  • 7/30/2019 December 11 2012 Complete Agenda

    1/22

    AGENDA

    MAYOR AND CITY COUNCIL WORK SESSION

    TUESDAY, DECEMBER 11, 2012 11:30 A.M.

    Closed Session Tuesday, December 11, 2012 11:30 a.m.- 1:00 p.m. Legal, Real Estateand Personnel Matters

    1. Report on Closed Session Tuesday, December 11, 2012 11:30 a.m. Legal, Real Estateand Personnel Matters

    2. Retirement Recognition for Deputy Fire Marshal Jack Hastings3. Request Approval for Final Design & Construction Documents for Fire Station 4

    Presented by: Terence McGean, City Engineer

    4. Request Permission to Solicit Proposals for Design of Fire Headquarters Renovations andAdditionsPresented by: Terence McGean, City Engineer

  • 7/30/2019 December 11 2012 Complete Agenda

    2/22

    WORK SESSION -MAYOR AND CITY COUNCIL

    TUESDAY, DECEMBER 11, 2012

    1 Report on Closed Session - Tuesday, December 11, 2012

    11:30 a.m. 1:00 p.m. Legal, Real Estate and Personnel

    Matters

  • 7/30/2019 December 11 2012 Complete Agenda

    3/22

    NOTICE OF CLOSED SESSION OF MAYOR & CITY COUNCIL OF OCEAN CITY

    AUTHORITY: State Government Article: Section 10-508(a) Annotated Code of MarylandPURPOSES:

    X

    1. To discuss:(i) the appointment, employment, assignment, promotion, discipline, demotion,

    compensation, removal, resignation or performance evaluation ofappointees, employees or officials over whom it has jurisdiction; or(ii) any other personnel matter that affects one or more specific individuals;

    2. To protect the privacy or reputation of individuals with respect to a matter that isnot related to public business

    X3. To consider the acquisition of real property for the public purpose and matters

    directly related thereto;

    4. Consider a matter that concerns the proposal for a business or industrialorganization to locate, expand or locate in the state;

    5. Consider the investment of public funds;

    6. Consider the marketing of public securities;

    X 7. Consult with counsel to obtain legal advice;8. Consult with staff, consultants or other individuals about pending or potential

    litigations;

    9. Conduct collective bargaining negotiations or consider matters that relate to the

    negotiations;

    10. Discuss public security if the public body determines that public discussion

    would constitute a risk to the public or public security, including;

    a) the deployment of fire and police services and staff; and

    b) the development and implementation of emergency plans

    11. Prepare, administer or grade a scholastic, licensing or qualifying examination;

    12. Conduct or discuss an investigative proceeding on actual or possible criminal

    conduct;13. Comply with a specific constitutional, statutory or judicially imposed

    requirement that prevents public disclosures about a particular proceeding or

    matter; or

    14. Before a contract is awarded or bids are opened, discuss a matter directly related

    to a negotiation strategy or the contents of a bid or proposal, if public discussionor disclosure would adversely impact the ability of the public body to participate

    in the competitive bidding or proposal process

    DATE AND TIME: Tuesday, December 11, 2012 11:30 a.m.

    PLACE: City Hall

    SUBJECT: Legal, Real Estate and Personnel Matters

    VOTE: UNANIMOUS

    OTHER: FOR:

    AGAINST:

    ABSTAIN:

    ABSENT:

    from voteonly:

  • 7/30/2019 December 11 2012 Complete Agenda

    4/22

    REPORT OF CLOSED SESSION

    OF THE MAYOR AND CITY COUNCIL OF OCEAN CITY

    Prior to this open session of the Mayor and City Council being held on Tuesday,

    December 11, 2012, a closed session was held on Tuesday, December 11, 2012 at

    11:30 a.m. The following is a report of the closed session.

