design and implementation of smartlab infrastructuresci.tamucc.edu/~cams/projects/521.pdflike...
TRANSCRIPT
![Page 1: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/1.jpg)
Design and Implementation ofSmartLab Infrastructure
GRADUATE PROJECT REPORT
Submitted to the Faculty ofthe Department of Computing SciencesTexas A&M University-Corpus Christi
Corpus Christi, Texas
In Partial Fulfillment of the Requirements for the Degree ofMaster of Science in Computer Science
By
Vinay Datta PinnakaSummer 2017
Committee Members
Dr. Scott A. KingCommittee Chairperson
Dr.Ajay K. KatangurCommittee Member
![Page 2: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/2.jpg)
ii
ABSTRACT
Human efforts to interact with the digital world are continuously increasing
ever since the invention of the first computer. Advancements in embedded devices,
sensor technologies and distributed computing have driven forward research of smart
environments. Recently, the usage of smart environments has become popular in or-
der to make everyday living more comfortable and to improve the quality of life. This
work is concerned with constructing low cost infrastructure for a smart environment
which is proposed for implementation in Pixel Island Lab over time. The SmartLab
system collects depth, RGB and infrared data from a Kinect sensor by using Single
Board Computers and stream reduced data over the network. A novel client-server
model based on TCP protocol suite is proposed for transferring 3D data from the
Single Board server to client. The complete software and hardware infrastructure
designed and implemented in this project will help the application designers build
intelligent services and applications on top of SmartLab more easily.
![Page 3: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/3.jpg)
iii
TABLE OF CONTENTS
CHAPTER Page
ABSTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii
TABLE OF CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v
LIST OF FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi
1 BACKGROUND AND RATIONALE . . . . . . . . . . . . . . . . . . . . 1
1.1 Single Board Computers(SBC) . . . . . . . . . . . . . . . . . . . . . . 2
1.2 Microsoft Kinect 360 . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3 Computer Vision for SmartLab . . . . . . . . . . . . . . . . . . . . . 4
1.4 Network Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.5 Pixel Island lab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.6 Related work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2 PROJECT OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.1 Project objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.2 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3 SYSTEM DESIGN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.1 Hardware and Software requirements . . . . . . . . . . . . . . . . . . 11
3.2 Data collection phase . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.3 Network phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
3.4 Centralized client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
4 IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.1 Server Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.1.1 Kinect Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
4.1.2 TCP Server . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4.1.3 Server Data structure . . . . . . . . . . . . . . . . . . . . . . . 21
4.1.4 Server Configuration . . . . . . . . . . . . . . . . . . . . . . . . 22
![Page 4: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/4.jpg)
iv
CHAPTER Page
4.2 Client Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
4.2.1 TCP Client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
4.2.2 Client Data structure . . . . . . . . . . . . . . . . . . . . . . . 25
4.3 Background Subtraction . . . . . . . . . . . . . . . . . . . . . . . . . 25
4.4 Data Compression . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
5 RESULTS AND EVALUATIONS . . . . . . . . . . . . . . . . . . . . . . 27
5.1 Smartlab Hardware setup . . . . . . . . . . . . . . . . . . . . . . . . 27
5.2 Smartlab system usage . . . . . . . . . . . . . . . . . . . . . . . . . . 28
5.3 Smartlab software results . . . . . . . . . . . . . . . . . . . . . . . . . 29
5.3.1 Depth data stream . . . . . . . . . . . . . . . . . . . . . . . . . 30
5.3.2 Color data stream . . . . . . . . . . . . . . . . . . . . . . . . . 33
5.3.3 Depth and Color data combination . . . . . . . . . . . . . . . . 36
5.3.4 Factors influencing SmartLab software performance . . . . . . . 38
6 CONCLUSION AND FUTURE WORK . . . . . . . . . . . . . . . . . . . 40
6.1 Future work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
APPENDIX A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
7.1 Environment for SmartLab server (Linux Environment- ODROID XU4) 46
7.1.1 Ubuntu Image . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
7.1.2 Installing OpenCV . . . . . . . . . . . . . . . . . . . . . . . . . 47
7.1.3 Installing OPENNI . . . . . . . . . . . . . . . . . . . . . . . . 48
7.1.4 Installing Libfreenect . . . . . . . . . . . . . . . . . . . . . . . 49
7.1.5 Installing Boost . . . . . . . . . . . . . . . . . . . . . . . . . . 50
7.2 Environment for Smartlab server (Windows Environment-Lattepanda) 50
7.3 Building SmartLab server in Linux . . . . . . . . . . . . . . . . . . . 50
7.4 Building SmartLab server in Windows . . . . . . . . . . . . . . . . . 51
7.5 Running SmartLab server in Linux . . . . . . . . . . . . . . . . . . . 52
7.6 Running SmartLab server in Windows . . . . . . . . . . . . . . . . . 52
7.7 SmartLab client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
7.8 Running SmartLab client . . . . . . . . . . . . . . . . . . . . . . . . . 53
![Page 5: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/5.jpg)
v
LIST OF TABLES
TABLE Page
1 Benchmark analysis of three Kinect libraries . . . . . . . . . . . . . . 18
2 Data capture and receiving rate without compression on Odroid
and Lattepanda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
3 Network throughput with out compression . . . . . . . . . . . . . . . 39
4 Data capture and receiving rate with compression on Odroid and
Lattepanda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
5 Network throughput with compression . . . . . . . . . . . . . . . . . 39
![Page 6: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/6.jpg)
vi
LIST OF FIGURES
FIGURE Page
1 Kinect V1 hardware configuration and images from RGB and
depth camera. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2 SmartLab abstract architecture. . . . . . . . . . . . . . . . . . . . . . 10
3 Detailed architecture of data collection phase. . . . . . . . . . . . . . 13
4 Network interconnection for SmartLab. . . . . . . . . . . . . . . . . . 14
5 Centralized client module. . . . . . . . . . . . . . . . . . . . . . . . . 15
6 Class diagram of server module . . . . . . . . . . . . . . . . . . . . . 16
7 Class diagram of client module . . . . . . . . . . . . . . . . . . . . . 24
8 Arrangement of Microsoft Kinects in Pixel Island . . . . . . . . . . . 27
9 Microsoft Kinect connected to SBC. . . . . . . . . . . . . . . . . . . 28
10 Face detection application using SmartLab . . . . . . . . . . . . . . . 29
11 Depth stream output without data compresssion . . . . . . . . . . . 32
12 depth stream result with data compresssion . . . . . . . . . . . . . . 33
13 Color stream output without data compression . . . . . . . . . . . . 34
14 color stream output without data compression . . . . . . . . . . . . . 35
15 depth and color image streams output without compression . . . . . 36
16 network statistics for depth and color stream collected from two
odroids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
17 network statistics for depth and color stream collected from single
Lattepanda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
![Page 7: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/7.jpg)
1
CHAPTER 1
BACKGROUND AND RATIONALE
Smart environment is defined as a physical world that is equipped with sen-
sors, actuators, embedded devices and interconnected seamlessly through a network.
Recently, smart environment has become prominent research topic since it plays
a key role in predicting health, lifestyle and wellbeing of humans. Due to its ap-
plication in various fields this research received several transformations in terms of
hardware utilization as well as software practices. The concept of smart environments
evolved from the term ubiquitous computing according to Mark Weiser. Ubiquitous
computing can occur on any device, this type of computing utilizes the supporting
technologies such as embedded hardware, internet protocols and sensors. The focus
of SmartLab is to develop smart environment with low cost infrastructure.
