it from spreading beyond the design area of the automatic fire protection system.

Annex for unprotected: The term unprotected indicates that the growth of a fire may exceed the capabilitiesof the automatic fire protection system and extend beyond the design area of the system. In such cases,the total contents of the fire area may become involved in a fire, regardless of the protection featuresprovided.

Statement of Problem and Substantiation for Public Comment

This submission is on behalf of the Protection Task Group who wishes to expand the definitions.

Related Item

Committee Input No. 209-NFPA 30-2015 [Chapter 16]

Submitter Information Verification

Submitter Full Name: Claire De Taeye

Organization: Travelers Insurance Company

Street Address:

City:

State:

Zip:

Submittal Date: Mon May 16 13:49:54 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

1 of 176 6/13/2016 1:09 AM

bbenedetti
Text Box
Attachment No. A5
Page 14: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 47-NFPA 30-2016 [ Section No. 2.3.1 ]

2.3.1 API Publications.

American Petroleum Institute, 1220 L Street, NW, Washington, DC 20005-4070.

API Specification 12B, Bolted Tanks for Storage of Production Liquids, 16th edition, 2014.

API Specification 12D, Field Welded Tanks for Storage of Production Liquids, 11th edition, 2008.

API Specification 12F, Shop Welded Tanks for Storage of Production Liquids, 12th edition, 2008.

API Standard 620, Recommended Rules for the Design and Construction of Large, Welded, Low-PressureStorage Tanks, 12th edition, 2013.

API Standard 650, Welded Tanks for Oil Storage, 12th edition, 2013.

API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction, 5th edition, 2014.

API Standard 2000, Venting Atmospheric and Low-Pressure Storage Tanks, 7th edition, 2014.

API Standard 2350, Overfill Protection for Storage Tanks in Petroleum Facilities, 4th edition, 2012.

API Standard 12P Specification for Fiberglass Reinforced Plastic Tanks, 4th edition, 2016

Statement of Problem and Substantiation for Public Comment

1.API Specification 12P is referenced in the IFC and such tanks are preferred in the Petroleum Exploration and Production industry to separate produced water from produced crude oil in water separation and wash tanks. Produced water is contaminated with sulfur and other corrosive materials that is best processed in non-corrosive fiberglass tanks.2. API 12P (2016) has been upgraded to include the requirements for (a) electrostatic hazards that may accumulate on both the inside and outside fo the tank wall (i.e. static protection) and (b) lightning protection grounding, both of which are required to prevent such fire occurrences that have occurred in the past. 3. API 12P (2016) formalized their API Monogram quality control warranty program to Licensed manufacturers and includes manufacturing site inspections.

Related Item

First Revision No. 19-NFPA 30-2015 [Section No. 2.3]

Public Input No. 58-NFPA 30-2015 [Section No. 21.4.2.1.1]

Submitter Information Verification

Submitter Full Name: Sullivan Curran

Organization: Fiberglass Tank & Pipe Institute

Street Address:

City:

State:

Zip:

Submittal Date: Sun May 15 12:04:32 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

2 of 176 6/13/2016 1:09 AM

Page 15: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 25-NFPA 30-2016 [ Section No. 2.3.3 ]

2.3.3 ASTM Publications.

ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959.

ASTM A395/A395M, Standard Specification for Ferritic Ductile Iron Pressure-Retaining Castings for Use atElevated Temperatures, 1999 (reapproved 2014).

ASTM D5/D5M, Standard Test Method for Penetration of Bituminous Materials, 2013.

ASTM D56, Standard Test Method for Flash Point by Tag Closed Cup Tester, 2005 (reapproved 2010).

ASTM D86, Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure, 2012.

ASTM D92, Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester, 2012b.

ASTM D93, Standard Test Methods for Flash Point by Pensky-Martens Closed Cup Tester, 2015.

ASTM D323, Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method), 2015a.

ASTM D3278, Standard Test Methods for Flash Point of Liquids by Small Scale Closed-Cup Apparatus,1996 reapproved 2011).

ASTM D3828, Standard Test Methods for Flash Point by Small Scale Closed Cup Tester, 2012a.

ASTM D4359, Standard Test for Determining Whether a Material is a Liquid or a Solid, 1990 (reapproved2012).

ASTM E119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2014 2016 .

ASTM F852, Standard Specification for Portable Gasoline Containers for Consumer Use, 2008.

ASTM F976, Specification for Portable Kerosene and Diesel Containers for Consumer Use, 2008.

Statement of Problem and Substantiation for Public Comment

date update

Related Item

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

Zip:

Submittal Date: Wed May 04 14:40:05 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

3 of 176 6/13/2016 1:09 AM

Page 16: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 20-NFPA 30-2016 [ Section No. 3.3.12.2 ]

3.3.12.2 Intermediate Bulk Container.

Any closed vessel having a liquid capacity not exceeding 3000 L (793 gal) and intended for storing andtransporting liquids, as defined in Title 49, Code of Federal Regulations, Parts 100 through 199 or in Part 6of the United Nations’ Recommendations on the Transport of Dangerous Goods .

Statement of Problem and Substantiation for Public Comment

The Manual of Style requires that definitions not contain requirements or references to specific codes, standards or regulations. No public input was submitted on this issue.

Related Item

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

Zip:

Submittal Date: Wed May 04 14:17:48 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

4 of 176 6/13/2016 1:09 AM

Page 17: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 21-NFPA 30-2016 [ Section No. 3.3.19 ]

3.3.19 Fire Code.

The applicable fire code referenced in Chapter 2 of this code for the jurisdiction .

Statement of Problem and Substantiation for Public Comment

The Manual of Style requires that definitions not contain requirements or references to specific codes, standards or regulations. No public input was submitted on this issue.

Related Item

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

Zip:

Submittal Date: Wed May 04 14:22:40 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

5 of 176 6/13/2016 1:09 AM

Page 18: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 22-NFPA 30-2016 [ Section No. 3.3.20 ]

3.3.20 Fire Point.

The lowest temperature at which a liquid will ignite and achieve sustained burning when exposed to a testflame in accordance with ASTM D92, Standard Test Method for Flash and Fire Points by Cleveland OpenCup Tester an applicable fire point test .

Statement of Problem and Substantiation for Public Comment

The Manual of Style requires that definitions not contain requirements or references to specific codes, standards or regulations. No public input was submitted on this issue.

Related Public Comments for This Document

Related Comment Relationship

Public Comment No. 24-NFPA 30-2016 [Section No. 4.4]

Related Item

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

Zip:

Submittal Date: Wed May 04 14:23:33 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

6 of 176 6/13/2016 1:09 AM

Page 19: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 23-NFPA 30-2016 [ Section No. 3.3.21 ]

3.3.21 Flash Point.

The minimum temperature of a liquid at which sufficient vapor is given off to form an ignitible ignitablemixture with the air, near the surface of the liquid or within the vessel used, as determined by theappropriate test procedure and apparatus specified in Section 4 . 4.

Statement of Problem and Substantiation for Public Comment

The Manual of Style requires that definitions not contain requirements or references to specific codes, standards or regulations. No public input was submitted on this issue.

Related Item

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

Zip:

Submittal Date: Wed May 04 14:25:49 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

7 of 176 6/13/2016 1:09 AM

Page 20: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 37-NFPA 30-2016 [ New Section after 3.3.46 ]

TITLE OF NEW CONTENT

3.3.47 Rack . Any combination of vertical, horizontal, and diagonal members that supports storedmaterials. [ 1 , 2015]

3.3.47.1 Rack Bay. That space extending between two adjacent vertical uprights in the longitudinaldirection of the rack.

3.3.47.2* Rack Section. One or more racks bounded by aisles and/or walls.

A.3.3.47.2 Passageways that traverse the rack at grade level in the transverse direction with storedmaterials or commodities located in the rack above the passageway are not considered aisles for thepurpose of determining the extent of the rack section. Likewise, longitudinal and transverse flue spaces in arack are not considered aisles for the purpose of determining the extent of the rack section.

Statement of Problem and Substantiation for Public Comment

Chapters 12 & 16 use the word 'Rack', yet no definition exists in NFPA 30 for 'Rack'. Adding the global definition of 'Rack' extracted from NFPA 1 avoids conflicts with other codes and standards. Chapter 16 uses the term 'Rack Bay' in its protection criteria Schemes, yet no definition exists in NFPA 30 for 'Rack Bay'. No global definition of 'Rack Bay' exists in other NFPA documents and questions have been raised regarding what a 'Rack Bay' is. So, a definition has been created based on the Technical Committee's intent on how it is used in Chapter 16 and what the term typically references in the logistics and storage industries. Chapters 12 & 16 uses the term 'Rack Section', yet no definition exists in NFPA 30 for 'Rack Section'. No global definition of 'Rack Section' exists in other NFPA documents and questions have been raised regarding what a 'Rack Section' is. So, a definition has been created based on the Technical Committee's intent on what it is intended to reference with regards to storage racks.

Related Item

Committee Input No. 209-NFPA 30-2015 [Chapter 16]

Submitter Information Verification

Submitter Full Name: Anthony Ordile

Organization: Haines Fire & Risk Consulting Corporation

Street Address:

City:

State:

Zip:

Submittal Date: Wed May 11 17:07:51 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

8 of 176 6/13/2016 1:09 AM

Page 21: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 24-NFPA 30-2016 [ Section No. 4.4 ]

4.4 Determination of Flash Point.

The flash point of a liquid shall be determined according to the methods specified in 4.4.1 through 4.4.4.

4.4.1

Except as specified in 4.4.1.1, the flash point of a liquid having a viscosity below 5.5 centiStokes at 104°F(40°C) or below 9.5 centiStokes at 77°F (25°C) shall be determined in accordance with ASTM D56,Standard Test Method for Flash Point by Tag Closed Cup Tester.

4.4.1.1

Cut-back asphalts, liquids that tend to form a surface film, and liquids that contain suspended solids shallnot be tested in accordance with ASTM D56, even if they otherwise meet the viscosity criteria. Such liquidsshall be tested in accordance with 4.4.2.

4.4.2

The flash point of a liquid having a viscosity of 5.5 centiStokes or more at 104°F (40°C) or 9.5 centiStokesor more at 77°F (25°C) or a flash point of 200°F (93.4°C) or higher shall be determined in accordance withASTM D93, Standard Test Methods for Flash Point by Pensky-Martens Closed Cup Tester.

4.4.3

As an alternative, ASTM D3278, Standard Test Methods for Flash Point of Liquids by Small ScaleClosed-Cup Apparatus, shall be permitted to be used for paints, enamels, lacquers, varnishes, and relatedproducts and their components that have flash points between 32°F (0°C) and 230°F (110°C) andviscosities below 150 Stokes at 77°F (25°C).

4.4.4

As an alternative, ASTM D3828, Standard Test Methods for Flash Point by Small Scale Closed Cup Tester,shall be permitted to be used for materials other than those for which ASTM D3278 is specifically required.

4.4.5

Fire point shall be determined in accordance with ASTM D92, Standard Test Method for Flash and FirePoints by Cleveland Open Cup Tester .

Statement of Problem and Substantiation for Public Comment

This is connected with deleting the reference to ASTM D92 in the definition of fire point. No public input was submitted on this issue.

Related Public Comments for This Document

Related Comment Relationship

Public Comment No. 22-NFPA 30-2016 [Section No. 3.3.20]

Related Item

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

9 of 176 6/13/2016 1:09 AM

Page 22: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Zip:

Submittal Date: Wed May 04 14:27:45 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

10 of 176 6/13/2016 1:09 AM

Page 23: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 50-NFPA 30-2016 [ Section No. 7.3.3 ]

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

11 of 176 6/13/2016 1:09 AM

Page 24: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

7.3.3*

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

12 of 176 6/13/2016 1:09 AM

Page 25: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Table 7.3.3 shall be used to delineate and classify areas for the purpose of installation of electricalutilization equipment and wiring under normal operating conditions for Class I liquids, and Class II and IIIAliquids heated above their flash point . The determination of the classified area associated with Class IIIBliquids heated above their flash points shall be determined by an engineering evaluation, as required bySection 6.4, Hazard Analysis, or be in accordance with this table.

Table 7.3.3 Electrical Area Classifications

Entire

Location

NEC Class I

Extent of Classified AreaDivision Zone

Indoor equipment Equipmentinstalled indoors in accordancewith Section 7.3 whereflammable vapor–air mixturescan exist under normal operation

1 0

The entire area associated space associatedwith such equipment where flammable gasesor vapors are present continuously or for longperiods of time

1 1Area The space within 5 ft of any edge ofsuch equipment, extending in all directions

2 2

Area between The space between 5 ft and 8ft of any edge of such equipment, extendingin all directions; also, space up to 3 ft abovefloor or grade level within 5 ft to 25 fthorizontally from any edge of such

equipment1

Outdoor equipment ofEquipment installed outdoors, ofthe type covered in Section 7.3where flammable vapor–airmixtures can exist under normaloperation

1 0

The entire area associated space associatedwith such equipment where flammable gasesor vapors are present continuously or for longperiods of time

1 1Area The space within 3 ft of any edge ofsuch equipment, extending in all directions

2 2

Area The space between 3 ft and 8 ft of anyedge of such equipment, extending in alldirections; also, space up to 3 ft above flooror grade level within 3 ft to 10 ft horizontallyfrom any edge of such equipment

Tank storage installations insidebuildings

1 1All The space surrounding all equipmentlocated below grade level

2 2Any The space surrounding any equipmentlocated at or above grade level

Tank — aboveground, fixed roof 1 0 Inside The vapor space inside fixed-roof tank

1 1

Area The space inside dike of a dike wheredike height is greater than the distance fromthe tank to the dike for more than 50 percentof the tank circumference

2 2Within The space within 10 ft from shell,ends, or roof of tank; also, area inside thespace inside dike up to top of dike wall

1 0Area The space inside of any vent piping orany vent opening

1 1Within The space within 5 ft of open end ofvent, extending in all directions

2 2Area The space between 5 ft and 10 ft fromopen end of vent, extending in all directions

Tank — aboveground, floatingroof

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

13 of 176 6/13/2016 1:09 AM

Page 26: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Location

NEC Class I

Extent of Classified AreaDivision Zone

 With fixed outer roof 1 0Area The space between the floating andfixed-roof sections and within the shell

 With no fixed outer roof 1 1Area above The space above the floatingroof and within the shell