    1. A statement of the time, place, and purpose of the closed session is attached.

    2. A record of the vote of each member as to closing the session is attached.

    3. A citation of the authority under the law for closing the session is attached.

    4. (a) Topics of Discussion: Legal, Real Estate and Personnel Matters

    (b) Persons present:

    Mayor Richard Meehan

    City Manager David Recor

    Council President Lloyd Martin

    Council Secretary Mary Knight

    Council Members Doug Cymek; Margaret Pillas; Brent Ashley; Dennis Dare

    and Joe Mitrecic

    City Solicitor Guy Ayres

    Public Works Director Hal Adkins

    Executive Office Associate Diana Chavis

    Action(s) taken:

    Motion to close meeting:

    H:\Wpdoc\closedsess.wpd

  • 7/30/2019 December 11 2012 Complete Agenda

    5/22

    WORK SESSION -MAYOR AND CITY COUNCIL

    TUESDAY, DECEMBER 11, 2012

    2 Retirement Recognition for Deputy Fire Marshal Jack

    Hastings

  • 7/30/2019 December 11 2012 Complete Agenda

    6/22

    IN APPRECIATION OF CHARLES JACK HASTINGS

    24 YEARS OF SERVICECharles Jack Hastings has contributed Twenty-four

    (24) years of dedicated service to the Town of Ocean City, where hebegan his career in 1988; and

    WHEREAS, Charles Jack Hastings has played an integral role inthe Fire Marshals Office of the Town of Ocean City for the pastTwenty-four (24) years; and

    WHEREAS, Charles Jack Hastings skill and experience have beeninstrumental in the overall success of the Fire Marshals Office for theTown of Ocean City, Maryland.

    NOW, THEREFORE, I, Richard W. Meehan, Mayor of the Town ofOcean City, Maryland, along with the Ocean City Council, do herebycommend Jack for his Twenty-four (24) years of devoted service andwish him a happy and healthy retirement.

    IN WITNESS WHEREOF, I have hereunto set my hand and causedthe Great Seal of the Town of Ocean City, Maryland to be affixed this31st day of December in the year of Our Lord two thousand andtwelve.

    ______________________________RICHARD W. MEEHANM

  • 7/30/2019 December 11 2012 Complete Agenda

    7/22

    WORK SESSION -MAYOR AND CITY COUNCIL

    TUESDAY, DECEMBER 11, 2012

    3 Request Approval for Fire Station 4 Final Design and

    Construction Documents

    Presented by: Terence McGean, City Engineer

  • 7/30/2019 December 11 2012 Complete Agenda

    8/22

    TOW N OF

    The W h i t e Mar l i n Cap i t a l o f t he Wor ld

    TO: The Honorable Mayor, Council President and Members of CouncilTHRU: David L. Recor, ICMA-CM, City ManagerFROM: Terence J. McGean, PE, City EngineerRE: Fire Station 4 Final Design Services ContractDATE: November 30, 2012

    I SSUE( S) : Contract for final design services and construction documents forFire Station #4.

    SUMMARY: The preliminary design for a new Fire Station #4 has beenapproved by the Fire Department Building Committee. Staffrequests Council approval to move forward with final design andpreparation of construction documents with the goal of beginningconstruction in the spring of 2013.

    FI SCAL I MPACT: $131,125. Total building budget $3.5 million, funded in 2012bond.

    RECOMMENDATI ON: Approve contract with Design Atlantic in the amount of $131,125for final design and preparation of construction documents forFire Station #4.

    ALTERNATI VES: None

    RESPONSI BLE STAFF: Terrance McGean, City Engineer

    COORDI NATED W I TH: Ocean City Fire Department, Cliff Christello, Deputy Fire Marshal II

    ATTACHMENT(S) : 1) Summary Memo2) Drawings

    Agenda Item # 3

    Council Meeting 12-11-12

  • 7/30/2019 December 11 2012 Complete Agenda

    9/22

    INTEROFFICE MEMORANDUM

    TO: DAVID RECOR

    FROM: TERENCE MCGEAN

    SUBJECT: FIRE STATION 4 RECONSTRUCTION

    DATE: 11/30/2012

    CC: DIANA CHAVIS, CHIEF LARMORE, CLIFF CHRISTELLO, COUNCIL AGENDA

    The reconstruction of Fire Station 4 (located at 130th St.) was included in the recent bondissuance. The preliminary design and architect selection for this project occurred in 2009. Fire Station4 was selected by the Fire Department as the top priority for station expansion due to theconcentration of high rise structures and year round residents in the North end of the City. At that

    time we investigated options of renovating and expanding the existing facility versus newconstruction and it was determined that renovation was not cost effective. We then completed apreliminary design and cost estimate for a new building in the hopes of obtaining Federal stimulusmoney for the project. When we were unsuccessful in getting any grants, the project was put on holduntil the 2012 bond issuance.

