    Electricity is an essential requirement for all facets of our life. It has been recognized as a

    basic human need. It is a critical infrastructure on which the socio-economic development

    of the country depends. Supply of electricity at reasonable rate to rural India is essential for

    its overall development. Equally important is availability of reliable and quality power at

    competitive rates to Indian industry to make it globally competitive and to enable it to

    exploit the tremendous potential of employment generation. Services sector has made

    significant contribution to the growth of our economy. Availability of quality supply of

    electricity is very crucial to sustained growth of this segment.

    Electric power is something that any and every economy requires not just to grow, but also

    to sustain. There is hence no rocket science to the fact that development in the electric

    power industry of a country is a significant cause of overall economic development. When

    we extent this logic to the Indian context, the argument is even more compelling. Given

    that the Indian industry is growing at a rate of 6% per year in an era where double-digit

    GDP growth targets are being set, the role of electric power assumes great importance. The

    situation thus offers a huge potential for both domestic and overseas private players.

    Electricity is one of the key inputs for the over all socio-economic development of the

    country. The basic responsibility of the power supply industry is to provide adequate

    electricity at economic cost, while ensuring reliability and quality of the supply. The power

    industry in India has been characterized by energy shortages. In fiscal year 2004, demand

    for electricity exceeded supply by an estimated 7.1% in terms of total requirement and

    11.2% in terms of peak demand requirements. Although power generation capacity has

    increased substantially in the recent years, it has not kept pace with the growth in demand

    and growth of the economy in general.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    3/128

    RELIANCE ENERGY LTD 3

    Table 1 Trends in growth of physical output in infrastructure sectors (in per cent)

    * Provisional

    Source-Economic survey 2005-07/chapter 93

    Supply and Demand:

    Although electricity generation capacity has increased substantially in recent years, the

    demand for electricity in India is still substantially higher than the available supply. In the

    fiscal year 2004, India faced an energy shortage of approximately 7.1% of total energy

    requirements and 11.2% of peak demand requirements. He following table presents data

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    4/128

    RELIANCE ENERGY LTD 4

    showing the gap between the total requirement foe electricity versus the total amount of

    electricity made available from 2000 to 2004.

    Year Requirements Availability Surplus/Deficit (+/-)

    (Million Units) (Million Units) (Million Units) (%)2001

    2002

    2003

    2004

    2005

    480,430

    507,216

    522,537

    545,983

    559,264

    450,494

    467,400

    483,350

    497,890

    519,398

    -29,836

    -29,816

    -39,817

    -48,093

    -39,866

    -6.2%3

    -7.8%

    -7.5%

    -8.8%

    -7.1%

    Table 2: Actual Power Supply Position (2001 to 2005)

    Source-PMI Research Bulletin-2005

    Power Generation:

    As of March 31, 2005, Indias power system had an installed generation capacity of

    approximately 112,058 MW. Thermal Power Plants powered by coal, gas, naphtha or oil

    accounted for approximately 69% of the total power capacity in India as of March 31,

    2005, hydroelectric stations for approximately 26% and others (including nuclear stationsand wind power) accounted for approximately 5%. The CPSUs accounted for

    approximately 31% of the total power generation capacity as of March 31, 2005, the

    various SEBs accounted for 56% and private sector companies accounted for

    approximately 13%.

    Consumption:

    The end users of power can be broadly classified into industrial (representing

    approximately 34% of sales), agricultural (representing approximately 25% of sales),

    domestic (representing approximately 25% of sales), and commercial consumers

    (representing approximately 7% of sales). The balance of the sales goes to various other

    consumers. The following table compares per capita electricity consumption in India, other

    countries and the world average consumption as in 2000.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    5/128

    RELIANCE ENERGY LTD 5

    Installed Capacities

    The following table presents the installed generation capacity of Indias electricity

    generators by type of generation in the year 2005:

    Table 3: Trends in the power sector (utilities only)

    *Provisional

    @ April-December

    Source-Economic survey 2006-07

    Transmission and Distribution (T&D):

    The transmission of electricity is defined as bulk power over along distance, generally

    132KV and above. The entire country has been divided into four regions of transmission

    system, namely northern region, eastern region, western region, southern region. Theinterconnected transmission system within each region is also called the regional grid.

    The Government of India has an ambitious mission ofPOWER FOR ALL BY 2012.

    This mission would require that our installed generation capacity should be at least 2,

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    6/128

    RELIANCE ENERGY LTD 6

    00,000 MW by 2012 from the present level of 1, 14,000 MW. To be able to reach this

    power to the entire country an expansion of the regional transmission network and inter

    regional capacity to transmit power would be essential. The latter is required because

    resources are unevenly distributed in the country and power needs to be carried great

    distances to areas where load centers exist.

    In India, the T&D system is the three-tier structure comprising regional grids, state grids

    and distribution networks. The distribution network and the state grids are owned and

    operated by SEBs or state government through SEBs. Most of the inter-state transmission

    links are owned and operated by POWERGRID. In order to facilitate the transfer of power

    between neighboring states, states grids are interconnected to form regional grids. Because

    peak demand does not occur simultaneously in all states, situations may arise in which

    there is surplus power in one state while another state faces deficit.

    Power Trading:

    The Electricity Act recognized power trading as a distinct activity from generation,

    transmission and distribution. Power trading involves the exchange of power from

    suppliers with surpluses to suppliers with deficits. Seasonal diversity in generation and

    demand, as well as the concentration of power generation facilitates in the fuel rich eastern

    region of India, has created ample opportunities for trading of power. Recent regulatory

    developments include the announcement of rules and provisions for the open

    access and licensing related to interstate trading in electricity. Under the rules notified, the

    regulatory intention is the promotion of competition. Several entities have started trading

    operations or have applied for trading licenses. Current participants in the power trading

    business include, among others, PTC, NTPSs subsidiary NTPC Vidyut Vyapar Nigam

    Limited and Tata Power Trading Company Private Limited.

    Rural Electrification

    Rural Electricity involves supply of energy for two types of programmes:

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    7/128

    RELIANCE ENERGY LTD 7

    a. Production oriented activities like minor irrigation, rural industries etc.;s

    b. Electrification of villages.

    While the emphasis is laid on exploration of ground water potential and energisation of

    pump sets/tube wells, which has a bearing on agricultural production, the accent in respect

    of areas covered under the Revised Minimum Needs Programme (RMN P), is on village

    electrification.

    Rural Electricity Supply Technology (REST) Mission

    The Rural Electrification Supply Technology (REST) Mission was set up in September

    02. The base objective of formation of REST mission is to accelerate electrification of all

    villages and households progressively by year 2012 through local renewable energysources and decentralized technologies including through the conventional grid connection.

    The Mission is also to identify technologies that could be used in providing affordable and

    reliable power supply to rural areas and effect implementation through distributed

    generation schemes, wherever feasible.

    Current Status of Rural Electrification

    Out of estimated 586,000 villages about 140,000 - 150,000 remain to be electrified.

    Eight States have achieved 100% village electrification Andhra Pradesh, Goa, Haryana,

    Maharashtra, Kerala, Punjab, Tamil Nadu and Nagaland

    These States constitute 18% of villages in the country.

    States Villages to be

    Electrified

    Percentage

    Uttar Pradesh 40,389 42%

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    8/128

    RELIANCE ENERGY LTD 8

    Bihar 20,449 53%

    West Bengal 7,694 20%

    Uttranchal 2,.785 18%

    Jharkhand 22,920 78%

    Orissa 9,682 21%

    Assam 5,640 23%Meghalaya 2,754 50%

    Table 4: Eight States with substantial number of villages to be electrified

    Source;www.powermin.nic.in/Reporton rural electrification program

    PROBLEMS BEING FACED BY INDIAN POWER SECTOR

    The achievement of increasing installed power capacity from 1362 MW to over 100,000MW since independence and electrification of more than 500,000 villages is impressive.

    However, it is a matter of concern that the annual per capita consumption, at about 350

    kWh is among the lowest in the world. Still many households in a large number of villages

    have no access to electricity. The end users of electricity like

    Since independence, generating capacity has increased from 1362 to over 100,000

    MW however there are widespread shortages of power in almost all parts of the

    country.

    Households, farmers, commercial establishments, industries etc. are confronted with

    frequent power cuts both scheduled and unscheduled. Power cuts, erratic voltage levels and

    wide fluctuations in the frequency of supply have added to the 'power woes' of the

    consumer. The consumers are resorting to captive power supply arrangements of varioustypes ranging from 300 Mega Watts (industry) to 250 Watts (households).

