Page 1: Department of Commerce Local Content Report (November 2013)

Legislative Council

1152 Tabled 12 December 2013

UNDER STANDING ORDER 223 TABLED PAPERS ARE NOT TO BE REMOVED

FROM THE PRECINCTS OF THE HOUSE

(Please return by close of business same day)

Local Content Repo

November 2013

Page 2: Department of Commerce Local Content Report (November 2013)

Contents

1. Introduction ............................................................................................................................ 3

2. The Resource Sector-Trends and Implications .................................•............................... 4

3. State Government Actions: Post Local Industry Participation Framework, ....•••.............. 6

4. Liaison with the Commonwealth Government ....................................................•..••••.•...... 9

S. Local Content Reporting ................................................•...................................................•..• 10

6. Conclusion ..............•••...............................................................•..•••••.....•................................. 12

7. Appendix 1-Summary of IFSP Reports ..........................................................••................... 13

8. Appendix 2 - Publicly announced, locally awarded, resource sector contracts , ............ 14

21Page

,

Page 3: Department of Commerce Local Content Report (November 2013)

1. Introduction

The Western Australian Government continues to pursue as a priority the provision of full, fair and

reasonab le opportunity for competitive local suppliers to participate in the state's mineral and energy

projects. To achieve this objective in an increasingly complex environment, in July 2011, the

Government introduced the Western Australian Local Industry Participation Framework. The

Framework conta ins a number of initiatives designed to enhance the capacity of the state's industries to

supply.

Framework outcomes are captured in the bi-annuallocal content reports.

This is the sixth report to be tabled by the Minister for Commerce to provide the Parliament and people

of Western Australia with a description of contemporary local industry participation trends and issues.

The previous five reports can be accessed at the Department of Commerce's website:

http://www.commerce.wa .gov.au/Sciencelnnovation/Content/About Us/Key focus areas/Local Indus

try Participation/State Government reports.html

The Western Australian economy continues to perform strongly and the outlook remains positive. The

areas of iron ore and natural gas remain particularly strong points of demand.

This ongoing buoyancy in the May 2013 to November 2013 period is demonstrated by the increase from

$43 billion to $57 billion in the value of publicly announced, locally awarded contracts, which has

occurred since July 2011 (the date of the introduction of the State Government's Local Industry

Participation Framework). It is estimated that this aggregated figure represents 202,920 employment

positions (direct and indirect) created or maintained.

High levels of local content are also a continuing feature of the reports submitted over the last six

months by projects operating through State Agreement Acts.

Section 5 of this document also outlines examples of other forms of benefit accruing to Western

Australia from these resource projects.

This local content report also details the impact of the assistance provided by the State Government to

local companies aspiring to extend supply to major projects. Sixty eight local companies have provided

reports on assistance outcomes through the Industry Facilitation and Support Program of $143 million

of contracts won. The value of assistance provided to these companies was $1.4 million thereby

representing a leverage ratio of $1: $94.

31 Page

Page 4: Department of Commerce Local Content Report (November 2013)

2. The Resource Sector - Trends and Implications

Previous reports have emphasised the direct relationship between global investment and trading

conditions and the performance of Western Australia's resource sector. Since the downward

movement in commodity prices, which began in September 2012, there has been a host of commentary

regarding the demise of the so called "resources boom".

The Western Australian Government has not subscribed to the "boom" concept and therefore considers

that as commodity prices stabilise and Asian economies maintain significant rates of growth the outlook

for the State remains positive.

Although a number of mineral and energy projects have recently moved from the construction to

operational phase there remains $141 billion of projects either committed or under consideration.

Projects moving from the construction phase include the North Rankin and Macedon Gas projects and

the Tropicana Gold Mine.

The prognosis of continued expansion is supported by the Bureau of Resource and Energy Economics

September 2013 Quarterly Report. The Bureau believes that capital expenditure is currently peaking

and that as it slows there will be a compensatory rise in production and exports.

The Bureau has identified LNG, iron ore and coal as the basic contributors to the sectors' ongoing

expansion. For example, of the 12 LNG projects under construction globally, half are in Australia. The

Bureau forecasts that gas production nationally will increase by 22 per cent per annum to 2017/18.

In terms of iron ore, the Pilbara region is identified as having particular capacity to take advantage of

expansions and demand due to attractive grades, competitive production costs and increasing

realisation of advanced technologies.

In this latter regard, in July 2013, the Premier opened BHP Billiton's Integrated Remote Operations

Centre. The Centre will enable real time management of its entire iron ore operations from pit to port

encompassing seven mines, 1600 kilometres of rail and two port loading facilities. The company regards

the Centre as fundamental to maintaining its international competiveness. At the same time progress

continues to be made on the implementation of the $5.2 billion Rapid Growth 5 expansion.

The Premier offiCially opened Cape Lambert B as part of Rio Tinto's 290 mt/a expansion celebrations in

October. The 290 Mt/a milestone was reached ahead of schedule and under budget. Studies to further

expand Pilbara capacity beyond 290 mt/a are still underway, a number of options for mine capacity

growth are under evaluation, including incremental tonnes from further low-cost productivity

improvements, expansion of existing mines and the potential development of new mines. Rio Tinto has

become the world's largest owner and operator of autonomous haulage system (AHS) trucks.At the

Yandicoogina mine Rio Tinto has 13 Komatsu AHS trucks in operation moving both ore and waste in the

Junction South East pit. During 2013 17 autonomous trucks were introduced at the Nammuldi

operation and a further three are being utilised to trial the latest version of the AHS system. Hope

Downs 4 is also gearing up to commence autonomous operations in 2014. These technologies are

revolutionising the way large-scale mining is done, creating attractive hi-tech jobs, and helping to

improve safety and environmental performance and reduce carbon emissions

41Page

Page 5: Department of Commerce Local Content Report (November 2013)

Further, in May 2013, Fortescue Metals Group opened its Firetail iron ore mine representing the first

stage of the Solomon project which will provide an output of 20 million tonnes per annum (mt/a). The

second stage of the project, entailing 40 mt/a, should be completed by the end of 2013. FMG also in

August 2013 opened its US$2.4 billion expansion offacilities in Port Hedland.

Roy Hill is letting a range of major contracts related to its $10 billion project which will see production of

55 mt/a of iron ore with first shipment scheduled for late 2015. A mine life of more than 20 years is

anticipated.

Atlas Iron has also been active with the opening of the Abydos Mine in June 2013 which is the

company's fourth in the Pilbara.

When the above activity is combined with the ongoing construction of the Gorgon and Wheatstone

projects and the commencement of the Prelude project, the basis for forecasts for ongoing expansion

by the Western Australian economy is apparent.

Western Australia is also estimated to have the fifth largest resource of shale gas in the world. While

significant build-up and investment in equipment and infrastructure will be required, there is potential

for a new energy source for the State. For instance, a State Agreement Act has been ratified between

the State and Buru Energy Limited, Diamond Resources (Fitzroy) Pty Ltd, Diamond Resources (Canning)

Pty Ltd and Mitsubishi Corporation relating to the evaluation, development and exploitation of natural

gas resources in the Canning Basin region of the State, and for incidental and other purposes. Amongst

other obligations, the Act includes a future requirement for the project proponents to produce a Local

Industry Participation Plan that will articulate avenues for prospective local supply.

The State's economy grew by 4.9 per cent in 2012/13 with economic commentators including the

Chamber of Commerce and Industry of Western Australia predicting further growth of 5 per cent for

2013/14. This contrasts markedly with national trends. For example, Westpac anticipates Australian

economic growth of 2.5 per cent in 2013 falling to 2.3 per cent in 2014.

However, as has been noted in previous reports, Western Australia's integration into the global

economy also presents stringent challenges. The companies investing and operating in the resource

sector utilise international best practices and benchmarks in undertaking research, selecting

technologies and engaging with suppliers.

The advent of modular construction, entailing utilisation of global centres of excellence for engineering

and design and Asian manufacturing for the supply and fabrication of steel, is a pervasive example of

this aspect of the relationship. The Bureau of Resource and Energy Economics has pointed to floating

LNG and remote and automated mine management as further illustrations of this theme.

The role of Western Australian industry in the development and application of these advanced

technologies will be a crucial determinant of the type and level of future stimulus derived from our

resource developments. It can also be argued that the traditional relationship between government

and developer in terms of the benefits generated in return for access to a non-renewable asset has

been disrupted and a readjustment of this relationship is thereby required.

The work undertaken by the Industry Participation Branch of the Department of Commerce in the

period covered by this report has continued to highlight the need for close and effective communication

51Page

Page 6: Department of Commerce Local Content Report (November 2013)

between project proponents and their Tier 1 contractors and local suppliers if optimal contract

outcomes are to be achieved. There is a significant diversity in approach to procurement by project

proponents. Variations can include the degree to which purchasing is retained in-house or contracted

out, the extent of local purchasing autonomy, the location of decision makers for different aspects of

the construction and operation of complex projects and to the extent to which qualitative factors such

as safety and quality management are emphasised.

There is considerable evidence that small to medium enterprises often experience difficulties in how to

approach proponents and in understanding the functioning of the developers' business and

procurement models.

It is in this context that the Department will continue to encourage proponents to give greater emphasis

to educating and explaining their approach to sourcing through workshop seminars and electronic

media. Equally, suppliers should give an appropriate weighting to market research in this competitive

and multi-dimensional field.

3. State Government Actions: Post Local Industry Participation

Framework

Through the Minister for Commerce, the State Government continues to progress the implementation

of the Framework initiatives.

Since May 2013, this has entailed:

• The first round of the Industry Facilitation and Support Program (IFSP) closed at the end of June

2012. A second round of the IFSP, funded by Royalties for Regions, closed in September 2013.

Some 148 applications for assistance were approved in both rounds, representing a State

funding commitment of $2.926 million

It is a requirement of the IFSP that beneficiaries of assistance report outcomes from their

projects, six months after completion. To date, 68 reports have been received, representing

assistance of $1.4 million.

These reports indicate that the company projects, assisted by IFSP, have resulted in resource

contract awards of over $143 million (leverage $1:$94). Other benefits reported include

employment gains and increased engagement of apprentices, productivity growth, market

diversification and improvements to quality and safety standards.

It is estimated that IFSP assistance has also generated significant investment by these

companies. The relationship of government funding to private sector expenditure is 28 per cent

to 72 per cent.

Appendix 1 provides a summary of IFSP reports received so far.

Reports from IFSP round 2 have begun to be received. To date, two reports have been received

demonstrating that for grant assistance of $25,825 contracts valued at $870,000 had been

acquired.

