33
DDD 40 2016 2016-10-03 Page 1 CEN System - Delegated Decisions Dispatch 40:2016 1 CEN/TC 19 ............................................................................................................................................... 1 2 CEN/TC 38 ............................................................................................................................................... 2 3 CEN/TC 49 ............................................................................................................................................... 3 4 CEN/TC 79 ............................................................................................................................................... 3 5 CEN/TC 135 ............................................................................................................................................. 8 6 CEN/TC 138 ............................................................................................................................................. 8 7 CEN/TC 139 ........................................................................................................................................... 14 8 CEN/TC 143 ........................................................................................................................................... 19 9 CEN/TC 180 ........................................................................................................................................... 20 10 CEN/TC 181 ........................................................................................................................................... 22 11 CEN/TC 227 ........................................................................................................................................... 24 12 CEN/TC 229 ........................................................................................................................................... 24 13 CEN/TC 242 ........................................................................................................................................... 27 14 CEN/TC 260 ........................................................................................................................................... 28 15 CEN/TC 265 ........................................................................................................................................... 29 16 CEN/TC 274 ........................................................................................................................................... 31 17 CEN/TC 312 ........................................................................................................................................... 33 1 CEN/TC 19 DECISION 17/2016 taken by CEN/TC 19 on 2016-09-26 Subject: 3 year time-frame for the development of ENs, TRs and TSs – 9 month Tolerance Request CEN/TC 19, Gaseous and liquid fuels, lubricants and related products of petroleum, synthetic and biological origin, noting the information from WG 33 as discussed during its recent teleconference that the ILS schedule and the draft method are ready and agreed upon by WG 36, but that the project leader is still negotiating on the funding which is almost but not completely covered; noting that it looks like WG 33 will be able to start the ILS within 2016 so that we are optimistic to present a enquiry text within an extended period; considering Resolution BT 34/2002 by which BT decided that any work item to result in an EN, registered after 2002-10-31, shall normally result in an EN after 3 years and set maximum times between well identified stages, as well as Resolution BT 42/2003 deciding on variant timeframes; considering Resolution BT 42/2008 allowing the CEN/TCs, for well identified and justified reasons, to claim one tolerance of 9 months, applicable to the target dates for submission of a draft to CCMC for the relevant procedure (i.e. CEN Enquiry and/or Formal Vote); considering that for the work items 00 019 509, Liquid petroleum products - Determination of aerobic biological degradation of fully formulated lubricants in an aqueous solution - Test method based on CO2-production and 00 019 510, Liquid petroleum products -

Upload: buidieu

Post on 17-Mar-2018

218 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 2016-10-03 Page 1

CEN System - Delegated Decisions Dispatch 40:2016

1 CEN/TC 19 ............................................................................................................................................... 1 2 CEN/TC 38 ............................................................................................................................................... 2 3 CEN/TC 49 ............................................................................................................................................... 3 4 CEN/TC 79 ............................................................................................................................................... 3 5 CEN/TC 135 ............................................................................................................................................. 8 6 CEN/TC 138 ............................................................................................................................................. 8 7 CEN/TC 139 ........................................................................................................................................... 14 8 CEN/TC 143 ........................................................................................................................................... 19 9 CEN/TC 180 ........................................................................................................................................... 20 10 CEN/TC 181 ........................................................................................................................................... 22 11 CEN/TC 227 ........................................................................................................................................... 24 12 CEN/TC 229 ........................................................................................................................................... 24 13 CEN/TC 242 ........................................................................................................................................... 27 14 CEN/TC 260 ........................................................................................................................................... 28 15 CEN/TC 265 ........................................................................................................................................... 29 16 CEN/TC 274 ........................................................................................................................................... 31 17 CEN/TC 312 ........................................................................................................................................... 33

1 CEN/TC 19

DECISION 17/2016 taken by CEN/TC 19 on 2016-09-26

Subject: 3 year time-frame for the development of ENs, TRs and TSs – 9 month Tolerance Request

CEN/TC 19, Gaseous and liquid fuels, lubricants and related products of petroleum, synthetic and biological origin,

• noting the information from WG 33 as discussed during its recent teleconference that the ILS schedule and the draft method are ready and agreed upon by WG 36, but that the project leader is still negotiating on the funding which is almost but not completely covered;

• noting that it looks like WG 33 will be able to start the ILS within 2016 so that we are optimistic to present a enquiry text within an extended period;

• considering Resolution BT 34/2002 by which BT decided that any work item to result in an EN, registered after 2002-10-31, shall normally result in an EN after 3 years and set maximum times between well identified stages, as well as Resolution BT 42/2003 deciding on variant timeframes;

• considering Resolution BT 42/2008 allowing the CEN/TCs, for well identified and justified reasons, to claim one tolerance of 9 months, applicable to the target dates for submission of a draft to CCMC for the relevant procedure (i.e. CEN Enquiry and/or Formal Vote);

• considering that for the work items 00 019 509, Liquid petroleum products - Determination of aerobic biological degradation of fully formulated lubricants in an aqueous solution - Test method based on CO2-production and 00 019 510, Liquid petroleum products -

Page 2: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 2

Determination of aerobic biological degradation of fully formulated lubricants in an aqueous solution - Test method based on CO2-production, it proves impossible to provide a draft for CEN Enquiry by 2016-10-15;

• claims a tolerance of 9 months (i.e. a postponement of 9 months of the deadlines for all the stages not yet reached) for the two work items for the following reasons: the interlaboratory study to determine method precision is ready to start but the funding has not yet been completely arranged for which is essential for labs that perform this type of longer tests

• confirms that the drafts will be sent to CCMC (or ISO/CS in case of Vienna Agreement – CEN Lead) for submission to CEN Enquiry by 2017-07-15 at the latest.