    Almost every shop in an urban market place has a generator set. Most establishments have

    battery operated inverters and diesel generation sets. Most urban households have voltage

    stabilisers for different appliances. In fact the money spent by the domestic consumer on

    Indian Institute of Finance 2005-07

    http://www.powermin.nic.in/Reporthttp://www.powermin.nic.in/Reporthttp://www.powermin.nic.in/Report
  • 7/31/2019 Deepti Project

    9/128

    RELIANCE ENERGY LTD 9

    these standby power supply (DG sets / Inverters) and power-conditioning (stabilisers)

    arrangements could be among the highest in the world. The same money could be more

    gainfully invested through corporate investments in power generation, transmission and

    distribution with assured returns on investments

    The major reasons for inadequate, erratic and unreliable power supply are:

    Inadequate power generation capacity;

    Lack of optimum utilisation of the existing generation capacity;

    Inadequate inter-regional transmission links;

    Inadequate and ageing sub-transmission & distribution network leading to power

    cuts and local failures/faults;

    Large scale theft and skewed tariff structure;

    Slow pace of rural electrification;

    Inefficient use of electricity by the end consumer.

    Slow Capacity Addition

    In 1947, India had installed capacity of 1362 MW. It reached a level of 20117 MW in

    1976. And as on March 2000, we have and installed capacity of 96949 MW. The demand

    has always outstripped the supply position during these years.

    Poor Utilization of Existing Capacities

    The All India average Plant Load Factor is 67%. This is mainly because of poor

    performance in the State sector. Against this Central performance is much higher, the

    CPSU-NTPC has recorded a PLF of more than 80% during the year. The All India PLF

    was 45% in 1980-81.

    High Transmission and Distribution Losses

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    10/128

    RELIANCE ENERGY LTD 10

    The present level of transmission and distribution loss is very high. The All India T&D loss

    is around 23% and the losses in some state are much higher. Losses in Delhi are as high as

    50%. Whereas in developed countries, T&D losses are in the range of 5% to 14%. While a

    part of T&D losses are due to technical deficiencies in the system and the large spread of

    low voltage distribution in rural area, a large portion of the line losses is due to theft &

    pilferage compounded by connivance on the part of the line personnel.

    Hydro Thermal Mix

    In spite of governments intention of maximizing exploitation of the hydro potential of

    over 84000 MW in India, the hydro thermal mix has changed adversely from around 44:54

    in 1970-71 to around 25:72 in 1999-2000.

    Unrealistic Tariff

    There are too many subsidies and in many cases sales price of electricity is much lower

    than the cost than its cost to the State Electricity Boards. In the agricultural sector, the

    subsidies are the highest.

    Renovation and Modernization (R & R)

    Every plant after a certain life of operation requires renovation and modernization effort to

    increase the utility life of the plant. Of late, there is lot of awareness on this account and

    efforts are being put towards this area to get more from the existing capacities.

    Poor Financial Health of State Electricity Boards

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    11/128

    RELIANCE ENERGY LTD 11

    The State Electricity Boards are facing severe financial crunch. Many of the SEBs are

    running into losses. They are short of funds to add capacities and take up renovation and

    modernization programs.

    Resettlement & Rehabilitation (R & R)

    The setting up of large hydro and thermal plants often necessitates clearing of large tracts

    of land, affecting the lives of people, flora and fauna. Since the displacement of people

    becomes unavoidable, the resettlement and rehabilitation of the displaced people becomes a

    major issue. This is more important for hydro power projects, as land area is large. This has

    resulted in delays of many projects.

    Reliance Energy

    Reliance Energy Ltd is India's leading integrated power utility company in the private

    sector. It has a significant presence in generation, transmission and distribution of power in

    Uttar Pradesh, Maharashtra, Goa and Andhra Pradesh.

    With the ushering in of the power sector reforms and in the new environment of

    opportunity for the power sector, REL is a key player in this transformation process.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    12/128

    RELIANCE ENERGY LTD 12

    Reliance's gas finds in KG-D6 block in Krishna Godavari basin which constitutes 60% of

    India's present total gas production, will provide an enormous opportunity to scale up

    power generation capacities in India. With the new gas find, REL has the unique advantage

    of integration from 'well head to wall socket'. This will help the company position itself as

    a global integrated energy player under the Reliance banner.

    REL and its affiliate power companies rank among the top 25 listed private sector

    companies on major financial parameters. REL is part of the Reliance industries-India's

    private sector company ranked among the world's 175 largest companies in terms of net

    profit and the 500 largest companies in terms of sales.

    Infrastructure and services

    Generation-Creating the Power Capability

    The Generation division has proven expertise in designing, engineering, erection,

    installation, commissioning, operations and maintenance of power projects.

    The division implements project plans for in house power projects and supports ventures

    undertaken by other affiliate companies.

    The division is fully integrated and has in house capabilities to address every aspect of

    power projects including:

    Mechanical

    Civil

    Electrical

    Instrumentation &

    Environmental

    The division also provides engineering consultancy to external agencies and projects.

    The 940.59 MW Generation capacity of the Division comes from five projects:

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    13/128

    RELIANCE ENERGY LTD 13

    Dahanu TPS the 2x250 MW multi fuel based thermal power station at Dahanu

    near Mumbai.

    7.59 MW Wind Farm Project at Jogimatti in the district of Chitradurga in

    Karnataka.

    BSES Kerala Limited: The 165 MW combined cycle power station at Kochi,

    Kerala.

    BSES Andhra Power Limited: The 220 MW combined cycle power plant at

    Samalkot in Andhra Pradesh

    Goa Power Station : The 48 MW naphtha based combined cycle power plant at

    Goa.

    Transmission

    The Transmission department has successfully implemented and operated a 2 x 220 kV

    transmission system. It has been responsible for the laying of the double circuit

    transmission system from Dahanu to Mumbai. It has planned, constructed and

    commissioned two modern 200 kV receiving stations having a capacity of 300 MVA each

    at Ghodbunder, & Versova . It has also commissioned a 400 MVA station at Aarey for

    receiving power from the Dahanu plant.

    It is one of the select few electricity companies to commission a network of 4 circuit

    transmission towers for economical and efficient power transmission. The Engineering cell

    of the department co ordinates the engineering activities of the company's transmission

    network.

    The Transmission Division is an intermediary between Generation & Distribution Division

    and is responsible for transmission of power at 220 kV from DTPS to the Company's areaof supply in Mumbai Suburbs.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    14/128

    RELIANCE ENERGY LTD 14

    Distribution

    Seven decades of experience and continuous investment in modernizing its distribution

    infrastructure have helped the company achieve the enviable distinction of operating its

    network with 99.99% reliability!

    The efforts made towards achieving higher levels of efficiency have reduced distribution

    losses to 13.4% - The lowest in the country! Today the company caters to 5 million

    satisfied customers!

    Reliance Energy Limiteds Mumbai operations cover a population of 9.0 million within an

    area of about 384 sq. kilometers. The Distribution network handled and sold 5,879.66 MUs

    in the year 2002-2003. Reliance Energy Limited continually upgrades its distribution

    network. This is accomplished through a process of decentralized operation in supply

    management to maintain very high on-line reliability.

    Stock Price Movement of Reliance

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    15/128

    RELIANCE ENERGY LTD 15

    Daily Return of Reliance vis-a-vis

    -0.08

    -0.06

    -0.04

    -0.02

    0

    0.02

    0.04

    0.06

    0.08

    0.1

    0.12

    1 11 21 31 41 51 61 71 81 91 101111121131141151161171181191201211221231241251

    Days

    Return

    R etur n o f N S E R eturn o f R el ianc

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    16/128

    RELIANCE ENERGY LTD 16

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    17/128

    RELIANCE ENERGY LTD 17

    Reliance is the supplier of electricity to the metro resident people and major

    revenues are generated from the retail consumer. Reliance has grown in the

    subsequent years in residential but it has not shown a relevant increase in the

    commercial and industrial supply of power, the company is planning to increase

    the generation of power from different sources to meet the demand for its

    different types of consumers.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    18/128

    RELIANCE ENERGY LTD 18

    Company Overview-NTPC

    National Thermal Power Corporation Limited (NTPC) is a premier thermal power

    generating company of India. It was incorporated in the year 1975 with the

    objective of planning, promoting and organizing an integrated development of

    thermal power in the country. At present, Government of India holds 89.5% of the

    total equity shares of the company and the balance 10.5% is held by FIIs,

    Domestic Banks, public and others.

    National Thermal Power Corporation. The Group's principal activities are

    engineering, construction and operation of power generating plants and providing

    consultancy to power utilities in India and abroad. The Group has installed

    capacity of 21,749 MW through its 13 coal based (17,480 MW), 7 gas based

    (3,955 MW) and 3 Joint Venture Projects (314 MW). The ash produced at its coal

    stations are used in cement, concrete, cellular concrete and building material.

    The Group has generated 149.2 billion units of electricity in 2004.

    NTPC is also expected to form various new Joint Ventures with the following

    companies:

    Indian Oil Corporation Ltd (IOCL), with the objective of setting up a combinedpower stations based on refinery residue/ Naphtha and other petroleum

    products.

    Indian Railways, with the objective of setting up power stations to meet

    traction and non-traction power requirements of Indian Railways.