SmartLab is an interactive lab environment which can identify individuals and
monitor activities. SmartLab Infrastructure Project(SLIP) is focused on building a
low cost infrastructure to acquire a variety of data including RGB, depth and infrared
from motion sensing sensor like Kinect [1], placed on the ceiling and walls of Pixel
Island Lab at Texas A&M University-Corpus Christi using Single Board Comput-
ers(SBC). Availability of low-cost motion sensing sensors such as Microsoft Kinect
360 [1] reinforced the SmartLab research. Human-computer interaction became more
amicable with the advent of multi sensor devices like Kinect. However, interaction
with Kinect to obtain data is still in its naive stage. Particularly interacting with
multiple sensors simultaneously is a complex hardware limitation as mentioned by
Mario Mart and Miguel Pedraza [2]. There were few researchers who addressed this
problem and developed a system for it. One such system that we came across is
![Page 8: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/8.jpg)
2
constructed as a distributed system that uses TCP protocol to stream the data from
the server to a client [2]. But the system still uses powerful desktop system which
are expensive and contradicts the idea of inexpensive infrastructure for smartlab.
In this work, the focus is on developing a distributed system that is economically
subtle and easy to setup. We have chosen cost effective yet powerful Single Board
Computers(SBC’s) for smartlab. Later sections talk more about the SBC’s and their
applications. In addition to these tiny computers, we have chosen a well-known con-
sumer camera, Microsoft Kinect xbox 360 [1]. These two in combination provide a
reasonable system for smartlab.
1.1 Single Board Computers(SBC)
A single-board computer (SBC) is a complete computer built on a single cir-
cuit board, with microprocessor(s), memory, input/output (I/O) and other features
required for a functional computer. Compared with desktop computers SBC’s are
compact and consume less power. Moreover, SBC’s are significantly cheaper than
PC’s and also powerful enough to perform solitary tasks, in turn they are good re-
placement to PC’s where multitasking is not a priority. For example, Odrioid-XU4
a $70 Single Board Computer has processor speed of 2GHz where as the first gen-
eration Pentium Quad Code desktop has 2.16GHz processor speed which is almost
comparable. Applications of SBC’s are typically home automation, robot control,
media players, and personal cloud storage servers etc. Among all the SBC’s available
in market Raspberry Pi is famous for its low cost and ease. In addition to Raspberry
Pi, other boards like Odroid, Banana Pi, Orange Pi, Cubieboard and recent windows
10 board Lattepanda are much more powerful and have diverse applications. The
choice of SBC for SmartLab is made by considering three features; cost, ethernet
![Page 9: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/9.jpg)
3
specifications, and processing power. For this project the ability of different SBC’s
like Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the
three boards perform satisfactorily, but for Raspberry pi, we have to compromise
with lesser video frame rate.
1.2 Microsoft Kinect 360
To acquire multiple data streams such as RGB, depth and infrared, there
are a number of devices available such as stereo cameras, time of flight cameras and
consumer motion sensing cameras such as Asus Xtion [3], Microsoft Kinect [1], Struc-
ture [4] sensors. Amongst all these motion sensing devices available in the market
Microsoft Kinect stands out for its reasonable cost and satisfactory frame rates and
resolution. Kinect 360 also called Kinect for Xbox 360 is a combination of Microsoft
built software and hardware. Kinect 360 hardware includes a range of chipset tech-
nology, which consists of an infrared projector, camera and a special microchip that
generates a grid from which the location of a nearby object in three dimensions can
be ascertained. Though the Kinect is released for games, the usability of the sensor
in the computer vision field makes it popular among the research groups. Presently,
there are several software tools available to interact with the Kinect, among them
the popular ones are Microsoft official SDK, OpenNI, and LibFreenect. Microsoft
SDK is windows only and the remaining two software’s are multi-platform. A de-
tailed comparison of these software’s are presented by Han, Jungong and Shao, Ling
[5]. These software provide access to the RGB and depth and infrared sensors of the
Kinect, Figure1 [5] shows the hardware configuration of Microsoft Kinect 360 and
sample images from RGB and depth sensors. OpenNI works along with a middleware
called NiTE to provide high-level features namely hand tracking and human skeletal
![Page 10: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/10.jpg)
4
joints. The wide applications of Kinect in Computer vision and its ability to track
human skeleton are the primary reasons to choose it as data collection sensor.
Figure 1: Kinect V1 hardware configuration and images from RGB and depth
camera.
1.3 Computer Vision for SmartLab
Computer vision is an interdisciplinary field that deals with how computers
can be used to gain high-level understanding from digital images or videos. Computer
vision tasks include methods for acquiring, processing, analyzing and understanding
digital images, and in general, deal with the extraction of high-dimensional data
from the real world in order to produce numerical or symbolic information. When
streaming data from the static camera, we face the problem of sending the back-
ground data multiple times when is not changing. To avoid this problem and to
extract only sensible data, background subtraction is used. In this technique the
image’s foreground is extracted for further processing [6]. Background subtraction is
a widely used approach for detecting moving objects in videos from static cameras
[7]. The rationale for the approach is to detect moving objects from the difference
between the current frame and a reference frame, often called as ”background im-
age”, or ”background model”. Each server application employs this technique and
![Page 11: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/11.jpg)
5
sends only essential data to the client. By employing this technique the network
bandwidth utilized by each server is reduced.
1.4 Network Interface
A novel TCP/IP based client-server paradigm is developed using low-level
sockets for devising a sophisticated network interface for the SmartLab. Sockets al-
low network software applications to communicate using standard mechanisms built
into network hardware and operating systems. TCP/IP (Transmission Control Pro-
tocol/Internet Protocol) is the basic Internet communication protocol. TCP/IP is a
four-layer protocol, the higher layer is Transmission Control Protocol that manages
assembling of a message into smaller packets that are transmitted over the Internet.
The lower layer is called as Internet Protocol that handles the address part of each
packet. In the SmartLab application, the data streamed over the network is crucial,
as the data is used for critical application such as face recognition, object detection
etc. on the client side. TCP is selected for its reliable, ordered, and error-checked
delivery of a stream of bytes. Moreover, network interface implemented via sockets
does not have the programming language barrier and provides low-level access to the
network. So, we can easily modify the application layer over it.
1.5 Pixel Island lab
Pixel Island Lab is the research facility available at Texas A&M University
- Corpus Christi, the mission of Pixel Island is to conduct research in computer
graphics and visualization, to be a source of expertise in these areas for the campus,
and to educate students in these areas. Pixel Island currently has two major focus
areas: face-to-face human-computer interaction and visualizing scientific data.
![Page 12: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/12.jpg)
6
1.6 Related work
Implementation and selection of sensors differentiate many smart environ-
ments from one another. Study for smart environments recommended three foremost
research works. Firstly, Aware Home Research Initiative (AHRI) [8] at Georgia In-
stitute of Technology is a interdisciplinary research project for analyzing health and
well-being, providing entertainment and child study. Secondly, MIT Media Lab has
a research project named House n [9], this project provides the environment for sci-
entific study. Finally, MavHome [10], the smart home research project developed by
University of Texas at Arlington, this project involved building a intelligent agent
that maximizes the comfort of inhabitants. Alongside the research work done by
Maurizio Caon and Yong Yue [11] talks about context aware gesture interactions
based on multiple Kinects. Moreover, all these systems acts as an inspiration to
implement a personalized smart environment in Pixel island lab.