The decision was taken by 11 positive votes, 0 negative votes and 22 abstentions.

2 CEN/TC 38

Decision CEN/TC 38 C125/2016 taken on 2016-09-28

Subject: 3 year time-frame for the development of WI 00038181 - 9 month Tolerance Request.

CEN/TC 38 - Durability of wood and wood-based products • considering Resolution BT 34/2002 by which BT decided that any work item to result in an

EN, registered after 2002-10-31, shall normally result in an EN after 3 years and set maximum times between well identified stages, as well as Resolution BT 42/2003 deciding on variant timeframes;

• considering Resolution BT 42/2008 allowing the CEN/TCs, for well identified and justified reasons, to claim one tolerance of 9 months, applicable to the target dates for submission of a draft to CCMC (or ISO/CS in case of Vienna Agreement - CEN Lead) for the relevant procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, TCA);

• considering that for work item 00038181 - prEN 16818 - Durability of wood and wood-based products - Moisture dynamics of wood and wood-based products, it proves impossible to Dispatch ENQ draft to CMC by 2016-09-28

• claims a tolerance of 9 months (i.e. a postponement of 9 months of the deadlines for all the stages not yet reached) for the following reasons: The Final draft is not ready yet to be submit to CCMC in order to launh Formal Vote Procedure

• confirms that CEN/TC 38 will Dispatch ENQ draft to CMC (or ISO/CS in case of Vienna Agreement - CEN Lead) by 2017-06-28 at the latest.

The decision was taken by simple majority with 11 positive vote(s), 0 negative vote(s) and 6 abstention(s).

Page 3: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 3

3 CEN/TC 49

Decision C9/2016 taken by CEN/TC 49 on 2016-08-31

Subject: CEN/TC 49 - Appointment of Chairperson

The CEN/TC 49 Gas cooking appliances, - considering the CEN/CENELEC Internal Regulations - Part 2, subclause 3.2.2, which lays

down the rules for nomination, appointment and responsibilities of Chairpersons;

- noting the nomination by the Technical Committee Secretariat;

- noting the commitment of the applicant to the responsibilities and duties of a Technical

Committee Chairperson as given in the CEN BOSS;

decides to re-appoint Mr E. BARBIERI, as Chairman of CEN/TC 49 for a period of 3 years starting

on 2016-08-31, noting that Mr E. BARBIERI is Chairperson of the Technical Committee since

1997-10-10.

The decision was taken by simple majority with 12 positive votes, 0 negative votes and 6

abstentions..

4 CEN/TC 79

Decision CEN/TC 79 5/2016 taken on 2016-05-12

Subject: CEN/TC 79 - Adoption of a Preliminary Work Item

CEN/TC 79 - Respiratory protective devices • having considered the proposal for a new work item as documented in CEN/TC 79 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 13794:2002

3. Document developed in drafting body

CEN/TC 79/WG 6 - Supplied breathable gas Respiratory Protective Devices (RPD)

4. Title Respiratory protective devices - Self-contained closed-circuit breathing apparatus for escape - Requirements, testing, marking

Page 4: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 4

Section Details

5. Scope This EN specifies minimum requirements for self-contained closed-circuit breathing apparatus, chemical oxygen (KO2, NaCIO3) type and compressed oxygen type, for escape (short: oxygen escape apparatus OEA). This EN does not apply to apparatus for work and rescue and to diving apparatus. Laboratory and practical performance tests are included for the assessment of compliance with the requirements.

6. Environmental aspects - OPTIONAL

Noise/Vibration Use of energy Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WGUse of environmental checklist

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related mandate(s)

Yes M/031

10. Related directive(s)

Yes Directive reference For citation in Official Journal

89/686/EEC No

11. The decision was taken by

Simple majority with 8 positive vote(s), 0 negative vote(s) and 0 abstention(s).

Decision CEN/TC 79 15/2016 taken on 2016-05-12

Subject: CEN/TC 79 - Adoption of a Preliminary Work Item

CEN/TC 79 - Respiratory protective devices • having considered the proposal for a new work item as documented in CEN/TC 79 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 145:1997

3. Document developed in drafting

CEN/TC 79/WG 6 - Supplied breathable gas Respiratory Protective Devices (RPD)

Page 5: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 5

Section Details

body

4. Title Respiratory protective devices - Self-contained closed-circuit breathing apparatus compressed oxygen or compressed oxygen-nitrogen type - Requirements, testing, marking

5. Scope This European Standard specifies minimum requirements for self-contained closed-circuit breathing apparatus, compressed oxygen (O2) and compressed oxygen-nitrogen (O2 - N2) types, used as respiratory protective devices, except escape apparatus and diving apparatus. Laboratory and practical performance tests are included for the assessment of compliance with the requirements.

6. Environmental aspects - OPTIONAL

Noise/Vibration Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WGUse of environmental checklist

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related mandate(s)

Yes M/031

10. Related directive(s)

Yes Directive reference For citation in Official Journal

89/686/EEC Yes

11. The decision was taken by

Simple majority with 8 positive vote(s), 0 negative vote(s) and 0 abstention(s).

Decision CEN/TC 79 16/2016 taken on 2016-05-12

Subject: CEN/TC 79 - Adoption of a Preliminary Work Item

CEN/TC 79 - Respiratory protective devices • having considered the proposal for a new work item as documented in CEN/TC 79 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

2. This item the revision of an EN. EN 402:2003

Page 6: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 6

Section Details

corresponds to

3. Document developed in drafting body

CEN/TC 79/WG 6 - Supplied breathable gas Respiratory Protective Devices (RPD)

4. Title Respiratory protective devices - Lung governed demand self-contained open-circuit compressed air breathing apparatus with full face mask or mouthpiece assembly for escape - Requirements, testing, marking

5. Scope This European Standard specifies minimum requirements for lung governed demand self-contained open-circuit compressed air breathing apparatus for escape. This European Standard does not apply to apparatus for work and rescue or to diving apparatus. Laboratory and practical performance tests are included for the assessment of compliance with the requirements.