    Tamil Nadu Electricity Board, with the objective of setting up a1000 MW coal

    based power station at Ennore in Tamil Nadu utilizing the existing infrastructure

    facility at Ennore

    NTPC has also been trying to diversify in the areas related to NTPCs core

    business of power generation such as Hydro Power, Power Distribution, Power

    Trading, Coal Mining, LNG, etc so as to broad base the business and to ensure

    growth. The priority sectors identified by NTPC in the concern are:

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    19/128

    RELIANCE ENERGY LTD 19

    Horizontal Diversification-Hydro Power

    Government is laying trust on adding hydro stations so as to meet the domestic

    demand for power and to control pollution. This has provided NTPC with an

    opportunity to horizontally diversify and set up hydro electric power stations

    towards the due need of operating peak load demands and thermal for base

    load.

    In 1997 NTPC started the preliminary activities to tap a part of the abundant

    hydroelectric potential of the country by identifying suitable projects for

    development. Northern Region and more specifically Himachal Pradesh and

    Uttar Pradesh were targeted for initial entry in hydro sector. NTPC's venture in

    hydro sector became a reality when Koldam Project, a green field Hydro Electric

    project of 800 MW capacities in the State of Himachal Pradesh, was formally

    assigned to NTPC on 26th Feb. 2000.

    An MOU has been signed with Govt. of Uttranchal on 31.12.02 for

    implementation of Lohari-Nagpala(4x130MW) and Tapovan Vishnugad

    (360MW)Hydro Electric power Project in the state of Uttaranchal on BOOMbasis, subject to techno-commercial viability of the project, and clearance of

    MOEF.

    In order to develop small and medium Hydro Electric Power Project up to 250

    MW capacity a wholly owned subsidiary company named NTPC Hydro Ltd. has

    been incorporated on 12th December 2002.

    More hydro projects are being explored to find out the techno-economic viability

    for development by NTPC. The company intends to add at least 3000 MW

    capacities through hydro projects by the end of 10th Plan.

    Vertical (Forward) Integration-Distribution and Power Trading

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    20/128

    RELIANCE ENERGY LTD 20

    In order to diversify along the power value chain, NTPC has gone in for

    distribution and power trading to ensure forward linkages and also enhance

    revenue channels. To acquire, establish and operate electrical systems etc. for

    distribution and supply of electrical energy to consumers, a subsidiary company

    named as NTPC Electric Supply Company Ltd. (NESCL) has been incorporated.

    In order to undertake business of sale and purchase of electric power, a

    subsidiary company known as NTPC Vidyut Vyapar Nigam Ltd. (NVVNL) has

    also been incorporated.

    Vertical (Backward) Integration-Coal Mining and LNG

    Coal Mining:

    The policy changes in coal sector provide an opportunity to NTPC to enter

    captive coal mining business. NTPC is contemplating captive mines in North

    Karanpura area of Central Coal-fields Ltd (CCL) and Talcher area of Mahandi

    Coal-fields Ltd (MCL). Central Mine Planning & Design Institute Ltd (CMPDIL) (a

    subsidiary of Coal India Ltd), Ranchi is being appointed as a consultant for

    assisting and guiding NTPC in various activities of captive mining.

    Coal Washeries:

    NTPC is intending to set up coal washeries in the following three coal mine

    areas:

    Amlori area under Northern Coal-fields Ltd. (NCL)

    Talcher area under Mahandi Coal-fields Ltd. (MCL)

    North Karanpura under Central Coal-fields Ltd. (CCL)

    Feasibility studies for Amlori area have already been completed in December

    2002. NTPC has appointed Central Mine Planning & Design Institute Ltd.

    (CMPDIL) (a subsidiary of Coal India Ltd), Ranchi, India as the consultant for the

    feasibility studies.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    21/128

    RELIANCE ENERGY LTD 21

    LNG:

    NTPC is contemplating procurement of LNG fuel/Natural Gas for expanding its

    gas based power projects at Anta, Auraiya, Kawas & Jhanor - Gandhar in North

    India with cumulative capacity addition of 2600 MW and at Kayamkulam in South

    India by 1950 MW. Fuel requirement for North India is approximately 3.0 MMTPA

    and for South India is 2.0 MMTPA. Accordingly, LNG fuel/Natural Gas terminals

    have been planned, one in North India and one in South India, to be

    commissioned by prospective suppliers.

    NTPC intends to keep options for 26% equity stake in regasification terminal and

    may seek 10% equity in liquefaction terminal.

    Step Towards Globalization

    NTPC is exploring the possibility of setting up a Gas Based Combined Cycle

    Power Plant in Bangladesh through Joint Venture with Bangladesh Power

    Development Board (BPDB) and Petro Bangla.

    NTPC has signed an MOU with Black and Veatch (USA) for rendering services in

    the areas of Engineering, Project Management, Operation and Maintenance,

    Quality Assurance etc.

    NTPC and BHEL have joined hands to work as consortium partners to set up a

    500MW integrated water and power project with 30MGD of desalination plant in

    Oman on BOO basis.

    NTPC is Indias largest power generation company of India. As on March 31,

    2005 the total installed capacity of NTPC was 20.1% (including capacities of

    Joint Venture companies) of Indias total installed capacity, and it contributed

    27.1% of the total power generation of India during the last fiscal year.

    NTPC generated a total of 159.11 billion units of electricity registering an

    increase of 6.67% over previous years generation. 136.11 billion units or 85.54%

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    22/128

    RELIANCE ENERGY LTD 22

    of total generation was through coal-fired plants and 23 billion units or 14.46% of

    total generation was through gas fired plants.

    Power Trading Corporation of India Limited

    Power Trading Corporation of India Limited was incorporated in 1999 to act as an

    entity, which could undertake trading of power to achieve economic efficiency

    and security of supply. PTC India Ltd has a two-fold mandate; to develop a full

    fledged, efficient and competitive market mechanism for trading in power and to

    facilitate the development of generation projects including through privateinvestment, both resulting in reliable, economic and quality power in the long

    term. A vibrant power market, which is deep and liquid, needs to be developed in

    the long term, and PTC India Ltd would continue to play a frontrunner's role

    towards this objective and strive to add value to its customers' operations through

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    23/128

    RELIANCE ENERGY LTD 23

    providing services that serve their evolving needs. The main objective for

    establishing PTC India Ltd was to develop power market for optimal utilization of

    energy, to Promote power trading to optimally utilize the existing resources, to

    Catalyze development of Power Projects particularly environment friendly hydro

    projects and to Promote exchange of power with neighboring countries.

    Various services provided by PTC India Ltd are:

    Acting as an intermediary providing single window service after identifying the

    Buyers and Sellers

    Providing end to end marketing strategies for the power generated from

    power projects

    Studying the transmission feasibility for transfer of Power including transfer

    through displacement

    Facilitate sale of surplus power from Captive Power Plants

    Finding alternative buyer(s) in the event of default

    Acting as the nodal agency to facilitate Cross Border Trading

    Coordination with agencies for open access, dispatch, metering, billing,

    energy accounting & revenue realization

    Facilitating the development of Power projects which can generate electricity

    at competitive tariff

    Providing advisory services

    PTC India Ltd has been aggressively looking for CPPs across the country, which

    has surplus power available with them for sale. PTC India Ltd has entered into

    MoUs with such CPPs for purchase of surplus power available with them and is

    providing full assistance to such CPPs in getting their petitions filed for openaccess in the State system before respective SERCs. PTC India Ltd is acting as

    a single window service provider to such CPPs and is also making all out efforts

    to get competitive tariff to such CPPs. PTC India Ltd derives its competencies

    from the fact that it is the pioneer in starting power trading in India, is the leader

    in the power trading market and has negotiated steep learning curves in its

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    24/128

    RELIANCE ENERGY LTD 24

    efforts to create a commercially vibrant power market in the country. PTC India

    Ltd has also had a unique track record of bringing innovations in sync with the

    needs of its clients, thereby providing a win-win situation for all. Moreover, PTC

    India Ltd is able to provide the security of payments to its suppliers; this assumes

    great importance in a sector, which has been marred by the high credit risk of

    almost all the state utilities. PTC India Ltd has continually proven its expertise in

    the field of power trading and this has translated into its client list covering all the

    state utilities in all the five regions of the country. Due to its market acceptability,

    PTC India Ltd is also in a position to sell surplus power from a CPP to its various

    customers viz. SEBs/ Distribution Companies, High-Tension consumers etc. at a

    market driven competitive rate ensuring good return to CPPs as compared to

    sale of power to the respective SEBs/ State Utilities where they are located.

    The main shareholders of PTC India Ltd are:

    Power Grid Corporation of India Ltd.

    Power Finance Corporation Ltd.

    National Thermal Power Corporation Ltd.

    National Hydro-Electric Power Corporation Ltd.

    Damodar Valley Corporation

    Financial Institutions: IDBI, IDFC, IFCI, GIC, LIC

    Tata Power Company

    Others/ Public at Large

    The authorized capital of the company is Rs. 750 cr. and the present paid-up

    equity capital base is Rs. 150 cr.