![Page 13: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/13.jpg)
7
CHAPTER 2
PROJECT OVERVIEW
2.1 Project objective
The goal of SmartLab Infrastructure Project is to build low cost infrastructure
for extracting 3D data from multiple Microsoft Kinects. This system also focuses
on transferring the data over the network effectively. The use of this extensive
data collection setup helps researchers easily set up monitoring system that can be
employed in useful applications, such as those related to security and surveillance,
human behavior analysis and patient health care.
In this project we setup multiple Kinects on the walls and ceiling of our pixel
island lab. In general, a personal computer is required to interact with each Kinect,
but in our system, in opposite to this general approach, we utilized Single Board
Computers that are hooked with Kinect. Server module running on SBC’s obtain
RGB, depth and human skeleton information from Microsoft Kinect. The server
application performs Gaussian background subtraction [6] on RGB and creates a
mask to obtain only sensible data that changes from frame to frame. Apart from
data collection and understanding, the server module also streams the data over
the network with a novel protocol built on top of TCP/IP. On the other hand, the
client module is responsible for interacting with multiple servers simultaneously and
collecting the data obtained over the network. Client module process the data and
reconstructs it to obtain the original RGB, depth and infrared images. Moreover, the
huge data obtained on the client side is utilized for human monitoring applications.
![Page 14: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/14.jpg)
8
2.2 Requirements
The main focus of this project as stated in the earlier section, is building the
infrastructure, to interact with multiple Kinects. More specifically, this project will
enable researchers to develop futuristic application for human monitoring. Addition-
ally, the following are the required characteristics of the SmartLab Project.
• Inexpensive: Building a multiple data collection system is never inexpen-
sive but, in order to achieve this goal, the low cost motion sensor Microsoft
Kinect 360 is selected. Dealing with multi-array data sensors require power-
ful computers which is not an economic solution. Research on various Single
Board Computers showed that SBC’s can work with Microsoft Kinect effec-
tively. SBC’s make a viable solution to cut off the costs. Overall the hardware
selected for building SmartLab is economical and also unprecedented.
• Portability: While selecting SBC’s we came across several effective boards
which have varying operating software. Specifically, to mention Raspberry Pi
and Odroid are compatible with running Ubuntu mate 16.04 and Lattepanda
is able to run only windows 10. SmartLab application is intended to run on
any kind of SBC, hence the development of server application should be done
in such a way that the application is highly portable with minor changes.
• Incorporate: SmartLab Infrastructure Project can be incorporated into many
applications such as Surveillance system, clinical applications, gait analysis,
and fall detection. To make this application generalized to all other fields
the design and development are planned accordingly. Data obtained from the
SmartLab, RGB and depth and infrared are collected as simple data format.
This allows researchers to comfortably combine SmartLab to any functional
![Page 15: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/15.jpg)
9
module.
![Page 16: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/16.jpg)
10
CHAPTER 3
SYSTEM DESIGN
This chapter illustrates the functional phases of SmartLab system. Each block
contains different software components that are executed sequentially. Figure 2 show
the abstract flow diagram of the SmartLab system. Section 3.1 lists the hardware
and software requirements for SmartLab system.
Figure 2: SmartLab abstract architecture.
In the fallowing sections, details about the three phases of the SmartLab
are discussed. The first phase deals with data collection from Microsoft Kinect,
this phase is responsible for collecting RGB, depth, infrared and human skeleton
joints(only with Lattepanda) at 30 frames per second. The second phase is network
![Page 17: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/17.jpg)
11
phase where data is transmitted to the client. The last phase is a centralized client,
data collected over the network is processed and displayed to the user.
3.1 Hardware and Software requirements
• Microsoft Kinect 360
– RGB video camera
– Depth sensor
– Infrared camera
• Single Board Computers(SBC’s)
– Lattepanda [12]
– Ordroid XU4 [13]
– Raspberry Pi
• OpenNI 2 and NiTe 2
– OpenNI 2 - Open Natural Interaction [14]
– NiTE 2 - Natural Interaction Technology for End-user [15]
3.2 Data collection phase
In this phase, Single Board Computers interact with Microsoft Kinect and
obtain RGB, Infrared, depth and human skeletal joints information. Figure 3 shows
each component of data collection phase. In order to communicate with the Kinect, a
range of software tools is available namely, Libfreenect, OpenNI and official Microsoft
Kinect SDK[18]. OpenNI is multiplatform and open source tool which made it a
![Page 18: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/18.jpg)
12
preferable Kinect software tool. OpenNI works along with compliment middleware
NiTE and provides human skeletal data along with RGB and depth streams. Kinect
provides 640x480 pixels 8-bit RGB image and also 11-bit monochrome depth image
with the same resolution at a default frame rate of 30Hz. Typically, NiTE also
processes the human joints at the same rate. The size of the data generated by
Kinect per second by default is provided in the equation 3.1
Total size of a data generated per second = [ (640 * 480) * 2 bytes depth+
(640 * 480) * 3 bytes RGB+ 4 * 3 * 15 Joints] * 30 fps = 43.95 Mbytes per second
(3.1)
Theoretically, the size of the data generated by Kinect is 43.95 MB per second. This
summarizes that Kinect generates a lot of data. It is not a good idea to send this
huge data over the network because most of the collected data is redundant. Firstly,
after data collection the important step is to apply data reduction techniques based
on background subtraction. MOG2 is a sophisticated background and foreground
separator algorithm proposed by Z.Zivkovic [6]. MOG2 extracts a foreground mask
by learning from the video stream. MOG2 background subtractor works indefinitely
for the RGB image. Human skeleton joints are insignificant in size compared to
depth and RGB images and do not need any reduction mechanisms.
![Page 19: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/19.jpg)
13
Figure 3: Detailed architecture of data collection phase.
Secondly, serialization of data into character array is a major task. Processed
RGB, depth, and skeleton joints are serialized into a string object, in order to send
over the network. The data serialization involves a specific encoding format with
RGB+depth+joints, selection of this flow makes de-serialization simple on the client.
Thirdly, compression using Zlib [16] is an essential part of data collection
phase. Compression further minimizes the redundant data in the serialized string.
Zlib is free, general-purpose, lossless compression library for both Windows and Linux
operating systems.The estimated reduction of actual data(43.95 MBps) is by 50%,
approximately equivalent to 20 MBps. This estimate is based on the analysis per-
formed on a single RGB image of size 900KB. Utilizing both background subtraction
and Zlib compression, this RGB image size is reduced to 141KB, which is 82% re-
duction. But, taking the worst case scenarios into consideration and also scaling to
![Page 20: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/20.jpg)
14
1.46 MB(each frame size contains RGB, depth, infrared and human skeleton joints)
will justify the estimated 50% reduction. The compressed data is forwarded to the
network phase where the server streams over the network.
3.3 Network phase
Network phase completely deals with client-server communication. Intercon-
nection and setup of this phase are illustrated in figure 4. In order to transmit
data over the network TCP/IP based client-server protocol is implemented Multiple
servers running simultaneously provides large network traffic. To simulate the actual
inter networking of SmartLab environment a local area network is setup with a router
and a network switch. A centralized client collects RGB, depth and infrared data
from individual server. Data obtained by the client is further processed for obtaining
original 3D data.