6. Environmental aspects - OPTIONAL

Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WGUse of environmental checklist

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related mandate(s)

Yes M/BC/CEN/88/7

10. Related directive(s)

Yes Directive reference For citation in Official Journal

89/686/EEC Yes

11. The decision was taken by

Simple majority with 8 positive vote(s), 0 negative vote(s) and 0 abstention(s).

Decision CEN/TC 79 17/2016 taken on 2016-05-12

Subject: CEN/TC 79 - Adoption of a Preliminary Work Item

CEN/TC 79 - Respiratory protective devices • having considered the proposal for a new work item as documented in CEN/TC 79 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Page 7: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 7

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 1146:2005

3. Document developed in drafting body

CEN/TC 79/WG 6 - Supplied breathable gas Respiratory Protective Devices (RPD)

4. Title Respiratory protective devices - Self-contained open-circuit compressed air breathing apparatus incorporating a hood for escape - Requirements, testing, marking

5. Scope This European Standard specifies minimum requirements for self-contained open-circuit compressed air breathing apparatus for escape only, incorporating a hood. Such equipment is intended for use in work situations where the risk on overpressurisation of the pressure vessels with their valves due to hot environmental conditions is low. Laboratory and practical performance tests are included for the assessment of compliance with the requirements. This European Standard does not apply to apparatus for work or to diving devices.

6. Environmental aspects - OPTIONAL

Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WGUse of environmental checklist

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related mandate(s)

Yes M/031

10. Related directive(s)

Yes Directive reference For citation in Official Journal

89/686/EEC Yes

11. The decision was taken by

Simple majority with 8 positive vote(s), 0 negative vote(s) and 0 abstention(s).

Page 8: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 8

5 CEN/TC 135

Decision CEN/TC 135 6/2016 taken on 2016-09-23

Subject: 3 year time-frame for the development of WI 00135023 - 9 month Tolerance Request.

CEN/TC 135 - Execution of steel structures and aluminium structures • considering Resolution BT 34/2002 by which BT decided that any work item to result in an

EN, registered after 2002-10-31, shall normally result in an EN after 3 years and set maximum times between well identified stages, as well as Resolution BT 42/2003 deciding on variant timeframes;

• considering Resolution BT 42/2008 allowing the CEN/TCs, for well identified and justified reasons, to claim one tolerance of 9 months, applicable to the target dates for submission of a draft to CCMC (or ISO/CS in case of Vienna Agreement - CEN Lead) for the relevant procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, TCA);

• considering that for work item 00135023 - prEN 1090-2 - Execution of steel structures and aluminium structures - Part 2: Technical requirements for steel structures, it proves impossible to Dispatch ENQ draft to CMC by 2017-01-26

• claims a tolerance of 9 months (i.e. a postponement of 9 months of the deadlines for all the stages not yet reached) for the following reasons: The standard has been registered by CEN for Second CEN Enquiry with deadline date for voting set to 2017-03-30. The tolerance of 9 months is needed to complete fhe Formal Vote draft.

• confirms that CEN/TC 135 will Dispatch ENQ draft to CMC (or ISO/CS in case of Vienna Agreement - CEN Lead) by 2017-10-26 at the latest.

The decision was taken by simple majority with 18 positive vote(s), 0 negative vote(s) and 2 abstention(s).

6 CEN/TC 138

Decision CEN/TC 138 29/2016 taken on 2016-09-23

Subject: CEN/TC 138 - Adoption of a Preliminary Work Item

CEN/TC 138 - Non-destructive testing • having considered the proposal for a new work item as documented in CEN/TC 138 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

Page 9: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 9

Section Details

2. This item corresponds to

a new project

3. Document developed in drafting body

CEN/TC 138/WG 7 - Acoustic emission testing

4. Title Non-destructive testing - Acoustic emission testing Application of AE within the scope of in-service (periodic) inspection and requalification

5. Scope This standard specifies the application of acoustic emission testing (AT) on metallic pressurised structures during in-service (periodic) inspection and requalification. The objective is to integrate AT with the standard set of testing (internal/external visual testing, thickness measurements, hydrostatic/pneumatic tests, etc.) in order to allow its application either alone or in combination with other methods in the course of inspection and/or requalification procedures. It demonstrates the capability of AT to ensure at least the same level of safety of the pressurised structure compared to the conventional inspection and requalification procedures.

6. Environmental aspects - OPTIONAL

None of the above. Not applicable

7. How do you plan to address these environmental aspects?

Other: Not applicable

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related mandate(s)

No

10. Related directive(s)

No

11. The decision was taken by

Simple majority with 5 positive vote(s), 0 negative vote(s) and 0 abstention(s).