    Equity Structure

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    25/128

    RELIANCE ENERGY LTD 25

    Source: www.ptcindia.com

    Note- For shareholding Patten, balance sheet, p & l and cash flow statement,

    please refer to Annexure 5, 6, 7 & 8 respectively.

    Power Finance Corporation

    Power Finance Corporation was established in 1986 as a Development Financial

    Institution (DFI) for the development of power sector. Since then, PFC has been

    playing an increasingly important role in mobilizing financial resources from

    within and abroad at optimum cost and in providing various kinds of financial

    Indian Institute of Finance 2005-07

    http://www.ptcindia.com/http://www.ptcindia.com/
  • 7/31/2019 Deepti Project

    26/128

    RELIANCE ENERGY LTD 26

    assistance to power projects. As a DFI, PFC also focuses on the institutional

    development of its borrowers-State Power Utilities in particular. Reserve Bank of

    India registered the corporation as a Non-Banking Financial Institution in

    February 1997. PFCs funding criteria are based on borrowers credit worthiness

    and project viability. A modest beginning saw the corporation makes a

    disbursement of Rs. 1010 million in 1987. In the year gone by (2004-05), PFC

    disbursed Rs. 94 billion.

    Government has 100% ownership in PFI and no the government gives further

    budgetary support to it. Later on in 1997-98 it was registered as a non banking

    entity by RBI and in May 2002 Ministry of Power recommended the grant of

    Navratna status to PFC. The role of PFC is:

    Pivotal Development Financial Institution for the power sector excluding

    rural electrification.

    Catalyst to bring about institutional improvements and reforms in the

    power sector.

    Mobilization of resources, internal and external, at optimum cost.

    Extend financial assistance and encourage flow of investment to the

    power and associated sectors.

    PFC disbursed around Rs. 16525 Crores during 9th plan and Rs.33000

    Crores in the first three years of 10 th plan.

    PFC endeavors to achieve 20% share of Indias power sector investment

    for the 10th and 11th plan period.

    PFCs borrowers profile is:

    State Power Utilities State Power/ Electricity Departments

    Central Power Utilities

    Joint Sector Power Utilities

    Private Sector Power Utilities

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    27/128

    RELIANCE ENERGY LTD 27

    Co-operative Societies

    Municipal Bodies

    Power Equipment Manufacturers

    Independent Power Producers

    PFCs priorities and extent of funding is:

    Category of Schemes Extent of

    Financing

    for Reforming

    Utilities (%)

    Extent of

    Financing

    for Private Sector

    Borrowers (%)

    Studies, Consultancy & Training 100 50

    R&D 90 50Meters, Computerization 80 50Transmission and Urban Distribution 80 50R&M, R&U of Generation &

    Transmission

    80 50

    Small hydro, Captive & Co-generation 80 50Medium & Large Hydro Generation 80 25Thermal Generation 80 20

    Performance Highlights (2005-06)

    Cumulative Sanctions More than Rs. 743 billionCumulative Disbursements More than Rs. 500 billion

    Net Profit Rs. 9.83 billion

    Recovery Rate 99% (Nil NPAs)

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    28/128

    RELIANCE ENERGY LTD 28

    Growth in Operations

    Financial results

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    29/128

    RELIANCE ENERGY LTD 29

    Capital structure

    Source: www.pfcindia.com

    Note for selected financial performance and statements of PFC please refer to

    Annexure 9, 10, 11 & 12 respectively.

    Indian Institute of Finance 2005-07

    http://www.pfcindia.com/http://www.pfcindia.com/
  • 7/31/2019 Deepti Project

    30/128

    RELIANCE ENERGY LTD 30

    Government has 100% ownership in PFI and no further budgetary support is

    given to it by the government. Later on in 1997-98 it was registered as a non

    banking entity by RBI and in May 2002 Ministry of Power recommended the grant

    of Navratna status to PFC. The role of PFC is:

    Pivotal Development Financial Institution for the power sector excluding

    rural electrification.

    Catalyst to bring about institutional improvements and reforms in the

    power sector.

    Mobilization of resources, internal and external, at optimum cost.

    Extend financial assistance and encourage flow of investment to the

    power and associated sectors.

    PFC disbursed around Rs. 16525 Crores during 9 th plan and Rs.33000

    Crores in the first three years of 10th plan.

    PFC endeavors to achieve 20% share of Indias power sector investment

    for the 10th and 11th plan period.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    31/128

    RELIANCE ENERGY LTD 31

    Chapter 2

    Objective

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    32/128

    RELIANCE ENERGY LTD 32

    Objective

    Power sector is an important ingredient for the growth of any economy. Industrial

    growth and economic growth cannot be thought of without sustainable power

    supply. National Thermal Power Corporation (NTPC) in India is ensuring this

    smooth flow of power supply since 1995 and has contributed effectively in the

    growth of this nation.

    During the last 30 years of its operation NTPC has been able to build up a

    position of market leader in the Indian power sector but it wont be able to add a

    global perspective to its business if it continues in the similar manner. NTPC

    needs to grow; it needs to add more value to its product and needs to get closer

    to its customers. That is why there is an urgent need to figure out those issues

    which are acting as a barrier in the way of NTPC becoming a global leader in

    power generation. Here in my project I have tried to figure out these issues and

    tried to provide solution in the manner which might help NTPC in making its

    presence felt globally.

    My main objective of this project was to analyze performance of NTPC vis--vis

    other PSU players like Power Finance Corporation, Power Trading Corporation

    of India and National Hydro Power Corporation so that I can get an insight intothe actual condition of these organizations.

    Further I have mentioned some global companies, which are also Public Sector

    Undertakings, but still they have grown into global giants by applying modern

    techniques and practices. The main rationale behind my mentioning these

    companies was that that these companies have close resemblance with NTPC in

    terms of origination and business operation but still they have become global

    players despite of any hindrances they might have faced due to the government

    policies in their countries. I have not only mentioned the performance of these

    companies but have also tried to show through a model, how NTPC can be one

    of them by maintaining its desired structure.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    33/128

    RELIANCE ENERGY LTD 33

    Later with the objective of making NTPC a global player, I have suggested further

    consolidation by means of mergers and acquisitions. Here I have shown forward

    integration where I have tried to formulate a strategy of possible merger between

    NTPC and PTC. Further I have supported my rationale with the help of a deal

    structure and future shape of the acquiring company.

    Thus, my overall objective is to evaluate the possibilities through which NTPC

    can become a global player and make its presence felt globally.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    34/128

    RELIANCE ENERGY LTD 34

    Chapter 4

    Methodology

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    35/128

    RELIANCE ENERGY LTD 35

    Methodology

    NTPC is the largest thermal power generating organization in India but it has

    not been able to make its presence felt globally. There are various fronts where

    it is lacking. This project is an effort to find out ways to consolidate the position

    of NTPC and also to find out solutions to the problems faced by NTPC. Various

    phases are involved in the completion of this project.

    These are:

    1. Data gathering phase: This phase involves finding the information about thevarious policies of the government regarding the power sector and finding out

    the details of the functioning of NTPC, its relative position in India and in the

    world. This phase also involves gathering information about various global

    players in the field of power generation. Here I have also tried to figure out the

    problems faced by NTPC and how they can tackled.

    2. Structuring phase: This phase includes a deep insight into the requirements

    of NTPC for becoming a global player and finding out the companies which can

    be merged with NTPC so that its size is increased and also it gets access into

    other related products which will add value to NTPC. This phase also includes

    qualitative comparison of NTPC with other global players.

    3. Method Used: In this project I have first tried to find out government policies

    which have an impact on NTPC, then tried to find out the strategies

    implemented by NTPC to tackle the problems and the growth plans of NTPC.Then I have tried to figure out the companies which could be merged into NTPC

    so that NTPC can gain cost effectiveness and get access to the related

    products to improve its product line and also to increase its market. I have also

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    36/128

    RELIANCE ENERGY LTD 36

    done ratio analysis of NTPC, PTC and PFC to find out the financial position of

    these companies and to see the benefits derived by NTPC by merging these

    companies with itself. Then I have tried to prepare a model which can be used

    by NTPC to consolidate its position and become a global player. Later on I have

    showed a merger deal between PTC and NTPC with appropriated rationale for

    this merger.

    4. Documentation phase: This phase involves clearly writing all the findings in

    a structured manner. And showing the merger as a feasible option with NTPC

    for growing at a rapid speed with the required rationale for the merger and also

    the details for the merger deal with the appropriate rationale for the merger of

    PTC with NTPC.