61Page

Page 7: Department of Commerce Local Content Report (November 2013)

Recipients of assistance that have reported positive outcomes operate in industry areas

including steel fabrication, engineering, construction, electrical, information technology,

logistics and marine services.

Companies accessing the IFSP reported positively to the Department of Commerce on the ease

of the application and the reporting processes.

• Currently, a third round of IFSP is open. This round is focused on assisting businesses based in

Onslow to enhance their capability to supply to the Chevron Joint Venturers $29 billion

Wheatstone project. A budget of $200,000 has been determined with equal contributions from

the State Government and Chevron. Since opening in September 2013, five applications have

been approved for projects including equipment acqUisition, site works and infrastructure

upgrades.

The demonstrated ability of IFSP to lift the competitive capacity of local suppliers has attracted

a Significant level of interest from resource project proponents. The Department of Commerce

is currently negotiating with a number of major proponents on joint funding exercises. These

proponents acknowledge that the IFSP outcomes very often have mutual benefits for the

supplier and the market.

• Ongoing monitoring of publicly announced, locally awarded, resource sector contracts show

approximately $57 billion has been allocated since July 2011 (Appendix 2 provides a listing of

these contracts).

Based on input-output tables, developed by the Australian National University, it is estimated

that this flow of contracts has resulted in the maintenance or creation of approximately 202,920

positions in the Western Australian economy.

The makeup of contracts, referred to in previous Parliamentary reports, of a diverse range of

activities encompassing both manufacturing and service industries has been maintained.

• Supported by Royalties for Regions, the Department of Commerce completed its schedule of

regional workshops in June 2013. These eight workshops, held in regional centres across the

State, were attended by over 450 businesses. Speakers provided information on relevant

government policies and assistance in supporting local involvement in the resource and

government purchasing markets.

A particular feature was the ability to involve various relevant Commonwealth agencies,

consequently raising their profile and increasing regional awareness of industry assistance

programs.

Initial exit surveys indicated high levels of satisfaction with the workshops' content. The

Department of Commerce is now following up with attendees to determine if further benefits

were realised such as accessing of assistance, or increased contract award.

71Page

Page 8: Department of Commerce Local Content Report (November 2013)

• In October 2013, Rio Tinto participated in a seminar held at Henderson organised by the

Department of Commerce, outlining its future supply requirements and the opportunities

presented for local industry.

Over 100 interested companies attended the event. It is the intention to maintain a program of

"how to do business" seminars with a range of major proponents.

• The Department of Commerce has made a written submission to the Economics and Industry

Standing Committee Inquiry into floating LNG. The submission gives a particular focus to the

perceived implications of FLNG for fabrication and manufacturing, engineering and design and

construction companies.

A further dimension to this issue is Shell's decision to establish a formal dialogue mechanism to

identify and pursue opportunities for local suppliers during the operational phase ofthe Prelude

project. Membership will include the Department of Commerce.

• The feasibility and planning of the proposed Pilbara Fabrication & Services Common Use Facility

Project at Lumsden Point, Port Hedland has reached an advanced stage. A business case for

government's consideration is anticipated by the end of 2013.

• The Department of Commerce has worked closely with Woodside and other consortium

members on progressing the concept of Western Australia becoming the focus of an industry

and innovation offshore energy precinct.

• In October 2013, the State Government determined that after some 28 years of support it

would cease funding the vendor identification service, provided by the Industry Capability

Network of Western Australia (ICNWA). Since inception, this service has received over $20

million from successive governments. In recent years, the ICNWA has entered into funding

arrangements with project proponents including Woodside, Chevron, Shell and Roy Hill. The

State Government considers that this fee for service model can be maintained.

• The Department of Commerce has entered into discussions with the Chamber of Minerals and

Energy to consider development of a code of practice covering members' approach to the

principle of full, fair and reasonable opportunity and the use of Industry Participation Plans.

81Page

Page 9: Department of Commerce Local Content Report (November 2013)

4. Liaison with the Commonwealth Government

The election of a new Commonwealth Government, in September 2013, opens up existing

policies, programs and Commonwealth State relations for possible reconsideration and revision.

At this point in time, the new Commonwealth government is undertaking its audit of activities

and programs in the context of budget priorities. As such, a variety of initiatives are on hold.

These include the Industry Innovation Precinct Program. It had been announced in August 2013

that a consortium led by Woodside have been successful in securing Commonwealth funding of

$20 million over five years to establish and operate an oil and gas technology precinct,

headquartered in Perth.

Amongst the features of the Woodside proposal was the capacity for enhanced communication

on exploration, development and production with various segments of the Australian supply

chain.

There are more than thirty consortium members including Chevron, Shell, GE, Thiess, Apache

and the University of Western Australia and Curtin University.

Another comparatively relevant introduction is Resources Connect, an offshoot of Enterprise

Connect. Resources Connect is designed to provide small to medium size enterprises with a

detailed grounding on the different aspects of supply to major proponents. Sessions are

designed in specific modules covering topics including managing cash flow, prequalification,

understanding contractual terms and conditions and how to identify appropriate contacts

within a proponent's organisation.

The recently reformed Skills Connect program has also been of interest to WA's suppliers. Skills

Connect offered part funding on a company specific basis to design and implement tailored

training programs for up skilling.

Finally, as referred to in the May 2013 report, there is the broader question of the future of the

proposed Australian Industry Participation Authority.

91Page

Page 10: Department of Commerce Local Content Report (November 2013)

5. Local Content Reporting

Local content reports are submitted by companies that operate under State Agreement Acts. These reports are submitted quarterly during the construction/expansion phase and annually throughout operation to demonstrate the outcomes of sourcing decisions. These aggregated figures and corresponding percentages are presented in the table below.

In addition to reports received under State Agreement Acts, Chevron has voluntarily reported for the Wheatstone Project provided through the Wheatstone Local Content Steering Committee, chaired by the Department of Commerce. These figures have been aggregated into the below table.

The table shows an amalgamated 76 per cent operational local content during this period. This percentage remains relatively unchanged from the previous reporting periods, representing a consistently high level of local content. Of interest is the high value of awarded contracts, compared with previous periods, totalling $18.65 billion; with a $14.11 billion as the estimated value of work carried out in WA.

Levels of local content for the expansion and construction phase have remained constant at 74 per cent

(May 2013 and November 2012 were reported at 77 per cent and 65 per cent).

LOCAL CONTENT REPORTS .CUMULATIVE RESULTS/OUTCOMES

1101/2013 to

Notes:

* Overseas component is fuel

*. Roy Hill figures are a consolidated summary of spending

An important element of the Local Industry Participation Framework has been to expand the definition

of local content to gain a comprehensive picture of benefits delivered to Western Australia aside from

the award of local contracts.

Companies that operate under State Agreement Acts were recently invited to include information on

broader contributions to Western Australia.

The activities reported to date include, research and development; grant funding for local community

groups and organisations; environmental rehabilitation programs; and directly led community programs

and initiatives.

10 I P age

Page 11: Department of Commerce Local Content Report (November 2013)

A specific example of the generation of these types of benefits is the Gorgon project. As part of this

development the Chevron Joint Venturers have committed approximately $190 million in

environmental offsets and Net Conservation Benefits, including $62.5 million to establish the North

West Shelf Flatback Sea Turtle Conservation Program.

Program and initiatives supported under the Gorgon Social Impact Management Plan include:

Karratha and Districts Chamber of Commerce and Industry (KDCCI) Business Excellence Awards;

Pilbara Pulse Economic Summit incorporating the Karratha Business Expo and Career Central;

Karratha NGO Incubator

Pilbara Small Business Development Series and Pilbara Women's Network

Pilbara Aboriginal Contractors Association

Gorgon Entry Skills Training Program -linked with employment outcomes at Henderson (AMe)

Gorgon Trades Assistant Training Program

Aboriginal Quarantine Inspector Training Program

Support has been provided to develop local business, including:

Micro-financing through Many Rivers

Small business development and facilitation through the Small Business Centre West Pilbara

Aboriginal business support and mentoring through RSM Bird Cameron

In October 2013, BHP Billiton reported a further $10 million contribution to the Australian Indigenous

Education Foundation to fund an additional 90 secondary and tertiary scholarships for Indigenous

students. The program is funded through the BHP Billiton Community Development Program which

invested $58 million in the 2012/13 financial year.

Also of interest is the September 2013 report commissioned by the Minerals Council of Australia,

entitled "The Value of Community Contributions in the Australian Minerals Industry". The study outlined

the various forms of industry spending within the community. The Department will continue to work

with project proponents to gain a clearer understanding of other benefits that flow through to WA

communities. This information will improve the State Government's capacity to support local industry

and to further recognise contributions to the local community.

lllPage

Page 12: Department of Commerce Local Content Report (November 2013)

6. Conclusion

The scenario presented by this report is one of ongoing growth and stimulation.

However, realisation of opportunities by Western Australian based businesses will remain on the basis

of competitive performance against international benchmarks. This cha llenge is compounded by the

rapid and expanding use of new technologies containing far reaching consequences.

The future will also be influenced by the yet to be established relationship between the State and the

new Commonwealth Government.

As such, this is a period of important long term decision making.

The State Government welcomes feedback from any interested parties on the contents of this report.

Comment can be provided to:

The Department of Commerce

Industry and Innovation Division

Locked Bag 14

Cloisters Square WA 6850

Phone: 1300 136 237

Fax: +61 8 9263 8100

Email: [email protected]

12 I P ag e

Page 13: Department of Commerce Local Content Report (November 2013)

Appendix 1- Summary of IFSP reports, received to date

Outcomes Reported Totals

New staff 223

New apprentices 16

Number of major contracts won 165

Total value of major contracts reported $143,647,905

Increase in productivity/cost reductions 52

FTE up skilled (training) 24

Enter new/larger market 32

Increased turnover 42

Diversification 16

Reported rise in health & safety levels 20

Total number of companies that have reported 67

Grant value $1,495,917

Leverage to $1 $96.03

131Page

Page 14: Department of Commerce Local Content Report (November 2013)

Appendix 2 - Publicly announced, locally awarded, resource sector contracts

Appendix 2 - Publicly announced, locally awarded, resource sector contract Company Location Project Proponent Project Contract Details Contract Award Information Cumulative Total

Location Value Date Source ASS CSD Rio Tinto Pilbara To construct 17 14/03/2012 Business News

power distribution 100,000,000 -substations.

ASS CSD Rio Tinto Cape Lambert Upgrade existing 26/06/2013 Mining News power substation. 27,000,000 127,000,000

Abesque Nedlands Shark Say Shark Say Design and 17108/2011 Australian Stock Engineering Resources Pty Ltd construction. 30,000,000 Exchange 157,000,000

Abigroup Selmont Rio Tinto Pilbara Rail fonmation 12/07/2011 Company Website framework 500,000,000 657,000,000 agreement.