Figure 4: Network interconnection for SmartLab.
3.4 Centralized client
Figure 5 show the modules in central client, also the implementation details
and hardware specifications of the client system are mentioned. The centralized
![Page 21: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/21.jpg)
15
client module collects the data from the various servers and display it to the user
or provides a way to utilize the data in some other applications such as human
monitoring.
Figure 5: Centralized client module.
The centralized client is implemented on Intel x86 i7 computer with 12 GB
of RAM. The multi-threaded program runs on the client with each thread dedicated
to the single server. Once the data is collected by the client a series of operations
occur. Firstly, decompression and then de-serialization at last image reconstruction.
RGB, depth and skeleton data can be obtained by any application using a function
call.
![Page 22: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/22.jpg)
16
CHAPTER 4
IMPLEMENTATION
To build an effective and reliable infrastructure for Smartlab, the system is
modularized to have good scope for re-usability. Figure 6 and 7 shows the modules
of Smartlab architecture, on the higher level the entire Smartlab architecture is
divided into two modules the server module and client module and these modules
are further divided into sub-components. Appendix A explains in detail about, how
to set up Smartlab environment on both Single Board Computers and desktop client.
The functioning of each module and interaction between the sub-components will be
discussed in the following sections.
Figure 6: Class diagram of server module
4.1 Server Module
As discussed in section 3.1, Single Board Computers interact with Microsoft
Kinect and obtain RGB, Infrared, depth and human skeletal joints information. It
![Page 23: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/23.jpg)
17
is the server module which is set to run on the SBC to obtain data from Microsoft
Kinect sensor. In order to implement this module, the main challenge is finding
the most suitable library that helps to interact with Kinect. After intense research,
we noticed that the top three libraries on the list are OpenNI 2.2 [14], Libfreenect
[17] and Microsoft Kinect SDK 1.8 [18]. The next task is to perform a benchmark
analysis on all these three libraries and select the best amongst them. The factors
which are considered to preform benchmark analysis are as follows: using simple API
calls, multi-platform support, easy integration with other modules, and open source
support. Table 1 provides a comparison overview of all the three Kinect interface
libraries. In addition to the benchmarking features, libraries have been tested by
writing sample programs that actually simulates the server module. Finally, OpenNI
is selected for implementing interaction with Kinect. This library is selected not only
to achieve all our benchmarks but to support wide verity of sensors such as Asus
Xtion [3], structure sensor [4]. We are positive that in the near future with the help
of OpenNI it is possible to replace Microsoft Kinect with any of the aforementioned
sensors. OpenNi 2.2 library provides access to three video streams of the Kinect
namely, depth, RGB, and infrared. However, to obtain the skeleton joints of a
person in the video stream we need to use a third-party middleware library NiTE
[15]. NiTE is developed by Primesense, the same company that developed OpenNI
as well. For network interface Boost.asio [19] library is selected, boost is a header
only library for c++ and also users have the option to select only a few components
of the library for linking the program, this makes it more viable when developing on
low power devices such as Single Board Computers.
![Page 24: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/24.jpg)
18
Table 1: Benchmark analysis of three Kinect libraries
OpenNI Libfreenect Microsoft KinectSDK
API calls simple to use not that simple Complex
Multi-platform sup-port
Linux, windows,Mac
Linux, Windows,Mac
Only windows
Integration withother modules
Easily integrates Low level driver,complex to inte-grate
Compatible withwindows only soft-ware
Open source support Available Available Support availablefrom Microsoft blog
Overall, the server module is subdivided into different components such as
Kinect data, TCP server, Data structure, and configuration. A multi-threaded ap-
proach is followed to implement server module, Figure 6 shows the overview of the
server module class design and thread execution. The following sections give more in-
formation about each component and how they are coordinated to achieve a reliable
system that runs on low-powered devices.
4.1.1 Kinect Data
Kinect data is a component of the server module that utilizes OpenNI [14]
for obtaining depth and color streams, kinectdata object is instantiated in the main
function and all the operations of the kinectdata class runs on the main thread. The
server module continuously collects data from Kinect on a dedicated program thread.
• kinectdata::run(): run is the first function called from the main method,
this method is responsible for updating the Kinect data between several client
interactions. Initializing Kinect, starting video capture and reading data from
different streams is performed by calling the corresponding function in run()
method. After completion of the each client session, all the previously selected
![Page 25: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/25.jpg)
19
Kinect streams are suspended thereby making the server module ready for the
next session.
• kinectdata::init kinect(): This function opens the Kinect device instance
and returns STATUS OK signal. If any error occurs in accessing the Kinect
device, an exception is raised and a STATUS ERROR signal is returned. All
other Kinect related functionality such as starting a video stream or reading a
frame happens only after this function is called.
• kinectdata::init videocapture(): init videocapture is responsible for creat-
ing the selected stream among the available three video streams depth, RGB
and infrared. For creating a particular stream the required parameters are to be
initialized openni::device, selected openni::VideoStream, and its corresponding
SensorType. If the selected stream is already created it returns STATUS OK
or otherwise it opens a new stream with default video mode.
• kinectdata::read frames(): Once the client session is initiated the corre-
sponding streams selected by the client are created by kinectdata::init videocapture().
After stream creation, kinectdata::read frames() functions continioulsy looks
for any available stream using openni::OpenNI::waitForAnyStream function for
a predefined timeout, if any stream is available it grabs the frame and writes
to the corresponding data buffer.
4.1.2 TCP Server
TCP server component is responsible for network operations in server mod-
ule, Boost.Asio library [19] is used to implement tcp server. Boost.Asio [19] is a
cross-platform C++ library for network and low-level I/O programming that pro-
![Page 26: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/26.jpg)
20
vides developers with a consistent synchronous and asynchronous model. tcp server
is basically a synchronous program that creates a TCP socket and continuously ac-
cepts clients on a user defined port. Once the client is connected, the configuration
file is read from the client and the configuration parameters are updated locally so
that the Kinect starts reading the selected frames. Whenever the data is available
from the Kinect, the tcp server sends data to the client over the TCP socket. The
main() method creates a tcp server thread for network operations. The members of
tcp server class are as follows:
• tcp server::run(): The main() method creates a network boost::thread, so
that all the client sessions that only in the network thread. run() method is the
starting point of the tcp server class which will internally call the accept client
method.
• tcp server::accept client(): accept client() method continuously accepts
client connections over the socket and once the client gets connected tcp session
is initiated. If tcp session is completed tcp server again waits on acceptor.accept(socket)
until the next connection
• tcp server::tcp session(): A single tcp server::tcp session() consists of one
configuration read and several data writes Initiallly tcp server reads the con-
figuation sent by the client and updates it to local config file. The data
in data buffer is updated by the thread and set the ready flag. Whenever,
tcp server::tcp session() reads the data ready flag it will initiate the write ses-
sion.
![Page 27: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/27.jpg)
21
4.1.3 Server Data structure
In the server module, data is obtained from a Kinect and transferred over
the network. However, Kinect data obtained in different formats such as RGB,
depth , infrared and person skeleton joints. In order to format the data obtained
from the Kinect, a data structure is necessary. Server module data structure have
two buffers, one for reading configuration data from the client and second buffer to
collect data from the Kinect. In addition to these buffers, a lock-free queue is also
implemented to share data between the Kinect thread and the network thread. A
static data structure object is shared across different threads to maintain consistency.