Decision CEN/TC 138 10/2016 taken on 2016-09-26

Subject: CEN/TC 138 - Adoption of a New Work Item

CEN/TC 138 - Non-destructive testing • having considered the proposal for a new work item as documented in CEN/TC 138 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

Page 10: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 10

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 16407-1:2014

3. Document developed in drafting body

CEN/TC 138/WG 1 - Radiographic testing

4. Title Non-destructive testing - Radiographic inspection of corrosion and deposits in pipes by X- and gamma rays - Part 1: Tangential radiographic inspection

5. Scope This European Standard specifies fundamental techniques of film and digital radiography with the object of enabling satisfactory and repeatable results to be obtained economically. The techniques are based on generally recognized practice and fundamental theory of the subject. This European Standard applies to the radiographic examination of pipes in metallic materials for service induced flaws such as corrosion pitting, generalized corrosion and erosion. Besides its conventional meaning, pipe as used in this standard should be understood to cover other cylindrical bodies such as tubes, penstocks, boiler drums and pressure vessels. Weld inspection for typical welding process induced flaws is not covered, but weld inspection is included for corrosion/erosion type flaws. The pipes may be insulated or not, and can be assessed where loss of material due, for example, to corrosion or erosion is suspected either internally or externally. This part of EN 16407 covers the tangential inspection technique for detection and through-wall sizing of wall loss, including: a) with the source on the pipe centre line, and b) with the source offset from it by the pipe radius. Part 2 of EN 16407 covers double wall radiography, and note that the double wall double image technique is often combined with tangential radiography with the source on the pipe centre line. This European Standard applies to tangential radiographic inspection using industrial radiographic film techniques, computed digital radiography (CR) and digital detector arrays (DDA).

6. Environmental aspects

None of the above. NA

7. How do you plan to address these environmental aspects?

Other: NA

8.Vienna Agreement Yes - Parallel ISO Lead ISO project reference: 20769-1 ISO Project ID: 71632 ISO TC: ISO/TC 135

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

Page 11: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 11

Section Details

11. Related mandate(s)

No

12. Related directive(s)

No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN NEN

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 13 positive vote(s), 0 negative vote(s) and 9 abstention(s).

Decision CEN/TC 138 11/2016 taken on 2016-09-26

Subject: CEN/TC 138 - Adoption of a New Work Item

CEN/TC 138 - Non-destructive testing • having considered the proposal for a new work item as documented in CEN/TC 138 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 16407-2:2014

3. Document developed in drafting body

CEN/TC 138/WG 1 - Radiographic testing

4. Title Non-destructive testing - Radiographic inspection of corrosion and deposits in pipes by X- and gamma rays - Part 2: Double wall radiographic inspection

5. Scope This European Standard specifies fundamental techniques of film and digital radiography with the object of enabling satisfactory and repeatable

Page 12: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 12

Section Details

results to be obtained economically. The techniques are based on generally recognized practice and fundamental theory of the subject. This European Standard applies to the radiographic examination of pipes in metallic materials for service induced flaws such as corrosion pitting, generalized corrosion and erosion. Besides its conventional meaning, "pipe" as used in this standard should be understood to cover other cylindrical bodies such as tubes, penstocks, boiler drums and pressure vessels. Weld inspection for typical welding process induced flaws is not covered, but weld inspection is included for corrosion/erosion type flaws. The pipes may be insulated or not, and can be assessed where loss of material due, for example, to corrosion or erosion is suspected either internally or externally. This part of EN 16407 covers double wall inspection techniques for detection of wall loss, including double wall single image (DWSI) and double wall double image (DWDI). Note that the DWDI technique described in this part of EN 16407 is often combined with the tangential technique covered in EN 16407-1. This European Standard applies to in-service double wall radiographic inspection using industrial radiographic film techniques, computed digital radiography (CR) and digital detector arrays (DDA).

6. Environmental aspects

None of the above. NA

7. How do you plan to address these environmental aspects?

Other: NA

8.Vienna Agreement Yes - Parallel ISO Lead ISO project reference: 20769-2 ISO Project ID: 71688 ISO TC: ISO/TC 135

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s)

No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN NEN

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 13 positive vote(s),

Page 13: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 13

Section Details

0 negative vote(s) and 9 abstention(s).

Decision CEN/TC 138 12/2016 taken on 2016-09-26

Subject: CEN/TC 138 - Adoption of a New Work Item

CEN/TC 138 - Non-destructive testing • having considered the proposal for a new work item as documented in CEN/TC 138 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 14784-1:2005

3. Document developed in drafting body

CEN/TC 138/WG 1 - Radiographic testing

4. Title Non-destructive testing - Industrial computed radiography with storage phosphor imaging plates - Part 1: Classification of systems

5. Scope This European standard specifies fundamental parameters of computed radiography systems with the aim of enabling satisfactory and repeatable results to be obtained economically. The techniques are based both on fundamental theory and test measurements. This European standard specifies the performance of computed radiography (CR) systems and the measurement of the corresponding parameters for the system scanner and phosphor imaging plate (IP). It describes the classification of these systems in combination with specified metal screens for industrial radiography. It is intended to ensure that the quality of images - as far as this is influenced by the scanner-IP system - is in conformity with the requirements of Part 2 of this standard. The standard relates to the requirements of film radiography defined in EN 584-1 and ISO 11699-1. This European standard defines system tests at different levels. More complicated tests are described, which allow the determination of exact system parameters. They can be used to classify the systems of different suppliers and make them comparable for users. These tests are specified as manufacturer tests. Some of them require special tools, which are usually not available in user laboratories. Therefore, simpler user tests are also described, which are designed for a fast test of the quality of CR systems and long term stability. There are several factors affecting the quality of a CR image including geometrical unsharpness, signal/noise

Page 14: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 14

Section Details

ratio, scatter and contrast sensitivity. There are several additional factors (e.g. scanning parameters), which affect the accurate reading of images on exposed IPs using an optical scanner.

6. Environmental aspects

None of the above. NA

7. How do you plan to address these environmental aspects?

Other: NA

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AENOR AFNOR BSI DIN NEN

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 12 positive vote(s), 0 negative vote(s) and 10 abstention(s).

7 CEN/TC 139

Decision CEN/TC 139 7/2016 taken on 2016-09-15

Subject: CEN/TC 139 - Adoption of a New Work Item

CEN/TC 139 - Paints and varnishes • having considered the proposal for a new work item as documented in CEN/TC 139 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

Page 15: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 15

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the conversion of a CEN/TS into an EN.

