Department of Transportation Office of Project Development 700 E Broadway Avenue Pierre, South Dakota 57501-2586 605/773-3268 FAX: 605/773-2614
February 13, 2018 ADDENDUM NO. 1
RE: Item #3, February 21, 2018 Letting - PH 0083(70)0, P 0ENH(173), PCN 03B2, 01EV, Todd County - Shoulder Widening, Spot Grading, Asphalt Concrete Surfacing, Sidewalk, & Lighting
TO WHOM IT MAY CONCERN: The following addenda to the plans shall be inserted and made a part of your proposal for the referenced project. SPECIAL PROVISIONS: Please remove the Special Provisions checklist and replace with
attached Special Provisions checklist revised 2/13/18. “Special Provision for Flexible Pavement Smoothness” dated 7/21/15 was removed.
Please add the “Special Provision for Alternate Bidding”, dated 2/13/18 before the “Special Provision for Subletting of Contract”, dated 1/16/18.
BID ITEM FILE: Bidders must log in to retrieve the addendum bid item file that must be loaded into the SDEBS
to incorporate the revisions listed here. Bid Items were added:
Alternate Group 1 Asphalt Concrete – Alternate A Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Alternate Group 1 Asphalt Concrete – Alternate B Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Alternate Group 2 Asphalt Concrete – Alternate A Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Alternate Group 2 Asphalt Concrete – Alternate B Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Quantities for Bid Items were changed: Bid Item 330E0100 “SS-1h or CSS-1h Asphalt for Tack” changed from 59.1
to 59.3 Ton
Connecting South Dakota and the Nation
Bid Items were removed due to asphalt alternates being added: Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete”
PLANS: Please destroy sheets A2, A3, and F2-F6 and replace with the enclosed sheets,
dated 2/5/18 and 2/13/18.
Sheet A2: Section F – Surfacing PCN 03B2 Bid Items were added:
PCN 03B2 – Alternate A Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” PCN 03B2 – Alternate B Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Quantities for Bid Items were changed: Bid Item 330E0100 “SS-1h or CSS-1h Asphalt for Tack” changed from 55.9
to 56.1 Ton Bid Items were removed: (both asterisked and non-asterisked items) Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete”
Sheet A3: Section F – Surfacing PCN 03B2
Bid Items were added: PCN 03B2 – Non-Participating Alternate A Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” PCN 03B2 – Non-Participating Alternate B Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete”
Sheet F2: Section F Estimate of Quantities
Bid Items were added: Section F Estimate of Quantities – Alternate A Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Section F Estimate of Quantities – Alternate B Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Section F Estimate of Quantities – Non-Participating – Alternate A Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Section F Estimate of Quantities – Non-participating – Alternate B Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” Quantities for Bid Items were changed: Bid Item 330E0100 “SS-1h or CSS-1h Asphalt for Tack” changed from 55.9
to 56.1 Ton
Bid Items were removed: (both asterisked and non-asterisked) Bid Item 320E0005 “PG 58-34 Asphalt Binder” Bid Item 320E1070 “Class HR Asphalt Concrete” CLASS HR ASPHALT CONCRETE note was moved to Sheet F3.
Sheet F3: FLEXIBLE PAVEMENT SMOOTHNESS PROVISION note was removed. SUMMARY OF CLASS HR ASPHALT CONCRETE table was removed. SUMMARY OF CLASS HR ASPHALT CONCRETE Alternate A and
SUMMARY OF CLASS HR ASPHALT CONCRETE Alternate B tables were added.
Sheet F4: Rates of Class HR Asphalt Concrete were revised to include Alternate A and
Alternate B. Sheet F5: TABLE OF ADDITIONAL QUANTITIES, Class HR Asphalt Concrete and
PG 58-34 Asphalt Binder columns were revised to include Alternate A and Alternate B.
Sheet F6: TABLE OF TURNING LANE QUANTITIES – PARTICIPATING ITEMS and
TABLE OF TURNING LANE QUANTITIES – NON-PARTICIPATING ITEMS, Class HR Asphalt Concrete and PG 58-34 Asphalt Binder columns were revised to include Alternate A and Alternate B.