The read buffer only holds configuration data received from the client, read buffer
is updated only when a new client session occurs. The write buffer is a complex
structured buffer formed by concatenation of selected data frames. In other words,
if client requests depth, color and body joints, the write buffer is constructed by
appending depth followed by color and body joints. This complex design is chosen
for two main reasons, one is network aspect and other is coordination between the
client and server.
The data structure also houses a synchronous communication mechanism be-
tween Kinect thread and TCP server thread. A lock-free communication system
is implemented in server data structure component, the main intention to select
lock-free mechanism is to avoid thread waiting and improve performance without
mutex locks. Also, server module runs on low power devices, consequently choos-
ing a wait-free mechanism significantly improves performance when compared to
locks. boost::lockfree:spsc queue [19] provided by boost library is thread-safe lockfree-
container. Multiple threads can access lockfree containers without having any syn-
chronization, the abbreviation spsc stands for single producer/single consumer. The
![Page 28: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/28.jpg)
22
lockfree queue is technically implemented as a ring buffer with ordering mechanism,
unlike mutex locks, lock-free buffers does not have busy waiting, so they are fast and
have less overhead on the operating system. The Kinect thread is responsible for
serializing different data streams into write buffer and then sends it to spsc queue,
where as TCP server thread de-queues the data and sends it to the client.
4.1.4 Server Configuration
The principal design of smartlab is modular in other words each phase of
smartlab is configurable. Users can select the type of data they wants from the
server module, to enable this the server module is equipped with configuration com-
ponent. The config component obtains data from the client and parses it to select
the necessary data stream from Kinect. Configuration buffer is in JSON format as
shown below with parameters either set to true or false.
"VIDEO_CONFIG":{
"IMAGE_CONFIG":{
"RGB_IMAGE":true,
"IR_IMAGE":false
},
"DEPTH_CONFIG":{
"DEPTH_MAP":true,
},
"BODYJOINTS_CONFIG":{
"SKELETON":true
},
"BACKGROUND_SUBTRACTION":{
![Page 29: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/29.jpg)
23
"RGB_SUBTRACTION":false,
},
"COMPRESSION":{
"SELECTED":true
}
}
For example, in the above configuration RGB, depth images and body joints
are selected. However, background subtraction is set to false and data compression
is enabled. Server program by parsing the config buffer will enable the respective
module and prepare the data before sending to the client.
4.2 Client Module
As discussed in section 3.3 the client module is responsible for collecting data
from multiple servers and provide a way for the user to utilize this data for further
processing. The implementation of client module is different from the server, it
consists a network componet, user interaction component and display component.
However, the data structure and configuration components are almost similar to that
of the server. The network component houses a TCP client module to communicate
with the TCP server. The client module dedicates a thread to each server, data
collected by each thread is added to a one dimensional array of lockfree queue.
Figure 7 shows the implementation of multi-threaded client module. The following
sections describe more about sub components of client module.
![Page 30: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/30.jpg)
24
Figure 7: Class diagram of client module
4.2.1 TCP Client
The TCP client component is responsible for interacting with a server, to send
user configuration and retrieve data accordingly. The implementation of TCP client
is similar to that of the server. Boost.Asio [19] the library used for implementing
server is also used for the client. The client module creates an individual thread
for each server and assigns them the task to continuously interact with the server.
Each TCP client thread connects to its corresponding server using IP address and
port number read from the configuration file. In addition, to connection details, each
thread is assigned an id number so that they can write the retrieved data into a buffer
with the same id. The static member function run() of tcp client class is passed to
boost::thread with connection details and server id number. The run() function
establishes the connection to the server and initiates a TCP session. The following
tcp client class members give more details about the TCP Client component.
• tcp client::run(): run() is the static member function that is first called
when initializing the client thread. The parameters that are required to be
passed to this function are server details such as port number, IP address
![Page 31: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/31.jpg)
25
and Id number. After initializing all the parameter in tcp client object, it is
connected to the server.
• tcp client::connect server(): The client thread connects to the server using
IP address and port number read from the configuration file by the main thread.
• tcp client::tcp session(): After the connection is established, client thread
writes the video configurations read from config.json file to the server. The
server then writes the serialized data based on the configuration parameters
and is followed by writing data to the lock-free buffer.
4.2.2 Client Data structure
The data structure of client module is very similar to that of server except
for one-dimensional lock-free buffer. This data structure also has a config buffer and
a read buffer, the config.json file is read into config buffer which is later sent to the
server. The serialized data received from the server is read into the read buffer. In
addition, to these two buffers one-dimensional lock-free queue is also initialized and
the client thread queues the read buffer to the respective index of the lock-free buffer
queue.
4.3 Background Subtraction
Background subtraction is a major pre-processing step in many vision based
applications. If we have a static camera we can always subtract the background
from the current frame and obtain only the changes, but this is not easy when the
room is illuminated with multiple lights. The shadows of the objects confuse vi-
sion algorithms. In order to avoid this MOG2 [6] background subtractor is utilized.
![Page 32: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/32.jpg)
26
This subtraction algorithm is Gaussian Mixture-based Background/Foreground Seg-
mentation Algorithm. One important feature of this algorithm is that it selects the
appropriate number of Gaussian distribution for each pixel. It provides better adapt-
ability to varying scenes due to illumination changes etc. Including this background,
subtraction not only reduces the data to be transferred but also eliminates initial
preprocessing of data for many vision applications.
4.4 Data Compression
Data compression step in server module is performed before the network trans-
mission. The use of data compression excludes the redundant data and decreases
the load on the network. On the client side, the received data is decompressed and
deserialized in further steps. Zlib [16] is the lossless compression library that is used
in the smartlab application.
![Page 33: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/33.jpg)
27
CHAPTER 5
RESULTS AND EVALUATIONS
The foremost objective of SmartLab Infrastructure Project is to set up a
reliable infrastructure to collect 3D data from depth sensors. In order to achieve this
goal we have arranged hardware in the Pixel Island Lab and developed software for
it to attain a reliable data acquisition rate. This chapter illustrates how hardware
components such as Microsoft Kinect and Single Board computers are coupled with
each other. Furthermore, an analysis of data acquisition rates on different SBC’s is
presented.
5.1 Smartlab Hardware setup
Smartlab infrastructure involves two components, motion sensing sensor Mi-
crosoft Kinect and Single Board Computer. Firstly, the Kinects are mounted on the
ceiling of the Pixel Island Lab.
Figure 8: Arrangement of Microsoft Kinects in Pixel Island
![Page 34: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/34.jpg)
28
The Kinects are arranged to cover most of the lab, figure 8 shows a part of the
lab where Microsoft Kinects are arranged. Each Kinect is connected with a Single
Board Computer(SBC) and these SBC’s are connected to the network through a
switch. Figure 9 shows an individual Kinect and SBC pair.
(a) Kinect mounted on ceiling(b) Single Board Computers
Figure 9: Microsoft Kinect connected to SBC.
5.2 Smartlab system usage
Infrastructure for SmartLab is set up with a focus to provide reliable and
effective data collection mechanism for research. The SmartLab system can be ex-
tended to implement sophisticated applications such as Facial recolonization, Object
detection and health care analysis. As a naive step to implement such complex
application, a face detection program is developed. Figure 10 shows results for face
detection application. Similar to this application researchers can make great progress
and develop many other sophisticated applications.