Tank vault — interior 1 1Entire interior volume The entire interiorspace of the vault , if Class I liquids arestored within

Underground tank fill opening 1 1Any pit, box, or space below grade level, ifany part is within a Division 1 or 2 or Zone 1or 2 classified location

2 2

Up to 18 in. above grade level within ahorizontal radius of 10 ft from a loose fillconnection and , or within a horizontalradius of 5 ft from a tight fill connection

Vent — discharging upward 1 0Area The space inside of vent piping oropening

1 1Within The space within 3 ft of open end ofvent, extending in all directions

2 2Area between The space between 3 ft and 5ft of open end of vent, extending in alldirections

Drum and container filling —outdoors or indoors

1 0Area inside The space inside the drum orcontainer

1 1Within The space within 3 ft of vent and fillopenings, extending in all directions

2 2

Area between The space between 3 ft and 5ft from vent or fill opening, extending in alldirections; also, up to 18 in. above floor orgrade level within a horizontal radius of 10 ftfrom vent or fill opening

Pumps, bleeders, withdrawalfittings

 Indoor 2 2

Within 5 ft of any edge of such devices,extending in all directions; also, up to 3 ftabove floor or grade level within 25 fthorizontally from any edge of such devices

 Outdoor 2 2

Within 3 ft of any edge of such devices,extending in all directions; also, up to 18 in.above grade level within 10 ft horizontallyfrom any edge of such devices

Pits and sumps

 Without mechanical ventilation 1 1Entire area The entire space within a pit orsump if any part is within a Division 1 or 2 orZone 1 or 2 classified location

 With adequate mechanicalventilation

2 2Entire area within The entire space within apit or sump if any part is within a Division 1 or2 or Zone 1 or 2 classified location

Containing valves, fittings, orpiping, and not within a Division 1or 2 or Zone 1 or 2 classifiedlocation

2 2 Entire The entire pit or sump

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

14 of 176 6/13/2016 1:09 AM

Page 27: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Location

NEC Class I

Extent of Classified AreaDivision Zone

Drainage ditches, separators,impounding basins

 Outdoor 2 2

Area up The space up to 18 in. above ditch,separator, or basin; also, area up thespace up to 18 in. above grade within 15 fthorizontally from any edge

 Indoor Same as pits and sumps

Tank vehicle and tank car2

 Loading through open dome 1 0 Area inside The space inside of the tank

1 1Within The space within 3 ft of the edge ofdome, extending in all directions

2 2Area The space between 3 ft and 15 ft fromedge of dome, extending in all directions

Loading through bottomconnections with atmosphericventing

1 0 Area The space inside of the tank

1 1Within The space within 3 ft of point ofventing to atmosphere, extending in alldirections

2 2

Area between The space between 3 ft and15 ft from the point of venting to atmosphere,extending in all directions; also, the space upto 18 in. above grade within a horizontalradius of 10 ft from point of the loadingconnection

Loading through closed domewith atmospheric venting

1 1Within The space within 3 ft of open end ofvent, extending in all directions

2 2

Area between The space between 3 ft and15 ft from open end of vent, extending in alldirections; also, the space within 3 ft of edgeof dome, extending in all directions

Loading through closed domewith vapor control

2 2Within The space within 3 ft of point ofconnection of both fill and vapor lines,extending in all directions

Bottom loading with vapor controlor any bottom unloading

2 2

Within The space within 3 ft of point ofconnections, extending in all directions; also,up to 18 in. above grade within a horizontalradius of 10 ft from point of connections

Storage and repair garage fortank vehicles

1 1 All pits or spaces below floor level

2 2Area up The space up to 18 in. above flooror grade level for entire storage or repairgarage

Garages for other than tankvehicles

Ordinary

If there is any opening to these rooms withinthe extent of an outdoor classified location,the entire room shall be classified the sameas the area classification at the point of theopening

Outdoor drum storage Ordinary

InsideLiquid storage rooms orhazardous material storage

2

Ordinary2 Ordinary

The entireroom or

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

15 of 176 6/13/2016 1:09 AM

Page 28: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Location

NEC Class I

Extent of Classified AreaDivision Zone

lockers used for the storage ofClass I liquids with flammableliquid transfer

Liquid storage rooms orhazardous material storagelockers used for the storage ofClass I liquids with no flammableliquid transfer

locker

Indoor warehousing where thereis no flammable liquid transfer

Ordinary

If there is any opening to these rooms withinthe extent of an indoor classified location, theclassified location shall extend through theopening to the same extent as if the wall,curb, or partition did not exist

Office and rest rooms Ordinary

If there is any opening to these rooms withinthe extent of an indoor classified location, theroom shall be classified the same as if thewall, curb, or partition did not exist

Piers and wharves See Figure 29.3.22.

For SI units, 1 in. = 25 mm; 1 ft = 0.3 m.

1The release of Class I liquids can generate vapors to the extent that the entire building, and possibly anarea surrounding it, should be considered a Class I, Division 2, or Zone 2 location.

2When classifying extent of area, consideration should be given to the fact that tank cars or tank vehiclescan be spotted at varying points. Therefore, the extremities of the loading or unloading positions should beused.

Statement of Problem and Substantiation for Public Comment

A Task Group of the NFPA 30 Fundamentals Committee was created when the Committee identified the need to review Chapter 7 in light of ongoing updates of the recommended practice for establishing electrical classification of hazardous locations in chemical process areas, by the NFPA 497 Committee. The Task Group recognizes that the NFPA 30, Chapter 7 establishes requirements, not recommended practices, that are applied broadly to more than just chemical process areas. The recommended practices documented in NFPA 497 and the requirements in NFPA 30 are to be applied with engineering judgment. When addressing the need for electrical area classification, under the same conditions, the two documents should not conflict without reason. The objective of this proposal is to minimize conflicts between the two documents.

Related Item

Committee Input No. 401-NFPA 30-2015 [Section No. 7.3.3]

Submitter Information Verification

Submitter Full Name: Dwight Havens

Organization: Bechtel Marine Propulsion Corp

Street Address:

City:

State:

Zip:

Submittal Date: Sun May 15 15:29:04 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

16 of 176 6/13/2016 1:09 AM

Page 29: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Public Comment No. 6-NFPA 30-2016 [ Section No. I.1.2.6 ]

I.1.2.6 ASTM Publications.

ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959.

ASTM C1055, Standard Guide for Heated System Surface Conditions that Produce Contact Burn Injuries,2003 (reapproved 2014).

ASTM D4206, Standard Test Method for Sustained Burning of Liquid Mixtures Using the Small ScaleOpen-Cup Apparatus, 1996 (reapproved 2013).

ASTM D4207, Standard Test Method for Sustained Burning of Low Viscosity Liquid Mixtures by the WickTest, 1991 (withdrawn 1998) .

ASTM D4956, Standard Specification for Retroreflective Sheeting for Traffic Control, 2013.

ASTM D6469, Standard Guide for Microbial Contamination in Fuels and Fuel Systems, 2014.

ASTM E119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2015 2016 .

ASTM E502, Standard Test Method for Selection and Use of ASTM Standards for the Determination ofFlash Point of Chemicals by Closed Cup Methods, 2007e1 (reapproved 2013).

ASTM E1529, Standard Test Methods for Determining Effects of Large Hydrocarbon Pool Fires onStructural Members and Assemblies, 2014a

Manual on Flash Point Standards and Their Use, 1992.

Statement of Problem and Substantiation for Public Comment

Standard added in public input and comment

Related Public Comments for This Document

Related Comment Relationship

Public Comment No. 5-NFPA 30-2016 [Section No. A.22.5.2.4]

Related Item

Public Input No. 83-NFPA 30-2015 [Section No. A.22.5.2.4]

Submitter Information Verification

Submitter Full Name: Marcelo Hirschler

Organization: GBH International

Street Address:

City:

State:

Zip:

Submittal Date: Thu Mar 24 21:46:13 EDT 2016

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

176 of 176 6/13/2016 1:09 AM

Page 30: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 19-NFPA 30-2015 [ Section No. 2.3 ]

2.3 Other Publications.

2.3.1 API Publications.

American Petroleum Institute, 1220 L Street, NW, Washington, DC 20005-4070.

API Specification 12B, Bolted Tanks for Storage of Production Liquids, 15 16 th edition, 2008 2014 .

API Specification 12D, Field Welded Tanks for Storage of Production Liquids, 11th edition, 2008.

API Specification 12F, Shop Welded Tanks for Storage of Production Liquids, 12th edition, 2008.

API Standard 620, Recommended Rules for the Design and Construction of Large, Welded,Low-Pressure Storage Tanks, 11th 12th edition, Addendum 2, 2010 2013 .

API Standard 650, Welded Steel Tanks for Oil Storage, 11th 12th edition, Addendum 2, 2009 2013 .

API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction, 4th 5th edition, 2012 2014 .

API Standard 2000, Venting Atmospheric and Low-Pressure Storage Tanks, 5th 7th edition, 1998 2014 .

API Standard 2350, Overfill Protection for Storage Tanks in Petroleum Facilities, 4th edition, 2012.

2.3.2 ASME Publications.

American Society of Mechanical Engineers, Two Park Avenue, New York, NY 10016-5990.

ASME Boiler and Pressure Vessel Code, 2010 2015 .

ASME B31, Code for Process Pressure Piping, 2012 .

ASME Code for Unfired Pressure Vessels,2010 2015 .

2.3.3 ASTM Publications.

ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959.

ASTM A395/A395M, , Standard Specification for Ferritic Ductile Iron Pressure-Retaining Castings for Useat Elevated Temperatures, 1999 (reaffirmed 2009) (reapproved 2014) .

ASTM D5/D5M, Standard Test Method for Penetration of Bituminous Materials, 2013.

ASTM D56, Standard Test Method for Flash Point by Tag Closed Cup Tester, 2005(reaffirmed reapproved 2010).

ASTM D86, Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure, 2012.

ASTM D92, Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester, 2012b.

ASTM D93, Standard Test Methods for Flash Point by Pensky-Martens Closed Cup Tester, 2012 2015 .

ASTM D323, Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method),2008 2015a .

ASTM D3278, Standard Test Methods for Flash Point of Liquids by Small Scale Closed-Cup Apparatus,1996 (reaffirmed reapproved 2011).

ASTM D3828, Standard Test Methods for Flash Point by Small Scale Closed Cup Tester, 2012a.

ASTM D4359, Standard Test for Determining Whether a Material is a Liquid or a Solid, 1990(reaffirmed reapproved 2012).

ASTM E119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2012a 2014 .

ASTM F852, Standard Specification for Portable Gasoline Containers for Consumer Use, 2008.

ASTM F976, Specification for Portable Kerosine Kerosene and Diesel Containers for Consumer Use,2008.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

1 of 163 6/13/2016 1:30 AM

bbenedetti
Text Box
Attachment No. A6
Page 31: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

2.3.4 CSA America Publications.

Canadian Standards Association, 5060 Spectrum Way, Mississauga 178 Rexdale Blvd, Toronto , ON,L4W 5N6 M9W 1R3 , Canada.

CSA B51, Boiler, Pressure Vessel and Pressure Piping Code, 2009 2014, Update 1, 2014 .

2.3.5 FM Publications.

FM Global, 1301 Atwood 270 Central Avenue, P.O. Box 7500, Johnston, RI 02919.

Approval Standard for Safety Intermediate Bulk Containers, Class Number 6020, December 2010.

Approval Standard for Storage Cabinets (Flammable and Combustible Liquids) , Class Number 6050,December 1996.

Approval Standard for Safety Containers and Filling, Supply, and Disposal Containers, Class Number6051 and 6052, May 1976.

Approval Standard for Plastic Plugs for Steel Drums, Class Number 6083, October 2006.

2.3.6 NMFTA Publications.

National Motor Freight Traffic Association, 1001 North Fairfax Street, Suite 600, Alexandria, VA 22314.

National Motor Freight Classification (NMFC), 2012.

2.3.7 NRFC Publications.

National Railroad Freight Committee, 222 South Riverside Plaza, Chicago, IL 60606-5945.

Uniform Freight Classification (UFC), 2005.

2.3.8 STI/SPFA Publications.

Steel Tank Institute, 570 Oakwood Road /Steel Plate Fabricators Association, 944 Donata Ct , LakeZurich, IL 60047.

STI SP001, Standard for the Inspection of Aboveground Storage Tanks, 5th edition, 2011.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

2 of 163 6/13/2016 1:30 AM

Page 32: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

2.3.9 UL Publications.

Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096.

ANSI/UL 30, Standard for Metal Safety Cans, 1995, Revised 2009 revised 2014 .

UL 58, Standard for Steel Underground Tanks for Flammable and Combustible Liquids, 1996,Revised revised 1998 2008 .

ANSI/UL 80, Standard for Steel Tanks for Oil -Burner Fuels and Other Combustible Liquids, 2007,Revised revised 2009 2014 .

ANSI/UL 142, Standard for Steel Aboveground Tanks for Flammable and Combustible Liquids, 2006,Revised 2010 revised 2014 .

UL 971, Standard for Nonmetallic Underground Piping for Flammable Liquids, 1995, Revised revised2006.

ANSI/UL 499, Electric Heating Appliances, 2008 2014 .

ANSI/UL 1275, Standard for Safety for Flammable Liquid Storage Cabinets, 2008 2014 .

ANSI/UL 1313, Standard for Nonmetallic Safety Cans for Petroleum Products, 1993,Revised revised 2007 2012 .

ANSI/UL 1316, Standard for Glass-Fiber Reinforced Plastic Underground Storage Tanks for PetroleumProducts, Alcohols, and Alcohol-Gasoline Mixtures, 2006.

ANSI/UL 1746, Standard for External Corrosion Protection Systems for Steel Underground Storage Tanks,2007 revised 2014 .

UL 2080, Standard for Fire Resistant Tanks for Flammable and Combustible Liquids, 2000.

ANSI/UL 2085, Standard for Protected Aboveground Tanks for Flammable and Combustible Liquids,1997, Revised revised 2010.

ANSI/UL 2208, Standard for Solvent Distillation Units, 2005, Revised revised 2011.

ANSI/UL 2245, Standard for Below-Grade Vaults for Flammable Liquid Storage Tanks, 2006.

UL 2368, Standard for Fire Exposure Testing of Intermediate Bulk Containers for Flammable andCombustible Liquids, 2012 2014 .