    5. Feedback interaction phase: This phase involves discussions with the

    project guide and going through the project again and again to make the project

    more comprehensive and a more valuable study.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    37/128

    RELIANCE ENERGY LTD 37

    Chapter 5Analysis & Interpretation

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    38/128

    RELIANCE ENERGY LTD 38

    Growth of Power Sector

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    39/128

    RELIANCE ENERGY LTD 39

    Introduction

    Industry Outlook

    As per the estimates for Index of Industrial Production (IIP) released by Central

    Statistical Organization, the electricity sector has grown at 5.2% during 2004-05

    over the previous year 2003-04 as against the growth in General Index of 8.2%.

    During the year, capacities amounting to 3,949 MW were added of which 2,934

    MW came in Thermal Sector, 1,015 MW in Hydro. With this 10,773 MW of

    capacity has been added in the first three years of the X Plan period (2002-2007)

    out of the total target of 41,110 MW for the whole plan.

    Generation of electricity during the year in the country was 587 BUs which as

    compared to 558 BUs in the previous year registered an increase of 5%.

    Capacity utilization as measured by Plant Load Factor (PLF) of generating

    stations for coal-fired plants has increased to 74.8% in 2005 from 72.7% in 2004.

    Per capita consumption of power in India is 592 Kwh per annum much lower than

    the world average of over 2,000 kWh. Even at the current levels of consumption,

    there is a wide gap between demand and supply of power and in fiscal 2005,there was a peak demand deficit of 11.7% and an energy deficit of 7.3%. The

    following table presents data showing the gap between the total requirements of

    electricity versus the total amount of electricity made available in the last five

    years:

    (In million units)

    Fiscal Year Requirement Availability Surplus/Deficit (+/-)

    Units %

    2001 507216 467400 -29816 -7.8

    2002 522537 483350 -39817 -7.5

    2003 545983 497890 -48093 -8.8

    2004 559264 519398 -39866 -7.1

    2005 591373 548115 -43258 -7.3

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    40/128

    RELIANCE ENERGY LTD 40

    Opportunities

    Considering the existing demand-supply gap and the expected increase in per

    capita consumption in view of the overall growth targets for the economy, the

    16th electric Power Survey has projected a peak load demand of 157,107 MW

    and an energy demand of 975.2 billion units by the end of March, 2012. To meet

    this projected growth in peak demand, India would require 212,000 MW of

    generating capacity by 2012. Also, Electricity Act 2003 has opened up several

    opportunities for existing power sector players like NTPC. These opportunities

    are in the area of direct supply to large customers, retail supply, distribution,

    trading, etc. The enabling framework put in place by the Act and the built in

    reform thrust would lead to better cash flows for the States. This, in turn, would

    result in better realisations and better paying capacity of NTPCs customers. All

    these factors provide enough opportunities for NTPC to pursue aggressive plans

    in its core area of generation.

    Risks And Concerns

    Fuel Supply constraint

    Coal

    Coal mines are not being developed or expanded at required pace in comparison

    to the pace at which capacities are being added. This may lead to situations

    where some of the power stations may have difficulty in operating at full capacity

    due to scarcity of coal. However, the shortages in coal supplies are considered

    temporary and are not expected to affect current levels of capacity utilisation.

    Also, coal companies are expected to put up capacities as per requirement.

    Further, developing coal mining blocks and import of coal to augment supplies

    are options, which have been initiated by NTPC to mitigate the risk. An order has

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    41/128

    RELIANCE ENERGY LTD 41

    been placed with MMTC for importing 2.1 MT of coal, against which, coal

    supplies have already commenced.

    Gas

    Availability of gas and its pricing is a key concern. However, the recent gas finds

    in India and the prospective supplies of gas in liquefied form from off-shore fields

    provide opportunities to tie-up gas for existing and upcoming gas power projects.

    The company is adopting various strategies such as procuring gas through

    international competitive bidding process, exploring the possibilities of

    participating in the Gas / LNG value chain abroad. In this regard the company

    has also submitted offer to the Government of India for allocation of blocks for

    exploration of oil and natural gas under the New Exploration Licensing Policy

    which may unfold an opportunity for securing gas at an affordable price. Besides

    these efforts towards long term security in gas supplies , to augment the present

    requirements , additional gas supplies have been tied up with GAIL from Panna

    Muktha Tapthi gas fields and Gujarat State Petroleum Corporation and re-

    gasified LNG from GAIL and BPCL.

    Industry Scenario for all the power sector companies

    The generating capacity in India at the end of FY05 stood at 1,22,275 MW

    (excluding captive capacities of around 25,000 MW). Out of this, India utilises a

    poor 66% due to inefficient transmission and distribution causing a lot of power

    shortage. As a result, it has become necessary to resort to power cuts and other

    regulatory measures to ration power supply. Currently central institutions like

    National Thermal Power Corporation (NTPC) and the State Electricity Boards

    (SEBs) dominate the power scene in India. India has adopted a blend of thermal,

    hydel and nuclear sources with a view to increasing the availability of electricity.

    Thermal plants at present account for 70% (85,590 MW) of the total power

    generation, hydro-electricity plants contribute 26% and the rest come from

    nuclear and wind.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    42/128

    RELIANCE ENERGY LTD 42

    Average transmission and distribution losses (T&D) exceed 25% of total power

    generation compared to less than 15% for developing economies. The T&D

    losses are due to a variety of reasons, viz., substantial energy sold at low

    voltage, sparsely distributed loads over large rural areas, inadequate investment

    in distribution system, improper billing, and high pilferage.

    Further, the government plans to add 150,000 MW of generation capacity over

    the next decade (including 100,000 MW thermal capacity and 50,000 MW hydro

    capacity) in order to bridge the current demand-supply gap. This is almost 1.2

    times the current generation capacity in the country. Also, if India has to achieve

    a consistent 7% GDP growth, then power generation has to grow by around 10%

    per annum.

    In FY05, the total power generation figures stood at 520 bn units as compared to

    519 bn units in FY04. The overall PLF for the year ended March 2005 stood at a

    lower 51.4% as compared to 52.9% during FY04. A capacity addition of 3,487

    MW was witnessed during FY05, almost 15% lower than the addition of 4,085

    MW in FY04.

    The per capita consumption of electricity was 606 kWh in FY05. While energy

    demand deficit was recorded at 7.4%, peak demand deficit soared to 12.2%

    during the fiscal.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    43/128

    RELIANCE ENERGY LTD 43

    Performance of Undertakings under Ministry of Power

    2002-03 2003-04

    (provisional)NTPC Generation (BU) 141 149 +5.1%

    PLF (%) 83.6 84.41 +0.8%Fresh Capacity Starts (MW) 1000 2710 +171%

    Ash Utilization (lakh MT(%)) 57 (20%) 75 (23.5%) +3.5%

    PFC Sanctions (Rs. Cr.) 14001 16472 +17.6%Disbursals (Rs. Cr.) 7338 8973 +22%Net Profits (Rs. Cr.) 1172 1601 +37%

    PTC Sales Revenue (Rs. Cr.) 927 2378 +156%Energy Traded (MU) 4178 110029 +164%

    NHPC Generation (MU) 9863 11045 +12%Net Profits (Rs. Cr.) 510 581 +14%Fresh Capacity Added (MW) 0 800Fresh Starts (MW) 800 2772 +246%

    Various Policies and its Impact on the Functioning of

    Power Sector companies

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    44/128

    RELIANCE ENERGY LTD 44

    Electricity is an essential requirement for all facets of our life. It has been

    recognized as a basic human need. It is a critical infrastructure on which the

    socio-economic development of the country depends. Supply of electricity at

    reasonable rate to rural India is essential for its overall development. Equally

    important is availability of reliable and quality power at competitive rates to Indian

    industry to make it globally competitive and to enable it to exploit the tremendous

    potential of employment generation. Services sector has made significant

    contribution to the growth of our economy. Availability of quality supply of

    electricity is very crucial to sustained growth of this segment.

    Recognizing that electricity is one of the key drivers for rapid economic growth

    and poverty alleviation, the nation has set itself the target of providing access to

    all households in next five years. As per Census 2001, about 44% of the

    households do not have access to electricity. Hence meeting the target of

    providing universal access is a daunting task requiring significant addition to

    generation capacity and expansion of the transmission and distribution network.

    Indian Power sector is witnessing major changes. Growth of Power Sector in

    India since its Independence has been noteworthy. However, the demand for

    power has been outstripping the growth of availability. Substantial peak and

    energy shortages prevail in the country. This is due to inadequacies in

    generation, transmission & distribution as well as inefficient use of electricity.

    Very high level of technical and commercial losses and lack of commercial

    approach in management of utilities has led to unsustainable financial

    operations. Cross-subsidies have risen to unsustainable levels. Inadequacies in

    distribution networks have been one of the major reasons for poor quality of

    supply.

    Electricity industry is capital-intensive having long gestation period. Resources of

    power generation are unevenly dispersed across the country. Electricity is a

    commodity that can not be stored in the grid where demand and supply have to

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    45/128

    RELIANCE ENERGY LTD 45

    be continuously balanced. The widely distributed and rapidly increasing demand

    requirements of the country need to be met in an optimum manner.