![Page 35: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/35.jpg)
29
Figure 10: Face detection application using SmartLab
5.3 Smartlab software results
Smartlab Infrastructure project comprises of two software modules server
module and the client module. The server module collects different data streams of
Microsoft Kinect 360 [1] such as depth, color(RGB), IR and human skeleton joints.
Client module can select individual streams or combination of the streams and re-
ceive data accordingly. Along with data streams, data compression and background
subtraction are additional features that can be selected in server module. The per-
formance of the smartlab system is analyzed on two factors. Firstly, the frame rate
at which the server module is capturing data from Kinect. Typically, the default
output video frame rate of Kinect 360 is 30fps. But, the computational capability of
the host machine effects the capture frame rate. Secondly, the data retrieval rate at
![Page 36: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/36.jpg)
30
client side is also taken into consideration for analyzing network bandwidth utiliza-
tion. Analysis is done on selecting each data stream and the results are presented in
the following sections
The hardware components utilized in the analysis are two Single Board Com-
puters(SBC) Odroid-XU4 [13], Lattepanda [12] and depth sensor Microsoft Kinect
360 [1]. Odroid-XU4 has cortex A15 2GHz processor with 2GB of RAM and Lat-
tepanda has intel quad core 1.8GHz processor and 2GB of RAM. Odroid runs on
linux operating system where as Lattepanda is windows SBC. The server module is
tested on the above mentioned SBC’s and the client module is tested on general PC
with an i7 processor, 12 GB of RAM and Gigabit ethernet port. Odroid-XU4 also
has a gigabit ethernet port and Lattepanda has 100Mbits Ethernet capability. The
aforementioned properties of the hardware impacts data capture and transfer rate.
The following sections discuss more on how a trade off occurs between computational
power and network bandwidth usage.
5.3.1 Depth data stream
A depth frame collected from the Kinect sensor is 640x480 pixels with 2 bytes
(by default 11 bits per pixel but computers store each pixel in 16 bits) for each pixel.
This sums up to 614,400 bytes collected for each frame. The default frame rate of
depth stream is 30 fps(frames per second). So, the total data collected from Kinect
by SBC per second is 17.578MBytes(140.625Mbits). Figure 12a is depth stream out-
put on client side. Odroid and Lattepanda are efficient to capture the data at 30
frames per second. However, Odroid is able to stream data to the client at 30 fps
as evident from the Figure 12b, but Lattepanda suffers from bandwidth limitations
while transferring data over the network, considering it’s 100Mbps LAN port. Fig-
![Page 37: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/37.jpg)
31
ure 12c shows data receiving rate on the client side when depth data is streamed
from Lattepanda and the frame rate is approximately equivalent to 20fps. However,
data compression reduces the load on the network but computation performed for
compression reduces the data capture rate in SBC. Subsequently, the frame rate on
the client is reduced to 16fps. Figure 12b and 12c shows network throughput of
compressed depth data. This is incident both in Odroid and Lattepanda.
![Page 38: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/38.jpg)
32
(a) depth stream output on client module (b) network throughput for depth streamfrom odroid
(c) network throughput for depth stream from Lattepanda
Figure 11: Depth stream output without data compresssion
![Page 39: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/39.jpg)
33
(a) depth stream frame rate with compression from Odroid
(b) network throughput for depth streamwith compression from Odroid
(c) Network throughput for depth streamwith compression from Lattepanda
Figure 12: depth stream result with data compresssion
5.3.2 Color data stream
The default color frame uses 8-bit video resolution (640x480 pixels and each
pixel have three 8-bit channels each for storing R, G and B values) as shown in
figure 13a . At default frame rate of 30fps, the data captured by the SBC is
26.367MBytes(210.937Mbits). Odroid XU4 is successful in streaming the data at
30fps but Lattepanda is not that efficient and it is able to attain an average frame
rate of 10fps. Figure 13b and Figure 13c shows the network statistics of color frame
![Page 40: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/40.jpg)
34
streaming done by Odroid and Lattepanda.
(a) color stream(RGB) output on client mod-ule
(b) network throughput for color stream fromodroid
(c) network throughput for color stream from lattepanda
Figure 13: Color stream output without data compression
Data compression of color streams also has an impact on data capture rate
of the SBC. The data capture frame rate is reduced to 9 fps in odroid and 4 fps
in Lattepanda(originally 30 fps from Kinect). Utilization of background subtraction
further reduces the data capture rate and but provides a better compression result.
![Page 41: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/41.jpg)
35
Figure 14 shows the results obtained by utilizing data compression and background
subtraction.
(a) network throughput with data compress-sion
(b) frame rate of color stream with data com-presssion
(c) color stream output with backgroundsubtraction and data compresssion
(d) network statistics for color stream outputwith background subtraction and data com-presssion
Figure 14: color stream output without data compression
![Page 42: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/42.jpg)
36
5.3.3 Depth and Color data combination
Figure 15: depth and color image streams output without compression
Depth data and color(RGB image) data together sum up to 43.95Mbytes at a
frame rate of 30fps. When the same data is collected from two SBC’s then the size is
doubled equivalent to 2x43.95 Mbytes(703.125 Mbits). Two Odroids simultaneously
sending data to client are comfortably able to achieve 100% frame rate(30 fps),
where as single Lattepand is able to achieve only 8 fps. Figure 16 shows the network
throughput obtained from two odroids and Figure 17 shows throughput from single
Lattepanda.
![Page 43: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/43.jpg)
37
Figure 16: network statistics for depth and color stream collected from two odroids
Figure 17: network statistics for depth and color stream collected from single Lat-
tepanda
![Page 44: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/44.jpg)
38
5.3.4 Factors influencing SmartLab software performance
In order to analyze the SmartLab system, different performance metrics have
been tested by setting up a wired connection between the SmartLab server and client.
Firstly, network bandwidth of the system including the Ethernet specifications of
SBC and desktop client. Table 2 and Table 3 shows that Odroid is able to send
both color(RGB) and depth data to the client at 30 frames per second. On the
other hand, Lattepanda is able to achieve only 8 fps. The major difference between
these two boards is Ethernet port, Odroid has a Gigabit port where as Lattepanda
has 100Mbps port. Therefore, network bandwidth seriously effects the data transfer
rate and it is similar case with wireless network. Secondly, the data compression
rate on the server side also effects the SmartLab performance. Table 4 and Table 5
shows data compression results. From the results it is evident that data compression
effects the data collection rate of the server, because most of the computational power
is invested on compression. However, compression reduces the load on network as
shown in Table 5. In addition, to the aforementioned two factors processing power
and type of compression technique also effects the performance of SmartLab.
Note: All the experiments were conducted in wired network.