2.3.10 UN Publications.

United Nations Headquarters, New York, NY 10017.

Recommendations on the Transport of Dangerous Goods, 17th 19th revised edition, 2011.

2.3.11 U.S. Government Publications.

U.S. Government Printing Publishing Office, Washington, DC 20402.

Title 33, Code of Federal Regulations, “Navigation and Navigable Waters,” Parts 154, 155, and 156.

Title 46, Code of Federal Regulations, “Shipping,” Parts 30, 32, 35, and 39.

Title 49, Code of Federal Regulations, “Transportation,” Parts 100–199.

2.3.12 Other Publications.

Merriam-Webster’s Collegiate Dictionary, 11th edition, Merriam-Webster, Inc., Springfield, MA, 2003.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Mon Sep 14 14:27:16 EDT 2015

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

3 of 163 6/13/2016 1:30 AM

Page 33: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Committee Statement

Committee Statement: Referenced current SDO names, addresses, standard names, and years.

Response Message:

Public Input No. 5-NFPA 30-2015 [Section No. 2.3]

Public Input No. 38-NFPA 30-2015 [Section No. 2.3.1]

Public Input No. 81-NFPA 30-2015 [Section No. 2.3.3]

Public Input No. 78-NFPA 30-2015 [Section No. 2.3.9]

Public Input No. 84-NFPA 30-2015 [Section No. 2.3.9]

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

4 of 163 6/13/2016 1:30 AM

Page 34: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

5 of 163 6/13/2016 1:30 AM

Page 35: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 409-NFPA 30-2015 [ Section No. 2.4 ]

2.4 References for Extracts in Mandatory Sections.

NFPA 52, Vehicular Gaseous Fuel Systems Code, 2013 2016 edition.

NFPA 55, Compressed Gases and Cryogenic Fluids Code, 2013 2016 edition.

NFPA 77, Recommended Practice on Static Electricity, 2014 edition.

NFPA 101®, Life Safety Code®, 2015 edition.

NFPA 307, Standard for the Construction and Fire Protection of Marine Terminals, Piers, and Wharves,2011 2016 edition.

NFPA 400, Hazardous Materials Code, 2013 2016 edition.

NFPA 5000®, Building Construction and Safety Code®, 2015 edition.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 06 14:13:05 EDT 2015

Committee Statement

Committee Statement: Reference documents have been updated to current editions.

Response Message:

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

6 of 163 6/13/2016 1:30 AM

Page 36: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

7 of 163 6/13/2016 1:30 AM

Page 37: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Committee Input No. 1-NFPA 30-2015 [ New Section after 3.3 ]

General Definition: Protected Storage

Protected Storage: Storage installed after January 1, 1997, that is protected in accordance with Chapter 16 or through an alternate means of protection that has been approved by the authority having jurisdiction(See 16.3.5 and Section 16.9 .). This storage classification designates a fire risk that is managed toprovide fire control and limit the extent of fire size at or below the design area of the automatic fireprotection system..

General Definition: Unprotected Storage

Unprotected Storage: Any storage configuration that does not meet the definition of protected storage. This storage classification implies that should a fire occur, the total contents of the fire area may becomeinvolved in a fire, regardless of the fire protection features provided.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Thu Sep 10 17:22:57 EDT 2015

Committee Statement

CommitteeStatement:

The committee determined that the proposed criteria for describing protected vs. unprotectedstorage is not uniformly explained so that it should be included in chapter 3 as a general definition.Therefore, the committee is considering including the proposed definitions or an amended versionthereof into Section 16.2. The committee solicits opinions or suggestions on this issue. Theresolution of this issue will be tasked to the Task Group on Protection Criteria.

ResponseMessage:

Public Input No. 75-NFPA 30-2015 [New Section after 3.3]

Ballot Results

This item has not been balloted

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

8 of 163 6/13/2016 1:30 AM

Page 38: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Committee Input No. 27-NFPA 30-2015 [ Section No. 3.3 ]

3.3 General Definitions.

3.3.1 Alcohol-Based Hand Rub (ABHR).

An alcohol-containing preparation designed for application to the hands for reducing the number of visiblemicroorganisms on the hands and containing ethanol or isopropanol in an amount not exceeding 95percent by volume.

3.3.2 Area.

3.3.2.1 Control Area.

For the purpose of this code, a building or portion of a building within which flammable and combustibleliquids are allowed to be stored, dispensed, and used or handled in quantities that do not exceed themaximum allowable quantity (MAQ). (See also 3.3.38, Maximum Allowable Quantity.)

3.3.2.2 Fire Area.

An area of a building separated from the remainder of the building by construction having a fire resistanceof at least 1 hour and having all communicating openings properly protected by an assembly having a fireresistance rating of at least 1 hour.

3.3.2.3 Inside Liquid Storage Area.

A room or building used for the storage of liquids in containers or portable tanks, separated from othertypes of occupancies.

3.3.3 Barrel.

A unit of volume used in the petroleum industry that is equal to 42 gal (159 L).

3.3.4 Basement.

For the purposes of this code, a story of a building or structure having one-half or more of its height belowground level and to which access for fire-fighting purposes is restricted.

3.3.5 Boiling Point.

The temperature at which the vapor pressure of a liquid equals the surrounding atmospheric pressure.

3.3.6* Boil-Over.

An event in the burning of certain oils in an open-top tank when, after a long period of quiescent burning,there is a sudden increase in fire intensity associated with expulsion of burning oil from the tank.

3.3.7 Bonding.

For the purpose of controlling static electric hazards, the process of connecting two or more conductiveobjects together by means of a conductor so that they are at the same electrical potential, but notnecessarily at the same potential as the earth. [77,2014]

3.3.8 Building.

Any structure used or intended for supporting or sheltering any use or occupancy.

3.3.8.1* Important Building.

A building that is considered not expendable in an exposure fire.

3.3.8.2 Storage Tank Building.

A three-dimensional space that is enclosed by a roof and walls that cover more than one-half of thepossible area of the sides of the space, is of sufficient size to allow entry by personnel, will likely limit thedissipation of heat or dispersion of vapors, and restricts access for fire fighting.

3.3.9 Building Code.

The building or construction code adopted by the jurisdiction. [55, 2013]

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

9 of 163 6/13/2016 1:30 AM

Page 39: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

3.3.10 Chemical Plant.

A large integrated plant or that portion of such a plant, other than a refinery or distillery, where liquids areproduced by chemical reactions or used in chemical reactions.

3.3.11 Closed-Top Diking.

A dike with a cover intended to minimize the entrance of precipitation into the diked area.

3.3.12* Container.

Any vessel of 119 gal (450 L) or less capacity used for transporting or storing liquids.

3.3.12.1 Closed Container.

A container as herein defined, so sealed by means of a lid or other device that neither liquid nor vapor willescape from it at ordinary temperatures.

3.3.12.2 Intermediate Bulk Container.

Any closed vessel having a liquid capacity not exceeding 3000 L (793 gal) and intended for storing andtransporting liquids, as defined in Title 49, Code of Federal Regulations, Parts 100 through 199 or in Part 6of the United Nations’ Recommendations on the Transport of Dangerous Goods.

3.3.12.3* Nonmetallic Container.

A container as defined in 3.3.12, constructed of glass, plastic, fiber, or a material other than metal.

3.3.12.4* Nonmetallic Intermediate Bulk Container.

An intermediate bulk container, as defined in 3.3.12.2, constructed of glass, plastic, fiber, or a materialother than metal.

3.3.13 Crude Petroleum.

Hydrocarbon mixtures that have a flash point below 150°F (65.6°C) and that have not been processed in arefinery.

3.3.14 Cryogenic Fluid.

A fluid with a boiling point lower than –130°F (–90°C) at an absolute pressure of 14.7 psi (101.325 kPa).[55,2013]

3.3.15 Damage-Limiting Construction.

For the purposes of this code, any set of construction elements, used individually or in combination, whichwill act to limit damage from an explosion, including open structures, pressure relieving construction, orpressure resistant construction.

3.3.16 Distillery.

A plant or that portion of a plant where liquids produced by fermentation are concentrated and where theconcentrated products are also mixed, stored, or packaged.

3.3.17 Dwelling.

3.3.17.1 Multifamily Dwelling.

A building that contains three or more dwelling units.

3.3.17.2 One-Family Dwelling.

A building that consists solely of one dwelling unit.

3.3.17.3 Two-Family Dwelling.

A building that consists solely of two dwelling units.

3.3.18 Dwelling Unit.

One or more rooms arranged for complete, independent housekeeping purposes, with space for eating,living, and sleeping; facilities for cooking; and provisions for sanitation. [5000,2015]

3.3.19 Fire Code.

The fire code referenced in Chapter 2 of this code.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

10 of 163 6/13/2016 1:30 AM

Page 40: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

3.3.20 Fire Point.

The lowest temperature at which a liquid will ignite and achieve sustained burning when exposed to a testflame in accordance with ASTM D 92, Standard Test Method for Flash and Fire Points by Cleveland OpenCup Tester.

3.3.21 Flash Point.

The minimum temperature of a liquid at which sufficient vapor is given off to form an ignitible mixture withthe air, near the surface of the liquid or within the vessel used, as determined by the appropriate testprocedure and apparatus specified in Section 4.4.

3.3.22* Fugitive Emissions.

Releases of flammable vapor that continuously or intermittently occur from process equipment duringnormal operations.

3.3.23 Grounding.

The process of bonding one or more conductive objects to the ground, so that all objects are at zero (0)electrical potential; also referred to as earthing. [77,2014]

3.3.24* Hazardous Material or Hazardous Chemical.

Material presenting dangers beyond the fire problems relating to flash point and boiling point.

3.3.25 Hazardous Materials Storage Locker.

A movable prefabricated structure, manufactured primarily at a site other than the final location of thestructure and transported completely assembled or in a ready-to-assemble package to the final location,and intended to meet local, state, and federal requirements for outside storage of hazardous materials.

3.3.26* Hazardous Reaction or Hazardous Chemical Reaction.

Reactions that result in dangers beyond the fire problems relating to flash point and boiling point of eitherthe reactants or of the products.

3.3.27 Heat Transfer Fluid (HTF).

A liquid that is used as a medium to transfer heat energy from a heater or vaporizer to a remote heatconsumer (e.g., injection molding machine, oven, or dryer, or jacketed chemical reactor).

3.3.28 High Hazard Level 2 Contents.

Contents that present a deflagration hazard or a hazard from accelerated burning. For the purposes of thiscode, this includes Class I, Class II, or Class IIIA liquids that are used or stored in normally opencontainers or systems, or in closed containers or systems at gauge pressures 15 psi (103 kPa) or greater.

3.3.29 High Hazard Level 3 Contents.

Contents that readily support combustion or that present a physical hazard. For the purposes of this code,this includes Class I, Class II, or Class IIIA liquids that are used or stored in normally closed containers orin closed systems at gauge pressures of less than 15 psi (103 kPa).

3.3.30 Hotel.

A building or groups of buildings under the same management in which there are sleepingaccommodations for more than 16 persons and primarily used by transients for lodging with or withoutmeals. [ 101, 2015]

3.3.31 Incidental Liquid Use or Storage.

Use or storage as a subordinate activity to that which establishes the occupancy or area classification.

3.3.32 Liquefied Gas.

A gas, other than in solution, that in a packaging under the charged pressure exists both as a liquid and agas at a temperature of 68°F (20°C).

3.3.33 Liquid.

Any material that (1) has a fluidity greater than that of 300 penetration asphalt when tested in accordancewith ASTM D 5, Standard Test Method for Penetration of Bituminous Materials, or (2) is a viscoussubstance for which a specific melting point cannot be determined but that is determined to be a liquid inaccordance with ASTM D 4359, Standard Test for Determining Whether a Material is a Liquid or a Solid.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

11 of 163 6/13/2016 1:30 AM

Page 41: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

3.3.33.1 Combustible Liquid.

Any liquid that has a closed-cup flash point at or above 100°F (37.8°C), as determined by the testprocedures and apparatus set forth in Section 4.4. Combustible liquids are classified according to Section4.3.

3.3.33.2* Flammable Liquid.

Any liquid that has a closed-cup flash point below 100°F (37.8°C), as determined by the test proceduresand apparatus set forth in Section 4.4, and a Reid vapor pressure that does not exceed an absolutepressure of 40 psi (276 kPa) at 100°F (37.8°C), as determined by ASTM D 323, Standard Test Method forVapor Pressure of Petroleum Products (Reid Method). Flammable liquids are classified according toSection 4.3.

3.3.33.3 Stable Liquid.

Any liquid not defined as unstable.

3.3.33.4* Unstable Liquid.

A liquid that, in the pure state or as commercially produced or transported, will vigorously polymerize,decompose, undergo condensation reaction, or become self-reactive under conditions of shock, pressure,or temperature.

3.3.33.5* Water-Miscible Liquid.

A liquid that mixes in all proportions with water without the use of chemical additives, such as emulsifyingagents.

3.3.34 Liquid Storage Room.

A room that is used for the storage of liquids in containers, portable tanks, or intermediate bulk containers,

has a floor area that does not exceed 500 ft2 (46 m2), and might be totally enclosed within a building —that is, the room might have no exterior walls.

3.3.35 Liquidtight.

The ability of an enclosure or device to prevent the unintended release of liquids at normal operatingtemperature and pressure ranges.

3.3.36 Liquid Warehouse.

See 3.3.62.2.

3.3.37 Lower Flammable Limit (LFL).

That concentration of a flammable vapor in air below which ignition will not occur. Also known as the lowerexplosive limit (LEL).

3.3.38* Maximum Allowable Quantity (MAQ).

For the purposes of this code, the quantity of flammable and combustible liquid permitted in a control area.