    The Fire Department Building Committee and myself have since worked with the architect torefine the design to reduce cost and improve the efficiency of the building. Changes included theelimination of the green roof, scaling back the first floor kitchen, and reconfiguration of the enginebay support spaces. The new 11,500 square foot building increases the capacity of the engine bay bymore than one third and provides areas for both duty crews and the departments successful live inprogram. We are now ready to move forward with the final design of the building and preparationof construction documents with the goal of starting construction this spring. The Committee is

    recommending that we continue with the previous selected architect, Design Atlantic.

    The negotiated cost for Design Atlantic to complete bid documents including architectural,structural engineering, civil engineering, mechanical and electrical engineering, is $131,125. The staffestimate for this work was $155,000. The total building budget is $3.5 million.

    Staff therefore requests permission to contract with Design Atlantic for final design andconstruction documents for a new Fire Station #4 in the amount of $131,125.

  • 7/30/2019 December 11 2012 Complete Agenda

    10/22

    /Volumes/MBDrive2/~DAProjects/~OceanCity/OCS

    tation4/Sta4Restart2012.p

    ln

    EAELEV

    SOUTHELEVATION

    1SECTION

    1SECTION

    5SECTION

    5SECTION

    WESTELEVATION

    2SECTION

    2SECTION

    3SECTION

    4SECTION

    4SECTION

    View from NE View f

    1 Roof Plan 1/16" = 1'-0"

    View from East

    OCEAN CITY VOLUNTEER FCOMPANY

    STATION 4130th Street and Coastal Highway, Ocean City

  • 7/30/2019 December 11 2012 Complete Agenda

    11/22

    /Volumes/MBDrive2/~DAProjects/~OceanCity/OCStation4/Sta4Restart2012.p

    ln

    SOUTHELEVATION

    MEPA: 103 sq ft

    ElevatorA: 59 sq ft

    StairA: 145 sq ft

    CirculationA: 174 sq ft

    DormA: 361 sq ft

    BathA: 79 sq ft Bath

    A: 79 sq ft

    BathA: 39 sq ft

    DayroomA: 726 sq ft

    Physical TrainingA: 517 sq ft

    StairA: 144 sq ft

    MezzanineA: 1,263 sq ft

    PantryA: 10 sq ft

    StorageA: 22 sq ft

    StorageA: 46 sq ft

    1SECTION

    1SECTION

    NORTHELEVATION

    W

    CD

    20x 61/2"= 11'-0"

    12 3 4

    5 6 7 8

    9 1 0 1 1 1

    2 1 3 1 4 1

    5 1 6 1 7 1

    8 1 9

    31x 7" =18'-0"

    1 2 3 45 6 7

    8 9 10 1

    1 12 13 14 15

    16 17 1

    8 19 20 21 22 23 24 2

    5 26 27 28 29 30

    20x 61/2" = 11'-0 "

    1 2 3 4

    5 6 7

    8 9 1 0

    11 1

    2 13 14 15 16 17 1

    8 19

    5SECTION

    5SECTION

    WESTELEVATION

    DW

    R

    21 x6 3/4" =11'-91/4"

    1 2 34 5

    2SECTION

    2SECTION

    3SECTION

    4SECTION

    4SECTION

    LaundryA: 19 sq ft

    SOUTHELEVATION

    En

    trance

    Entrance

    LinenA: 14 sq ft

    DayroomA: 596 sq ft

    StudyA: 139 sq ft

    BathA: 79 sq ft

    HC BathA: 93 sq ft

    DormA: 439 sq ft

    EMTA: 46 sq ft

    EMTA: 71 sq ft

    DecontamA: 88 sq ft

    MEPA: 52 sq ft

    LiftA: 21 sq ft

    ElevatorA: 59 sq ft

    CirculationA: 412 sq ft

    StorA: 21 sq ft

    Apparatus BaysA: 4,248 sq ft

    1SECTION

    1SECTION

    NORTHELEVATION

    W

    CD

    R

    31 x7" =18'-0"

