delivery report

12
DELIVERY REPORT AIESEC in Delhi IIT oGCDP

Upload: anay-vaish

Post on 08-May-2015

269 views

Category:

Technology


2 download

TRANSCRIPT

Page 1: Delivery report

DELIVERY REPORT AIESEC in Delhi IIT oGCDP

Page 2: Delivery report

Ideology

This time we as an LC are trying to lay special focus on delivery and enhancing EP experience, a policy of growth through increase in conversion rate has been adopted, after seeing a summer of an extremely weak conversion rate.

Page 3: Delivery report

Key Initiatives

Page 4: Delivery report

Innovative OS

Director

TL UR TL Adhoc TL IR +EP Engagement

Project Coordinator EP

Engagement

Member

Project Coordinator EP

Engagement

Member

Director

TL AdhocTL IR TL UR

Page 5: Delivery report

• A special team solely responsible for EP Engagement.

• Team of 6 people, headed by 2 Team Leaders and Senior Project Coordinators.

• Team mutually exclusive to raising/matching.

Page 6: Delivery report

Parralel Raising-Matching• The OS allows us to raise and match parallel with distinct

teams responsible for both. • This can satisfy EP’s and assure them a project very soon,

thereby them not making other plans. • Concept of projections being driven down.• 4 Matches • 6 more Interviews Done awaiting AN• 8 more Interviews Scheduled in the coming weak

Page 7: Delivery report

Integration through LC events• All interns made to come for the following LC

events to get engaged through AIESEC-

• Youth to Business Forum (6 interns)• Global Humanism Summit Pre-event (8 interns)• Global Humanism Summit Main Event (20 inters)

Page 8: Delivery report

Right Raising• Only 8 countries being promoted. While raising

instead of saying 110 countries only 8 countries being pitched.

• Proper serious interviews conducted.• Standard template for Interviews and selection

criteria • https://docs.google.com/a/aiesec.net/document/d/

1u_xj8lVURwwxuRD3jrr4xT_6q2swfc5XLnR92KwxP0U/edit

• https://docs.google.com/a/aiesec.net/spreadsheet/ccc?key=0AvkpFNZYWMoHdDRiUHlPTW9uazhFaGtqVGZSVXR3NWc#gid=0

Page 9: Delivery report

Right Expectation Setting

• While the interview everything is said in black and white.

• Only countries that can be matched being pitched.

• Being pitched as a cultural exchange and NOT an Internship

Page 10: Delivery report

Assigning Grievance Managers to EP’s• Every EP is been given a sheet of

contacts in various teams to streamline processes.

• They each have been assigned a grievence manager from the engagement who is solely responsible for any problem

Page 11: Delivery report

Initiatives to teach AIESEC to EP’s• Teaching basics of AIESEC such as

AIESEC Way are being taken forward as they are imperative according to XPP.

• Personal Meetings/calls of engagement team with raised EP’s and started teaching them AIESEC something similar to what is being done for new recruits.

Page 12: Delivery report

Mailers and Newsletters

•Sending EP’s engagement Newsletters and Mailers, including messages from IXP, potential projects etc.