3.3.39 Occupancy.

The purpose for which a building or other structure, or part thereof, is used or intended to be used. [ 101,2015]

3.3.39.1 Ambulatory Health Care Occupancy.

[A building or portion thereof] used to provide services or treatment simultaneously to four or more patientsthat provides, on an outpatient basis, one or more of the following: (1) treatment for patients that rendersthe patients incapable of taking action for self-preservation under emergency conditions without theassistance of others; (2) anesthesia that renders the patients incapable of taking action forself-preservation under emergency conditions without the assistance of others; (3) emergency or urgentcare for patients who, due to the nature of their injury or illness, are incapable of taking action forself-preservation under emergency conditions without the assistance of others. [ 101, 2015]

3.3.39.2 Assembly Occupancy.

An occupancy (1) used for a gathering of 50 or more persons for deliberation, worship, entertainment,eating, drinking, amusement, awaiting transportation, or similar uses; or (2) used as a special amusementbuilding, regardless of occupant load. [ 101, 2015]

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

12 of 163 6/13/2016 1:30 AM

Page 42: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

3.3.39.3 Business Occupancy.

An occupancy used for the transaction of business other than mercantile. [ 101, 2015]

3.3.39.4 Day-Care Occupancy.

An occupancy in which four or more clients receive care, maintenance, and supervision, by other than theirrelatives or legal guardians, for less than 24 hours per day. [ 101, 2015]

3.3.39.5 Detention and Correctional Occupancy.

An occupancy used to house [four] or more persons under varied degrees of restraint or security wheresuch occupants are mostly incapable of self-preservation because of security measures not under theoccupants’ control. [ 101, 2015]

3.3.39.6 Educational Occupancy.

An occupancy used for educational purposes through the twelfth grade by six or more persons for 4 ormore hours per day or more than 12 hours per week. [ 101, 2015]

3.3.39.7 Health Care Occupancy.

An occupancy used to provide medical or other treatment or care simultaneously to four or more patientson an inpatient basis, where such patients are mostly incapable of self-preservation due to age, physical ormental disability, or because of security measures not under the occupants’ control. [ 101, 2015]

3.3.39.8 Industrial Occupancy.

An occupancy in which products are manufactured or in which processing, assembling, mixing, packaging,finishing, decorating, or repair operations are conducted. [ 101, 2015]

3.3.39.9 Mercantile Occupancy.

An occupancy used for the display and sale of merchandise. [ 101, 2015]

3.3.39.10 Residential Occupancy.

An occupancy that provides sleeping accommodations for purposes other than health care or detentionand correctional. [ 101, 2015]

3.3.39.11 Residential Board and Care Occupancy.

An occupancy used for lodging and boarding of four or more residents, not related by blood or marriage tothe owners or operators, for the purpose of providing personal care services. [ 101, 2015]

3.3.39.12 Storage Occupancy.

An occupancy used primarily for the storage or sheltering of goods, merchandise, products, or vehicles. [101, 2015]

3.3.40 Occupancy Classification.

The system of defining the predominant operating characteristic of a portion of a building or plant forpurposes of applying relevant sections of this code.

3.3.40.1 Outdoor Occupancy Classification.

The system of defining the predominant operating characteristic of an outdoor operation that is notenclosed in a building or shelter for purposes of applying relevant sections of this code.

3.3.41* Operating Unit (Vessel) or Process Unit (Vessel).

The equipment in which a unit operation or unit process is conducted. (See also 3.3.53, Unit Operation orUnit Process.)

3.3.42 Operations.

A general term that includes, but is not limited to, the use, transfer, storage, and processing of liquids.

3.3.43* Pier.

A structure, usually of greater length than width and projecting from the shore into a body of water withdirect access from land, that can be either open deck or provided with a superstructure. [307, 2011]

3.3.44 Pressure Vessel.

A container or other component designed in accordance with the ASME Boiler and Pressure Vessel Codeor CSA B51, Boiler, Pressure Vessel and Pressure Piping Code. [52,2013]

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

13 of 163 6/13/2016 1:30 AM

Page 43: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

3.3.45* Process or Processing.

An integrated sequence of operations.

3.3.46 Protection for Exposures.

Fire protection for structures on property adjacent to liquid storage that is provided by (1) a public firedepartment or (2) a private fire brigade maintained on the property adjacent to the liquid storage, either ofwhich is capable of providing cooling water streams to protect the property adjacent to the liquid storage.

3.3.47 Refinery.

A plant in which flammable or combustible liquids are produced on a commercial scale from crudepetroleum, natural gasoline, or other hydrocarbon sources.

3.3.48* Safety Can.

A listed container of not more than 5.3 gal (20 L) capacity having a screen or strainer in each fill and pouropening and having a spring-closing lid and spout cover designed to safely relieve internal pressure whenexposed to fire.

3.3.49 Solvent Distillation Unit.

An appliance that distills a flammable or combustible liquid to remove contaminants and recover the liquid.

3.3.50 Staging.

Temporary storage in a process area of liquids in containers, intermediate bulk containers, and portabletanks.

3.3.51 Tank.

3.3.51.1 Aboveground Tank.

A storage tank that is installed above grade, at grade, or below grade without backfill.

3.3.51.2* Atmospheric Tank.

A storage tank that has been designed to operate at pressures from atmospheric through a gaugepressure of 1.0 psi (6.9 kPa) (i.e., 760 mm Hg through 812 mm Hg) measured at the top of the tank.

3.3.51.3 Low-Pressure Tank.

For the purposes of this code, a storage tank designed to withstand an internal pressure above a gaugepressure of 1.0 psi (6.9 kPa) but not more than a gauge pressure of 15 psi (103 kPa) measured at the topof the tank.

3.3.51.4 Portable Tank.

Any vessel having a liquid capacity over 60 gal (230 L) intended for storing liquids and not intended forfixed installation.

3.3.51.4.1* Nonmetallic Portable Tank.

A portable tank, as herein defined, constructed of plastic, fiber, or a material other than metal.

3.3.51.5 Secondary Containment Tank.

A tank that has an inner and outer wall with an interstitial space (annulus) between the walls and that hasa means for monitoring the interstitial space for a leak.

3.3.51.6 Storage Tank.

Any vessel having a liquid capacity that exceeds 60 gal (230 L), is intended for fixed installation, and is notused for processing.

3.3.52 Terminal.

That portion of a property where liquids are received by tank vessel, pipelines, tank car, or tank vehicleand are stored or blended in bulk for the purpose of distributing such liquids by tank vessel, pipeline, tankcar, tank vehicle, portable tank, or container.

3.3.53 Unit Operation or Unit Process.

A segment of a physical or chemical process that might or might not be integrated with other segments toconstitute the manufacturing sequence.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

14 of 163 6/13/2016 1:30 AM

Page 44: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

3.3.54 Vapor Pressure.

The pressure, measured in pounds per square inch, absolute (psia), exerted by a liquid, as determined byASTM D 323, Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method).

3.3.55 Vapor Processing Equipment.

Those components of a vapor processing system designed to process vapors or liquids captured duringtransfer or filling operations.

3.3.56* Vapor Processing System.

A system designed to capture and process vapors displaced during transfer or filling operations by use ofmechanical or chemical means.

3.3.57* Vapor Recovery System.

A system designed to capture and retain, without processing, vapors displaced during transfer or fillingoperations.

3.3.58 Vaportight.

The ability of an enclosure or device to prevent the unintended release of flammable vapor at normaloperating temperature and pressure ranges.

3.3.59 Vault.

An enclosure consisting of four walls, a floor, and a top for the purpose of containing a liquid storage tankand not intended to be occupied by personnel other than for inspection, repair, or maintenance of the vault,the storage tank, or related equipment.

3.3.60 Vent.

3.3.60.1 Emergency Relief Vent.

An opening, construction method, or device that will automatically relieve excessive internal pressure dueto an exposure fire.

3.3.60.2 Normal Vent.

An opening, construction method, or device that allows the relief of excessive internal pressure or vacuumduring normal storage and operations.

3.3.61* Ventilation.

For the purpose of this code, movement of air that is provided for the prevention of fire and explosion.

3.3.62* Warehouse.

3.3.62.1 General-Purpose Warehouse.

A separate, detached building or portion of a building used only for warehousing-type operations andclassified as a “storage — low hazard” or “storage — ordinary hazard” occupancy by the building code andby NFPA 101, Life Safety Code.

3.3.62.2 Liquid Warehouse.

A separate, detached building or an attached building that is used for warehousing-type operations forliquids and whose exterior wall comprises at least 25 percent of the building perimeter.

3.3.63* Wharf.

A structure at the shoreline that has a platform built along and parallel to a body of water with either anopen deck or a superstructure. [307, 2011]

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

15 of 163 6/13/2016 1:30 AM

Page 45: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Zip:

Submittal Date: Mon Sep 21 10:07:03 EDT 2015

Committee Statement

Committee Statement: It is suggested that definitions be created or revised for the following terms:

- Container (T/C on Storage and Warehousing)

- Portable Tank (T/C on Storage and Warehousing)

- Rack Section (T/C on Storage and Warehousing)

- Liquids in Process (T/C on Operations)

- Staged Liquids (T/C on Operations)

The designated technical committees are soliciting any comments or suggestions.

Response Message:

Ballot Results

This item has not been balloted

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

16 of 163 6/13/2016 1:30 AM

Page 46: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 23-NFPA 30-2015 [ Section No. 6.6.1 ]

6.6.1*

An approved means shall be provided for prompt notification of fire or other emergency to those withinthe plant and to the available public or mutual aid fire department shall be provided identified in theemergency action plan in accordance with Section 6.8 .

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Fri Sep 18 09:35:57 EDT 2015

Committee Statement

CommitteeStatement:

This FR addresses the intent of PI 40, but has been revised to more clearly identify thoseaffected by a potential fire or other emergency as indicated in the emergency action plan.

ResponseMessage:

Public Input No. 40-NFPA 30-2015 [Section No. 6.6.1]

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

17 of 163 6/13/2016 1:30 AM

Page 47: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

18 of 163 6/13/2016 1:30 AM

Page 48: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 3-NFPA 30-2015 [ Section No. 6.9.2 ]

6.9.2

Maintenance and operating practices shall be established and implemented to prevent and controlleakage and prevent spillage of flammable and combustible liquids.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Thu Sep 10 18:06:56 EDT 2015

Committee Statement

CommitteeStatement:

This FR addresses PI 41 and PI 42. Changes have been made to address both prevention ofleaks and spills as well as control of leaks and spills should they occur.

ResponseMessage:

Public Input No. 42-NFPA 30-2015 [Section No. 6.9.2]

Public Input No. 41-NFPA 30-2015 [Section No. 6.9.2]

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

19 of 163 6/13/2016 1:30 AM

Page 49: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Apostoluk, Peter R.

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

20 of 163 6/13/2016 1:30 AM

Page 50: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 5-NFPA 30-2015 [ Section No. 6.10.1.1 ]

6.10.1.1

This section shall apply to the management methodology used to identify, evaluate, and control thesecurity hazards involved in the processing, storage, and handling of flammable and combustible liquids.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Thu Sep 10 19:30:10 EDT 2015

Committee Statement

CommitteeStatement:

This committee-generated FR addresses the fact that storage of liquids is within the scope ofthe code and should appropriately be addressed by any security measures.

ResponseMessage:

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

Barber, Jonathan R.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

21 of 163 6/13/2016 1:30 AM

Page 51: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

22 of 163 6/13/2016 1:30 AM

Page 52: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Committee Input No. 401-NFPA 30-2015 [ Section No. 7.3.3 ]

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

23 of 163 6/13/2016 1:30 AM

Page 53: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

7.3.3*

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

24 of 163 6/13/2016 1:30 AM

Page 54: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Table 7.3.3 shall be used to delineate and classify areas for the purpose of installation of electricalutilization equipment and wiring under normal operating conditions.

Table 7.3.3 Electrical Area Classifications

Location

NEC Class I

Extent of Classified AreaDivision Zone

Indoor equipment installed inaccordance with Section 7.3 whereflammable vapor–air mixtures canexist under normal operation

1 0The entire area associated with such equipmentwhere flammable gases or vapors are presentcontinuously or for long periods of time

1 1Area within 5 ft of any edge of such equipment,extending in all directions

2 2

Area between 5 ft and 8 ft of any edge of suchequipment, extending in all directions; also, spaceup to 3 ft above floor or grade level within 5 ft to 25

ft horizontally from any edge of such equipment1

Outdoor equipment of the typecovered in Section 7.3 whereflammable vapor–air mixtures canexist under normal operation

1 0The entire area associated with such equipmentwhere flammable gases or vapors are presentcontinuously or for long periods of time

1 1Area within 3 ft of any edge of such equipment,extending in all directions

2 2

Area between 3 ft and 8 ft of any edge of suchequipment, extending in all directions; also, spaceup to 3 ft above floor or grade level within 3 ft to 10ft horizontally from any edge of such equipment

Tank storage installations insidebuildings

1 1 All equipment located below grade level

2 2 Any equipment located at or above grade level

Tank — aboveground, fixed roof 1 0 Inside fixed-roof tank

1 1Area inside dike where dike height is greater thanthe distance from the tank to the dike for more than50 percent of the tank circumference

2 2Within 10 ft from shell, ends, or roof of tank; also,area inside dike up to top of dike wall

1 0 Area inside of vent piping or vent opening

1 1Within 5 ft of open end of vent, extending in alldirections

2 2Area between 5 ft and 10 ft from open end of vent,extending in all directions

Tank — aboveground, floating roof

 With fixed outer roof 1 0Area between the floating and fixed-roof sectionsand within the shell

 With no fixed outer roof 1 1 Area above the floating roof and within the shell

Tank vault — interior 1 1Entire interior volume, if Class I liquids are storedwithin

Underground tank fill opening 1 1Any pit, box, or space below grade level, if any partis within a Division 1 or 2 or Zone 1 or 2 classifiedlocation

2 2Up to 18 in. above grade level within a horizontalradius of 10 ft from a loose fill connection and withina horizontal radius of 5 ft from a tight fill connection

Vent — discharging upward 1 0 Area inside of vent piping or opening

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

25 of 163 6/13/2016 1:30 AM

Page 55: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Location

NEC Class I

Extent of Classified AreaDivision Zone

1 1Within 3 ft of open end of vent, extending in alldirections

2 2Area between 3 ft and 5 ft of open end of vent,extending in all directions

Drum and container filling —outdoors or indoors

1 0 Area inside the drum or container

1 1Within 3 ft of vent and fill openings, extending in alldirections

2 2

Area between 3 ft and 5 ft from vent or fill opening,extending in all directions; also, up to 18 in. abovefloor or grade level within a horizontal radius of 10 ftfrom vent or fill opening

Pumps, bleeders, withdrawal fittings

 Indoor 2 2

Within 5 ft of any edge of such devices, extending inall directions; also, up to 3 ft above floor or gradelevel within 25 ft horizontally from any edge of suchdevices