    1 2 34 5 6

    7 8 91

    0 11 12 13 14 15

    16 17 1

    8 19 20 21 22 23 2

    4 25 26 27 28 29 3

    0

    20 x6 1/2" =11'-0"

    1 2 3

    4 5

    5SECTION

    N

    LaundryA: 16 sq ft

    SprinklerA: 47 sq ft

    Turnout GearA: 139 sq ft

    2SECTION

    2SECTION

    4SECTION

    SCALE: 1/8" = 1'-0"22nd FLOOR PLAN

    SCALE: 1/8" = 1'-0"11st FLOOR PLAN

  • 7/30/2019 December 11 2012 Complete Agenda

    12/22

    WORK SESSION -MAYOR AND CITY COUNCIL

    TUESDAY, DECEMBER 11, 2012

    4 Request Permission to Solicit Proposals for Design of Fire

    Headquarters Renovations and Additions

    Presented by: Terence McGean, City Engineer

  • 7/30/2019 December 11 2012 Complete Agenda

    13/22

    TOWN OF

    The W h i t e Mar l i n Cap i t a l o f t he Wor ld

    TO: The Honorable Mayor, Council President and Members of CouncilTHRU: David L. Recor, ICMA-CM, City ManagerFROM: Terence J. McGean, PE, City EngineerRE: Request to Receive Proposals for Fire Headquarters DesignDATE: November 30, 2012

    ISSUE(S): Request permission to receive proposals for design services forrenovations and additions to the Fire Headquarters Building.

    SUMMARY: Renovations and additions to the Fire Headquarters Building (15thSt.) were included in the 2012 Bond. The services of a designprofessional are required to proceed with this project.

    FISCAL IMPACT: Total project budget is $1.5 million.

    RECOMMENDATION: Grant permission to solicit proposals for design of renovationsand additions to Fire Headquarters.

    ALTERNATIVES: None

    RESPONSIBLE STAFF: Terrance McGean, City Engineer

    COORDINATED WITH: Cliff Christello, Deputy Fire Marshal II

    ATTACHMENT(S): RFP

    Agenda Item # 4

    Council Meeting 12-11-12

  • 7/30/2019 December 11 2012 Complete Agenda

    14/22

    TOWN OF OCEAN CITY

    OCEAN CITY, MARYLAND

    REQUEST FOR PROPOSALS

    ARCHITECTURAL/ENGINEERING SERVICES

    Ocean City Fire DepartmentHeadquarters Building Renovation

    COUNCIL

    LLOYD MARTIN

    PRESIDENT

    MARY P. KNIGHTSECRETARY

    BRENT ASHLEY

    DOUGLAS S. CYMEK

    DENNIS W. DARE

    JOSEPH MITRECIC

    MARGARET PILLAS

    MAYOR CITY MANAGERRICHARD W. MEEHAN. DAVID RECOR

    CITY ENGINEER

    TERENCE J. MCGEAN, P.E.

    PROPOSAL DATE/TIME: 11:00 AM, TUESDAY, JANUARY 15, 2013

  • 7/30/2019 December 11 2012 Complete Agenda

    15/22

    INTRODUCTION

    OCEAN CITY FIRE DEPARTMENT HEADQUARTERS BUILDINGARCHITECTURAL/ENGINEERING SERVICES

    The Town of Ocean City Maryland is currently accepting proposals forEngineering/Architectural services for renovations at the Ocean City Volunteer Fire DepartmentHeadquartersto be located within the Town of Ocean City at 1409 Philadelphia Ave.

    Proposals will be received in the City Manager's Office located on the second floor of City Hall,3rd Street and Baltimore Avenue, Ocean City, Maryland.

    Proposals will be accepted no later than 11:00 am, Tuesday, January 15, 2013Interested firms should submit three (3) copies of a written proposal prepared in accordance with

    this RFP. The proposal shall be in an envelope marked "Proposal for: OCEAN CITY FIREDEPARTMENT HEADQUARTERS BUILDING - ARCHITECTURAL/ENGINEERINGSERVICES.