Abigroup Selmont Rio Tinto Pilbara Rail fonmation 13/09/2011 Company Website earthworks. - 657,000,000

Abigroup Selmont Fortescue Metals Pilbara Rail embankment 13/09/2011 Company Website Group duplication. 42,500,000 699,500,000

Abigroup Selmont Rio Tinto Pilbara To build a railway 9/11/2012 Company Website and conduct - 699,500,000 associated civil works.

AGC Industries Kwinana & SHP Silliton Jimblebar Iron Structural, 23/07/2012 Mining News Henderson Ore mechanical and 48,000,000 747,500,000

piping works for the infiow circuit of the Dlant.

AGC Industries Kwinana & Chevron Gorgon Project Fabrication of post 31/10/2012 Company Website Henderson metrology subsea - 747,500,000

spools.

AGC Industries Kwinana & Chevron Gorgon Fabrication of shear Dec 2011 Gorgon Website Henderson keys. 8,000,000 755,500,000

Page 15: Department of Commerce Local Content Report (November 2013)

AGC Industries Kwinana & Woodside Greater Western Fabrication of post 01/01/2013 Media Monitors Henderson Flank metrology subsea - 755,500,000

spools.

AGC Industries Kwinana & Chevron Wheatstone Fabrication contract. 22/03/2013 Media Monitors Henderson - 755,500,000

AMEC CBD Roy Hill Pilbara Detailed design and 20/11/2013 Mining News engineering services. 20,000,000 775,500,000

AT-PAC CBD Chevron Wheatstone Supply and 26/11/2013 Company Website Australia management of 67,000,000 842,500,000

scaffolding.

AusGroup Kwinana & Karara Mining Karara Iron Ore Structural, 11/08/2011 Company Website Henderson Limited mechanical and - 842,500,000

pipinQ. AusGroup Kwinana & Rio Tinto Pilbara Structural, 14/09/2011 Company Website

Henderson mechanical and 30,000,000 872,500,000 piping.

AusGroup Kwinana & Rio Tinto Brockman 4 Construction of pilot 24/10/2011 Company Website Henderson plant. 22,000,000 894,500,000

AusGroup Kwinana & Karara Mining Karara Iron Ore Structural, 16/03/2012 Mining News Henderson Limited mechanical and 160,000,000 1,054,500,000

piping installation works.

AusGroup Kwinana & Southern Seawater Binningup Structural, 04105/2012 The West Henderson Alliance mechanical and 30,000,000 Australian 1,084,500,000

piping installation of the main facility and fabrication of the secondary steelwork.

151Page

Page 16: Department of Commerce Local Content Report (November 2013)

AusGroup Kwinana & Chevron Gorgon Project Fabrication of 23/01/2013 Company Website Henderson stainless and carbon 80,000,000 1,164,500,000

steel pipework, non-destructive testing, post weld heat treatment, blasting and specification painting.

AusGroup Kwinana & Chevron Gorgon Project Scaffolding contract. 14106/2013 Company Website Henderson 34,500,000 1,199,000,000

AusGroup Kwinana & Alcoa Various Maintenance and 05/07/2013 Business News Henderson service works. 36,000,000 1,235,000,000

Agility Logistics Kewdale Chevron Gorgon Project To provide logistics, 16/07/2012 ProjectConnect Australasia stevedoring, and 232,000,000 1,467,000,000

related services.

Alinta Energy CBD Roy Hill Roy Hill Iron Ore To build a 120km - 30108/2013 Yahoo News high-voltage 1,467,000,000 transmission line from its power station in Newman.

Alimine/Arcconl Nedlands MCC Mining Sino Iron General 13/1012011 Company Website Construction construction. 53,000,000 1,520,000,000 Industries Australia Alimine/Arcconl Nedlands MCC Mining Sino Iron Service contract. 02/11/2011 Company Website Construction 50,000,000 1,570,000,000 Industries Australia Alimine/Arcconl Nedlands Downer EDI Undisclosed Undisclosed. 09/04/2012 Business News Construction 10,000,000 1,580,000,000 Industries Australia Allseas CBD Apache Energy Julimar Transportation and 05/10/2012 Business News Construction Development pipeline equipment. 500,000,000 2,080,000,000 Contractors Project

16 I P age

Page 17: Department of Commerce Local Content Report (November 2013)

Alltype Naval Base Chevron Gorgon Project Supply and 18104/2013 Company Website Engineering fabrication of - 2,080,000,000

temporary bracing and sea fasteninQ.

Ansaldo STS Canning Vale Rio Tinto Roy Hill Iron Ore To provide the 02105/2012 Mining News Australia signalling and 15,100,000 2,095,100,000

telecommunications system for heavy rail traffic with satellite positioning.

Ansaldo STS Canning Vale Rio Tinto Pilbara To develop and 17/07/2012 Mining News Australia deliver a heavy-haul 317,000,000 2,412,100,000

railway automation system.

Ansaldo STS Canning Vale Rio Tinto Pilbara Upgrades for 10/12/2012 Projectory Australia capacity and 44,000,000 2,456,100,000

efficiency enhancements to Rio Tinto's long-distance heavy-haul rail network.

ATCO CBD Chevron Wheatstone Miscellaneous 28/05/2013 Business News works. 400,000,000 2,856,100,000

ATCO CBD Chevron Wheatstone To supply 257 28/0512013 Business News modular units. 100,000,000 2,956,100,000

Ausco O'Connor BHP Billiton Iron Packsaddle Room villages. 28/09/2011 Company Website Ore 24,000,000 2,980,100,000

Ausco O'Connor Roy Hill Roy Hill Iron Ore Accommodation unit 10104/2012 ICNWA supply and hire; rail 50,000,000 3,030,100,000 camp - kitchen and dining room supply including port kitchen camp; ancillary buildings rail.

Ausco O'Connor Hancock Roy Hill Iron Ore Man camps. 07/10/2011 ProjectConnect Prospecting 35,000,000 3,065,100,000

17 I P age

Page 18: Department of Commerce Local Content Report (November 2013)

Ausdrill Canning Vale Fortescue Metals Solomon Production drilling. 26/07/2011 Mining News Group 75,000,000 3,140,100,000

BAE Systems Henderson Chevron Wheatstone To provide offshore 20107/2012 Company Website Project satellite 10,000,000 3,150,100,000

communications.

BGC Hazelmere Hancock Roy Hill Iron Ore Build an aerodrome 2010412012 The West Contracting Prospecting and two key roads. 120,000,000 Australian 3,270,100,000

BGC CBO Atlas Iron Wodgina Iron Contract extension. 23/08/2012 Business News Contracting Ore Mine 350,000,000 3,620,100,000

BGC CBO Atlas Iron MtWebber To perform 10109/2013 The West Contracting development work, 300,000,000 Australian 3,920,100,000

mining, crushing and screening.

BGC CBO Roy Hill Roy Hill Iron Ore Civil earthworks, 25/09/2013 Mining News Contracting concrete works and 420,000,000 4,340,100,000

general infrastructure.

BIS Industries Osborne Park Karara Mining Karara Iron Ore A 15 year contract to 10101/2012 Business News Limited manage tailings. 23,000,000 4,363,100,000

Brierty Ltd South Perth Fortescue Metals Solomon Construction of rail 04/11/2011 ASX Group formation. 60,000,000 4,423,100,000

Brierty Ltd South Perth Fortescue Metals Cloudbreak Construction of fuel 15/11/2011 Company Website Group loading and 10,000,000 4,433,100,000

provisioning facility.

Brierly Ltd South Perth Karara Mining Solomon Mining services 01/02/2012 Company Website Limited including drill and 185,000,000 4,618,100,000

blast, load and haul, crushing and screening, road haulage and train loading.

Brierty Ltd South Perth FMG Cloudbreak To construct rail 19/06/2012 Business News formation for six 39,000,000 4,657,100,000 sidings.

18 I P age

Page 19: Department of Commerce Local Content Report (November 2013)

Brierty Ltd South Perth Fremantle Ports Rous Head To develop a public 07/01/2013 Business News extension project dual lane access 13,000,000 4,670,100,000

road.

Briety Ltd South Perth Atlas Iron Abydos Construction of 11/03/2013 Mining News access roads, bulk 15,000,000 4,685,100,000 earthworks, drainage and pavement lavers.

Briety Ltd South Perth Rio Tinto Cape Lambert To include 10/05/2012 Business News earthworks, services, 55,000,000 4,740,100,000 road works and landscaping and to develop 221 housing lots.

Brookefield CBO Hancock Roy Hill Iron Ore To build and 27/0612012 Business News Multiplex Prospecting accommodation 190,000,000 4,930,100,000

villages.

Brookefield CBO Hancock Roy Hill Iron Ore Design and 23/04/2013 Business News Multiplex Prospecting construction of non- 70,000,000 5,000,100,000

processing infrastructure.

Calibre CBO Rio Tinto Yandicoogina To provide EPM. 21/08/2012 Business News Project 150,000,000 5,150,100,000

Calibre CBO BHP Mooka EPCM contract. 19/07/2013 Mining News 30,000,000 5,180,100,000

Calibre CBO Rio Tinto Koodaideri Engineering study. 19/07/2013 Mining News 30,000,000 5,210,100,000

Calibre CBO Sam sung Roy Hill Iron Ore Detailed design for 28/08/2013 Company Website heavy haul main-line 23,000,000 5,233,100,000 railway.

Cape Crushing South Guilford BHP Billiton Nickel West Ore handling, 29/07/2011 Company Website and crushing and 40,000,000 5,273,100,000 Earthmoving sampling. Contractors

19 I P age

Page 20: Department of Commerce Local Content Report (November 2013)

Cape Australia Malaga Chevron Wheatstone Scaffold erection and 13/11/2013 Company Website Onshore dismantling services. 80,000,000 5,353,100,000

Cape Australia Malaga Chevron Wheatstone Painting, Insulation 29/11/2013 Company Website Onshore and Fireproofing 275,000,000 5,628,100,000

services.

Cardno BEC South Perth Rio Tinto Various Supply design 13/02/2012 Mining News services for an 22,000,000 5,650,100,000 electrical infrastructure upgrade.

Cays Greenfields FMG T155 Port Project 2012 Company Website Engineering Expansion Management, 6,100,000 5,656,200,000

supply, fabrication, surface treatment and assembly of 500 tonne of structural steel, chutes, conveyor frames, hand railing, grating and stairs.

Centurion Hazelmere Woodside Various A five-year contract 10107/2013 The West extension to supply - Australian 5,656,200,000 logistics in Perth, Dampier, Broome and Darwin.