 Outdoor 2 2

Within 3 ft of any edge of such devices, extending inall directions; also, up to 18 in. above grade levelwithin 10 ft horizontally from any edge of suchdevices

Pits and sumps

 Without mechanical ventilation 1 1Entire area within a pit or sump if any part is withina Division 1 or 2 or Zone 1 or 2 classified location

 With adequate mechanicalventilation

2 2Entire area within a pit or sump if any part is withina Division 1 or 2 or Zone 1 or 2 classified location

Containing valves, fittings, or piping,and not within a Division 1 or 2 orZone 1 or 2 classified location

2 2 Entire pit or sump

Drainage ditches, separators,impounding basins

 Outdoor 2 2Area up to 18 in. above ditch, separator, or basin;also, area up to 18 in. above grade within 15 fthorizontally from any edge

 Indoor Same as pits and sumps

Tank vehicle and tank car2

 Loading through open dome 1 0 Area inside of the tank

1 1Within 3 ft of edge of dome, extending in alldirections

2 2Area between 3 ft and 15 ft from edge of dome,extending in all directions

Loading through bottom connectionswith atmospheric venting

1 0 Area inside of the tank

1 1Within 3 ft of point of venting to atmosphere,extending in all directions

2 2

Area between 3 ft and 15 ft from point of venting toatmosphere, extending in all directions; also, up to18 in. above grade within a horizontal radius of 10 ftfrom point of loading connection

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

26 of 163 6/13/2016 1:30 AM

Page 56: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Location

NEC Class I

Extent of Classified AreaDivision Zone

Loading through closed dome withatmospheric venting

1 1Within 3 ft of open end of vent, extending in alldirections

2 2Area between 3 ft and 15 ft from open end of vent,extending in all directions; also, within 3 ft of edgeof dome, extending in all directions

Loading through closed dome withvapor control

2 2Within 3 ft of point of connection of both fill andvapor lines, extending in all directions

Bottom loading with vapor control orany bottom unloading

2 2Within 3 ft of point of connections, extending in alldirections; also, up to 18 in. above grade within ahorizontal radius of 10 ft from point of connections

Storage and repair garage for tankvehicles

1 1 All pits or spaces below floor level

2 2Area up to 18 in. above floor or grade level forentire storage or repair garage

Garages for other than tank vehicles Ordinary

If there is any opening to these rooms within theextent of an outdoor classified location, the entireroom shall be classified the same as the areaclassification at the point of the opening

Outdoor drum storage Ordinary

Inside rooms or storage lockersused for the storage of Class Iliquids

2 2 Entire room or locker

Indoor warehousing where there isno flammable liquid transfer

Ordinary

If there is any opening to these rooms within theextent of an indoor classified location, the classifiedlocation shall extend through the opening to thesame extent as if the wall, curb, or partition did notexist

Office and rest rooms Ordinary

If there is any opening to these rooms within theextent of an indoor classified location, the roomshall be classified the same as if the wall, curb, orpartition did not exist

Piers and wharves See Figure 29.3.22.

For SI units, 1 in. = 25 mm; 1 ft = 0.3 m.

1The release of Class I liquids can generate vapors to the extent that the entire building, and possibly anarea surrounding it, should be considered a Class I, Division 2, or Zone 2 location.

2When classifying extent of area, consideration should be given to the fact that tank cars or tank vehiclescan be spotted at varying points. Therefore, the extremities of the loading or unloading positions should beused.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Thu Sep 24 14:41:57 EDT 2015

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

27 of 163 6/13/2016 1:30 AM

Page 57: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Committee Statement

CommitteeStatement:

The committee may initiate a task group jointly with the technical committee on electricalequipment in chemical atmospheres (NFPA 497) to consider appropriate changes to eliminate anyconflicts between chapter 7 of NFPA 30 and NFPA 497.

ResponseMessage:

Ballot Results

This item has not been balloted

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

28 of 163 6/13/2016 1:30 AM

Page 58: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 4-NFPA 30-2015 [ Section No. G.1 ]

G.1 General.

The process used to assess the level of security of a facility is generally referred to as securityvulnerability assessment (SVA). The following published guidelines are available to assist the owner andmanagement of a facility to identify, evaluate, and control security hazards:

(1) NFPA 730, Guide for Premises Security

(2) American Institute of Chemical Engineers–Center for Chemical Process Safety (CCPS), Guidelinesfor Analyzing and Managing the Security Vulnerabilities of Fixed Chemical Sites

(3) API, Security Guidelines for the Petroleum Industry

(4) API RP 70, Security for Offshore Oil and Natural Gas Operations

(5) API RP 70I, Security for Worldwide Offshore Oil and Natural Gas Operations

(6) API Standard 1164, Pipeline SCADA Security

(7) API/National Petrochemical and Refiners Association, Security Vulnerability AssessmentMethodology

(8) American Chemistry Council (ACC), Site Security Guidelines for the U.S. Chemical Industry

(9) ACC, Implementation Resource Guide for Responsible Care Security Code of ManagementPractices: Value Chain Activities

(10) ACC, Transportation Security Guidelines for the U.S. Chemical Industry

(11) DOT, Office of Pipeline Safety, Pipeline Security Information Circular, Information of Concern toPipeline Security Personnel, Security Guidance for Natural Gas, and Hazardous Liquid Pipelines andLiquefied Natural Gas Facilities, September 5, 2002

(12) Sandia National Laboratories, “Vulnerability Assessment Methodology for Chemical Facilities(VAM-CF)”

(13) U.S. Coast Guard, NVIC 11-02 (and other NVICs)

In some cases, a terrorist attack or similar worst-case event will create response complications, such asinterruptions to communication between and among the facility fire brigade or response team; , facilitymanagement, and response personnel, and outside agencies; damage to response equipment, ; or lossof needed personnel. Existing emergency response plans should be updated to address and mitigatesuch identified potential disruptions to an effective response. Periodic table-top and full-scale drills arestrongly recommended to provide a means for proper training and identification of plan weaknesses to beaddressed.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Thu Sep 10 18:32:25 EDT 2015

Committee Statement

Committee Statement: Title of reference document has been corrected.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

152 of 163 6/13/2016 1:30 AM

Page 59: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Response Message:

Public Input No. 65-NFPA 30-2015 [Section No. G.1]

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

153 of 163 6/13/2016 1:30 AM

Page 60: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 20-NFPA 30-2015 [ Section No. I.1.2 ]

I.1.2 Other Publications.

I.1.2.1 ACC Publications.

American Chemistry Council, 700 Second Street, N.E., Washington DC 20002.

Implementation Resource Guide for Responsible Care Security Code of Management Practices: ValueChain Activities, 2002.

Site Security Guidelines for the U.S. Chemical Industry, 2001.

Transportation Security Guidelines for the U.S. Chemical Industry, 2001.

I.1.2.2 AIChE Publications.

American Institute of Chemical Engineers, 3 Park Avenue 120 Wall Street, FL 23 , New York, NY10016 10005-4020 .

Fisher, H. G., and Forrest, H. S., “Protection of Storage Tanks from Two-Phase Flow Due to FireExposure,” Process Safety Progress, Vol. 14, July 1995, pp. 183–199.

Guidelines for Analyzing and Managing the Security Vulnerabilities of Fixed Chemical Sites, 2003.

Guidelines for Chemical Process Quantitative Risk Analysis, 2nd edition, 1999.

Guidelines for Evaluating Process Plant Buildings for External Explosions and Fires and Toxic Releases ,1996 2012 .

Guidelines for Facility Siting and Layout , 2003.

Guidelines for Pressure Relief and Effluent Handling Systems, 1998.

Guidelines for Vapor Cloud Explosion, Pressure Vessel Burst, BLEVE and Flash Fire Hazards, 2ndedition, 2011.

Houser, J., et al., “Vent Sizing for Fire Considerations: External Fire Duration, Jacketed Vessels, and HeatFlux Variations Owing to Fuel Consumption,” Journal of Loss Prevention in the Process Industries, Vol. 14No. 5, September 2001, pp. 403–412.

Nugent, D. P., Freeman, J. L., and Oliszewicz, M. P., Guidelines for Safe Warehousing of Chemicals,1998.

I.1.2.3 ANSI Publications.

American National Standards Institute, Inc., 25 West 43rd Street, 4th Floor, New York, NY 10036.

ANSI Z400.1/ Z129.1, Hazardous Industrial Chemicals—Precautionary Labeling Workplace Chemicals -Hazard Evaluation and Safety Data Sheet and Precautionary Labeling Preparation , 2005 2010 .

ANSI Z535.2, Environmental and Facility Safety Signs, 2011.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

154 of 163 6/13/2016 1:30 AM

Page 61: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

I.1.2.4 API Publications.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

155 of 163 6/13/2016 1:30 AM

Page 62: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

American Petroleum Institute, 1220 L Street, NW, Washington, DC 20005.

API RP 70, Security for Offshore Oil and Natural Gas Operations, 1st edition, 2003, reaffirmed 2010 .

API RP 70I, Security for Worldwide Offshore Oil and Natural Gas Operations,1st edition, 2004, reaffirmed2012 .

API Specification 12R1, Setting, Maintenance, Inspection, Operation, and Repair of Tanks in ProductionService, 2008.

API RP 500, Recommended Practice for Classification of Locations for Electrical Installations atPetroleum Facilities Classified as Class I, Division 1 and Division 2, Revision 2 3rd edition , 1998 2012 .

ANSI/ API RP 505, Recommended Practice for Classification of Locations for Electrical Installations atPetroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2, 2002.

API Standard 620, Recommended Rules for the Design and Construction of Large, Welded,Low-Pressure Storage Tanks,11th 12th edition, 2012 2013 .

API Standard 650, Welded Steel Tanks for Oil Storage, 11th 12th edition, 2011 2013 .

API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction, 4th 5th edition, 2012 2014 .

API RP 752, Management of Hazards Associated with Location of Process Plant Buildings, 3rd edition,2009.

API RP 753, Management of Hazards Associated with Location of Process Plant Portable Buildings, 1stedition, 2007 (R2012) , reaffirmed 2012 .

API Standard 1164, Pipeline SCADA Security, Edition 2, 2009.

API 1501, Filtration and Dehydration of Aviation Fuels, 1st 4th edition, 1965.

API RP 1604, Removal and Disposal Closure of Used Underground Petroleum Storage Tanks, 3rdedition, reaffirmed 2001 2013 .

API RP 1615, Installation of Underground Petroleum Storage Systems, 6th edition, 2011.

API RP 1621, Bulk Liquid Stock Control at Retail Outlets, 2001 5th edition, 1993, reaffirmed 2012 .

API RP 1631, Interior Lining of Underground Storage Tanks, 5th edition, reaffirmed 2010.

API RP 1632, Cathodic Protection of Underground Petroleum Storage Tanks and Piping Systems, 3rdedition, reaffirmed 2010.

API Standard 2003, Protection Against Ignition Arising Out of Static, Lightning, and Stray Currents, 7thedition, 2008.

API Standard 2015, Cleaning Petroleum Storage Tanks, 6th 7th edition, reaffirmed 2006 2014 .

API RP 2016, Guidelines and Procedures for Entering and Cleaning Petroleum Storage Tanks, 1stedition, reaffirmed 2006.

API Publication 2214, Spark Ignition Properties of Hand Tools, 4th edition, 2004.

API Standard 2217A, Guidelines for Work in Inert Confined Spaces in the Petroleum Industry, 4th 5thedition, 2009 2015 .

API Publication 2218, Fireproofing Practices in Petroleum and Petrochemical Processing Plants, 2nd 3rdedition, 1999 2013 .

API Publication 2219, Safe Operating Guidelines for Vacuum Trucks in Petroleum Service, 3rd edition,2005, reaffirmed 2012 .

API Standard 2350, Overfill Protection for Storage Tanks in Petroleum Facilities, 4th edition, 2012.

API Security Guidelines for the Petroleum Industry, 3rd edition, 2005.

API Standard 2610, Design, Construction, Operation, Maintenance, and Inspection of Terminal and TankFacilities, 2nd edition, 2005, reaffirmed 2010 .

API Publication, “An Engineering Analysis of the Effects of Oxygenated Fuels on Marketing VaporRecovery Equipment,” September 1990.

API Publication 4589, Fugitive Hydrocarbon Emissions from Petroleum Production Operations, 1stedition , 1993.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

156 of 163 6/13/2016 1:30 AM

Page 63: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

API/National Petrochemical and Refiners Association, Security Vulnerability Assessment Methodology,2nd edition, 2004.

I.1.2.5 Association of Canadian Distillers Publications.

Association of Canadian Distillers, Suite 518, 90 Rue Sparks, Ottawa, Ontario, K1P 5B4, Canada.

“Fire Tests of Distilled Spirits Storage Tanks,” Client Report CR-5727.1, 2001.

I.1.2.6 ASTM Publications.

ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959.

ASTM C 1055 C1055 , Standard Guide for Heated System Surface Conditions that Produce Contact BurnInjuries, 2003 (Reaffirmed 2009 reapproved 2014 ).

ASTM D 4206 D4206 , Standard Test Method for Sustained Burning of Liquid Mixtures Using the SmallScale Open-Cup Apparatus, 1996 (reaffirmed 2007 reapproved 2013 ).

ASTM D 4207 D4207 , Standard Test Method for Sustained Burning of Low Viscosity Liquid Mixtures bythe Wick Test, 1991.

ASTM D 4956 D4956 , Standard Specification for Retroreflective Sheeting for Traffic Control, 2011a 2013 .

ASTM D 6469 D6469 , Standard Guide for Microbial Contamination in Fuels and Fuel Systems,2012 2014 .

ASTM E 119 E119 , Standard Test Methods for Fire Tests of Building Construction and Materials,2012a 2015 .

ASTM E 502 E502 , Standard Test Method for Selection and Use of ASTM Standards for theDetermination of Flash Point of Chemicals by Closed Cup Methods, 2007e1 (reapproved 2013) .

ASTM Manual on Flash Point Standards and Their Use, 1992.

I.1.2.7 ISO Publications.

International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56, CH-1211Geneva 20 ISO Central Secretariat, BIBC II, 8, Chemin de Blandonnet, CP 401, 1214 Vernier, Geneva ,Switzerland.