3. Document developed in drafting body

CEN/TC 139/WG 2 - Coating systems for wood

4. Title Paints and varnishes Coating materials and coating systems for exterior wood Assessment of tannin staining

5. Scope This European Standard specifies a test method for assessing the discoloration of coatings on wood by tannin staining due to wood extractives. The method uses an extract from Merbau wood as an indicator. Bleeding of wood extractives is assessed at two specified stages firstly after coating application and secondly after cyclic climate exposure. A qualification of colour differences that can be attributed to three different causes, bleeding of extractives, low opacity of the coating film or general yellowing in climate exposure, is included. This document does not specify acceptance values for colour differences that can be tolerated and it is not applicable to staining caused by knots for which there is a different test method (e. g. CEN/TS 16359).

6. Environmental aspects

Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN NEN

Page 16: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 16

Section Details

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):80 15 positive vote(s), 4 negative vote(s) and 1 abstention(s).

Decision CEN/TC 139 7.1/2016 taken on 2016-09-15

Subject: CEN/TC 139 - Adoption of a New Work Item

CEN/TC 139 - Paints and varnishes • having considered the proposal for a new work item as documented in CEN/TC 139 N 1276

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the conversion of a CEN/TS into an EN. CEN/TS 16499:2013

3. Document developed in drafting body

CEN/TC 139/WG 2 - Coating systems for wood

4. Title Paints and varnishes — Coating materials and coating systems for exterior wood — Resistance to blocking of paints and varnishes on wood

5. Scope This European Standard specifies a test method for determining, under standard conditions, whether a single-coat film or a multi-coat system of paints and varnishes on wood after a specified drying period is sufficiently dry to avoid damage when two painted surfaces or one painted surface and another surface are placed in contact under pressure and subsequently separated. The method is intended to simulate the conditions when painted articles come into contact which each other. In comparison to EN ISO 9117 2, the conditioning and parameters which influences the behaviour of wood coatings are more specific. NOTE In some countries, the test is called a “block or blocking resistance” test.

6. Environmental aspects

Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG Use of environmental checklist

Page 17: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 17

Section Details

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN NEN

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 81 Number of positive votes: 16 Number of negative votes: 5 Number of abstentions: 1

Decision CEN/TC 139 12/2016 taken on 2016-09-15

Subject: CEN/TC 139 - Adoption of a New Work Item

CEN/TC 139 - Paints and varnishes • having considered the proposal for a new work item as documented in CEN/TC 139 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 16402:2013

3. Document developed in drafting body

CEN/TC 139/WG 11 - Sampling, conditioning and testing of paints and coatings according to the needs of CEN/TC 351/WG 2, Indoor Air.

4. Title Paints and varnishes - Assessment of emissions of substances from coatings into indoor air - Sampling, conditioning and testing

5. Scope This European Standard specifies a reference method for the

Page 18: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 18

Section Details

determination of emissions from coatings into indoor air. This method is applicable to volatile organic compounds, semi-volatile organic compounds and volatile aldehydes. NOTE This European Standard is aimed at describing the overall procedure and makes use of existing standards mainly by normative reference complemented when necessary with additional or modified normative requirements. This European Standard applies to coatings for indoor use as listed in Clause 5.It is not applicable to coatings that are applied off site or coatings that are applied on site, prior to the structure being permanently weatherproof. It is not applicable for tinting pastes that are not ready for use as coating. It is mainly aimed at determining emission data in indoor air for the purpose of voluntary labelling of products but may also be used for CE marking and associated Attestation of Conformity in the case of products that are covered by the construction products directive.

6. Environmental aspects

Emissions to air

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN NEN UNI

14. The decision was taken by

Simple majority with 7 positive vote(s), 0 negative vote(s) and 0 abstention(s).

Page 19: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 19

8 CEN/TC 143

Decision CEN/TC 143 D003/2016 taken on 2016-09-23

Subject: CEN/TC 143 - Adoption of a New Work Item

CEN/TC 143 - Machine tools - Safety • having considered the proposal for a new work item as documented in CEN/TC 143 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 13236:2010+A1:2015

3. Document developed in drafting body

CEN/TC 143/WG 2 - Stationary grinding machines and abrasive products - Safety

4. Title Safety requirements for superabrasive products

5. Scope This European Standard only applies to superabrasives products containing natural or synthetic diamond or cBN (cubic boron Nitride). It includes precision grinding and cutting-off wheels, non-precision cutting-off wheels, diamond wires, mounted points and other superabrasive products for non-precision grinding. It also applies to reconditioned superabrasive cutting-off wheels. This European Standard specifies requirements and/or measures for the removal or reduction of hazards resulting from the design and application of the superabrasive products. This European Standard contains also procedures and tests for verification of the compliance with the requirements as well as safety information for use which is to be made available to the user by the manufacturer. The hazards taken into consideration are listed in Clause 4. This European Standard does not apply to bonded abrasive products, coated abrasive products, rotating dressing tools, truers nor any non-rotating superabrasive products.

6. Environmental aspects

Noise/Vibration Use of materials

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

Page 20: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 20

Section Details

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s)

No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN ILNAS

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 12 positive vote(s), 0 negative vote(s) and 7 abstention(s).

9 CEN/TC 180

Decision CEN/TC 180 C01/2016 taken on 2016-09-20

Subject: CEN/TC 180 - Adoption of a New Work Item

CEN/TC 180 - Decentralized gas heating • having considered the proposal for a new work item as documented in CEN/TC 180 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

a new project

3. Document CEN/TC 180/WG 1 - Non domestic gas-fired overhead radiant tube and

Page 21: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 21

Section Details

developed in drafting body

luminous heaters - Safety and Efficiency.