Centurion Hazelmere Rio Tinto Various To deliver transport 10107/2013 Company Website and logistics 500,000,000 6,156,200,000 services.

20lPage

Page 21: Department of Commerce Local Content Report (November 2013)

Central Systems Osborne Park Chevron Gorgon To undertake 08/0512012 Business News earthworks, site 7,000,000 6,163,200,000 preparation and pre-cast concrete construction for KT's carbon dioxide injection pipeline package.

Central Systems Osborne Park FMG Solornon Hub - Provide 01/12/2011 Company Website Iron Ore management, labour 25,000,000 6,188,200,000

and plant to construct the civil and concrete scope.

Central Systems Osborne Park Roy Hill Pilbara Construction of rail 04/10/2013 Business News bridges. 100,000,000 6,288,200,000

CEPT Joint TheCEPT Fortescue Metals Cloudbreak EPC 01/11/2011 AMEC Website Venture Group 247,000,000 6,535,200,000

Cimeco Spearwood Rio Tinto Various Design and 17/09/2012 Business News construction offuel 70,000,000 6,605,200,000 infrastructure.

Civmec Henderson Chevron Wheatstone To supply 14107/2011 The West Construction & approximately - Australian 6,605,200,000 Engineering 10,000 tonnes of

structural steel.

211 P age

Page 22: Department of Commerce Local Content Report (November 2013)

Civmec Henderson Cameron To construct subsea 02/02/2012 Media Release Construction & Australasia manifolds. 4,000,000 6,609,200,000 Engineering

Civmec Henderson Chevron Wheatstone Supply and 22101/2013 Company Article Construction & manufacture of 50,000,000 6,659,200,000 Engineering precast concrete.

Civmec Henderson Chevron Gorgon Assembly of 41 22/01/2013 Company Article Construction & modules. 6,659,200,000 Engineering

Cleveland Maddington Chevron Wheatstone Compaction Phase 08/10/2011 ProjectConnect Compressed Air Air Compressor - 6,659,200,000 Services Package.

Clough CSD Chevron Wheatstone Provide labour, 02/02/2012 Business News materials and a 350,000,000 7,009,200,000 support vessel for the offshore hook-up and commissioning component of the Wheatstone project.

Clough CSD Chevron Wheatstone Design and 09/02/2012 Business News construction of the 400,000,000 7,409,200,000 product loading facility and tug berths.

Clough CSD Chevron North West Contract extension to 14/11/2012 Business News Coast undertake 20,000,000 7,429,200,000

conceptual studies, FEED, procurement support, planning and development of construction work packs.

221Page

Page 23: Department of Commerce Local Content Report (November 2013)

CloughAMEC CBD Chevron Wheatstone Building the 11/04/2012 Business News maintenance 30,000,000 7,459,200,000 database, assuring operational readiness, training and development programs, operations engineering and support services.

Clough Forge CBD & Nedlands Hancock Roy Hill Iron Ore Build port materials 24/08/2011 Company Website Prospecting handling facility. - 7,459,200,000

Construction Nedlands Citic Pacific Sino Iron Undisclosed. 19/01/2012 Mining News Industries 23,000,000 7,482,200,000 Australia Coretrack Ltd Bibra Lake Newcrest Mining Newcrest Rig Services. 15/09/2011 Trader Dealer

2,000,000 7,484,200,000

CPC Kalgoorlie MacPhersons Nimbus Project Engineering and 15/11/2012 Business News Engineering Resources design. - 7,484,200,000

CTEC Balcatta Hamersley Iron West Angelas Includes the design, 29/1112011 Business News power station supply and - 7,484,200,000

manufacture of two low emission open cycle gas turbine units with the capability of running on natural gas and diesel fuel.

CTEC Balcatta Rio Tinto Cape Lambert To build a gas 03/09/2012 Business News turbine power 280,000,000 7,764,200,000 station.

DBP CBD Chevron Wheatstone Own and operate the 09/09/2013 Projectory Development Project domestic gas 94,900,000 7,859,100,000 Group pipeline.

Decmil Group Osborne Park Rio nnto Marandoo Mine The construct heavy 03/07/2012 The West Phase 2 Project mobile equipment 30,000,000 Australian 7,889,100,000

infrastructure and associated facilities.

231Page

Page 24: Department of Commerce Local Content Report (November 2013)

Decmil Group Osborne Park Chevron Wheatstone Fly camp. 11/10/2011 WA Business 70,000,000 News 7,959,100,000

Decmil Group Osborne Park FMG Christmas Creek Design, approvals, 13/12/2011 Mining News procurement, 30,000,000 7,989,100,000 construction and commissioning of an airport.

Decmil Group Osborne Park Rio Tinto Pilbara A five-year 09/02/2012 Mining News framework - 7,989,100,000 agreement to provide civil works including workers and E,gu~ment.

Decmil Group Osborne Park FMG Pilbara Will build a 200- 16/02/2012 Mining News person rail camp. 28,000,000 8,017,100,000

Decmil Group Osborne Park FMG Various To deliver a rail car 14/05/2012 Company Website workshop, amenities 137,000,000 8,154,100,000 building and administration centre. Variations to existing contracts include additional accommodation and rooms.

Decmil Group Osborne Park BHP Billiton Port Hedland Design an 12/0612012 The West accommodation 94,000,000 8,248,100,000 village.

Decmil Group Osborne Park Rio Tinto Western Turner Includes the 12/12/2012 Mining News Syncline construction of a 30,000,000 8,278,100,000

heavy vehicle workshop and associated facilities, a security gatehouse, a first aid building, a communications hut and a radio based station facility.

241Page

Page 25: Department of Commerce Local Content Report (November 2013)

Decmil Group Osborne Park Roy Hill Pilbara Construction of port 11/04/2013 Business News and rail facilities. 71,000,000 8,349,100,000

Decmil Group Osborne Park Woodside Browse Temporary workers 10104/2013 Jobs In Mining camp. 120,000,000 8,469,100,000

Decmil Group Osborne Park Roy Hil Pilbara Design and 29/11/2013 The West construction of diesel 37,500,000 Australian 8,506,600,000 fuel infrastructure.

Dimension Data CBD Chevron Wheatstone Detailed Design and 25/02/2013 Projectory Design Assurance of - 8,506,600,000 the Permanent Network and Telephony Systems.

Diploma Group Belmont Rio Tinto Paraburdoo Includes earthworks 19/0712012 Business News and demolition to 44,000,000 8,550,600,000 prepare the site, as well as design and construction of a 244-person camp.

Diploma Group Belmont Rio Tinto Wickham To design and 05/10/2012 Business News construct a fiy-in fiy- 49,000,000 8,599,600,000 out base.

Downer Clough CBD CSBP Ammonium I nvolves the 15/1212011 Business News Joint Venture Nitrate Facility construction of an 200,000,000 8,799,600,000

additional nitric acid plant and ammonium nitrate plant, together with an upgrade of the existing infrastructure.

Downer EDI CBD Undisclosed Pilbara Electrical and 04/10/2011 Company Website Mining instrumentation. 142,000,000 8,941,600,000

Downer EDI CBD Karara Mining Karara Iron Ore A six year contract 06/02/2012 Mining News Mining Limited for drill and blast and 570,000,000 9,511,600,000

load and haul services.

251Page

Page 26: Department of Commerce Local Content Report (November 2013)

Downer EDI CBD Gindalbie Metals Karara Iron Ore The contract 20102/2012 The West Mining includes electrical 64,000,000 Australian 9,575,600,000

and instrumentation works.

Downer EDI CBD BHP Billiton Iron Pilbara Supply of 02/03/2012 Mining News Mining Ore locomotives. 400,000,000 9,975,600,000

Downer EDI CBD Rio Tinto Cape Lambert 5 year framework 15/03/2012 Mining News Mining agreement that - 9,975,600,000

provides Downer with preferred contractor status for electrical and instrumentation work.

Downer EDI CBD BHP Billiton Jimblebar I ron Installation of power 19106/2012 Business News Mining Ore Mine lines and 71,700,000 10,047,300,000

substations. Downer EDI CBD FMG Pilbara Build locomotives 22/06/2012 Business News Mining and provide service 73,000,000 10,120,300,000

and support for the trains for a minimum of 5 years.

26 I P age

Page 27: Department of Commerce Local Content Report (November 2013)

Downer EDI CBD Chevron Wheatstone I nstallation of cable 01/11/2013 Media Release Mining support systems, 400,000,000

electrical, control and 10,520,300,000 instrumentation cabling, calibration of instruments, major electrical eqUipment, general lighting and power, pre-commissioning works and commissioning and start up assistance.

Downer EDI CBD Roy Hill Pilbara Drill and blast, pre- 18/11/2013 Mining News Mining strip, load and haul 500,000,000 11,020,300,000

of overburden as well as mining.

Eastern Guruma Various FMG Solomon Mine Mining services. 21/02/2013 Business News & Wirlu-murra 200,000,000 11,220,300,000 Yinjibarndi Aboriginal Corporation JV

27 I P age

Page 28: Department of Commerce Local Content Report (November 2013)

Ecologia CBO FMG Pilbara Fauna and mulga - - Company Environmental monitoring programs 11,220,300,000 Consultants at the company's rail

and mine operations in the Pilbara region of Western Australia. The first three programs comprise fauna monitoring at the Solomon Mine, Fortescue Hamersley Rail Line and the mainline. The final program is for mulga monitoring at the Fortescue Hamersley Rail Line, which will include ant trap installation, monitoring and ant trap collection.

Emerson Osborne Park Chevron Gorgon To supply control 13103/2012 Financial Review valves and valve 63,300,000 11,283,600,000 actuators to regulate gas flow.

Empired CBO St Barbara Leonora and To deliver a range of 09/05/2012 Perth Now Southem Cross selVices, including 4,500,000 11,288,100,000

service desk, desktop, server and network managed infrastructure services to all of St Barbara's core business systems and remote operations.

Engenium CBO Norton Gold Fields Enterprise EPCM contract 23/01/2013 Company Website Project - 11,288,100,000

281Page

Page 29: Department of Commerce Local Content Report (November 2013)

Ertech Holdings Wangara Chevron Gorgon General services. 08/11/2011 Company Website 50,000,000 11,338,100,000

Ertech Holdings Wangara Chevron Wheatstone Road and 28/05/2013 Business News earthworks contract 7,600,000 11,345,700,000 including car parks, signage and line markinQ.

Fleetwood East Perth State Government South Hedland A construction 18/07/2012 Business News Corporation contract for a 293- - 11,345,700,000

unit service workers villaoe.

Fleetwood East Perth Rio Tinto Searipple Village Provide housing for 06/12/2012 Mining News Corporation Rio's operational 14,000,000 11,359,700,000

workforce of up to 660 people.

