Page 1: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Derelict Boats: Removal, Processing and Disposal

ITT Bidders Conference 3 May 2019

Page 2: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Overview

1. Procurement Points to note

2. Project Overview

a) Removal work packages

b) Staging site

c) Vessel processing

d) Disposal

3. Tender Evaluation

4. Questions and answers

Page 3: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Procurement points to note

• The Tender-securing declaration (last page of Booklet 1) must be completed on the company’s letterhead and signed.

• The form of tender document in Booklet 5A must be completed by hand and signed.

• The technical and commercial proposals must be clearly identified and submitted separately in sealed envelopes.

• All requests for clarifications must be made in writing to [email protected]

• Late tender submissions will NOT be considered.

Page 4: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Timeline• 17 May 2019 at 10am: Bidders Conference / Site Visit at

Pockwood Pond

• 10 June: Last day to request clarifications

• 24 June 4:00 pm: Tender closes

• 25 June to 12 July: Evaluation and clarifications

• 9 August: Expected contract award

• 2 September: Mobilization and Works Commence

Page 5: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Vessel Summary

May 2019:

• 181 Vessels ‘Derelict’ vessels

• 23 Vessels identified for local auction, included in Work Packages in the event they do not sell

• 194 Vessel under consideration for removal and processing

• 204 Total Vessel under consideration for disposal

Page 6: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

3-Step Process

Remove from current location and transport

to Staging Site

Process at Staging Site into waste

streams

Waste stream Disposal / Recycling

Page 7: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Grouping of Work Packages

Removal Group No. of vesselsWP1. Beef Island 39WP2. Sea Cows Bay 32WP3. East End Group 32WP4. Paraquita Bay 25WP5. Road Town 24WP6. West End 35WP7. Outliers 7

WP8. Staging and Processing 194WP9. Disposal * inc Nanny Cay Pilot vessels 204

These figures are not yet confirmed and could change

Page 8: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Staging Site –Pockwood Pond

Page 9: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Staging Site -Indicative layout

[You configure as you need]

Page 10: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Staging Site Indicative layout [You configure as you need]

Page 11: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Derelict Boats Waste Stream: Summary of BVI capability

On Island Recycling

Batteries

Plastic

Ropes / Sail

Glass

Metals (Stainless, aluminum, steel, copper,

zinc) – Metal pile for export

Established Off Island Recycling

Engines, kitchen (metals)

Alternative recycling / Landfill (Local or Export)

Fiberglass

PVCFoams

Hatches

Toilets

Electronics

Lead (encasement)

Wood

Incinerator

Plastic (non-recyclable)

Fuels

Page 12: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Derelict Boats Waste Stream: Disposal Solutions

• Seeking environmentally sustainable, efficient and cost-effectiveproposals for the use and disposal of the waste streams.

• The waste streams must be transported and disposed of through in a transparent and accountable way.

• Must strive to achieve high environmental standards and make use of local capacity.

Page 13: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Other Options Considered for Waste

• Co-processing of fiberglass waste: No cement manufacturer locally, potential US based capability

• Fiberglass incorporation into concrete: wood content of the waste streams means the structural integrity of the concrete is compromised

• Incineration to generate electricity: Pyrolysis

• Entombment into concrete (cost prohibitive)

Page 14: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Evaluation process for tender returns

• Technical evaluation will be completed for tender returns

• Separate and independent commercial evaluation will be completed.

Page 15: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Evaluation process for tender returnsEvaluation Criteria Section Total Marks Available Weighting % of Total Mark

EXECUTIVE SUMMARY 30 2

SATISFYING THE TECHNICAL REQUIREMENT 40 38

METHOD OF WORKS 20 10

PROCUREMENT STRATEGY 10 5

PROGRAMME 10 5

RESOURCES 10 8

CONTRACTOR PERSONNEL 30 9

SUB-CONTRACTORS AND PARTNERS 20 8

HEALTH, SAFETY AND ENVIRONMENT 10 4

ENVIRONMENTAL MANAGEMENT 10 5

COMMUNICATIONS 0 0

MOBILISATION 20 7

TOTAL 210 100

Page 16: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Evaluation process for tender returns

Requirement Guide

The Tenderer shall demonstrate an overall understanding of the following:

a. The Project Requirement/Scope of Work.

b. The Contract deliverables.

c. The Agency priorities, including Contract completion date.

d. The Contractor’s liabilities/obligations.

e. The Agency’s requirement to carry out concurrent activity throughout the whole Contract.

10 marks - Fully compliant/demonstrates a comprehensive understanding of the requirement.

8 marks - Compliant and demonstrates a substantial understanding of the requirement.

6 marks - Compliant.

4 marks - Non-compliant in significant aspects/fails to demonstrate a satisfactory understanding/suspect mitigation proposals.

1 mark - Non-compliant in virtually all aspects/demonstrates a poor understanding.

Page 17: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25

Summary

1. Procurement Process

2. Project Overview

a) Removal work packages

b) Staging site

c) Vessel processing

d) Disposal

3. Tender Evaluation

Page 18: Derelict Boats: Removal, Processing and ... - bvirecovery.vg · Removal Group No. of vessels WP1. Beef Island 39 WP2. Sea Cows Bay 32 WP3. East End Group 32 WP4. Paraquita Bay 25