Table 2: Data capture and receiving rate without compression on Odroid and Lat-
tepanda
Odroid Lattepanda
Analysis Factor Capture rate(in fps)
Receiving rate(in fps)
Capture rate(in fps)
Receiving rate(in fps)
Depth 30 30 30 20
Color 30 30 30 13
Depth & Color 30, 30 30, 30 29, 27 8
Infrared 30 30 30 30
![Page 45: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/45.jpg)
39
Table 3: Network throughput with out compression
Odroid Lattepanda
Analysis Factor data collected(In Mbps)
networkthroughput(In Mbps)
data collected(In Mbps)
networkthroughput(In Mbps)
Depth 140 153 140 98.7
Color 210 225 210 67
Depth & Color 351 370 328 85
Table 4: Data capture and receiving rate with compression on Odroid and Lat-
tepanda
Odroid Lattepanda
Analysis Factor Capturerate(In fps)
Receivingrate(In fps)
Capturerate(In fps)
Receivingrate(In fps)
Depth 17 17 4 4
Color 9 9 3 3
Depth & Color 5, 5 5, 5 2, 2 2,2
Color backgroundsubtracted
11 11 5 5
Table 5: Network throughput with compression
Odroid Lattepanda
Analysis Factor data collected(In Mbps)
networkthroughput(In Mbps)
data collected(In Mbps)
networkthroughput(In Mbps)
Depth 79 9.3 18.73 1.3
Color 63.21 55.5 21.09 7
Depth & Color 59 48 23.43 6.9
![Page 46: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/46.jpg)
40
CHAPTER 6
CONCLUSION AND FUTURE WORK
The impact of Smart environments on human life is continuously increasing,
with the advent of low priced hardware. The research in the development of smart
environments is revamping. In order to realize our dream to have a smart environ-
ment in Pixel Island lab at Texas A&M University-Corpus Christi, the SmartLab
project has been started. As an initial step of this extensive project, we proposed
a novel and promising system for SmartLab infrastructure using Single Board Com-
puters and depth sensor like Microsoft Kinect. The main motivation to build this
system is to provide an infrastructure to the researchers in order to efficiently set up
data collection mechanism that can be employed in SmartLab applications such as
security surveillance, human behavior analysis, and smart interaction etc.
The SmartLab infrastructure is started with the focus on having a compact
and cost effective system for data collection. So, the experiments are conducted with
the pocket sized Single Board Computers to collect data from depth sensors like Mi-
crosoft Kinect. Another reason for using SBC’s is their cost effectiveness (typically
below $100). Although these SBC’s have less computation power as compared to
general purpose PC’s, our research demonstrated that they are a good enough for
developing smart environments. We experimented with a variety of Single Board
Computers such as Odroid XU4 and Lattepanda. The experimental results revealed
that Odroid outperforms both in wired and wireless connection. On the other hand,
Lattepanda provides acceptable frame rate for image processing or any other appli-
cations that use 3D data on a wired network.
We utilized multi threading principles and also avoided busy waiting using
![Page 47: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/47.jpg)
41
lock-free buffers to overcome computational limitations of Single board computer.
This approach boosted the data capture rate from Kinect on the server side and also
increased the data retrieval rate on the client side. Moreover, Smartlab software is
also equipped with background subtraction as well as data compression mechanism
and the experimental results reveal that the aforementioned system reduces band-
width usage of each server. Additionally, in the SmartLab system, we also provide
an easy access to specific data that can be one of the fallowing data streams: depth,
color, infrared and body joints unlike other systems where we get everything together
and segregation has to be performed separately to get specific data stream. Overall,
the SmartLab infrastructure project created a reliable and scalable infrastructure for
data collection and processing.
6.1 Future work
The proposed design for creating infrastructure for smartlab can be improved
in multiple ways. In this section, the future work is discussed by highlighting the
addtional components that can be integrated to server module and also the improve-
ments that can be made to client module.
• Server Module: As a part of implementing server on a Single Board Com-
puter, different SBC’s are utilized specifically Odroid-XU4, Lattepanda and
Raspberry PI. Though all these Single Board Computers are efficiently used
for data collection and transferring, their capability is not completely exploited.
To utilize the complete computational power of SBC, all the server components
should run in parallel. At present, the server implementation has data acqui-
sition thread and network thread but it can be extended to have individual
thread for data compression as well as background subtraction. Having mul-
![Page 48: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/48.jpg)
42
tiple threads also reduces the throughput as synchronization between threads
is expensive. However, it would be ideal to implement all the components in
parallel and compare the results with the existing system.
The data collected from the Kinect contains RGB, depth, infrared and
body joints. However, Microsoft Kinect has multi-array microphone, this en-
ables the server module to collect voice commands as sound signals. Implemen-
tation of sound component in server module is part of future research. The
Zlib compression library utilized for data compression on server side is compu-
tationally expensive, implementing a state of the art compression technique is
a necessary step in future.
• Client Module: In the client module, the interest is more about easy extensi-
bility of the project by fellow researchers. The client module is coded in C++
but it is possible to integrate Python code as well using Boost.Python [19].
Since Python is the widely used language for data analysis and machine learn-
ing, it would be more convenient to code when Boost.Python [19] is integrated
in to the client module.
![Page 49: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/49.jpg)
43
REFERENCES
[1] Microsoft Kinect developer page. https://developer.microsoft.com/en-us/
windows/kinect. Accessed: 07-30-2017.
[2] Mario Martınez-Zarzuela, Miguel Pedraza-Hueso, Francisco Javier Dıaz Pernas,
David Gonzalez Ortega, and Miriam Anton-Rodrıguez. Indoor 3d video moni-
toring using multiple kinect depth-cameras. CoRR, abs/1403.2895, 2014.
[3] Asus Xtion specifications. https://www.asus.com/3D-Sensor/Xtion_PRO/.
Accessed: 07-30-2017.
[4] Structure sensor developer page. https://structure.io/. Accessed: 07-30-
2017.
[5] Jungong Han, Ling Shao, Dong Xu, and Jamie Shotton. Enhanced computer
vision with microsoft kinect sensor: A review. IEEE transactions on cybernetics,
43(5):1318–1334, 2013.
[6] Zoran Zivkovic. Improved adaptive gaussian mixture model for background
subtraction. In Pattern Recognition, 2004. ICPR 2004. Proceedings of the 17th
International Conference on, volume 2, pages 28–31. IEEE, 2004.
[7] Roberto Arroyo, J. Javier Yebes, Luis M. Bergasa, Ivan G. Daza, and Javier
Almazan. Expert video-surveillance system for real-time detection of suspicious
behaviors in shopping malls. Expert Systems with Applications, 42(21):7991 –
8005, 2015.
![Page 50: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/50.jpg)
44
[8] Julie A Kientz, Shwetak N Patel, Brian Jones, ED Price, Elizabeth D Mynatt,
and Gregory D Abowd. The georgia tech aware home. In CHI’08 extended
abstracts on Human factors in computing systems, pages 3675–3680. ACM, 2008.
[9] Vincent Ricquebourg, David Menga, David Durand, Bruno Marhic, Laurent
Delahoche, and Christophe Loge. The smart home concept: our immediate
future. In E-Learning in Industrial Electronics, 2006 1ST IEEE International
Conference on, pages 23–28. IEEE, 2006.
[10] G Michael Youngblood, Diane J Cook, and Lawrence B Holder. The mavhome
architecture. Department of Computer Science and Engineering University of
Texas at Arlington, Techinal Report, 33, 2004.
[11] Maurizio Caon, Yong Yue, Julien Tscherrig, Elena Mugellini, and O Abou
Khaled. Context-aware 3d gesture interaction based on multiple kinects. In
Proceedings of the first international conference on ambient computing, applica-
tions, services and technologies, AMBIENT, pages 7–12. Citeseer, 2011.
[12] Lattepanda. [Online; accessed 21-July-2017].
[13] Odroid xu4 - hardkernel. [Online; accessed 21-July-2017].
[14] Openni 2.2. [Online; accessed 21-July-2017].
[15] Nite software. http://openni.ru/files/nite/index.html. Accessed 21-
July-2017.