FMC Henderson Chevron Wheatstone Design, manufacture 23/01/2012 Oil & Gas Australia Technologies and supply of subsea 325,000,000 11,684,700,000

production systems.

FMC Henderson Woodside Greater Western Design, manufacture 01102/2012 Media Monitors Technologies Flank and supply of subsea 150,000,000 11,834,700,000

production systems.

Forge Group Nedlands & Fortescue Metals Solomon Primary Crushing 30108/2011 Company Website Spearwood Group Hubs. 200,000,000 12,034,700,000

Forge Group Nedlands & FMG Solomon Iron Construction of civil 28/03/2012 Mining News Spearwood Ore and concrete works. 125,000,000 12,159,700,000

Forge Group Nedlands & BHP Port Hedland Will provide a scope 04105/2012 The West Spearwood of work associated 41,000,000 Australian 12,200,700,000

with the first phase of BHP's non process infrastructure.

Forge Group Nedlands & Yara Pilbara TAN Project Structural, 08/07/2013 Projectory Spearwood Nitrates pty Ltd mechanical, 70,000,000 12,270,700,000

electrical and instrumentation works.

291Page

Page 30: Department of Commerce Local Content Report (November 2013)

Forge Nedlands & BHP Yarnima The delivery of a 12/12/2012 Mining News Spearwood combined cycle gas 105,000,000 12,375,700,000

turbine power station.

Forge Nedlands & Roy Hill Pilbara Construction of the 02/09/2013 Minning Australia Spearwood processing plant, 830,000,000 13,205,700,000

detailed earthworks, foundations, steelworks, mechanical equipment, plate-work, piping, electrical equipment, instrumentation and controls, cabling, conveyors and in-plant roads.

Forge Nedlands & Rio Tinto Yandicoogina Expansion Works - 12/09/2013 Minning News Spearwood iron ore structural, 100,000,000 13,305,700,000

operation mechanical and piping works at the Junction South West area and stockyards of the Yandicoogina mining area.

Fugro TSM CBD Woodside North West Shelf Responsible for 10102/2012 Business News Project project management, 100,000,000 13,405,700,000

engineering, procurement and execution under the Great Western Flank Phase 1 subsea installation contract.

30lPage

Page 31: Department of Commerce Local Content Report (November 2013)

GCo Electrical Geraldton Karara Mining Karara I ron Ore The contract works 08103/2012 Business News Limited include the 8,500,000 13,414,200,000

installation of cables and cable trays, wiring, switch rooms, transformers and lighting, as well as relocation works of existing port infrastructure including substations and high-voltage cabling.

GCo Electrical Geraldton Sedgman ILa Kalgoorlie- To comprise 09/09/2013 Business News Nabcha Resources Boulder electrical and 6,800,000 13,421,000,000 Mungari gold instrumentation. proiect

GCo Electrical Geraldton Karara Mining Karara Iron Ore Electrical and 07/1112013 Company Website Limited instrumentation. 1,500,000 13,422,500,000

GE Jandakot Chevron Gorgon Project To maintain power 20107/2012 Business News generation, 600,000,000 14,022,500,000 compression trains and other associated equipment.

GE Jandakot Apache Energy Julimar Gas Supply subsea 24/02/2012 Business News Project equipment. 150,000,000 14,172,500,000

Georgiou Group Various Rio Tinto Pannawonica To construct a 04/07/2012 Business News & Gumala tailings storage 37,000,000 14,209,500,000 Enterprises facility. Joint Venture Giovenco Henderson Chevron Wheatstone Scaffolding erection 22/11/2013 Company Website

services. 85,000,000 14,294,500,000

Global Redcliffe Brookfield Tower 2 Formwork and 10/10/2013 The West Construction concrete works. 9,000,000 Australian 14,303,500,000 Services

31 I P age

Page 32: Department of Commerce Local Content Report (November 2013)

Global Surface Welshpool Fortescue Metals Christmas Creek To operate and 16/04/2013 Mining News Mining Group maintain 29 surface 160,000,000 14,463,500,000

miners.

GR Engineering Belmont Newcrest Mining Telfer Gold Mine EPC, Regrind 07/10/2011 Company Website Project. 48,000,000 14,511,500,000

GR Engineering Belmont Central Tenemyte Central Letter of Intent, EPC 07/10/2011 Company Website Gold Tenemyte Gold - refurbishment, - 14,511,500,000

upgrade and re-commissioning of process plant.

GR Engineering Belmont Sandfire DeGrussa EPCM contract 04104/2012 Australian Mining Resources Copper-Gold which includes the 12,000,000 14,523,500,000

Project foundations, structures, mechanical equipment, piping, electrical, instrumentation, controls, and information management systems of the plant.

GR Engineering Belmont Newcrest Mining Telfer Gold Mine Engineering design 23/04/2012 Mining News and documentation, 18,000,000 14,541,500,000 fabrication, construction and commissioning works.

GR Engineering Belmont Reed Resources Meekatharra To install a new 17/07/2012 Business News Gold Project heavy duty primary - 14,541,500,000

crusher. GR Engineering Belmont Doray Minerals Andy Well Gold Engineering, 31/07/2012 Mining News

Project procurement and 31,000,000 14,572,500,000 construction of the processing plant.

321Page

Page 33: Department of Commerce Local Content Report (November 2013)

GR Engineering Belmont Mutiny Gold Deflector project Design and 30/11/2012 ASX construction of - announcement 14,572,500,000 project processing alant.

GR Engineering Belmont Doray Minerals Andy Well Gold To provide 07/01/2013 Business News Project engineering, 30,300,000 14,602,800,000

procurement and construction.

GR Engineering Belmont Saracen Mineral Carosue Dam Engineering and 25/0212013 Business News Holdings gold mine river construction works. 16,000,000 14,618,800,000

GR Engineering Belmont MZI Resources Kysbrook Engineering and 28/10/2013 The West Mineral Sands construction works. 55,000,000 Australian 14,673,800,000 Project

GWH Kalgoorlie KalNorth Gold Lindsay's gold Open pit deal. 15/112012 Business News Equipment Mines mine - 14,673,800,000

Hertel Modern Malaga Chevron Gorgon Paint, insulation and 28/11/2011 Company Website fireproofing services 90,000,000 14,763,800,000 (3 year term).

Highline Ltd Welshpool Chevron Wheatstone Bolted Tanks 10/11/2011 ProjectConnect Construction Phase. - 14,763,800,000

Highline Ltd Welshpool Chevron Wheatstone Bolted Tanks 10/11/2011 ProjectConnect Construction Village. - 14,763,800,000

Highline Ltd Welshpool Chevron Wheatstone Bolted Tanks 27/10/2011 ProjectConnect Compaction Phase. - 14,763,800,000

HNZGlobal Belmont & Rio Tinto Dampier & Cape To purchase three 17/08/2012 Business News Karratha Lambert new helicopters to - 14,763,800,000

take marine pilots to the Dampier and Cape Lamberts ports.

ISS Group Osborne Park Chevron Gorgon Licences, services, 19/01/2012 Business News maintenance and 2,400,000 14,766,200,000 soflware support.

331Page

Page 34: Department of Commerce Local Content Report (November 2013)

John Holland West Perth & Chevron Wheatstone Design and 370,000,000 12/12/2011 Company Website Group Osborne Park construction of an 15,136,200,000

accommodation village including a 3,800-bed village which includes recreation centres, a football oval, a swimming pool, tennis courts, a medical centre and dining facilities.

John Holland West Perth & Chevron Wheatstone Design and construct 09/01/2012 Projectory Group Osborne Park a package of 12 240,000,000 15,376,200,000

permanent buildings.

John Holland West Perth & Rio Tinto Cape Lambert To deliver the wharf 07/02/2012 Mining News Group Osborne Park Port B extension. 186,000,000 15,562,200,000

John Holland West Perth & Samsung C&T Pilbara Construct nearly 350 17/0912013 Heraldsun Group Osborne Park kilometres of heavy 257,000,000 15,819,200,000

haulage railway track through remote terrain from the Roy Hill mine site to Port Hedland.

Keller Australia Willetton Chevron Wheatstone Piling Installation. 23/01/2012 Projectory Group 180,000,000 15,999,200,000

KentzlCBI CBD & West Extension Hill Gorgon Various. 21/07/2011 Kentz Website Perth 2,300,000,000 18,299,200,000

Kiewit Australia Various Chevron Wheatstone Installation and 28/05/2013 Business News & Ertech maintenance of 269,000,000 18,568,200,000 Holdings JV underground and

above-ground utilities, construction and maintenance of roads and laydown areas, and site support.

341Page

Page 35: Department of Commerce Local Content Report (November 2013)

Laing O'Rouke Burswood Chevron Wheatstone Civil and structural 13101/2013 Company Website engineering and - 18,568,200,000 construction.

Leighton West Perth Regional Ord-East Construction works. 08/12/2011 Business News Development and Kimberley 146,000,000 18,714,200,000 Lands Project

Leighton West Perth OneSteel South Includes supervision, 15/12/2011 Business News Middleback equipment, labour, 240,000,000 18,954,200,000 Ranges materials and

infrastructure.

Leighton West Perth & Fortescue Metals Firetail Iron Ore To provide mine 25/09/2012 Australian Mining CBD Group Deposit management, 1,500,000,000 20,454,200,000

including operating and maintaining the open cut mining fleet, ore handling plants, and associated infrastructure.

Leighton West Perth & Fortescue Metals Solomon Mine Operating and 15/10/2012 Projectory CBD Group Project maintaining the 1,500,000,000 21,954,200,000

mining fleet, ore handling plants and associated infrastructure.

Leighton West Perth & Chevron Wheatstone Design and 240,000,000 22/12/2011 Business News CBD construction of 12 22,194,200,000

permanent buildings for the onshore gas processing facilities, including an operations building, laboratory, maintenance centre, vehicle maintenance shop, fire station and plant warehouse.

351Page

Page 36: Department of Commerce Local Content Report (November 2013)

Leighton West Perth & Chevron Wheatstone Subsea Pipeline 60,000,000 22/12/2011 Business News CBD Micro tunnel - 22,254,200,000

Construction of a 1.2 kilometre long tunnelled shore.

Leighton West Perth & Rio Tinto Hope Downs Earthworks. 25108/2011 Company Website CBD 104,000,000 22,358,200,000

Leighton West Perth & Chevron Gorgon Fabrication and 15/06/2012 Business News CBD transportation work. 950,000,000 23,308,200,000

Leighton West Perth & Chevron Gorgon Carrying out 25/02/2013 Business News CBD earthworks and 850,000,000 24,158,200,000

installing concrete and underground drainage, pipes, and cables.

