defect list pentronic 1

2
DEFECT LIST – PLOT 7 LOCATION: PODIUM RELATED PARTY: PENTRONIC No. Location Description Before After Target To Complete Status 1. Level 3 - (Staircase 14) Poor Workmanship – No Exmet – Patching (Fire Intercom) 30.6.2015 2. Level 3 – (Shop Lot 2) Poor Workmanship – No Exmet – Patching (Fire Intercom) 30.6.2015

Upload: muhammad-zufar-bin-marwah

Post on 10-Sep-2015

231 views

Category:

Documents


4 download

DESCRIPTION

MSP

TRANSCRIPT

DEFECT LIST PLOT 7LOCATION: PODIUM

RELATED PARTY: PENTRONIC

No.LocationDescriptionBeforeAfterTarget To CompleteStatus

1.Level 3 -(Staircase 14)Poor Workmanship No Exmet Patching (Fire Intercom)

30.6.2015

2.Level 3

(Shop Lot 2)Poor Workmanship No Exmet Patching (Fire Intercom)

30.6.2015

3.Level 2- ( Shop Lot 2)Poor Workmanship No Exmet Patching (Fire Intercom)

30.6.2015