ISO 13732–1, Ergonomics of the Thermal Environment -- Methods for the Assessment of HumanResponses to Contact with Surfaces Part 1: Hot Surfaces, 2006 edition .

I.1.2.8 NACE Publications.

National Association of Corrosion Engineers NACE International , 1440 South Creek Drive, Houston, TX77084.

NACE RP SP -0169, Recommended Practice, Control of External Corrosion on Underground orSubmerged Metallic Piping Systems, 1996 2013 .

NACE RP SP -0285, Recommended Practice, External Corrosion Control of Underground Storage TankSystems by Cathodic Protection, 2002 2011 .

I.1.2.9 NEIWPCC Publications.

New England Interstate Water Pollution Control Commission, 85 Merrimac Street, Boston, MA 02114.

Tank Closure Without Tears: An Inspector’s Safety Guide, May 1988.

I.1.2.10 NIOSH Publications.

National Institute for Occupational Safety and Health, Centers for Disease Control and Prevention, 1600Clifton Road, Atlanta, GA 30333.

Criteria for Recommended Standard for Working in Confined Spaces, 1979.

NIOSH 87–113, A Guide to Safety in Confined Spaces, 1987.

I.1.2.11 NORA Publications.

National Oilheat Research Alliance, 600 Cameron Street, Suite 600, Alexandria, VA 22314.

Oilheat Technician's Manual, 2002.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

157 of 163 6/13/2016 1:30 AM

Page 64: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

I.1.2.12 Oil and Gas Journal Publications.

PennWell Publishing Co., 3050 Post Oak Boulevard, Houston 1455 West Loop South, Suite #400 , TX77056 77027 .

“Module Ventilation Rates Quantified,” W. E. Gale, December 23, 1985, p. 41.

I.1.2.13 PEI Publications.

Petroleum Equipment Institute, P.O. Box 2380, Tulsa, OK 74101-2380.

PEI RP100, Recommended Practices for Installation of Underground Liquid Storage Systems, 2011.

PEI RP200, Recommended Practices for Installation of Aboveground Storage Systems for Motor VehicleFueling,2008 2013 .

PEI RP600, Recommended Practices for Overfill Prevention for Shop-Fabricated Aboveground Tanks,2012.

I.1.2.14 SFPE Publications.

Society of Fire Protection Engineers, 7315 Wisconsin Avenue 9711 Washingtonian Blvd , Suite 1225W 380 , Bethesda Gaithersburg , MD 20814 20878 .

Directory of Fire Tests Involving Storage of Flammable and Combustible Liquids in Small Containers, 3rdedition, by David P. Nugent, Schirmer Engineering Corporation, 2006.

Engineering Guide: Assessing Flame Radiation to External Targets from Pool Fires, 1999.

Engineering Guide: Predicting 1st and 2nd Degree Skin Burns from Thermal Radiation, 2000.

Engineering Guide to Fire Exposures to Structural Elements, 2004.

Engineering Standard on Calculating Fire Exposures to Structures, 2010.

Handbook of Fire Protection Engineering, 2008.

I.1.2.15 STI/SPFA Publications.

Steel Tank Institute, 570 Oakwood Road /Steel Plate Fabricators Association, 944 Donata Ct. , LakeZurich, IL 60047.

SP001, Standard for Inspection of Aboveground Storage Tanks, 5th edition, 2011.

STI-P3, Specification and Manual for External Corrosion Protection of Underground Steel Storage Tanks,2012 2014 .

STI R931, Double Wall AST Installation and Testing F921 ® Installation Instructions, 2012 2014 .

STI RP 892, Recommended Practice for Corrosion Protection of Underground Piping NetworksAssociated with Liquid Storage and Dispensing Systems, 2012.

STI RP R011, Recommended Practice for Anchoring of Steel Underground Storage Tanks, 2006.

STI, ACT-100®, Specification for External Corrosion Protection of FRP Composite Steel UndergroundTanks, F894, 1997 2013, revised 2014 .

Keeping Water Out of Your Storage System, 2004 2015 .

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

158 of 163 6/13/2016 1:30 AM

Page 65: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

I.1.2.16 UL Publications.

Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096.

ANSI/UL 30, Standard for Metal Safety Cans, 1995, R r evised 2009 2014 .

ANSI/UL 142, Standard for Steel Aboveground Tanks for Flammable and Combustible Liquids, 2006,R r evised 2010 2014 .

ANSI/UL 263, Standard for Fire Tests of Building Construction and Materials, 2011, revised 2015 .

ANSI/UL 1313, Standard for Nonmetallic Safety Cans for Petroleum Products, 2005, R r evised2007 2012 .

UL 1316, Standard for Glass-Fiber-Reinforced Plastic Underground Storage Tanks for PetroleumProducts, Alcohols, and Alcohol-Gasoline Mixtures, 1994, R r evised 2006.

ANSI/UL 1709, Standard for Rapid Rise Fire Tests of Protection Materials for Structural Steel, 2005,R r evised 2011.

ANSI/UL 1746, Standard for External Corrosion Protection Systems for Steel Underground Storage Tanks,2007, revised 2014 .

I.1.2.17 ULC Publications.

Underwriters Laboratories of Canada, 7 Underwriters Road, Scarborough Toronto , Ontario M1R 3B4 3A9 ,Canada.

CAN/ULC-S603.1, Standard for External Corrosion Protection Systems for Steel Underground Tanks forFlammable and Combustible Liquids, 2011.

I.1.2.18 UN Publications.

United Nations Publications, 2 United Nations Plaza, Room DC2-853, New York, NY 10017.

Recommendations on the Transport of Dangerous Goods, 17th 19th revised edition,2011. 2015.

I.1.2.19 U.S. Government Publications.

U.S. Government Printing Publishing Office, Washington, DC 20402.

DOT, Office of Pipeline Safety, Pipeline Security Information Circular, Information of Concern to PipelineSecurity Personnel, Security Guidance for Natural Gas, and Hazardous Liquid Pipelines and LiquefiedNatural Gas Facilities, September 5, 2002.

U.S. Coast Guard NVIC 11–02 and other NVICs.

EPA Protocols for Generating Unit-Specific Emission Estimates for Equipment Leaks of VOC and HAP,1987 (Document No. 87-222-124-10-02).

EPA/Radian Study, 1979.

Occupational Safety and Health & Safety Administration (OSHA) 2226, Excavation & TrenchingOperations, 1990 2002 .

Title 21, Code of Federal Regulations, Part 800-898, “GMP for Medical Devices.”

Title 29, Code of Federal Regulations, Part 1910.106, “Flammable and Combustible Liquids.”

Title 29, Code of Federal Regulations, Part 1910.1200, “Hazard Communication.”

Title 33, Code of Federal Regulations, Parts 154–156, “Navigation and Navigable Waterways.”

Title 40, Code of Federal Regulations, Part 280, “Technical Standards and Requirements for Owners andOperators of Underground Storage Tanks.”

Title 49, Code of Federal Regulations, Parts 100–199, “Hazardous Materials Transportation.”

I.1.2.20 Other Publications.

Sandia National Laboratories, “Vulnerability Assessment Methodology for Chemical Facilities (VAM-CF)”.

Submitter Information Verification

Submitter Full Name: FLC-FUN

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

159 of 163 6/13/2016 1:30 AM

Page 66: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Mon Sep 14 15:02:49 EDT 2015

Committee Statement

Committee Statement: Information on reference documents has been updated.

Response Message:

Public Input No. 82-NFPA 30-2015 [Section No. I.1.2.6]

Public Input No. 33-NFPA 30-2015 [Section No. I.1.2]

Public Input No. 39-NFPA 30-2015 [Section No. I.1.2.4]

Public Input No. 80-NFPA 30-2015 [Section No. I.1.2.16]

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

160 of 163 6/13/2016 1:30 AM

Page 67: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

161 of 163 6/13/2016 1:30 AM

Page 68: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

First Revision No. 410-NFPA 30-2015 [ Section No. I.3 ]

I.3 References for Extracts in Informational Sections.

NFPA 307, Standard for the Construction and Fire Protection of Marine Terminals, Piers, and Wharves,2011 2016 edition.

Submitter Information Verification

Submitter Full Name: FLC-FUN

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 06 14:53:20 EDT 2015

Committee Statement

Committee Statement: Updated reference to current edition.

Response Message:

Ballot Results

This item has passed ballot

25 Eligible Voters

5 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cosey, William V. F.

Crumholt, Curtis W.

Drechsel, Carl M.

Gil, Frederic

Wagner, Paul

Affirmative All

Apostoluk, Peter R.

Barber, Jonathan R.

Brennecke, Gregory C.

De Taeye, Claire V.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

162 of 163 6/13/2016 1:30 AM

Page 69: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Garfunkel, Felix J.

Havens, Dwight H.

Jablonski, Jay J.

Kelly, Alwin A

King, John W.

Kraus, Richard S.

Morgan, Bob D.

Nugent, David P.

Ramirez, Alfredo M.

Richmond, Sr., John W.

Shank, Peter M.

Stocker, Warren G.

Upson, Robert

Wang, Qingsheng

Wethington, Robert P.

Wieczorek, Christopher J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

163 of 163 6/13/2016 1:30 AM

Page 70: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Recommended changes to NFPA 30, 2015 Edition (track changes)

Chapter 1

1.3.2 Chapters 9 through 12 shall apply to the storage of flammable or combustible liquids in containers , portable tanks, and intermediate bulk containers in the occupancies covered by the scope of each chapter.

1.3.3 Chapter 13 shall apply to the storage of flammable or combustible liquids in containers , portable tanks, and intermediate bulk containers in detached unprotected buildings.

1.3.4 Chapter 14 shall apply to the storage of flammable or combustible liquids in containers, portable

tanks, and intermediate bulk containers in hazardous materials storage lockers.

1.3.5 Chapter 15 shall apply to the outdoor storage of flammable or combustible liquids in containers , portable tanks, and intermediate bulk containers.

1.3.6 Chapter 16 shall apply to fire protection design criteria used to protect storage of flammable or combustible liquids in containers, portable tanks, and intermediate bulk containers.

Chapter 3

3.3.2.3 Inside Liquid Storage Area. A room or building used for the storage of liquids in containers or portable tanks, separated from other types of occupancies.

3.3.12* Container. Any vessel of 119 gal (450 L) or less capacity used for transporting or storing liquids

having a capacity that does not exceed 3000 L (793 gal).

3.3.12.1 Closed Container. A container, as herein defined, so sealed by means of a lid or other device that neither liquid nor vapor will escape from it at ordinary temperatures.

3.3.12.2 Intermediate Bulk Container. Any container closed vessel having a liquid capacity greater than 450 L (119 gal) but not greater than exceeding 3000 L (793 gal) and intended for storing and transporting liquids, as defined in Title 49, Code of Federal Regulations, Parts 100

through199 or in Part 6 of the United Nations’ Recommendations on the Transport of Dangerous Goods.

3.3.12.3* Non-Bulk Container. Any container having a capacity that does not exceed 450 L (119

gal).

3.3.12.34* Nonmetallic Container. Any container, as defined in 3.3.12, constructed of glass, plastic, fiber, or a combination thereof, and which might include metal componentsa material

other than metal.

3.3.12.4* Nonmetallic Intermediate Bulk Container. An intermediate bulk container, as defined in 3.3.12.2, constructed of glass, plastic, fiber, or a material other than metal.

A.3.3.12.3 Non-Bulk Container. The U.S. DOT defines non-bulk packaging as having up to 119 gal (450 L) capacity in 49 CFR 171.8.

bbenedetti
Text Box
Attachment No. A7
Page 71: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

A.3.3.12.3 Nonmetallic Container. Permissible nonmetallic containers for shipping Class I, Class II, and Class IIIA liquids are governed by the hazardous materials transportation regulations promulgated by

the United Nations publication, Recommendations on the Transport of Dangerous Goods , and the U.S. Department of Transportation's Hazardous Materials Regulations, Title 49, Code of Federal Regulations. Small tanks for Class IIIB liquids are not governed by these regulations. Fiber portable tanks for Class IIIB

liquids include composite designs consisting of a multi-ply cardboard box with a rigid or flexible plastic bladder.

A.3.3.12.4 Nonmetallic Intermediate Bulk Container. Permissible nonmetallic intermediate bulk

containers for shipping Class I, Class II, and Class IIIA liquids are governed by the hazardous materials transportation regulations promulgated by the United Nations publication, Recommendations on the Transport of Dangerous Goods, and the U.S. Department of Transportation's Hazardous Materials

Regulations, Title 49, Code of Federal Regulations. Intermediate bulk cContainers for Class IIIB liquids are not governed by these regulations. Fiber intermediate bulk containers for Class IIIB liquids include composite designs consisting of single- or multi-ply a cardboard boxes with a flexible plastic bladders,

which is commonly referred to as a “bag-in-box” containers.

3.3.34 Liquid Storage Room. A room that is used for the storage of liquids in containers, portable tanks, or intermediate bulk containers, has a floor area that does not exceed 500 ft2 (46 m2), and might be totally

enclosed within a building —that is, the room might have no exterior walls.

3.3.50 Staging. Temporary storage in a process area of liquids in containers in a process area, intermediate bulk containers, and portable tanks.

3.3.52 Terminal. That portion of a property where liquids are received by tank vessel, pipelines, tank car, or tank vehicle and are stored or blended in bulk for the purpose of distributing such liquids by tank vessel, pipeline, tank car, tank vehicle, portable tank, or container.

Chapter 9

9.1.1 This chapter shall apply to the storage of flammable and combustible liquids in containers as defined in section 3.3.12.:

(1) Drums or other containers that do not exceed 119 gal (450 L) individual capacity

(2) Portable tanks that do not exceed 660 gal (2500 L) individual capacity

(3) Intermediate bulk containers that do not exceed 793 gal (3000 L)

9.1.4 This chapter shall not apply to the following:

(1) Containers, intermediate bulk containers, and portable tanks that are used in operations areas, as covered by Chapter 17

[(2) through (7) remain as is]

9.3.9 Where containers, intermediate bulk containers, or portable tanks are stacked, they shall be stacked so that stability is maintained and excessive stress on container walls is prevented.

9.3.9.1 Portable tanks and iIntermediate bulk containers stored more than one high shall be designed to

stack securely, without the use of dunnage.

Page 72: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

9.3.9.2 Materials-handling equipment shall be capable of handling containers, portable tanks, and intermediate bulk containers that are stored at all storage levels.