4. Title Safety and efficiency of gas-fired radiant tube heaters and radiant tube heater systems (herringbone systems)

5. Scope This European Standard specifies the requirements and test methods for the construction, safety, classification, marking and efficiency of non-domestic gas-fired overhead radiant tube heaters incorporating a single burner and multiple burner systems (referred to in the body of the text as the system ) with each burner unit under the control of an automatic burner control system. For radiant tube heaters incorporating a single burner, this standard is applicable to Type A2, A3, B12, B13, B22, B23, B42, B43, B52, B53, C12, C13, C32, C33, C52 and C53 appliances intended for use in other than domestic dwellings, in which the supply of combustion air and/or the evacuation of the products of combustion is achieved by mechanical means located upstream of the draught diverter, if provided. For radiant tube heater systems incorporating multiple tube heater segments , this standard is applicable to Type B52, B52x, B53 and B53x systems intended for use in other than domestic dwellings, in which the supply of combustion air and/or the evacuation of the products of combustion is achieved by mechanical means. This standard also includes appliances incorporating a secondary heat exchanger in the flue system. This standard is not applicable to: a) systems designed for use in domestic dwelling; b) outdoor systems; c) systems where the heat input of any individual burner unit is in excess of 120 kW (based on the net calorific value of the appropriate reference test gas); d) systems having combustion products evacuation ducts that are non-metallic in the flue system except ducts downstream of a possible additional condensing exhaust gas heat exchanger. In addition, for heater systems incorporating multiple tube heaters this standard is not applicable to: e) systems that are designed for continuous condensation within the flue system under normal operating conditions except downstream a possible additional exhaust gas heat exchanger. This standard is applicable to systems which are intended to be type tested. It also includes requirements concerning the evaluation of conformity, including factory production control, but these requirements only apply to POCEDs and their associated terminals. NOTE Requirements for systems which are not intended to be type tested would need to be subject to further consideration.

6. Environmental aspects

Other: Will be completed later

7. How do you plan to address these environmental aspects?

Other: Will be completed later

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

Page 22: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 22

Section Details

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN NBN NEN UNI

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 10 positive vote(s), 0 negative vote(s) and 10 abstention(s).

10 CEN/TC 181

Decision CEN/TC 181 C01/2016 taken on 2016-09-27

Subject: CEN/TC 181 - Adoption of a New Work Item

CEN/TC 181 - Dedicated liquefied petroleum gas appliances • having considered the proposal for a new work item as documented in CEN/TC 181 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

an amendment to an EN.

3. Document developed in drafting body

CEN/TC 181/WG 7 - Essential requirements for rubber hoses and flexible assemblies for gas supply of non-industrial LPG appliances

4. Title Rubber and plastics hoses, tubing and assemblies for use with propane and butane and their mixture in the vapour phase - Part 1: Hoses and tubings

Page 23: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 23

Section Details

5. Scope This European Standard specifies the characteristics and performance requirements for tubing and hoses made of either rubber or plastics for use with commercial propane and commercial butane and mixtures thereof, in the vapour phase, for connection of appliances, from: - pressurized gas container to a regulating device, - pressurized gas container to an appliance, - regulating device to an appliance, and - regulating device to installation pipework, in environments of a temperature range from -30 C to +70 C. Working pressures are from 0 bar to 30 bar. Three classes are defined in Table 1 according to the maximum working pressures and minimum ambient temperatures. This European Standard only covers the tubing or hose part of assemblies. The assemblies themselves will be covered by EN 16436-2. This European Standard does not apply to hoses for: - welding purposes (see EN ISO 3821, EN 1327); - propulsion purposes; - LPG transfer purposes (see EN 1762).

6. Environmental aspects

Other: Will be provided later

7. How do you plan to address these environmental aspects?

Other: Will be provided later

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI DIN DS UNMZ

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 11 positive vote(s), 0 negative vote(s) and 7 abstention(s).

Page 24: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 24

11 CEN/TC 227

Decision CEN/TC 227 808/2016 taken on 2016-09-26

Subject: Change of deliverable for a work item neither mandated nor covered by an Order Voucher

CEN/TC 227 - Road materials • having fully justified the need for a change of deliverable concerning work item 00227433;

• considering that the work item covering the current deliverable is neither mandated nor covered by an Order Voucher;

• considering resolutions BT 34/2002, BT 42/2003 and related document BT N 6962 concerning timeframes for the development of ENs;

decides to change the deliverable from EN to CEN/TS for WI 00227433 - prEN 12697-52: Bituminous mixtures - Test methods - Part 52: Conditioning to address oxidative ageing

The standstill on this work item is released.

The decision was taken by weighted vote and simple majority with 98% votes, 15 positive vote(s), 1 negative vote(s) and 8 abstention(s).

12 CEN/TC 229

Decision CEN/TC 229 503/2016 taken on 2016-09-27

Subject: CEN/TC 229 - Adoption of a New Work Item

CEN/TC 229 - Precast concrete products • having considered the proposal for a new work item as documented in CEN/TC 229 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 13369:2013

3. Document developed in drafting

CEN/TC 229/WG 4 - Products which do not warrant a specific standard and which could be referred to in specific standards

Page 25: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 25

Section Details

body

4. Title Common rules for precast concrete products

5. Scope This European Standard specifies the requirements, the basic performance criteria and the evaluation of conformity for unreinforced, reinforced and prestressed precast concrete products made of compact light-, normal- and heavyweight concrete according to EN 206-1 with no appreciable amount of entrapped air other than entrained air. Concrete containing fibres for other than mechanical properties steel, polymer or other fibres is also covered. It does not cover prefabricated reinforced components of lightweight aggregate concrete with open structure. It may also be used to specify products for which there is no standard. Not all of the requirements (Clause 4) of this standard are relevant to all precast concrete products. If a specific product standard exists, it takes precedence over this standard. The precast concrete products dealt with in this standard are factory produced for building and civil engineering works. This standard may also be applied to products manufactured in temporary plants on site if the production is protected against adverse weather conditions and controlled following Clause 6 provisions. The analysis and design of precast concrete products is not within the scope of this standard but it does offer, for non-seismic zones, information about: - the choice of partial safety factors defined by the pertinent Eurocode; - the definition of some requirements for prestressed concrete products.