Leighton West Perth & Chevron Gorgon Miscellaneous civil 11/03/2013 The West CBD works. 212,000,000 Australian 24,370,200,000

Leighton West Perth & FMG Solomon Contract extension to 24/06/2013 Mining News CBD Deposit $1.5bn contract. 1,300,000,000 25,670,200,000

LogiCamms West Perth Rio Tinto 1 ntercourse Two design 11101/2012 Business News Island and Cape contracts. 8,300,000 25,678,500,000 Lambert sites

LogiCamms West Perth Chevron Gorgon To conduct 17102/2012 Business News maintenance 8,000,000 25,686,500,000 reviews, build asset registers, and develop maintenance tactics.

Lycopodium East Perth Rio Tinto Marandoo Mine Plant upgrade and 13/04/2012 Company Website Phase 2 Project associated project - 25,686,500,000

infrastructure.

Lycopodium East Perth Rio Tinto Nammuldi Iron To manage the 28/05/2012 Business News Ore Mine expansion. - 25,686,500,000

36 I P age

Page 37: Department of Commerce Local Content Report (November 2013)

MACA Welshpool Atlas Iron Mt Dove The award includes 25/0612012 Mining News 3 contracts and a 66,000,000 25,752,500,000 variety of services.

MACA Welshpool Regis Resources Rosemont Gold Letter of intent - 2/11/2012 Mining News operation Mining selVices 220,000,000 25,972,500,000

contract. MACA Welshpool Focus Minerals Laverton Project To supply drilling, 13/11/2012 Mining News

blasting, load and 45,000,000 26,017,500,000 haul services.

MACA Welshpool Atlas Iron Abydos Mine A construction, 14/11/2012 Mining News processing and 200,000,000 26,217,500,000 mining services contract.

MacMahon West Perth Fortescue Metals Solomon Rail Spur 16/08/2011 Company Website Group Deposit Construction. 300,000,000 26,517,500,000

MacMahon West Perth Tropicana Joint Tropicana Gold Mine Development 15/07/2011 Company Website Venture (10 year term). 900,000,000 27,417,500,000

MacMahon West Perth BHP Billiton Iron Wheelarra Construct haul roads 12/08/2011 Company Website Ore and run mine pad. 129,000,000 27,546,500,000

MacMahon West Perth Newmont Boddington Gold Mining operation and 12/0812011 Company Website Mine ore re-handling. - 27,546,500,000

MacMahon West Perth Panoramic Savannah Production drilling, 12/08/2011 Company Website Resources cable bolting and - 27,546,500,000

shotcreting.

MacMahon West Perth Rio Tinto Hope Downs 4 Rail Earthworks and 04/07/2011 CompanyWebsite Bridge Construction. 129,000,000 27,675,500,000

MacMahon West Perth Rio Tinto Cape Lambert Bridges over Boat 04/07/2011 Company Website Port B Beach Road. - 27,675,500,000

MacMahon West Perth Rio Tinto Cape Lambert Bulk Earthworks, 04/07/2011 Company Website PortA Road works and Civil - 27,675,500,000

Works.

MacMahon West Perth FMG Solomon Construct a rail spur 21/12/2011 Mining News Deposit! including a 330,000,000 28,005,500,000 Chichester construction of four Range major bridges.

37 I P age

Page 38: Department of Commerce Local Content Report (November 2013)

Macmahon West Perth Fortescue Metals Christmas Creek To provide open-cut 31/10/2012 Perth Now Group mining s8lVices. 1,800,000,000 29,805,500,000

Matrix Henderson Various Projects Various Projects Supply of iron ore 17/11/2011 Company Website Composites & car dumper 14,000,000 29,819,500,000 Engineering components, drilling

centralisers and various other products and services.

Matrix Henderson Various Various To provide drilling 10108/2012 Company Website Composites and products, subsea, 48,200,000 29,867,700,000 Engineering umbilical, riser and

flow line ancillary equipment and well construction products.

McConnell Mt Pleasant Roy Hill Pilbara EPC 07/10/2013 Mining News Dowell 455,000,000 30,322,700,000

McLaren Hire Karratha Chevron Wheatstonel Supply vehicles. 06/12/2011 Company Website Gorgon - 30,322,700,000

Mermaid Marine Fremantle, Santos Modec Offshore marine 16/10/2012 Business News Karratha & services. 15,000,000 30,337,700,000 Broome

Mermaid Marine Fremantle, BHP Billiton Floating To provide offshore 9/01/2013 Business News Karratha & Production marine support. 50,000,000 30,387,700,000 Broome Storage &

Offioading Operations

381Page

Page 39: Department of Commerce Local Content Report (November 2013)

Mermaid Marine Fremantle, Chevron Dampier Supply Vessel contract with 2110812013 Company Karratha & base Subsea 7 to provide 100,000,000 30,487,700,000 Broome tug and barge

support for the Heavy Lift & Tie-in Scope on the Chevron-operated Gorgon Project.

Metro Lintel Bibra Lake Chevron Gorgon Draw, fabricate and 0010812011 Company Steel supply. 5,486,000 30,493,186,000

Minepower Armadale Kentor Gold Murchison Gold Undisclosed. 610312012 Business News Project - 30,493,186,000

Minepower Armadale Reed Resources Meekatharra Stage 1 mining 1511012012 Projectory Gold Project contract. - 30,493,186,000

Mpower Canning Vale FMG Pilbara Installation and 24/0812013 Projectory commission of three 597,000,000 31,090,186,000 1.8MW black-start generators.

Miclyn Fremantle Chevron Gorgon To provide a fleet of 15108/2013 REPS anchor handling tugs 28,000,000 31,118,186,000 and barges.

Mineral Applecross Fortescue Metals Christmas Creek Design, Construct 04/0712011 Company Website Resources Group 2 and Operate (over 1,000,000,000 32,118,186,000

10 year term).

Mineral Applecross Rio Tinto Nammuldi below To design and - 09/09/2013 Minning News Resources water table mine construct a plant 32,118,186,000

project capable of crushing, wet screening and benefiCiating 25 million tonnes per annum (wet feed) of iron are.

391Page

Page 40: Department of Commerce Local Content Report (November 2013)

Mining and Civil Cannington Kimberley Ellendale Mining Services 17/11/2011 Company Website Australia Diamonds including drilling an 65,000,000 32,183,186,000

Company NL blasting, loading and hauling and crusher feed (21 month term):

Monadelphous Victoria Park Various Various Structural, 18/11/2011 Business News Group mechanical and 140,000,000 32,323,186,000

piping works, water utility and pipeline remediation.

Monadelphous Victoria Park BHP Billiton Worsley Alumina Three year contract, 19/08/2011 Company Website Group minor capital project - 32,323,186,000

services.

Monadelphous Victoria Park Rio Tinto and Hope Downs 4 Structural, 19/09/2011 Company Website Group Hancock Iron Ore mechanical and 150,000,000 32,473,186,000

Prospecting piping. Monadelphous Victoria Park Woodside Pluto LNG Mechanical 19/08/2011 Company Website Group commissioning - 32,473,186,000

support.

Monadelphous Victoria Park Chevron Gorgon LNG Onshore Gas 21/10/2011 Mining News Group Pipeline. 180,000,000 32,653,186,000

Monadelphous Victoria Park Bechtel Wheatstone Construction, 16/12/2011 Business News Group operation support 70,000,000 32,723,186,000

and services contract.

Monadelphous Victoria Park BHP Billiton Port Hedland Comprises structural, 23/12/2011 Perth Now Group Inner Harbour mechanical and 290,000,000 33,013,186,000

Project piping work associated with materials handling and processing facilities.

40lPage

Page 41: Department of Commerce Local Content Report (November 2013)

Monadelphous Victoria Park Rio Tinto Coastal Waters Will construct and 30101/2012 Mining News Group Project install a potable - 33,013,186,000

water supply system.

Monadelphous Victoria Park BHP Billiton Macedon Gas Structural, 16/05/2012 Business News Group Project mechanical and 150,000,000 33,163,186,000

piping installation.

Monadelphous Victoria Park Rio Tinto Pilbara Design and 16/0512012 Business News Group construction of a gas - 33,163,186,000

transmission pipeline.

Monadelphous Victoria Park BHP Billiton Jimblebar iron Involved structural, 30108/2012 Business News Group ore mechanical and 75,000,000 33,238,186,000

piping works.

Monadelphous Victoria Park Rio Tinto Various Structural, 24/10/2012 Business News Group mechanical and 320,000,000 33,558,186,000

piping works. Three year extensions to two shutdown and maintenance service contracts.

Monadelphous Victoria Park Chevron Gorgon Project One year extension 09/11/2012 Company Website Group of contract for 130,000,000 33,688,186,000

operation and maintenance of construction facilities and utilities on Barrow Island.

Monadelphous Victoria Park Woodside Energy Karratha Gas 3 year contract for 31/10/2012 LNG World news Group Plant provision of 150,000,000 33,838,186,000

maintenance and shutdown services.

Monadelphous Victoria Park Rio Tinto Cape Lambert To handle 11102/2013 Business News Group engineering, - 33,838,186,000

procurement and construction.

411Page

Page 42: Department of Commerce Local Content Report (November 2013)

Monadelphous Victoria Park Rio Tinto Western Turner To supply and install 25/02/2013 Business News Group Brockman structural, 260,000,000 34,098,186,000

mechanical, piping, electrical and instrumentation works.

Monadelphous Victoria Park Rio Tinto Pilbara Rio's Cape Lambert 04109/2013 Yahoo News Group Port B Project in the 235,000,000 34,333,186,000

Pilbara and involved structural mechanical and piping works for the supply and installation of a screen house, two car dumpers and associated conveyor and transfer stations.

Monadelphous Victoria Park Chevron Gorgon LNG Contract extension. 08/10/2013 The West Group 150,000,000 Australian 34,483,186,000

Neptune Marine CBD Hess Exploration Equus Gas Geotechnical and 16/1112011 Company Website Services Australia Pty Ltd Fields geophysical surveys. 34,483,186,000

Development

Neptune Marine CBD Eni Blacktip Gas Inspection, repair 21/02/2013 Business News Services Field and maintenance 6,000,000 34,489,186,000

including saturation diving, air diving and remote-operated vehicle works.

421Page

Page 43: Department of Commerce Local Content Report (November 2013)

NewSat Bayswater Chevron Wheatstone To provide satellite 20107/2012 Business News Project communications 8,590,000 34,497,776,000

services and hardware.

Nomad Building Osborne Park Rio Tinto Western Turner Design and build 20107/2011 MST Mine Supply Solutions Brockman accommodation and 6,300,000 Today 34,504,076,000

laundries.