Sincerely, Sam Weisgram Engineering Supervisor SW/cj CC: John Forman, Pierre Region Engineer Doug Sherman, Winner Area Engineer
REV. 2/13/18
INDEX OF SPECIAL PROVISIONS PROJECT NUMBER(S): PH 0083(70)0, P 0ENH(173) PCN: 03B2, 01EV TYPE OF WORK: SHOULDER WIDENING (560,000 CUYD), SPOT GRADING, ASPHALT
CONCRETE SURFACING (30,000 TON), SIDEWALK, & LIGHTING COUNTY: TODD The following clauses have been prepared subsequent to the Standard Specifications for Roads and Bridges and refer only to the above described improvement, for which the following Proposal is made. The Contractor’s attention is directed to the need for securing from the Department of Environment & Natural Resources, Foss Building, Pierre, South Dakota, permission to remove water from public sources (lakes, rivers, streams, etc.). The Contractor should make his request as early as possible after receiving his contract, and insofar as possible at least 30 days prior to the date that the water is to be used. Lynn Coonrod is the official in charge of the Winner Career Center for Todd County. THE FOLLOWING ITEMS ARE INCLUDED IN THIS PROPOSAL FORM: Special Provision for Alternate Bidding, dated 2/13/18. Special Provision for Subletting of Contract, dated 1/16/18. Special Provision for Right of Entry/Work Limits, dated 1/26/18. Special Provision for Indian Employment and Contracting on the
Rosebud Reservation, dated 1/11/18. Special Provision for On-The-Job Training Program, dated 3/10/16. Special Provision for Prosecution and Progress, dated 9/7/16. Special Provision for Cooperation by Contractor and Department, dated 8/17/17. Special Provision Regarding Restricted Work at Drainage
Crossings or Wetlands, dated 1/26/18. Special Provision for Contractor Staking with Machine Control
Grading Option, dated 1/16/18. List of Utilities.
Special Provision for Contractor Administered Preconstruction Meeting, dated 3/15/16. Fuel Adjustment Affidavit, DOT form 208 dated 7/15. Standard Title VI Assurance, dated 3/1/16. Special Provision For Disadvantaged Business Enterprise, dated 5/20/15. Special Provision For EEO Affirmative Action Requirements on Federal and Federal-aid
Construction Contracts, dated 9/1/97. Special Provision For Required Contract Provisions Federal-aid Construction Contracts, Form
FHWA 1273 (Rev. May/1/12), dated 4/30/13. Required Contract Provisions Federal-aid Construction Contracts, Form
FHWA 1273 (Rev. 5/1/12). Special Provision for Cargo Preference Act, dated 1/20/16. Special Provision Regarding Minimum Wage on Federal-Aid Projects, dated 4/30/13. Wage and Hour Division US Department of Labor Washington DC.
- US Dept. of Labor Decision Number SD150001, dated 10/9/15. Special Provision for Supplemental Specifications to 2015 Standard Specifications for Roads
and Bridges, dated 6/1/16. Special Provision for Errata to 2015 Standard Specifications for Roads and Bridges, dated 6/1/16. Special Provision for Price Schedule for Miscellaneous Items, dated 10/14/15. Special Provision Regarding Storm Water Discharge to Waters of the United States Within
Indian Reservations, dated 5/3/13. National Pollutant Discharge Elimination System General Permit for Discharges from
Large and Small Construction Activities. http://www.epa.gov/npdes/pubs/cgp2012_finalpermit.pdf
1
STATE OF SOUTH DAKOTADEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONFOR
ALTERNATE BIDDING
PROJECT PH 0083(70)0, PCN 03B2TODD COUNTY
FEBRUARY 13, 2018
Bidders shall submit bids for the same alternate (A or B) for both bid item group 1 and bid item group 2. Bids submitted that do not contain the same alternate for both bid item group 1 and bid item group 2 will be rejected and will be considered a non-responsive bid.
* * * * *
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
PH 0083(70)0
P 0ENH(173)
Sheet 3 A2
...\prj\todd03
B2\N
otesSection
A.d
gn
File -
Plotting Date: 02/13/2018 Revised 02/13/2018 SMD
Plot Scale -
1:2
00
Plotted Fro
m -
trsf1
2148
ESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTS A2 A6
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
PH 0083(70)0
P 0ENH(173)
Sheet 4 A3
...\prj\todd03
B2\N
otesSection
A.d
gn
File -
Plotting Date: 02/13/2018 Revised 02/13/2018 SMD
Plot Scale -
1:2
00
Plotted Fro
m -
trsf1
2148
ESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTS A3 A6
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\todd03
B2\N
otesSectionF.d
gn
File -
Plotting Date: 02/13/2018
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
8387
PH 0083(70)0 F2 F19
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\todd03
B2\N
otesSectionF.d
gn
File -
Plotting Date: 02/13/2018
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
8387
PH 0083(70)0 F3 F19
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\todd03
B2\N
otesSectionF.d
gn
File -
Plotting Date: 02/07/2018
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
8387
PH 0083(70)0 F4 F19
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\todd03
B2\N
otesSectionF.d
gn
File -
Plotting Date: 02/07/2018
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
8387
PH 0083(70)0 F5 F19
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\todd03
B2\N
otesSectionF.d
gn
File -
Plotting Date: 02/07/2018
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
8387
PH 0083(70)0 F6 F19