6. Environmental aspects

Use of energy Use of materials Use of water

7. How do you plan to address these environmental aspects?

Other: Necessary skills already in the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN DS NBN SIS

Page 26: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 26

Section Details

UNI

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):100 22 positive vote(s), 0 negative vote(s) and 11 abstention(s).

Decision CEN/TC 229 504/2016 taken on 2016-09-27

Subject: CEN/TC 229 - Adoption of a Preliminary Work Item

CEN/TC 229 - Precast concrete products • having considered the proposal for a new work item as documented in CEN/TC 229 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

2. This item corresponds to

a new project

3. Document developed in drafting body

CEN/TC 229/WG 1 - Products for which the stability requirements is predominant

4. Title Precast concrete products - Solid slabs

5. Scope This European Standard identifies the requirements, the basic performance criteria and evaluation of conformity for precast solid slabs such as solid floor plates (other than covered by EN1168 or EN 13747), balconies, landings (other than covered by EN 14843) made of reinforced or pre-stressed normal or lightweight concrete, used for the construction of the structures of buildings and other civil engineering works, except bridges (EN 15050). The products covered by this standard are produced in factories and intended to be used as part of structural floors and roofs without a structural topping. This document covers terminology, performance criteria, tolerances, relevant physical properties and test methods (and aspects of transport and erectionif needed). This document does not cover load bearing capacity determined by testing.

6. Environmental aspects - OPTIONAL

7. How do you plan to address these environmental aspects?

Page 27: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 27

Section Details

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related mandate(s) No

10. Related directive(s) No

11. The decision was taken by

Simple majority with 16 positive vote(s), 2 negative vote(s) and 4 abstention(s).

13 CEN/TC 242

Decision CEN/TC 242 11/2016 taken on 2016-04-08

Subject: CEN/TC 242 – Adoption of a New Work Item

CEN/TC 242 Safety requirements for passenger transportation by rope • having considered the proposal for a new work item as documented in CEN/TC 242 N 942

having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details 1. Deliverable EN

2. This item corresponds to

the revision of EN 12927-1:2004, EN 12927-2:2004, EN 12927-3:2004, EN 12927-4:2004, EN 12927-5:2004, EN 12927-6:2004, EN 12927-7:2004, EN 12927-8:2004

3. Document developed in drafting body

CEN/TC242 WG3 “Ropes”

4. Title Safety requirements for cableway installations designed to carry persons — Ropes

5. Scope This European Standard specifies the safety requirements applicable to: Selection criteria for ropes and their end fixings Safety factors (excluding brake ropes and ropes for installations used for the transportation of goods, nor to inclined lifts) Discard criteria Storage, handling, transportation and installation (including tensioning, connecting and/or splicing) Long splicing of 6 strand hauling, carrying hauling and towing ropes End fixings

Page 28: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 28

Section Details Inspection, repair and maintenance and the minimum requirements applicable to:

MRT and radiographic equipments and procedures for the examination of steel wire ropes

6. Environmental aspects

Other: not relevant

7. How do you plan to address these environmental aspects?

Other: not relevant

8.Vienna Agreement No or expected CEN Lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ + FV)

11. Related mandates(s)

Yes; M/300

12. Related directive(s) Yes: Directive 2000/9 For citation in Official Journal? No Yes

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: Austria, France, Germany, Italy, Switzerland

14. The decision was taken by

The decision was taken by Weighted vote Percentage of positive weighted votes (min. 71%):100% Number of positive votes:12 Number of negative votes: 0 Number of abstentions: 6

14 CEN/TC 260

Decision 624/2016 taken by CEN/TC 260 on 2016-09-30

Subject: CEN/TC 260 — Decision on the future of prEN 15961 after CEN Enquiry

CEN/TC 260, • considering the results of the Enquiry ballot (no technical comments received, see N 2134);

• considering the CEN/CENELEC Internal Regulations - Part 2, clause 11.2.3;

• considering Decisions BT 34/2002, BT 42/2003 and related document BT N 6962 concerning timeframes for the development of ENs;

• considering Decision BT 35/2014 to associate a vote to the CEN Enquiry and to allow Technical Bodies to decide to skip the Formal Vote;

• considering Decision 49/2014 to allow Technical Bodies to decide to skip the Formal Vote through a TC decision based on simple majority only;

Page 29: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 29

decides to skip the Formal Vote and proceed with the publication of EN 15961 Fertilizers — Extraction of water-soluble calcium, magnesium, sodium and sulfur in the form of sulfates. The decision was taken by unanimity.

Decision 629/2016 taken by CEN/TC 260 on 2016-09-30

Subject: CEN/TC 260 — Re-appointment of Chairperson

CEN/TC 260, • considering the CEN/CENELEC Internal Regulations - Part 2, subclause 3.2.2, which lays

down the rules for nomination, appointment and responsibilities of Chairpersons;

• noting the nomination by the Technical Committee Secretariat;

• noting the commitment of the applicant to the responsibilities and duties of a Technical Committee Chairperson as given in the CEN BOSS;

decides to re-appoint Dr. Dietrich Pradt, as Chairman of CEN/TC 260 for a period of 3 years starting on 2016-09-30, noting that Dr. Dietrich Pradt is Chairperson of the Technical Committee since 2012-09. The decision was taken by unanimity.