    Electricity Act, 2003 provides an enabling framework for accelerated and more

    efficient development of the power sector. The Act seeks to encouragecompetition with appropriate regulatory intervention. Competition is expected to

    yield efficiency gains and in turn result in availability of quality supply of electricity

    to consumers at competitive rates.

    NTPC being a public sector unit and the largest electricity generator in the

    country is subject to various policies formulated by the government. Be the policy

    related to power supply or consumption of fuel or dividend policy or any thingelse it has its impact on the decisions and functioning of NTPC. Here in this

    section I have considered few of the policies formulated by the Government of

    India and tried to analyse their impact on NTPC and its growth pattern.

    National Electricity Policy

    National Electricity Policy (NEP) lays down creation of adequate generation

    capacity with a spinning reserve of at least 5% by 2012. It also gives strong

    thrust to hydro development. Main targets of National Electricity Policy (NEP)

    are:

    Availability of electricity to all households in five years

    Demand to be fully met by 2012

    Minimum lifeline consumption of 1 unit per household per day.

    Along with all these issues NEP has also laid thrust on policy initiatives for saving

    of the fuel. It clearly states that there should be policy initiatives like priority

    allocation of captive coal mine blocks to power generation companies and

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    46/128

    RELIANCE ENERGY LTD 46

    allocation of profit gas share of the Government of India, under the Production

    Sharing Contract, for the power sector to keep power tariffs at affordable levels.

    Also, coal pricing mechanisms with greater transparency may be encouraged to

    facilitate the process of making cost of power affordable. Even 100% FDI has

    been allowed in all segments of power chain, including power trading.

    NTPCs Strategies

    NTPC has short and long-term strategies to not only deal with the issues and

    challenges but to convert the challenges into opportunities of enhancing

    corporate growth and strength and become a world-class integrated energy

    utility.

    Coal consumption by the power sector has gone up considerably driven

    substantially by higher PLF of coal based thermal power stations. Massive

    capacity expansion plans and increasing generation from existing plants indicate

    substantial shortage of power grade coal in the future. Coal sector is taking steps

    to speed up new coal mine developments in the 10th Plan. While, import of coal

    for addressing the current shortfall may be a short-term measure, there is a need

    to intensify mining activities with infusion of new participants, more capital and

    new technologies. Therefore NTPC is importing coal for meeting the shortfall at

    Talcher Stage-II, Farakka and Simhadri as a short-term measure.

    The Company is also going for coal mining in order to enhance its fuel

    security and mitigate fuel risk. It has been allotted one coal-mining block and

    has applied for many more. NTPC has adopt modern mining practices and state-

    of-the-art technologies. The Company has also identified coal pithead based

    integrated power projects where the Company can draw coal from its own

    mines for the power project. Applications for allocation of coal blocks for a few

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    47/128

    RELIANCE ENERGY LTD 47

    such projects have been recommended by Ministry of Power to Ministry of Coal.

    Further these arrangements are supplemented with the reliable and cost

    competitive gas/ LNG supply arrangements.

    NTPC is also looking at forward integration as one of the viable options. It has

    plans to acquire parallel distribution licenses in the related projects, like

    distribution and trading. The target behind this is to increase the Power Trading

    volume substantially. All the forward and backward integration initiatives are

    primarily aimed at strengthening the core business of power generation. Assured

    availability of coal and gas is the key to the Companys success and long-term

    sustainability as well as competitiveness.

    NTPC is also laying thrust on hydro power in order to achieve operational and

    commercial synergy.

    One Time Settlement Plan

    Government had come out with a policy called One Time Settlement Plan,

    where by all the receivables due to the power generating companies from the

    SEBs would be converted into bonds backed by the government. This policy

    helped all the power generating companies as they were able to recover their

    dues and hence their sales figure improved. NTPC had also gained a lot from

    this policy as it does not sell electricity directly to general public rather it sells

    electricity to State Electricity Boards (SEBs). In the past, NTPC was perennially

    exposed to the problem of large receivables from weak SEBs. NTPC has

    benefited from the Settlement Scheme as per the Ahluwalia Committees

    recommendations whereby the sundry debtor levels dropped from Rs. 12, 440

    crores (237 days of sales) in FY2002-03 to Rs. 470 crores (9 days of sales) in

    FY2003-04. The outstanding payments to Central Power Sector Utilities (CPSUs)

    by the SEBs as on September 30, 2001 along with 40% of the surcharge (60%

    waiver of surcharge) has been converted into State Govt. backed 8.5% tax Free

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    48/128

    RELIANCE ENERGY LTD 48

    Bonds. As per the scheme, the State Governments were asked to issue bonds

    worth Rs. 16,410 crores to NTPC in lieu of past debts of the SEBs. NTPC has

    entered into a bi-partite agreement with Delhi on similar lines for its dues to the

    tune of Rs. 1,060 Crores. As a result, receivables from weak state electricity

    boards have been converted into interest-bearing investments. These

    investments are potentially liquid, subject to annual sell-off caps. Prospectively,

    SEBs are required to open LCs with commercial banks in favour of NTPC,

    covering 105% of the average monthly billing for the preceding 12 months of

    sale. To that extent, the payment for power sold to the financially weak SEBs is

    secured. In FY2003-04, NTPC realised 100% amounts for the power sold to

    SEBs as a result of this arrangement.

    Fuel / Energy mix for capacity addition

    Currently, coal has a dominant share in the power generation capacities in India.

    This is also reflected in the high share of coal-based capacities in NTPCs current

    portfolio. With high uncertainties involved in Domestic gas/ LNG, both in terms of

    availability and prices, NTPC is continuing to set up large pit-head coal based

    projects, including few integrated coal cum power projects. To reduce the

    dependence on fossil fuels, there is a need to push for renewable sources of

    power in the sector. Therefore NTPC is trying to avail opportunities to add

    hydropower to its portfolio subject to competitive tariffs. A first step in this

    direction has already been taken with the investment in Koldam Hydro Power

    Project. NTPC is also continuously closely monitoring developments on nuclear

    front also and is open to setting up around 2000 MW of Nuclear power

    generation capacity, possibly through a Joint Venture. As a leader in power

    generation, NTPC is also considering other energy sources such as biomass,

    cogeneration, fuel cells, etc for future development thereby reducing the

    dependence on thermal fuels.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    49/128

    RELIANCE ENERGY LTD 49

    While a decision on the fuel/energy mix for NTPC in the future would be largely

    governed by their relative tariff-competitiveness, the fuel mix in 2017 may be

    different from the existing portfolio, though not very significantly.

    Diversification along the Value Chain

    NTPC has achieved the distinction of being the largest thermal generating

    company in India. In the past, this focus was adequate as the industry was highly

    regulated with limited diversification opportunities. Over last few years, the

    country has been facing acute shortages, both in coal and gas, severely affecting

    optimum utilisation of its power stations and these shortages are likely to

    continue in future as well. This is in spite of the fact that India is one of the largest

    producers of coal in the World. To safeguard its competitive advantage in power

    generation business, NTPC has moved ahead in diversifying its portfolio to

    emerge as an integrated power major, with presence across entire energy value

    chain. In fact, to symbolise this change, NTPC has taken on a new identity and a

    new name NTPC Limited. NTPC has recently diversified into coal mining

    business primarily to secure its fuel requirements and support its aggressive

    capacity addition program. In addition, NTPC is also giving thrust on

    diversification in the areas of power trading and distribution. Diversification would

    also allow NTPC to offer new growth opportunities to its employees while

    leveraging their skills to capitalise on new opportunities in the sector.

    Establishing a Global Presence

    To become a truly global company serving global markets, it is essential for

    NTPC to establish its brand equity in overseas markets. NTPC is continuously

    focusing on offering Engineering & Project Management Services, Operations &

    Maintenance services, and Renovation & Modernization services in the

    international market.

    Establishing a successful services brand would be a precursor to taking higher

    investment decisions in different markets. Going forward, NTPC will also

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    50/128

    RELIANCE ENERGY LTD 50

    continue to evaluate various options for strengthening its presence in global

    markets including setting up power generation capacity, acquisition of gas blocks

    etc.

    Circa 2017: NTPCs corporate profile

    NTPC aims to successfully diversify its generation mix, diversified across the

    power value chain and entered overseas markets by the year 2017. As a result

    NTPC would have altered its profile significantly. Elements of the revised profile

    that NTPC would seek to achieve are:

    Amongst top five market capitalisation in the Indian market

    An Indian MNC with presence in many countries

    Diversified utility with multiple businesses

    Setting benchmarks in project construction and plant availability &

    efficiency

    Preferred employer

    Have a strong research and technology base

    Loyal customer base in both bulk and retail supply

    A leading corporate citizen with a keen focus on executing its social

    responsibility

    Policy hindrances in the way of NTPC

    THE NTPC, India's biggest power utility, was established in 1975 to strengthen

    regional grids. It utilises coal near the pitheads for power generation, the

    reasoning being that generation at such locations is a cheaper alternative to

    transporting coal or transmitting power across the country. Most of the funding for

    its projects have come from the multilateral agencies, primarily the World Bank.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    51/128

    RELIANCE ENERGY LTD 51

    However, immediately after the new power policy was announced in 1991, The

    NTPC was not allowed to bid for Independent Power Projects (IPPs). Some of

    the projects allotted to it earlier were handed over to private developers. During

    the same year, the World Bank, the primary agency in respect of the funding of

    NTPC power projects, refused funding, alleging that the company was in poor

    financial health.