Nomad Building Osborne Park Rio Tinto Cape Lambert Design and 20107/2011 MST Mine Supply Solutions manufacture of camp 3,500,000 Today 34,507,576,000

buildings.

Nomad Building Osborne Park Newmont Mining Boddington Gold Purchase of rental 8,500,000 30/11/2011 Mining News Solutions Mine accommodation for 34,516,076,000

187 workers.

Norfolk Group Lake Argyle Rio Tinto Brockman mine Electrical and 17,500,000 10104/2012 Business News instrumentation 34,533,576,000 engineering and installation services.

Norfolk Group Lake Argyle GE Fortescue Metal To provide a radio- 17108/2012 Business News Group's track based rail signalling 56,000,000 34,589,576,000

system.

Northern Star Stirling FMG Various 23/01/2013 Media Monitors Resources 6,000,000 34,595,576,000

Northerly Group Subiaco Rio Tinto Perth Airport To create office 15,000,000 27106/2012 Business News buildings. 34,610,576,000

NRW Holdings Belmont Rio Tinto Cape Lambert Conveyor link 13/09/2012 Business News earthworks, 133,000,000 34,743,576,000 relocation of water pipes and rail formation earthworks.

NRW Holdings Belmont Rio Tinto Yandi Bulk earthworks. 16/10/2012 Mining News 90,000,000 34,833,576,000

NRW Holdings Belmont Fortescue Metals Herb Ellioll Site Works. 29/07/2011 Company Website Group 112,000,000 34,945,576,000

431Page

Page 44: Department of Commerce Local Content Report (November 2013)

NRW Holdings Belmont Fortescue Metals Pilbara Main Rail Line 14/07/2011 Company Website Group Duplication Works. 70,000,000 35,015,576,000

NRW Holdings Belmont Chevron Wheatstone Construction of 11/11/2011 Company Website access roads. 99,000,000 35,114,576,000

NRW Holdings Belmont Rio Tinto Various Various. 19/04/2012 The West 125,000,000 Australian 35,239,576,000

NRW Holdings Belmont BHP Billiton Inner Harbour Includes bulk 23/05/2012 The West Project earthworks, ground 129,000,000 Australian 35,368,576,000

improvement works, rail and concrete installation.

NRW Holdings Belmont Rio Tinto Pilbara Upgrade to the 15/11/2012 Mining News existing road 32,000,000 35,400,576,000 between Great Northern Highway and the West Angeles iron ore mine.

NRW Holdings Belmont FMG Solornon and a) 28.4km of rail 04/06/2012 The West Christmas Creek earthworks for the 148,500,000 Australian 35,549,076,000

Solomon spur rail project b) a joint venture early mining services contract for Solomon c) a drill and blast contract for Christmas Creek.

NRW Holdings Belmont Fortescue Metals Solomon Various. 29/07/2011 Company Website Group 80,000,000 35,629,076,000

NRW Holdings Belmont FMG Cloudbreak Drilling services. 12/0212013 Mining News 140,000,000 35,769,076,000

NRW Holdings Belmont Hancock Roy Hill Iron Ore Earthworks, piping 18/04/2013 The West Prospecting and associated 67,000,000 Australian 35,836,076,000

works along with drill and blast operations.

441Page

Page 45: Department of Commerce Local Content Report (November 2013)

NRW Holdings Belmont Rio Tinto Nammuldi Iron Bulk earthworks 30104/2013 Mining News Ore Mine projects. 180,000,000 36,016,076,000

NRW Holdings Belmont BHP Billiton Mooka Bulk earthworks, 16107/2013 Mining News rock excavation, 31,000,000 36,047,076,000 culvert construction, road construction and sub-ballast caooina.

NRW Holdings Belmont Newmont Mining Boddington Gold Engineering, design 11/04/2013 Mining News Mine and project 20,000,000 36,067,076,000

management services.

NRW Holdings Belmont Sam sung C&T Roy Hill Rail earthworks. 28108/2013 Mining News Holdings pty 20,000,000 36,087,076,000 Project

NRW Holdings Belmont Roy Hill Pilbara Construction of 19/09/2013 The West 330kms of main line 620,000,000 Australian 36,707,076,000 heavy haul rail formation together with sidings and level crossing and associated works.

NWPM Joondalup Newmont Boddington Gold To carry out the 11/04/2013 Mining News Mine detailed engineering, 20,000,000 36,727,076,000

design and project management services.

451Page

Page 46: Department of Commerce Local Content Report (November 2013)

O'Donnell Griffin Canning Vale Undisclosed Pilbara Electrical and 26/0712011 Company Website instrumentation for 37,000,000 36,764,076,000 the construction and commissioning of underground crushing, conveying and dewatering facilities.

O'Donnell Griffin Canning Vale BHP Billiton Pilbara Rail signalling 28/11/2011 Company Website systems. 82,000,000 36,846,076,000

Oceaneering Perth CBD Apache Energy Julimar To supply a 25 km - 05/10/2012 Business News International Development long electro- 36,846,076,000 Services Limited Project hydraulic umbilical.

OTOC Applecross Rio Tinto Brockman 4 To install 32,000,000 22/10/2012 Business News accommodation 36,878,076,000 units.

OTOC Applecross Rio Tinto Cape Lambert Civil works and 25/10/2011 Company Website associated services, 10,700,000 36,888,776,000 EPCM and Contractors Area.

OTOC Applecross Rio Tinto Western Turner Installation of 25/10/2011 Company Website Brockman permanent buildings. 3,700,000 36,892,476,000

OTOC Applecross Extension Hill Magnetite EPHL Exploration 25/1012011 Company Website Camp. 33,000,000 36,925,476,000

OTOC Applecross Hancock Roy Hill Iron Ore Rail Camp - Design, 25/1012011 Company Website Prospecting supply and - 36,925,476,000

installation.

OTOC Applecross Rio Tinto West Angelas Infrastructure 27/03/2012 Mining News Village upgrades and 14,000,000 36,939,476,000

installation of transportable accommodation buildings.

OTOC Applecross Rio Tinto Cape Lambert Survey services and 18/07/2013 Mining News aerial acquisition 4,300,000 36,943,776,000 works.

461Page

Page 47: Department of Commerce Local Content Report (November 2013)

Pacific Energy CBD AngloGold Ashanti Tropicana Gold A contract to build, 21/06/2012 Mining News Australia Limited own and maintain a - 36,943,776,000

power station.

Pacific Energy CBD Reed Resources Meekatharra To supply power. 17/07/2012 Business News Gold Project - 36,943,776,000

Perkins Builders Balcatta Hancock Perth Airport Construction contract 22/05/2012 Business News Prospecting to build corporate 46,000,000 36,989,776,000

headquarters and remote operations centre.

Perkins Builders Balcatta ATCOGas Jandakot To construct ATCO's 16/01/2013 Business News two story office 10,000,000 36,999,776,000 building.

Perth Surveying Landsdale John Holland Wheatstone To work on the 05/0912012 Business News Services Project Wheatstone LNG 2,700,000 37,002,476,000

construction village.

Pindan Belmont Rio Tinto Rail Capacity Accommodation 31/08/2011 Company Website Enhancement Rooms and 15,000,000 37,017,476,000

Associated Facilities.

Pindan Belmont Fortescue Metals Solomon Hub - Permanent Camp 17/11/2011 Company Website Group Iron Ore Construction. 56,000,000 37,073,476,000

Pressure Perth International Woodside Greater Western Aggregate figure. 01/06/2012 State of the Future Dynamics Airport Flank 13,000,000 37,086,476,000

Pressure Perth International Shell Prelude FLNG Project 01/06/2012 State of the Future Dynamics Airport - 37,086,476,000

Pressure Perth International Chevron Wheatstone 01106/2012 State of the Future Dynamics Airport Project - 37,086,476,000

OR National Welshpool Alcoa South West Road Haulage 19/1012011 Company Website Agreement - 400,000,000 37,486,476,000 Transport of bauxite, alumina and refinery inputs (10 year term).

Oube Logistics North Fremantle Sandfire DeGrussa Haulage and port 16103/2012 Business News Resources copper gold- services. 120,000,000 37,606,476,000

project

47 I P age

Page 48: Department of Commerce Local Content Report (November 2013)

Qube Logistics North Fremantle Chevron Gorgon Integrated services - 04/09/2013 Fully Loaded through its existing 37,606,476,000 operations at the Port of Fremantle multi-user terminal.

The primary tasks will be loading and unloading of freight moving between Fremantle and Chevron-operated assets on Barrow Island, off Western Australia's north coast.

Ranger Drilling Wangara Roy Hill Pilbara Grade control plus 22/10/2013 Mining News RC exploration, 18,000,000 37,624,476,000 water monitoring and diamond driliinQ.

RCR Ltd CBD (company Fortescue Metals Solomon Iron EPC - engineering, 02/11/2011 Mining News has three Group Ore procurement, 600,000,000 38,224,476,000 divisions with construction and pre-Mining, Energy, commissioning. Resources and Power divisions

RCR Ltd CBD (company BHP Billiton Iron Yarnima To provide power 17/01/2012 Mining News has three Ore generation works 30,000,000 38,254,476,000 divisions with including the design, Mining, Energy, manufacture and Resources and supply of three heat Power divisions recovery steam

generators and associated equipment.

481Page

Page 49: Department of Commerce Local Content Report (November 2013)

RCR Ltd CBD (company Rio Tinto Mesa J Mine Iron ore in-pit - 14/10/2013 The West has three crushing and Australian 38,254,476,000 divisions with conveying plant. Mining, Energy, Resources and Power divisions

Resource CBD Silver Lake Murchison Gold Design and construct 12/03/2012 Business News Development Resources Project a processing plant. 35,000,000 38,289,476,000 Group

Resource CBD Norton Gold Fields Paddington EPCM contract. 23/01/2013 Business News Development - 38,289,476,000 Group

Samsung C&T Hancock Roy Hill Iron Ore Construction of an 02/04/2013 REPS Prospecting iron-ore processing 5,600,000,000 43,889,476,000

plant.

Savcor Malaga Dampier Salt Dampier Ship Includes the removal 12/12/2011 Business News Loading Jetty of the existing timber 12,800,000 43,902,276,000

decking system, refurbishment and painting of the steel superstructure, and the installation of a new precast concrete decking system.

Schneider Balcatta Chevron Wheatstone Supply of an 01/03/2013 Company Website Electric electrical control and 189,000,000 44,091,276,000

distribution network solution.

Sky West Perth Airport BHP Billiton Jimblebar I ron Charter services to 03/10/2012 Business News Airlines Ore Jimblebar. - 44,091,276,000

Sky West Perth Airport Bechtel Wheatstone Charter Contract - 21/11/2011 ASX Airlines Transport - 44,091,276,000

constructions workers (6 year term).