15 CEN/TC 265

Decision CEN/TC 265 5/2016 taken on 2016-09-01

Subject: CEN/TC 265 - Adoption of a New Work Item

CEN/TC 265 - Metallic tanks for the storage of liquids • having considered the proposal for a new work item as documented in CEN/TC 265 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 14015:2004

3. Document developed in drafting body

CEN/TC 265/WG 9 - Site built tanks for liquids at ambient, refrigerated and cryogenic temperatures

Page 30: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 30

Section Details

4. Title Specification for the design and manufacture of site built, vertical, cylindrical, flat-bottomed, above ground, welded, steel tanks for the storage of liquids at ambient temperature and above

5. Scope This document specifies the requirements for the materials, design, fabrication, erection, testing and inspection of site built, vertical, cylindrical, flat bottomed, above ground, welded, steel tanks for the storage of liquids at ambient temperatures and above, and the technical agreements that need to be reached (see Annex A). This document does not apply to tanks where the product is refrigerated to maintain it as a liquid at atmospheric pressure (see prEN 14620). This document is concerned with the structural integrity of the basic tank structure and does not provide requirements for considering process design, operational issues, safety and firefighting facilities, in-service inspection, maintenance or repair. These aspects are covered in detail in other Codes of Practice (see Annex B). 1.2 This document applies to closed-top tanks, with and without internal floating covers (see Annex C) and open-top tanks, with and without floating roofs (see Annexes D and E). It does not apply to 'lift-type' gas holders. 1.3 This document applies to storage tanks with the following characteristics: a) design pressure less than 500 mbar ) and design internal negative pressure not lower than 20 mbar (see 5.1 for pressure limitations); b) design metal temperature not lower than -40 C and not higher than +300 C (see 5.2.2); c) maximum design liquid level not higher than the top of the cylindrical shell. 1.4 The limits of application of this document terminate at the following locations. - face of the first flange in a bolted flange connection; - first threaded joint on the pipe or coupling outside of the tank shell, roof or bottom; - first circumferential joint in a pipe not having a flange connection. 1.5 This document is applicable to steel tanks with a maximum design strength 260 N/mm2. 1.6 In addition to the definitive requirements, this document also requires the items detailed in Annex A to be documented. For compliance with this document,

6. Environmental aspects

Other: To be advised after consultation with Convenor

7. How do you plan to address these environmental aspects?

Other: See also Business Plan (N852, 4.3)

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AENOR

Page 31: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 31

Section Details

AFNOR BSI DIN NBN NEN SIS

14. The decision was taken by

Weighted vote and simple majority. Percentage of positive weighted votes (min. 71%):86 10 positive vote(s), 1 negative vote(s) and 6 abstention(s).

16 CEN/TC 274

Decision CEN/TC 274 C165/2016 taken on 2016-09-15

Subject: CEN/TC 274 - Adoption of a New Work Item

CEN/TC 274 - Aircraft ground support equipment • having considered the proposal for a new work item as documented in CEN/TC 274 N 639

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN. EN 12312-15:2006+A1:2009

3. Document developed in drafting body

CEN/TC 274/WG 1 - Working Group Revision

4. Title Aircraft ground support equipment - Specific requirements - Part 15: Baggage and equipment tractors

5. Scope This European Standard specifies the technical requirements to minimise the hazards listed in Clause 4 which can arise during the commissioning,

Page 32: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 32

Section Details

the operation and the maintenance of baggage and equipment tractors when used as intended, including misuse reasonably foreseeable by the manufacturer, when carried out in accordance with the specifications given by the manufacturer or his authorised representative. It also takes into account some requirements recognised as essential by authorities, aircraft and ground support equipment (GSE) manufacturers as well as airlines and handling agencies. This European Standard applies to self-propelled baggage and equipment tractors with driver accommodation. This European Standard does not apply to pedestrian controlled equipment. This European Standard deals with vibrations which are considered as significant. It does not establish requirements for noise. Vibration measurements are dealt with in EN 1915-3. Noise measurements and reduction are dealt with in EN 1915-4. This part of EN 12312 is not applicable to baggage and equipment tractors manufactured before the date of publication of this standard by CEN. This part of EN 12312 when used in conjunction with EN 1915-1, EN 1915-2, EN 1915-3 and EN 1915-4 provides the requirements for baggage and equipment tractors.

6. Environmental aspects

Noise/Vibration

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

Yes M/396

12. Related directive(s)

Yes Directive reference For citation in Official Journal

2006/42/EC Yes

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR DIN DS SIS SIST

14. The decision was taken by

Simple majority Number of positive votes: 8 Number of negative votes: 0 Number of abstentions: 11

Page 33: Delegated Decisions CEN -  · PDF fileCEN System - Delegated Decisions ... procedure(s) (i.e. CEN Enquiry and/or Formal Vote, UAP, ... Document developed in drafting

DDD 40 2016 Page 33

17 CEN/TC 312

DECISION 1 taken by CEN/TC 312 by correspondence, on 2016-09-02

Subject: CEN/TC 312 – Participation of EHI

The CEN/TC 312 Thermal solar systems and components, • considering the CEN/CENELEC Internal Regulations - Part 2, subclause 4.3.2, which lays

down the conditions for external liaisons;

• considering that the conditions laid down in CEN-CENELEC Guide 25 “The concept of partnership with European organizations and other stakeholders” are fulfilled;

• agrees to the participation of the European Heating Industry in CEN/TC 312;

• requests the CEN-CENELEC Management Centre to inform EHI accordingly of this decision.

The decision was taken by 15 positive votes, 0 negative votes and 3 abstentions.