    The NTPC now has 12 coal-based and seven gas-based power projects. The

    use of coal, the cheapest and most abundant resource for power generation, has

    enabled it to sell power at the cheapest rate in the country. The average cost of

    power generated by it is a rupee a unit; at Korba in Madhya Pradesh it is only 64

    paise. The Plant Load Factor (PLF), indicating the extent of capacity utilisation ofa power plant, is far higher than the national average. Last year, the average PLF

    of its power plants was 77 per cent, despite the poor performance of plants in the

    eastern region where the PLF was 43 per cent. To improve the situation, there

    are plans to evacuate surplus power from the eastern region to the northern and

    western regions.

    The NTPC's first 200 MW unit for the 2000 MW Singrauli power project in Uttar

    Pradesh was commissioned in 1982. By 1983-84 it had a capacity of 1000 MW,

    but the real spurt in growth came between 1987-88 and 1989-90, when 6713 MW

    of capacity was added. By this time the mega projects at Singrauli (2000 MW),

    Korba (2100 MW), Ramagundam (2100 MW), and Rihand (1000 MW) were fully

    completed. Since then, however, capacity has not expanded at the same pace

    (see chart). It now has an installed generating capacity of 16795 MW - about 19

    per cent of the entire power generating capacity in India. However, it produces

    about 25 per cent of the electricity generated in the country.

    The restructuring of the power sector and the 'rationalisation' of tariffs that

    accompanies it, is now being implemented at the level of SEBs. The NTPC is

    also likely to follow such a course. This will provide the Corporation avenues for

    rapid growth in revenue.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    52/128

    RELIANCE ENERGY LTD 52

    SEBs' arrears to the NTPC have mounted. The arrears now stand at Rs. 3,800

    crores, and, inclusive of surcharge, the amount is Rs. 6,200 crores. The NTPC,

    the largest corporate recipient of World Bank funding, has been told by the Bank

    that fresh assistance will become available only if the dues from the SEBs are

    cleared.

    Some of the SEBs, such as those in Andhra Pradesh and Orissa, are being

    restructured through the creation of separate companies for generation,

    transmission and distribution. A more moderate option advocated by critics of

    such a course is a modest increase in tariffs, which, they argue, will bring down

    the losses of SEBs. The NTPC recently indicated that it would prefer to be freed

    from the administered price mechanism (APM) that governs its sale price to

    SEBs. Its demand is similar to that planned for the oil companies after price

    deregulation. The NTPC has been allowed to set tariffs at levels that guarantee it

    a 16 per cent rate of return on new power plants. The Navaratna status is likely

    to help the company proceed with plans to break up the company into separate

    subsidiaries, each operating as a profit centre. The reasoning is that the loss-

    making units will be separated from the profit-generating units.

    The company's projects in Kayamkulam in Kerala, in Yamunanagar in Haryana,

    in Mangalore (where the controversial Cogentrix project is now located) and

    another controversial project, the Ib Valley project in Orissa, were all handed

    over to private developers after the Government announced its new power policy.

    The projects in Kerala and Haryana are now back with the NTPC because no

    private promoter wanted to undertake them.

    Despite its aborted partnership with Spectrum Technology for the Kakinada

    project, the NTPC is now keen on forming a joint venture with a company

    specialising in the lucrative renovation and modernisation (R&M) business in the

    power sector. Asked whether an alliance with BHEL may have been preferable,

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    53/128

    RELIANCE ENERGY LTD 53

    The NTPC plans to add 6270 MW of generating capacity during the Ninth Plan

    period and a further 8000 MW during the Tenth Plan, aiming for a total capacity

    of over 30000 MW by the end of the Tenth Plan period. The outlay for projects in

    the Ninth Plan is estimated to be Rs. 19,000 crores. Of the additional capacity in

    the Ninth Plan, 3920 MW of capacity are in coal-based projects and the

    remaining for projects utilising gas and other fuels. About 40 per cent of the funds

    for the projects are expected to be raised in foreign currency from multilateral

    agencies and a further 10 per cent in the form of suppliers' credit if equipment is

    sourced from the multinational power equipment companies.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    54/128

    RELIANCE ENERGY LTD 54

    Financial Analysis

    National Thermal Power Corporation

    Strategic Analysis of the Company

    Company and its Mission

    NTPC was set up by Ministry of Power in 1975 by observing the countries huge

    demand for electricity. Till today NTPC is contributing about 27% of the total

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    55/128

  • 7/31/2019 Deepti Project

    56/128

    RELIANCE ENERGY LTD 56

    Future Outlook

    Power sector has not been given its required due in the past years. Today when

    India has to compete with other developed nations it is planning to boost the

    growth of this sector as much as possible.

    Market leaders like NTPC have enough potential to gain momentum in such a

    supportive environment. Company is planning to develop ultra mega power

    projects of 4000 MW capacity and company is also looking to venture into other

    renewable sources of energy like nuclear power. To avoid the shortage of raw

    material company is initiating its projects near the pit heads and also acquiring

    lots of captive coal mines.

    Company is planning to have joint ventures with private players for supply of fuel

    especially gas (recently it has made an agreement with Reliance for the supply of

    gas) Company is also planning to go for a joint venture with private players for

    exploration of gas and coal under the National Exploration Licensing Policy-VI

    (NELP-VI).

    Thus company is all set to take advantage of supportive government policies and

    industry growth in order to become a global player in power sector.

    S.W.O.T Analysis of NTPC

    Strength Weight age Weakness Weight age

    Largest power utility 75 Long gestation period 70

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    57/128

    RELIANCE ENERGY LTD 57

    Trained Manpower 70 PSU work culture 50Diversification 50 Social responsibility 40Better capacity utilization 80 Compulsory obligations 60Government Support 70 Absence in distribution 80Market Leader 75 High Adm. Cost 70

    Total 340 310

    Change = +30

    Opportunity Weightage Threat Weightage

    Supportive power policy 60 Entry of private player 90Huge Demand 90 Low cost supply to SEBs 40Restriction on FDI 60 Availability of raw material 70

    Access to global debt market 70 Privatization 40

    Total 280 240

    Change = +40Total Change = +70

    So the SWOT analysis of NTPC is giving positive results with very high margin

    i.e. 70% which shows firms competence and efficiency.

    Note- the weights are assigned out of 100.

    Analysis

    Strengths

    NTPC is the largest thermal power generating company in India with total

    installed capacity 20.1% of Indias total installed capacity and contributed to

    about 27.1% of the total power generation in India during the year 2004-05.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    58/128

    RELIANCE ENERGY LTD 58

    NTPC has a highly trained manpower. The total strength of employees of the

    corporation stood at 23385 as on March,2005 and the overall Man-MW ratio for

    the year was 0.91.NTPC continuously trains its employees through various

    training programmes for their continuous growth.

    NTPC has diversified into coal mining, coal washeries and has also started a

    company by the name of NEECO. Hence it can be said that NTPC is trying to

    diversify its business.

    The plant load factor for thermal plants of NTPC during the year 2004-05 was

    87.5% as compared to 84.4% last year and for gas plants the plant load factor

    was 65.3%.

    NTPC, being a public sector unit, has a very strong government support and this

    gives NTPC an upper hand as compared to other players in this area. And NTPC

    is also a market leader as far as the power generation is concerned specifically

    thermal power generation.

    Weaknesses

    Establishments of power projects take a long time and same is the case with

    NTPC. NTPC has started with the establishment of hydro plants but still they arenot complete and would take another two to three years to start functioning.

    NTPC faces the same problem as most of the PSUs, that is, it takes lots of time

    to finish some work, file keeps on moving from one table to another and toll the

    time the project is finalized lots of time is wasted.

    And being a government entity it has to fulfill certain social responsibilities like

    taking care that the environment does not get polluted and to develop the area

    around the NTPC plant premises, etc. And it even has certain compulsory

    obligations like for example it had to overtake Dhabol Power Plant (which is loss

    making) as government had asked it to do so.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    59/128

    RELIANCE ENERGY LTD 59

    Absence of a strong place in the distribution sector is also harming the business

    of NTPC as it cannot get in direct touch with its customers. Though it has started

    a distribution company in 2001 but still it does not have that much of presence in

    the Indian market.

    NTPC has a very large number of employees and it remunerations are among

    the highest in the PSU sector and it also provides almost all the possible facilities

    to its employees, which makes the administrative cost for NTPC very high.