9.3.10 Containers, intermediate bulk containers, and portable tanks in unprotected liquid storage areas shall not be stored closer than 36 in. (915 mm) to the nearest beam, chord, girder, or other roof or ceiling member.

9.4.1* Only the following approved containers, intermediate bulk containers, and portable tanks shall be used for Class I, Class II, and Class IIIA liquids:

(1) Metal containers, metal intermediate bulk containers, and metal portable tanks meeting the

requirements of and containing products authorized by the U.S. Department of Transportation Hazardous Materials Regulations in Title 49, Code of Federal Regulations, Parts 100–199, or by Part 6 of the UN Recommendations on the Transport of Dangerous Goods

[(2) through (7) remain as is]

9.4.2 Each portable tank or intermediate bulk container shall be provided with one or more devices installed in the top with sufficient emergency venting capacity to limit internal pressure under fire

exposure conditions to a gauge pressure of 10 psi (70 kPa) or 30 percent of the bursting pressure of the portable tank, whichever is greater.

9.4.3 The maximum allowable size of a container, intermediate bulk container, or metal portable tank for

Class I, Class II, and Class IIIA liquids shall not exceed that specified in Table 9.4.3.

Table 9.4.3 Maximum Allowable Size of— Containers, Intermediate Bulk Containers (IBCs),

and Portable Tanks

Flammable Liquids Combustible Liquids

Container Type Class IA Class IB Class IC Class II Class IIIA

Glass 1 pt (0.5 L) 1 qt (1 L) 1.3 gal (5 L) 1.3 gal (5 L) 5.3 gal (20 L)

Metal (other than

drums) or approved plastic

1.3 gal (5 L) 5.3 gal (20 L) 5.3 gal (20 L) 5.3 gal (20 L) 5.3 gal (20 L)

Safety cans 2.6 gal (10 L) 5.3 gal (20 L) 5.3 gal (20 L) 5.3 gal (20 L) 5.3 gal (20 L)

Metal drum (e.g., UN 1A1/1A2)

119 gal (450 L)

119 gal (450 L)

119 gal (450 L)

119 gal (450 L)

119 gal (450 L)

Approved metal portable tanks and IBCs

793 gal (3000 L)

793 gal (3000 L)

793 gal (3000 L)

793 gal (3000 L)

793 gal (3000 L)

Rigid plastic IBCs (UN 31H1 or 31H2) and

NP NP NP 793 gal (3000 L)

793 gal (3000 L)

Page 73: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

composite IBCs with rigid inner receptacle (UN31HZ1)

Composite IBCs with flexible inner receptacle (UN31HZ2) and

DOT/UN-approved flexible IBCs

NP NP NP NP NP

Non-bulk Bag-in-Box NP NP NP NP NP

Polyethylene UN1H1

and UN1H2, or as authorized by DOT exemption

1.3 gal (5 L) 5.3 gal (20

L)*

5.3 gal (20 L)* 119 gal (450

L)

119 gal (450 L)

Fiber drum NMFC or UFC Type 2A; Types 3A, 3B-H, or 3B-

L; or Type 4A

NP NP NP 119 gal (450 L)

119 gal (450 L)

NP: Not permitted for the container categories so classified unless a fire protection system is provided that is developed in accordance with 16.3.6 and is approved for the specific container and protection against static electricity is provided.

*See 9.4.3.1.

Exception: As provided for in Section 9.1, 9.4.3.1, 9.4.3.2, and 9.4.3.3.

9.12.1 Electrical area classification shall not be required for liquid storage areas where all containers,

intermediate bulk containers, and portable tanks are sealed and are not opened, except as provided for in 9.12.2.

Chapter 10

10.1.1 This chapter shall apply to mercantile occupancies that handle, store, and display liquids in non-

bulk containers, as defined in 3.3.12.3 that do not exceed 119 gal (450 L) individual capacity.

10.1.3 This chapter shall not apply to the following:

(1) Containers, intermediate bulk containers, and portable tanks that are used in operations, as

covered by Chapter 17

10.12.2 Electrical area classification shall not be required for liquid storage areas where all containers, intermediate bulk containers, and portable tanks are sealed and are not opened, except as provided for in

9.12.2.

Page 74: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Chapter 11

11.1 Scope. This chapter shall apply to the storage of flammable and combustible liquids in containers, as defined in 3.3.12, in industrial occupancies. in the following:

(1) Containers that do not exceed 119 gal (450 L) individual capacity

(2) Portable tanks that do not exceed 660 gal (2500 L) individual capacity

(3) Intermediate bulk containers that do not exceed 793 gal (3000 L)

Chapter 12

12.1 Scope. This chapter shall apply to the storage of liquids in in containers, as defined in 3.3.12, in liquid storage rooms, liquid warehouses, and general purpose warehouses. in the following:

(1) Drums or other containers that do not exceed 119 gal (450 L) individual capacity

(2) Portable tanks that do not exceed 660 gal (2500 L) individual capacity

(3) Intermediate bulk containers that do not exceed 793 gal (3000 L) individual capacity

12.3.5 Protected and unprotected solid pile and palletized storage shall be provided with aisles that are

arranged so that no container, portable tank, or intermediate bulk container is more than 20 ft (6 m) from an aisle.

Table 12.6.2.2 Quantity Limitations for Unprotected Liquid Warehouses

Non-Bulk Containers Metal Portable Tanks and Metal IBCs

Rigid Nonmetallic IBCs and Composite IBCs

Liquid Class

Maximu

m Storage Height (ft)

Maximum Total Quantity

per Pile or Rack Section (gal)

Maximum Total Quantity (gal)

Maximu

m Storage Height (ft)

Maximum Total Quantity

per Pile or Rack Section (gal)

Maximum Total Quantity (gal)

Maximu

m Storage Height (ft)

Maximum Total Quantity

per Pile or Rack Section (gal)

Maximum Total Quantity (gal)

IA 5 660 660 NP NP NP NP NP NP

IB 5 1,375 1,375 7 2,000 2,000 NP NP NP

IC 5 2,750 2,750 7 4,000 4,000 NP NP NP

II 10 4,125 8,250 7 5,500 11,000 7 4,125 8,250

Page 75: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

IIIA 15 13,750 27,500 7 22,000 44,000 7 13,750 27,500

IIIB 15 13,750 55,000 7 22,000 88,000 7 13,750 55,000

12.8.1* Class IB and IC liquids in containers of 1.3 gal (5 L) or less capacity, Class II liquids in containers

of 5.3 gal (20 L) or less capacity, Class IIIA liquids in containers of 60 gal (230 L) or less capacity, and Class IIIB liquids in containers, intermediate bulk containers, or portable tanks of 275 gal (1040 L) or less capacity shall be permitted to be stored in warehouses that handle combustible commodities, as defined

in NFPA 13, Standard for the Installation of Sprink ler Systems , provided that the storage area for liquids is protected with automatic sprinklers in accordance with either of the following:

12.8.4* Liquids in Plastic Non-Bulk Containers

12.8.5 The following shall apply to the storage of liquids and ordinary combustible commodities in general purpose warehouses:

(1) Liquids shall not be stored in the same pile or in the same rack sections as ordinary combustible

commodities. Where liquids are packaged together with ordinary combustibles, as in kits, the storage shall be considered on the basis of whichever commodity predominates.

(2) Except as provided for in 12.8.5(1), ordinary combustible commodities shall be separated from

liquids in non-bulk containers by a minimum distance of 8 ft (2.4 m).

Chapter 13

13.1 Scope. This chapter shall apply to the storage of liquids in containers, as defined in 3.3.12, in

detached, unprotected buildings., in the following:

(1) Drums or other containers that do not exceed 119 gal (450 L) individual capacity

(2) Portable tanks that do not exceed 660 gal (2500 L) individual capacity

(3) Intermediate bulk containers that do not exceed 793 gal (3000 L)

13.3.5 Solid pile and palletized storage shall be arranged so that piles are separated from each other by at least 4 ft (1.2 m). Aisles shall be provided and arranged so that no container or portable tank is more

than 20 ft (6 m) from an aisle.

13.3.8 Containers, intermediate bulk containers, and portable tanks shall not be stored closer than 36 in. (915 mm) to the nearest beam, chord, girder, or other roof member.

Chapter 14

14.1* Scope. This chapter shall apply to the storage of liquids in containers, as defined in 3.3.12, within movable, modular, prefabricated storage lockers, also known as hazardous materials storage lockers (hereinafter referred to as lockers), specifically designed and manufactured for storage of hazardous

materials., in the following:

Page 76: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

(1) Containers that do not exceed 119 gal (450 L) individual capacity

(2) Portable tanks that do not exceed 660 gal (2500 L) individual capacity

(3) Intermediate bulk containers that do not exceed 793 gal (3000 L) individual capacity

Chapter 15

15.1 Scope. This chapter shall apply to the storage of liquids outdoors in containers, as defined in

3.3.12.the following:

(1) Drums or other containers that do not exceed 119 gal (450 L) individual capacity

(2) Portable tanks that do not exceed 660 gal (2500 L) individual capacity

(3) Intermediate bulk containers that do not exceed 793 gal (3000 L) individual capacity

15.2 Definitions Specific to Chapter 15. (Reserved)

15.3 General Requirements. Outdoor storage of liquids in containers, intermediate bulk containers, and

portable tanks shall comply with Table 15.3 and with all applicable requirements of this chapter.

Table 15.3 Storage Limitations for Outside Storage

Liquid Class

Non-Bulk Containers

Portable Tanks and Metal IBCs

Rigid Plastic and Composite IBCs

Minimum Separation Distance (ft)

Maximum

Quantity per Pile (gal)a,b,c

Maximum

Storage Height (ft)

Maximum

Quantity per Pile (gal)

Maximum

Storage Height (ft)

Maximum

Quantity per Pile (gal)a,c

Maximum

Storage Height (ft)

Between Piles

or Rack Sections

To Propert

y Line That Is or Can

Be Built Uponb,d

To Street

, Alley, or

Public Wayb

IA 1,100 10 2,200 7 NP NP 5 50 10

IB 2,200 12 4,400 14 NP NP 5 50 10

IC 4,400 12 8,800 14 NP NP 5 50 10

II 8,800 12 17,600 14 8,800 14 5 25 5

III 22,000 18 44,000 14 22,000 18 5 10 5

Page 77: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

15.3.2 No container, intermediate bulk container, or portable tank in a pile shall be more than 200 ft (60

m) from a minimum 20 ft (6 m) wide access way to permit approach of fire control apparatus under all weather conditions.

15.4.1 A maximum of 1100 gal (4160 L) of liquids in containers, intermediate bulk containers, or

portable tanks shall be permitted to be stored adjacent to a building under the same management, provided the following conditions apply:

15.4.4 The quantity of liquid stored shall be permitted to exceed the 1100 gal (4160 L) quantity specified

by 15.4.1 where a minimum distance equal to that specified by Table 15.3 for distance to property line shall be maintained between buildings and the nearest container or portable tank.

15.4.5 Where the provisions of 15.4.1 cannot be met, a minimum distance equal to that specified by

Table 15.3 for distance to property line shall be maintained between buildings and the nearest container or portable tank.

Chapter 16

16.1.1* This chapter shall apply to automatic fire protection systems for all inside storage of flammable and combustible liquids in containers, intermediate bulk containers, and portable tanks as specified in Section 9.4.

A.16.1.1 See Annex E for limitations of the protection criteria of Table 16.5.2.1 through Table 16.5.2.12, particularly for intermediate bulk containers and portable tanks having capacities greater than 60 gal (230 L)

Protected storage allowed under previous editions of this code can be continued if the class of liquids stored, the quantity of liquids stored, fire protection, and building configuration remain unchanged. Table A.16.1.1(a) and Table A.16.1.1(b), reprinted here from the 1993 edition of this code, can be used as a

reference for storage arrangements in previously approved, protected, inside liquid storage areas. It should be noted that the reference to portable tanks is retained in Tables A.16.1.1(a) and A.16.1.1(b), as the reference existed in the source tables.

16.2.3* Relieving-Style Container. A metal container, a metal intermediate bulk container, or a metal

portable tank that is equipped with at least one pressure-relieving mechanism at its top that is designed, sized, and arranged to relieve the internal pressure generated due to exposure to fire so that violent rupture is prevented.

Table A.16.2.3 Common Relieving- and Nonrelieving-Style Metal Containers

Container Type Relieving Style Nonrelieving Style

≤1 qta All N/A

>1 qt and ≤6 gala Metal containers with plastic cap, or flexible or rigid plastic spout

with plastic cap

Metal containers with steel spout and steel screw cap

Page 78: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

≤1 gal, friction lid Metal containers with metal friction-fit covers (e.g., paint can lid)

N/A

1 gal and ≤6 gal (lug cover) Metal containers with metal covers held in place with a mechanical friction-fit (e.g., lug-

type) closure mechanism

N/A

>6 gal and ≤60 galb,c (drums) Metal containers, tight or open-

head (drums) having at least one 2 in. plastic plug (Note: Cap seals, if used, need to be plastic

and nonmetallic.)

Open head metal containers with

steel covers having no steel flange openings; or open head and tight head metal containers

with steel flange openings where only steel plugs and/or cap seals are used

>60 gal and ≤793 gal Metal portable tanks or metal intermediate bulk containers with

at least one relief device conforming to the design, construction, and capacity of the

container's section

N/A

16.4.1.1 Figure 16.4.1(a) shall be used for miscible and nonmiscible flammable and combustible liquids in metal containers, metal portable tanks, and metal intermediate bulk containers .

16.4.1.2 Figure 16.4.1(b) shall be used for miscible and nonmiscible flammable and combustible liquids

in nonmetallic containers and in nonmetallic intermediate bulk containers.

16.4.1.3 Figure 16.4.1(c) shall be used for water-miscible flammable and combustible liquids in nonmetallic containers and in nonmetallic intermediate bulk containers.