    Written proposals will be evaluated in accordance with this RFP . Proposals will be evaluatedbased on a combination of qualifications (75%) and fee (25%)

    Successful proposers will have broad range experience in Fire House design and renovation, befamiliar with state-of-the-art fire fighting equipment, be familiar with current public safetyagency and fire department standards, practice and procedures, and have knowledge of localbuilding codes, regulations, and standards.

    Successful proposers must be willing to cooperate fully with Fire Department and City officialsin all phases of the design.

    Notice-to-Proceed is expected to be issued in February 2013

    Construction Documents will be expected to be submitted to the Town no later than July 2013.

  • 7/30/2019 December 11 2012 Complete Agenda

    16/22

    SCOPE OF SERVICES

    OCEAN CITY FIRE DEPARTMENT HEADQUARTERS BUILDINGARCHITECTURAL/ENGINEERING SERVICES

    The Project

    The Town of Ocean City, Maryland has initiated the necessary activities and funding for thedesign and construction of renovations to the Ocean City Fire Department Headquarters.The Town requires the professional services of an Architectural/Engineering Consulting Firm,Joint Venture, or Team to provide design services for the Project.

    Project History

    The Ocean City Fire Department Headquarters Building is located at 1409 Philadelphia Ave,Ocean City, Maryland. The building was constructed in 1960. The 18,000sf building serves as a

    Fire Station with bunk rooms, Meeting Area, Dispatch Area, and administrative offices for theOcean City Fire Department .

    As the Town of Ocean City has grown, fire and emergency medical services have become largerand more sophisticated. In 2008 the City Fire Marshall, Emergency Medical Services and theOcean City Volunteer Fire Company were combined under a single command structure. Theheadquarters building, as it currently exists, fails to adequately meet the needs of the occupants.Specifically, additional office space is required, additional equipment bay space and storagespace is needed and additional amenities for Fire Department personnel including an exercisefacility are desired. In order to accommodate these additional space needs, the City proposes toexpand the building approximately 70x30 to the south for administrative space and

    approximately 18 x 36 to the west for equipment and storage space.

    The buildings exterior, currently a combination of EIFS and masonry has numerous problemswith moisture penetration. The building has a flat roof system which has developed leaks. TheCity desires to completely renovate the building roof and envelope to esthetically fit with thesurrounding structures, eliminate moisture problems and maintain protection during stormevents. Other needs identified are relocation of the buildings generator and fuel tank, relocationof various electrical panels and relocation of the cascade oxygen system.

    The Fire Department Building Committee identified the buildings physical and programmaticdeficiencies, recommended solutions, and developed preliminary cost estimates. Based on the

    recommendations of this study, the Town has appropriated $1.5 million dollars in funds for thedesign and construction of the identified renovations. This includes $150,000 for elimination ofutility pole guy wires on the south side of the building.

  • 7/30/2019 December 11 2012 Complete Agenda

    17/22

    Scope of Services

    1. The consultant will review the existing building and meet with Town officials to finalizethe program for the renovation.

    2. The Consultant will prepare complete construction documents for the Project includingbut not limited to:Architectural PlansStructural PlansMechanical PlansElectrical PlansSite PlansLandscapingSpecifications

    These plans will be submitted to the Town for review and comments at the 30%, 60%, and 90%completion stages.

    3. The Consultant will assist in design and specification for equipment and furnishing forthe building .

    4. The Consultant will prepare and submit preliminary and final cost estimates for theProject.

    5. The Consultant will design the project to meet or exceed all local building codesincluding provisions for flood and wind damage protection.

    6. The Consultant recognizes that the building must remain in service during constructionand will assist in developing a phased design and construction process.

    Permits

    1. The Consultant will assist the Town in obtaining the following permits for constructionof the project:Stormwater ManagementErosion and Sediment ControlCritical Areas Consistency Report

    Construction

    1. The Consultant will review Construction bids for adherence to the Technical Provisionsof the Contract Documents.

    2. The Consultant will review all Shop Drawings submitted by the Contractor.

  • 7/30/2019 December 11 2012 Complete Agenda

    18/22

    3. The Town reserves the right to either select a separate firm to perform completeconstruction inspection and quality control of the project, or ask the Consultant to expandon the original scope of work to include these items.