    Opportunities

    Government is giving a lot of thrust on the development of the power sector and

    this is very helpful for NTPC as it can find more avenues to grow. And secondly

    there is a very large demand for electricity and shortage of electricity supply. So

    this also provides NTPC with an opportunity to grow further. Apart from this

    though 100% FDI is allowed in the power sector by automatic route but still there

    are certain government regulations which are a hindrance in this process. And

    since NTPC is a public sector unit and even cash rich this situation will help

    NTPC a lot. And NTPC being a large company has an access to global debt

    market for funds from where it can get funds at low interest rates hence helpingNTPC to maintain low cost of capital.

    Threats

    The major threat for NTPC is the entrance of private players like TATA Power,Reliance Energy, etc. in the Indian power sector. And for this NTPC has to grow

    at a very fast pace if it wants to retain its market leader position for long.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    60/128

    RELIANCE ENERGY LTD 60

    Another problem for NTPC is that it has to supply power to SEBs at a low cost

    even when the cost of generation is high and this at times leads to losses and

    this is because of the government policies.

    Another major problem with NTPC is the acute shortage of raw material, that is,

    coal. And because of this NTPC is trying to venture into other power generation

    methods like hydro power generation, gas projects and even into nuclear plants.

    But this will take a long time as the gestation period for establishing a plant and

    making it operational is long. So till the shortage of fuel will be NTPCs major

    concern.

    Analysis of the return of the NTPC stock

    NTPCs had come out with its Initial Public Offering in October 2004 and since

    then its stock had been performing very well.

    I have considered the stock price of NTPC from October 1, 2005 to March 31,

    2006 and have taken out its return and beta. For comparison I have taken the

    returns of NSE of the same period.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    61/128

    RELIANCE ENERGY LTD 61

    During this period the average return of NTPC stock was 0.21% and its beta was

    0.60. For stock price of last 6 months see Annexure 12

    The same is depicted in the graph given below.

    -0.06

    -0.04

    -0.02

    0

    0.02

    0.04

    0.06

    1 10 19 28 37 46 55 64 73 82 91 100 109 118

    Return NSE

    Return

    NTPC Return NTPC

    Return of NSE

    Linear (Return of NSE)

    Analysis

    NTPCs stock is one the most stable stock in the stock market and its clearly

    shown by its beta which is 0.60. It clearly suggests that NTPCs stock risk is

    almost half the risk of the market, or we can say slightly more as it is more that

    0.50. This stock can also act as a portfolio stabilizer due to its low volatility. The

    trading volume in the stock has been significant.

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    62/128

    RELIANCE ENERGY LTD 62

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    63/128

    RELIANCE ENERGY LTD 63

    Common Size Balance Sheet

    2005-06 2004-05 2003-04 2002-03 2001-02

    SOURCES OF FUNDS

    Shareholder's Funds

    Capital 13.93% 15.16% 17.56% 19.42% 21.22%

    Reserves and Surplus 56.64% 53.82% 52.95% 51.80% 52.15%

    70.57% 68.98% 70.41% 71.22% 73.37%Deferred Revenue-onaccountof advance againstdepreciation 0.57% 0.31% 0.06%Development Surcharge

    Fund 0.73%Loan Funds

    Secured Loans 7.50% 8.89% 9.21% 4.09% 5.34%

    Unsecured Loans 21.36% 21.09% 20.32% 24.69% 21.29%

    28.86% 29.98% 29.53% 28.78%Deferred Tax Liability(Net) 8.54% 10.14% 9.92%

    Less: Recoverable 8.54% 10.14% 9.92%

    0.00% 0.00% 0.00% 0.00% 0.00%

    TOTAL 100% 100% 100% 100% 100%

    APPLICATION OF FUNDS

    Fixed Assets

    Gross Block 72.81% 77.67% 81.80% 81.75% 86.69%

    Less: Depreciation 35.12% 36.42% 37.42% 37.81% 37.66%

    Net Block 37.69% 41.24% 44.39% 43.94% 49.03%

    Capital Work in Progress 11.33% 10.89% 11.52% 12.93% 7.58%Construction Stores &

    Advances 5.44% 3.60% 2.75% 3.36% 2.79%

    54.46% 55.78% 58.65% 60.23% 59.39%

    Investments 35.13% 33.64% 8.19% 10.01% 9.14%Current Assets, Loans &Advances

    Inventories 3% 3.37% 3.96% 5.01% 4.99%

    Sundry Debtors 2.32% 0.91% 27.78% 28.66% 25.61%

    Cash & Bank Balance 10.27% 1.18% 1.22% 2.99% 1.04%

    Other Current Assets 1.64% 15.53% 5.62% 1.37% 7.32%

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    64/128

    RELIANCE ENERGY LTD 64

    Loans & Advances 4.57% 5.29% 4.80% 3.66% 10.04%

    21.80% 26.28% 43.38% 41.71% 48.99%Less: Current Liabilities&

    Provisions

    Liabilities 8.84% 12.66% 7.64% 7.92% 44.18%Provisions 2.56% 3.05% 2.60% 4.04%

    11.40% 15.70% 10.24% 11.97% 17.55%

    Net Current Assets 10.41% 10.58% 33.13% 29.74% 31.44%

    Miscellaneous Expenditure(to the extent not written offor adjusted) 0.02% 0.02% 0.02%

    TOTAL 100% 100% 100% 100% 100%

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    65/128

    RELIANCE ENERGY LTD 65

    Common Size Income Statement

    2005-06 2004-05 2003-04 2002-03 2001-02

    INCOME

    Sales 100% 100% 100% 100% 100%

    Energy Internally Consumed 0.11% 0.10% 0.10% 0.10% 0.13%

    Provisions Written Back 2.76% 5.12% 2.09% 0.06% 1.91%

    Other Income 10.46% 32.53% 2.12% 3.77% 4.83%

    Total 113.30% 137.75% 104.31% 103.93% 106.87%

    EXPENDITURE

    Fuel 60.88% 64.80% 57.91% 58.37% 52.38%

    Employee's remuneration &Benefits 3.92% 4.69% 4.31% 4.51% 4.03%

    Generation, administration &other expenses 5.37% 5.21% 5.71% 6.53% 5.31%

    Depreciation 8.69% 10.73% 8.03% 7.34% 12.25%

    Provisions 0.03% 3.10% 2.92% 1.03% 5.25%

    Interest & Finance Charges 7.52% 17.88% 5.21% 4.87% 5.76%

    Total 86.41% 106.40% 84.08% 83.05% 84.97%

    Profit before Tax & Prior

    Period Adjustments 26.92% 31.34% 20.13% 20.78% 21.90%Prior Period Income/ Exp.(net) -0.04 0.01% 0.42% 0.00% 0.42%Extraordinary item-CapitalReciepts 0.28%

    Profit Before Tax 26.97% 31.25% 19.71% 21.06% 21.48%

    Provision for Current Tax 4.46% 4.61% 5.91% 5.78% 7.09%

    Less: Income tax recoverable 3.26% 1.27% 5.14% 4.59% 5.29%

    1.20% 3.34% 0.77% 1.19% 1.79%

    Profit after Current Tax 25.76% 27.91% 18.94% 19.87% 19.68%

    Provision for deferred tax -0.76% 4.19% 1.86%

    Less: Deferred TaxRecoverable -0.76% 4.19% 1.86%

    Profit after Tax 25.76% 27.91% 18.94% 19.87% 19.68%

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    66/128

  • 7/31/2019 Deepti Project

    67/128

    RELIANCE ENERGY LTD 67

    Chart No. 1

    Chart No. 2

    Recievables Turnover Ratio

    0

    5

    10

    15

    20

    25

    30

    2004-05 2003-04 2002-03 2001-02 2000-01

    Years

    Series1

    Indian Institute of Finance 2005-07

    Quick Ratio

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    2000-01 2001-02 2002-03 2003-04 2004-05

    Years

    Series1

  • 7/31/2019 Deepti Project

    68/128

    RELIANCE ENERGY LTD 68

    Chart No. 3

    Chart No. 4

    Indian Institute of Finance 2005-07

    Average Recievables Collection Period

    0

    50

    100

    150

    200

    250

    2000-01 2001-02 2002-03 2003-04 2004-05

    Years

    Days

    Series1

  • 7/31/2019 Deepti Project

    69/128

    RELIANCE ENERGY LTD 69

    Net Profit Margin

    0

    5

    10

    15

    20

    25

    30

    2000-01 2001-02 2002-03 2003-04 2004-05

    Years

    Percentage

    Series1

    Chart No. 5

    Cash Flow Coverage Ratio

    0

    5

    10

    15

    20

    25

    30

    2004-05 2003-04 2002-03 2001-02 2000-01

    Years

    Series1

    Chart No. 6

    Indian Institute of Finance 2005-07

  • 7/31/2019 Deepti Project

    70/128

    RELIANCE ENERGY LTD 70

    Growth Rate

    0

    2

    4

    6

    8

    10

    12

    14

    2