16.5.2.1 Table 16.5.2.1 shall apply to the following:

(1) Automatic sprinkler protection

(2) Single- or double-row rack storage

(3) Nonmiscible liquids and miscible liquids with concentration of flammable or combustible component greater than 50 percent by volume

(4) Metal containers, metal portable tanks, metal intermediate bulk containers

(5) Relieving- or nonrelieving-style containers

Table 16.5.2.1 Design Criteria for Sprinkler Protection of Single - and Double-Row Rack Storage of Liquids in Metal Containers, Portable Tanks, and IBCs

Page 79: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Contain

er Style and Capacit

y (gal)

Maximum

Storage Height

(ft)

Maxim

um Ceiling Height

(ft)

Ceiling Sprinkler Protection In-Rack Sprinkler Protection

Not

es

Fire

Test Ref. [See

Table D.2(

a)]

Sprinkler Design Sprinkler Minimum

Discharge Flow

(gpm)

Layout (See 16.5.1.

10) Type

Respo

nse

Density (gpm/f

t2)

Area (ft2

)

Typ

e

Respo

nse

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

≤1 16 30 K≥11.2

QR (HT)

0.60 2000

K≥5.6

QR(OT) 30 1 1, 2, 7

1

20 30 K≥11.2

SR or QR (HT)

0.60 2000

K≥5.6

QR(OT) 30 2 1, 2, 7

2

≤5 25 30 K≥8.0 SR or QR (HT)

0.30 3000

K≥5.6

QR(OT) 30 3 1, 7 3

>5 and ≤60

25 30 K≥11.2

SR (HT)

0.40 3000

K≥5.6

QR or SR(OT)

30 5 1, 7 5

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASS IIIB

≤5 40 50 K≥8.0 SR or

QR (HT)

0.30 200

0

K≥5

.6

QR(OT) 30 4 1, 3,

7

4

>5 and ≤60

40 50 K≥8.0 SR (HT)

0.30 3000

K≥5.6

QR(OT) 30 4 1, 3, 7

6

RELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

≤5 14 18 K≥11.2

pendent only

QR (HT)

0.65 2000

No in-rack sprinklers required 4 7

25 30 K≥8.0 SR or QR (HT)

0.30 3000

K≥5.6

QR(OT) 30 4,7 1, 5 8

Page 80: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

>5 and ≤60

25 30 K≥11.2

SR (HT)

0.60 3000

K≥5.6

QR(OT) 30 6, 7 1 10

Portabl

e tanks and IBCs

25 30 K≥11.

2

SR

(HT)

0.60 300

0

K≥5

.6

QR or

SR(OT)

30 5, 7 1 12

RELIEVING-STYLE CONTAINERS — LIQUID CLASS IIIB

≤ 5 gal 40 50 K≥8.0 SR or QR (HT)

0.30 2000

K≥5.6

QR(OT) 30 4, 7 1 9

>5 and ≤60

40 50 K≥8.0 SR (HT)

0.30 3000

K≥5.6

QR(OT) 30 4, 7 1, 3 11

Portable tanks and

IBCs

40 50 K≥8.0 SR (HT)

0.30 3000

K≥5.6

QR(OT) 30 4, 7 1, 6 13

16.5.2.2 Table 16.5.2.2 shall apply to the following:

(1) Automatic sprinkler protection

(2) Palletized or stacked storage

(3) Nonmiscible liquids and miscible liquids with concentration of flammable or combustible component greater than 50 percent by volume

(4) Metal containers, metal portable tanks, metal intermediate bulk containers

(5) Relieving- or nonrelieving-style containers

Table 16.5.2.2 Design Criteria for Sprinkler Protection of Palletized and Stacked Storage of

Liquids in Metal Containers, Portable Tanks, and IBCs

Container Style and Capacity

(gal)

Maximum Storage Height

(ft)

Maximum Ceiling Height

(ft)

Ceiling Sprinkler Protection

Notes

Fire Test Ref. [See Table

D.2(b)]

Sprinkler Design

Type Response

Density

(gpm/ft2)

Area

(ft2)

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

Page 81: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

≤5 4 18 K≥8.0 SR or QR (HT)

0.21 1500 1 1

5 18 K≥8.0 SR or QR

(HT)

0.30 3000 — 2

6.5 30 K≥11.2 QR (HT) 0.45 3000 — 3

>5 and ≤60

5 18 K≥11.2 SR (HT) 0.40 3000 — 4

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASS IIIB

≤5 18 30 K≥8.0 SR or QR

(HT)

0.25 3000 — 5

>5 and ≤60

10 20 K≥8.0 SR (HT) 0.25 3000 — 6

18 30 K≥8.0 SR (HT) 0.35 3000 — 7

RELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

≤5 12 30 K≥11.2 pendent

only

QR (HT) 0.60 3000 2 8

>5 and

≤60

5 30 K≥11.2 SR (HT) 0.40 3000 — 9

6.5 30 K≥11.2 SR (HT) 0.60 3000 3 10

Portable tanks

1-high 30 K≥8.0 SR (HT) 0.30 3000 — 14

and IBCs 2-high 30 K≥11.2 SR (HT) 0.60 3000 — 15

RELIEVING-STYLE CONTAINERS — LIQUID CLASS IIIB

≤5 18 30 K≥8.0 SR or QR (HT)

0.25 3000 — 11

>5 and

≤60

10 20 K≥8.0 SR (HT) 0.25 3000 — 12

Page 82: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

18 30 K≥8.0 SR (HT) 0.35 3000 — 13

Portable tanks

1-high 30 K≥8.0 SR (HT) 0.25 3000 — 16

and IBCs 2-high 30 K≥11.2 SR (HT) 0.50 3000 — 17

16.5.2.3 Table 16.5.2.3 shall apply to the following:

(1) Foam-water sprinkler protection

(2) Single- or double-row rack storage

(3) Nonmiscible liquids and miscible liquids with concentration of flammable or combustible

component greater than 50 percent by volume

(4) Metal containers, metal portable tanks, metal intermediate bulk containers

(5) Relieving- or nonrelieving-style containers

Table 16.5.2.3 Design Criteria for Foam-Water Sprinkler Protection of Single- or Double-Row Rack Storage of Liquids in Metal Containers, Portable Tanks, and IBCs

Contain

er Style and Capacit

y (gal)

Maximu

m Storage Height

(ft)

Maxim

um Ceiling Height

(ft)

Ceiling Sprinkler

Protection In-Rack Sprinkler Protection

Not

es

Fire Test Ref. [See

Table D.2(c)]

Sprinkler Design Sprinkler Minimum

Discharge Flow

(gpm)

Layout (See 16.5.1.

10)

Typ

e

Respo

nse

Density (gpm/ft

2)

Area (ft2

)

Typ

e

Respo

nse

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

≤5 25 30 K≥8.0

SR or QR (HT)

0.30 2000

K≥5.6

QR or SR (OT)

30 3 1, 2, 4, 5

1

>5 and ≤60

25 30 K≥8.0

SR (HT)

0.30 3000

K≥5.6

QR or SR (OT)

30 3 1, 3, 4, 5

2

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASS IIIB

Page 83: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

≤60 40 50 K≥8.0

SR (HT)

0.30 2000

K≥5.6

QR or SR (OT)

30 4 1,5 3

RELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

≤5 25 30 K≥8.

0

SR or

QR (HT)

0.30 200

0

K≥5.

6

QR or

SR (OT)

30 4 1, 2,

4, 5

4

>5 and ≤60, portable

tanks and IBCs

25 30 K≥8.0

SR (HT)

0.30 3000

K≥5.6

30 4 1, 3, 4, 5

5

RELIEVING-STYLE CONTAINERS — LIQUID CLASS IIIB

≤60 40 50 K≥8.

0

SR

(HT)

0.30 200

0

K≥5.

6

QR or

SR (OT)

30 4 1, 5 6

16.5.2.4 Table 16.5.2.4 shall apply to the following:

(1) Foam-water sprinkler protection

(2) Palletized or stacked storage

(3) Nonmiscible liquids and miscible liquids with concentration of flammable or combustible

component greater than 50 percent by volume

(4) Metal containers, metal portable tanks, metal intermediate bulk containers

(5) Relieving- or nonrelieving-style containers

Table 16.5.2.4 Design Criteria for Foam-Water Sprinkler Protection of Palletized and Stacked Storage of Liquids in Metal Containers, Portable Tanks, and IBCs

Container

Style and

Maximum

Storage

Maximum

Ceiling

Ceiling Sprinkler Protection

Notes

Fire Test

Ref. [See Sprinkler Design

Page 84: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Capacity (gal)

Height (ft)

Height (ft)

Type Response Density (gpm/ft2)

Area (ft2)

Table D.2(d)]

NONRELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

≤5, cartoned

11 30 K≥11.2 SR or QR (HT)

0.40 3000 1 1

≤5, uncartoned

12 30 K≥8.0 SR or QR (HT)

0.30 3000 1 2

>5 and ≤60

5 (1-high) 30 K≥8.0 SR (HT) 0.30 3000 1 3

RELIEVING-STYLE CONTAINERS — LIQUID CLASSES IB, IC, II, IIIA

>5 and ≤60

6.5 (2-high)

30 K≥8.0 SR (HT) 0.30 3000 2, 3 4

10 (3-high)

33 K≥11.2 SR (HT) 0.45 3000 2, 3 6

13.75 (4-high)

33 K≥11.2 SR (HT) 0.60 3000 2, 3 7

Portable tanks and IBCs

1- or 2-high

30 K≥8.0 SR (HT) 0.30 3000 5

16.5.2.5 Table 16.5.2.5 shall apply to the following:

(1) Automatic sprinkler protection

(2) Single-, double-, or multiple-row rack storage

(3) Class IIIB nonmiscible liquids and Class IIIB miscible liquids with concentration of flammable or

combustible component greater than 50 percent by volume

(4) Nonmetallic containers or intermediate bulk containers

(5) Cartoned or uncartoned

Table 16.5.2.5 Design Criteria for Sprinkler Protection of Single-, Double-, and Multiple-Row Rack Storage of Class IIIB Liquids

Closed-Cup

Container or IBC Packaging

Maximum Storage

Maximum Ceiling

Rack

Sprinkler Protection

Fire Test

Page 85: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

Flash Point (°F)

Capacity (gal)

Height (ft)

Height (ft) Minimum

Aisle Width (ft)

Depth (ft) Ceiling

Sprinkler Type Design

Ref. [See Table

D.2(e)]

≥200 ≤5 Plastic containers, cartoned or

uncartoned

Unlimited Unlimited 4 Any Any See 16.6.1, Fire

Protection System Design

Scheme “A”

1

≥375 ≤275 Flexible plastic liner within a

composite continuously wound

corrugated paperboard intermediate

bulk container (See Note 1)

28 30 8 Any Any See 16.6.3, Fire

Protection System Design

Scheme “C”

2

≥375 ≤6 Flexible plastic liner

within a composite corrugated paperboard

box

Unlimited Unlimited 8 Any Any See 16.6.3,

Fire Protection System Design

Scheme “C”

2

Chapter 18

18.4.8* The staging of liquids in containers, intermediate bulk containers, and portable tanks shall be

limited to the following:

(1) Containers, intermediate bulk containers, and portable tanks that are in use

(2) Containers, intermediate bulk containers, and portable tanks that were filled during a single shift

(3) Containers, intermediate bulk containers, and portable tanks needed to supply the process for one continuous 24-hour period

(4) Containers, intermediate bulk containers, and portable tanks that are stored in accordance with

Chapter 9

Page 86: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

18.4.9 Class I, Class II, or Class IIIA liquids used in a process and staged in the process area shall not be filled in the process area.

Exception No. 1: Intermediate bulk containers and portable tanks that meet the requirements of Chapter 9.

Exception No. 2: Intermediate products that are manufactured in the process area.

18.5.2 Class I liquids or Class II and Class III liquids that are heated up to or above their flash points shall be drawn from or transferred into vessels or, containers, or portable tanks as follows:

(1) From original shipping containers with a capacity of 5.3 gal (20 L) or less

(2) From safety cans

(3) Through a closed piping system

(4) From portable tanks or containers by means of a device that has antisiphoning protection and

that draws through an opening in the top of the tank or container

(5) By gravity through a listed self-closing valve or self-closing faucet

[18.5.4 and 18.5.5 done in MAQ TG]

Chapter 21

21.1 Scope. This chapter shall apply to the following:

(1) The storage of flammable and combustible liquids, as defined in 3.3.33 and Chapter 4, in fixed

storage tanks as defined in 3.3.51.6 that exceed 60 gal (230 L) capacity

(2) The storage of flammable and combustible liquids in portable tanks as defined in 3.3.51.4 that exceed 660 gal (2500 L) capacity

(3) The storage of flammable and combustible liquids in shipping vessels intermediate bulk containers that exceed 793 gal (3000 L) capacity

(4) The design, installation, testing, operation, and maintenance of such tanks, portable tanks, and

shipping vesselsbulk containers

Chapter 22

22.1 Scope. This chapter shall apply to the following:

(1) The storage of flammable and combustible liquids, as defined in 3.3.33 and Chapter 4, in fixed

storage tanks that exceed 60 gal (230 L) capacityas defined in 3.3.51.6

(2) The storage of flammable and combustible liquids in portable tanks as defined in 3.3.51.4 that exceed 660 gal (2500 L) capacity

Page 87: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

(3) The storage of flammable and combustible liquids in shipping vessels intermediate bulk containers that exceed 793 gal (3000 L)

(4) The design, installation, testing, operation, and maintenance of such tanks, portable tanks, and shipping vesselsbulk containers

Chapter 23

23.1 Scope. This chapter shall apply to the following:

(1) The storage of flammable and combustible liquids, as defined in 3.3.33 and Chapter 4, in fixed underground tanks

(2) The installation and operation of underground tanks

Page 88: Dear FLC-FUN Committee, - NFPA€¦ · David P. Nugent Principal. Global Risk Consultants 2037 Clover Road Northbrook, IL 60062-6422. SE. 10/27/2009. FLC-FUN Alfredo M. Ramirez Principal

“I make a motion to…”

“Create a Second Revision by…” “Resolve the Public Comment by…”

“Accepting the Public

Comment”

(This means accepting

EXACTLY what the

comment proposes! If

you want to make ANY

changes to the proposed

language, even as simple

as a comma, you MUST

choose “Reject but

see…”)

“Rejecting the Public

Comment, but see

related Second

Revision”

(This creates a SR based

on the comment, but

allows you to revise the

proposed language)

“Rejecting the Public

Comment”

(This means the

committee does not want

to make any changes

based on the Public

Comment)

“Rejecting the Public

Comment, but hold”

(This means the

committee does not want

to make any changes at

the moment, but the

proposal is held over and

considered during the

next revision cycle)