  • 7/30/2019 December 11 2012 Complete Agenda

    19/22

    SELECTION PROCEDURE

    OCEAN CITY FIRE DEPARTMENT HEADQUARTERS BUILDINGARCHITECTURAL/ENGINEERING SERVICES

    Written Proposals

    The Written Proposal shall indicate the firm's desire to perform services, provide a conceptualdescription of the major work elements, how the project should proceed andindicate the specific tasks or areas of expertise which will be subcontracted and to whom.Interested firms must submit the material required in the RESPONSE FORMAT to beconsideredfor the project.

    Proposals should stress previous fire house design and previous renovation design.

    Each Written Proposal will be evaluated by the Fire Department Building Committee and theCity Engineer.

    The Town's Project Committee may select a single firm based on the written proposals alone ormay invite two or more firms to make presentations to the full committee.

    Selection criteria will be weighted as follows:

    Experience: 40%Project approach and understanding:25%Schedule: 10%

    Price: 25%

  • 7/30/2019 December 11 2012 Complete Agenda

    20/22

    REPONSE FORMAT

    OCEAN CITY FIRE DEPARTMENT HEADQUARTERS BUILDINGARCHITECTURAL/ENGINEERING SERVICES

    Key Personnel

    Identify and provide resumes for the following individuals:

    1. Principal-in-Charge2. Project Manager3. Project Engineers4. Architects5. Subconsultants and their Key Personnel

    Resumes should stress the individuals experience with related projects.

    List the proposed design team and the key individual of each major component with a proposedpercentage and extent of responsibility for each firm and each key individual.

    Experience

    Fire Stations/Renovation Projects

    1. Provide specific examples of completed new Fire Stations and or renovations designed byfirms in the design team in the last five (5) years. Include client's name, contact point, addressand phone number.

    2. Provide specific examples of completed new Fire Stations and or renovation projects designedby individual members of the design team in the last five (5) years whether or not with thecurrent firm.

    Local Projects

    1. Provide specific examples of completed projects within the Town of Ocean City designed byfirms or individuals in the design team in the last ten (10) years. Include client's name, contactpoint, address and phone number.

    Additional Requirements

    1. Provide Standard Forms SF254 and SF255 for each member ofthe design team.

  • 7/30/2019 December 11 2012 Complete Agenda

    21/22

    Schedule Compliance

    Show in detail how you would execute this project in a manner compatible with each firm's keyindividuals present and future commitments to other projects.

    Show how the design team would accomplish the tasks outlined in the SCOPE OF SERVICES.

    Project Approach

    Explain the continuity, interaction, and coordination of the various professional disciplines beingprovided by the team.

    Explain the teams approach to each portion of the work outlined in the SCOPE OF SERVICESregarding procedures for:

    1. completeness

    2. Quality Control3. Record Keeping4. Constructability5. Technical Problem Resolution6. Compatibility with existing operations7. Current equipment and techniques8. Other

    References

    Provide a minimum of five (5) individuals who are directly familiar with the technical work of

    the following:

    1. Your client the individual represents2. Your firms work for the client.3. The performance of your firm's key individual workingfor that client.

    These references may include those provided under the other above provisions of this section(Experience).

  • 7/30/2019 December 11 2012 Complete Agenda

    22/22

    Fee:

    Under separate sealed cover from the Technical Proposal and clearly identified with the sameinformation noted on the Technical Proposal submit one (1) original signed paper copy of theproposed fee.

    The Fee Proposal shall state the following:

    The total fee, inclusive of all costs and reimbursables that will be charged to Ocean City tocomplete desired services, broken down by the following phases: Schematic Design,Permitting, Final Design, Construction Documents, and Bidding. Include cost to attend atleast five meetings with the Building Committee and one public hearing. Fee shall notinclude printing costs for bid documents.

    Provide hourly rates and multipliers for additional services and Construction Administration.