491Page

Page 50: Department of Commerce Local Content Report (November 2013)

Sky West Perth Airport BHP Billiton Iron Area C and Air charter services 03/1112011 ASX Airlines Ore Yandi (1 year term). - 44,091,276,000

Sky West Perth Airport BHP Billiton Jimblebar Iron Flying workers to the 3/10/2012 Mining News Airlines Ore Mine project. - 44,091,276,000

Sky West Perth Airport Rio Tinto Brockman 4 Charter contract. 24/12/2012 Mining News Airlines Mine - 44,091,276,000

Southern Cross Naval Base Rio Tinto Cape Lambert Supply and install 14/11/2011 Mining News Electrical Port B overhead lines. 15,000,000 44,106,276,000 Engineering

Southern Cross Naval Base Rio Tinto Yandi Iron Ore Power line 26/09/2012 Business News Electrical Project construction. 29,000,000 44,135,276,000 Engineering

Southern Cross Naval Base Anglogold Ashanti Tropicana Gold Electrical, 26/0912012 Business News Electrical & Independence Project instrumentation, 40,000,000 44,175,276,000 Engineering Group communication and

process control plant infrastructure package.

Southern Cross Naval Base Rio Tinto Cape Lambert To supply and install 24/1012012 Business News Electrical electrical and 100,000,000 44,275,276,000 Engineering instrumentation.

Southern Cross Naval Base Sino Iron Area F Process plant 17/08/2011 Company Website Electrical construction of - 44,275,276,000 Engineering power line.

Southern Cross Naval Base Rio Tina Cape Lambert To supply and install 14/11/2011 Mining News Electrical Port B Project overhead lines. 15,000,000 44,290,276,000 Enoineerina Southern Cross Naval Base Citic Pacific Sino Iron Ore To work on the 27/04/2012 Archived Article Electrical concentrator area for 16,000,000 44,306,276,000 Engineering the second process

train and to begin work on the conveyors at the project.

50 I P age

Page 51: Department of Commerce Local Content Report (November 2013)

Southern Cross Naval Base Rio Tinto Yandi Mine Design, supply and 01/06/2012 Mining News Electrical construct an 9,000,000 44,315,276,000 Engineering overhead distribution

line. Stella Industrial Kwinana Chevron Gorgon Painting tanks. 16/04/2013 Business News

- 44,315,276,000

Subsea 7 CBD Apache Energy Julirnar Transportation, 06/12/2012 Business News Development installation and pre- 100,000,000 44,415,276,000 Project commissioning of

subsea umbilicals, manifolds and diver-less tie-in spools.

Subsea 7 CBD Apache Energy Julimar Transportation and - 05/10/2012 Business News Development pipeline equipment. 44,415,276,000 Proiect

Svitzer Australia Fremantle Chevron Gorgon Svitzer will supply - 9/01/2012 Projectory four 33m 80-tonne 44,415,276,000 bollard-pull azimuthing stem drive (ASD) tugs and a 16m Pantocarere self-righting pilot boat.

Swick Mining South Guildford Newmont Mining Wiluna Drilling services. - 3/09/2013 Yahoo News 44,415,276,000

Thiess West Perth & Chevron Wheatstone Design and develop 31/01/2012 Business News Osborne Park a breakwater and 260,000,000 29,911,476,000

materials offloading facility.

Thiess CBD Chevron Wheatstone Engineering, 20/02/2012 The West procurement and 500,000,000 Australian 30,411,476,000 construction of two LNG full containment storage tanks.

511 P age

Page 52: Department of Commerce Local Content Report (November 2013)

Thiess West Perth & Chevron Wheatstone Preparation of the 20/04/2012 Perth Now CBD site for the liquefied 450,000,000 30,861,476,000

natural gas project's downstream processing including the bulk and final-finish earthworks for the plant, storm water drainage system and access roads around the project.

Toll Mermaind Broome Shell Shell Prelude Supply Base and 10101/2012 ProjectConnect Logistics FLNG Project Logistic Support - 45,625,276,000 Broome Pty Ltd Services.

Tox Free Pilbara Chevron Barrow Island & Provision of Waste 26/08/2013 Company Website Solutions Pilbara Management 170,000,000 45,795,276,000

Services

Transfield West Perth Undisclosed Port Hedland A three year contract 04/07/2012 Business News Services to provide shutdown 50,000,000 45,845,276,000

mechanical and electrical maintenance.

Transfield West Perth Rio Tinto Dampier To design and 30/07/2012 The West Services construct a fuel 65,000,000 Australian 45,910,276,000

storage terminal.

Transfield West Perth Fortescue Metals Solomon Mine To design and build 30/0712012 The West Services Group Project a diesel storage 35,000,000 Australian 45,945,276,000

facility. Transfield West Perth Woodside North West Shelf To provide 11/12/2012 Business News Services Project maintenance 45,000,000 45,990,276,000

services.

TWSP (50% CBD Newmont Tanami Gold Developing a vertical 13/12/2011 Mining News Australia and Mine shaft and associated 35,000,000 46,025,276,000 50% South works at the African) Northern Territory

operation.

52 I P age

Page 53: Department of Commerce Local Content Report (November 2013)

UGL CBD (company Citic Pacific Sino Iron Ore Construction and 29/11/2011 Company Website has four divisions installation of - 46,025,276,000 in WA in multiple desalination plant locations including stage 2. Kwinana).

UGL CBD (company Various Projects Various Projects Includes work on a 29/11/2011 Business News has four divisions desalination plant at 200,000,000 46,225,276,000 in WA in multiple the Sinosteel plant; a locations including maintenance Kwinana). contract at BHP's

Olympic Dam and crude distillation unit work with Caltex.

UGL CBD (company Various Projects Various Projects 18/0412012 Business News has four divisions 370,000,000 46,595,276,000 in WA in multiple locations including Kwinana).

UGL CBD (company Rio Tinto Pilbara To supply 38 31/05/2012 Mining News has four divisions locomotives. 190,000,000 46,785,276,000 in WA in multiple locations including Kwinana).

UGL Perth CBD BHP Billiton Jimblebar iron To undertake works 08/08/2012 Business News (company has ore for structural, 100,000,000 46,885,276,000 multiple locations) mechanical and

piping.

UXC Connect CBD Chevron Wheatstone IP surveillance and 10104/2013 REPS security solutions. 4,100,000 46,889,376,000

Various Fortescue Metals Various Miscellaneous. 06108/2013 Mining News Group 1,000,000,000 47,889,376,000

VDM Group Osborne Park Various Various Various. 24/10/2011 HI Consulting 65,000,000 47,954,376,000

VDM Group Osborne Park BHP Billiton Iron Newman Earthworks and road 22/08/2011 Company Website Ore works. - 47,954,376,000

531Page

Page 54: Department of Commerce Local Content Report (November 2013)

VDM Group Osborne Park AngloGold Ashanti Tropicana Gold Internal roads, 14/10/2011 Company Website Australia Limited diversion channels, - 47,954,376,000

fencing and temporary accommodation camp.

VDM Group Osborne Park Karara Mining Karara Iron Ore Design and 14/10/2011 Company Website Limited construction of mine 10,000,000 47,964,376,000

site warehouse, workshops and wash-down facility.

VDM Group Osborne Park BHP Billiton Iron Central REG Contract variation. 29/11/2011 The West Ore Camp Installation of a 21,400,000 Australian 47,985,776,000

central accommodation camo.

VDM Group Osborne Park BHP Billiton Macedon Gas Design and 29/11/2011 The West Petroleum Project construction of on site 9,200,000 Australian 47,994,976,000

buildings including administration control and warehouse maintenance buildings.

VDM Group Osborne Park BHP Billiton Iron Jimblebar Iron Design and 1010112012 Business News Ore Ore Mine construction of an 25,200,000 48,020,176,000

ammonium nitrate storage facility.

VDM Group Osborne Park CITIC Pacific Sino Iron project To proceed with the 16/05/2012 Company Website Line 2AG mill and 15,000,000 48,035,176,000 ball mill mechanical installation package for the mine's developer, MCC Mining.

541Page

Page 55: Department of Commerce Local Content Report (November 2013)

VDM Group Osborne Park MCC Mining Sino Iron project To install line four, 25/0512012 Business News five and six of the 13,000,000 48,048,176,000 Trunnion Bearing and Mill Placement Package.

VDM Group Osborne Park Rio Tinto Brockman 4 To provide the 27/06/2012 The West Project engineering design 17,000,000 Australian 48,065,176,000

work and construction of a new plant maintenance workshop, heavy vehicle fuel facility and related infrastructure, as well as additions to the existing village facilities.

Velocious Belmont Chevron Gorgon Subsea Gas Piping 05/08/2011 Company Website Support. 5,000,000 48,070,176,000

Viento Group Osborne Park Fortescue Metals Solomon Iron To build a tailings 27/0512013 Projectory Group Ore storage facility. 8,400,000,000 56,470,176,000

Viento Group Osborne Park Rio Tinto Dampier Salt Repair works. 29/07/2013 Business News 7,000,000 56,477,176,000

Watpac Nedlands BC Iron & Nullagine Project Hauling ore. The 03/07/2012 Mining News Fortescue Metals new work is a 35,000,000 56,512,176,000 Group modification to an

existing $289m contract to deliver surface mining services.

55 I P age

Page 56: Department of Commerce Local Content Report (November 2013)

WestNet Rail Welsh pool based Karara Mining Karara I ron Ore Access to rail 16/11/2011 Gindalbie Website company with Limited network, rail 450,000,000 56,962,176,000 multiple branches infrastructure in WA including supports service (15 Kwinana year agreement).

Wood Group CBD Hess Exploration Equus Gas To undertake work 1/02/2012 Media Monitors Australia Australia pty Ltd Fields for a subsea gas 8,100,000 56,970,276,000

Development gathering system and pipeline to link to an approved or existing liquefaction

. oioeline. Worley Parsons CBD Hess Exploration Equus Gas To undertake the 1/02/2012 Media Monitors

Australia Ply Ltd Fields contract for a deep- - 56,970,276,000 Development water semi-

submersible platform.

Worley Parsons CBD Chevron Wheatstone Construction 06/10/2011 Company Website Management 235,000,000 57,205,276,000 Services.

Worley Parsons CBD Chevron To provide 24/0612013 Company Website Brownfield - -enaineerina services.

Yokogawa Belmont Chevron Wheatstone Integrated control 03/12/2012 Projectory Australia and safety. 20,000,000 57,225,276,000

'Aggregate Figure 4,000,000 57,229,276,000

'Estimated aggregate figure for undisclosed contract values

56) P age