[16] Zlib manual. https://www.zlib.net/manual.html. Accessed: 07-30-2017.
[17] Libfreenect. Accessed 21-July-2017.
![Page 51: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/51.jpg)
45
[18] Microsoft kinect sdk. Accessed 21-July-2017.
[19] Boost library. [Online; accessed 21-July-2017].
![Page 52: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/52.jpg)
46
APPENDIX A
HOW TO SET UP SMARTLAB ENVIRONMENT
Setting up the smartlab environment is a two stage process. Firstly, we need to setup
the server environment and subsequently the client. From the architecture diagram
2, it is noticeable that smartlab server runs on Single-Board Computer whereas the
client is meant to be run on a general-purpose PC. Smartlab server is designed in
such a way that it can run on both Linux and Windows operating systems. In this
section, we will look at setting up the environment for the smartlab server in both
Linux and Windows.
7.1 Environment for SmartLab server (Linux Environment- ODROID XU4)
This section walks through the steps involved in preparing the environment
for a smartlab server on a Linux Single-Board Computer. ODROID XU4 is a Sin-
gle Board Computers with ARM architecture, It has an arm-cortex-a7 processor
with 2.0GHz clock speed. Odroid supports Debian distributed operating systems
(Ubuntu) as well as Embedded operating-system (Android). For developing smart-
lab infrastructure we have selected Ubuntu 15.04 with Mate desktop as our host op-
erating system, all the additional dependency libraries required for running smartlab
server are listed below:
• OpenCV 3.2
• OpenNI 2.2 (Libfreenect or Primesenese driver required)
• Libfreenect(for Kinect Xbox 360)
• Boost 1 63 0 (For Boost.asio network library)
![Page 53: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/53.jpg)
47
7.1.1 Ubuntu Image
Firstly download the Ubuntu image from this link. Burn the image into an
SD card with Win32DiskImager(or any other similar software). Insert the SD card
into ODROID and power it on, if it prompts for password type ’odroid’. Connect
the odroid to internet. The very first step is to install the necessary software with
the following commands.
#remove the unwanted so f tware which comes with the Ubuntu imagesudo apt−get updatesudo apt−get remove −−purge l i b r e o f f i c e ∗ plank simple−scan
sho twe l l imagemagick∗ pidg in hexchat thunderbird brase ro kodirhythmbox xzoom gnome−orca onboard a t r i l mate−u t i l s s eahor s et i l d a
sudo apt−get purge f i r e f o xsudo rm −r f ˜/ . moz i l l a / f i r e f o x ˜/ . macromedia ˜/ . adobe / e t c /
f i r e f o x / usr / l i b / f i r e f o x / usr / l i b / f i r e f o x−addonssudo apt−get c l eansudo apt−get autoremove
#Now i n s t a l l ext ra dependenc ies which are e s s e n s t i a lsudo apt−get updatesudo apt−get d i s t−upgradesudo apt−get i n s t a l l bui ld−e s s e n t i a l c h e c k i n s t a l l cmake cmake−
curses−gui pkg−c on f i g gparted guvcview lightdm−gtk−gree t e r−s e t t i n g s
7.1.2 Installing OpenCV
On the smartlab server OpenCV is required for image processing opera-
tions(eg: background subtraction) and in future, we can also select a region of interest
from the camera feed. Follow the steps to build OpenCV from source.
#I n s t a l l OpenCV dependenc iessudo apt−get i n s t a l l bui ld−e s s e n t i a lsudo apt−get i n s t a l l cmake g i t l i b g t k 2 .0−dev pkg−c on f i g
l ibavcodec−dev l ibavformat−dev l i b sws ca l e−devsudo apt−get i n s t a l l python−dev python−numpy l ib tbb2 l ibtbb−dev
![Page 54: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/54.jpg)
48
l i b j p eg−dev l ibpng−dev l i b t i f f −dev l i b j a s p e r−dev l ibdc1394−22−dev
#Get Opencv from source ” https : // github . com/opencv/opencv/ arch ive/ 3 . 2 . 0 . z ip ” OpenCV 3 .2
cd ˜g i t c l one https : // github . com/opencv/opencv . g i tcd ˜/opencv#Build and i n s t a l l OpenCVmkdir bu i ldcd bu i ldcmake −DCMAKE BUILD TYPE=RELEASE −DCMAKE INSTALL PREFIX=/usr /
local −DWITHOPENGL=ON −DWITH V4L=ON −DWITH TBB=ON −DBUILD TBB=ON −DENABLE VFPV3=ON −DENABLENEON=ON . .
make −j 4sudo make i n s t a l l
7.1.3 Installing OPENNI
OpenNI provides access to PrimeSense compatible depth sensors such as Mi-
crosoft Kinect, Asus Xtion, etc. It allows an application to initialize the sensor and
obtain RGB, depth, and IR video streams from the device. OpenNI in coordination
with NiTE middleware provides Skeleton tracking. But NiTE libraries are not avail-
able for ARM architecture, so we can’t install NiTe on ODROID. The subsequent
steps help you to build OpenNI libs from source.
#I n s t a l l addt iona l dependenc ies f o r OpenNIcd ˜sudo apt−get i n s t a l l −y g++ python l ibusb −1.0−0−dev l ibudev−dev
openjdk−6−jdk f r e e g l u t 3−dev doxygen graphviz#Get OpenNI from source https : // github . com/ o c c i p i t a l /OpenNI2
OPENNI 2.2</a>g i t c l one https : // github . com/ o c c i p i t a l /OpenNI2cd OpenNI2#Build OpenNI l i b r a r i e s f o r ARM ar ch i t e c t u r ePLATFORM=Arm makecd Packaging && python Re leaseVers ion . py Armmv Fina l /OpenNI−Linux−Arm−2.2 . ta r . bz2 ˜cd ˜
![Page 55: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/55.jpg)
49
ta r −xvf OpenNI−Linux−Arm−2.2 . ta r . bz2rm −r f OpenNI2rm OpenNI−Linux−Arm−2.2 . ta r . bz2#I n s t a l l OpenNIcd OpenNI−Linux−Arm−2.2sudo sh i n s t a l l . sh
7.1.4 Installing Libfreenect
Libfreenect is a userspace driver for the Microsoft Kinect. It runs on Linux,
OSX, and Windows and supports RGB and depth Images, Motors, Accelerome-
ter and LED. Libfreenect is open source driver and interacts with sensor raw data
streams, this driver acts as an underlying layer between Kinect hardware and high-
level layer OpenNI. Here are the instructions to build Libfreenect in Linux environ-
ment
#I n s t a l l dependenc iescd ˜sudo apt−get i n s t a l l libxmu−dev l i b x i−dev l ibusb−dev#Fetch the codeg i t c l one https : // github . com/OpenKinect/ l i b f r e e n e c tcd l i b f r e e n e c t#Build l i b r a r i e scd l i b f r e e n e c tmkdir bu i ldcd bu i ldcmake . . −DBUILD OPENNI2 DRIVER=ONmake −j 4
#Copy L ib f r e en e c t d r i v e r to OpenNI d i r e c t o r yRepos i tory=˜/OpenNI−Linux−Arm−2.2/ Redist /OpenNI2/Dr iver s /cp −L l i b /OpenNI2−FreenectDr iver / l i bFr e ene c tDr i v e r . so ${
Repos i tory }
#Copy Kinect r u l e s to user devsudo cp ˜/ l i b f r e e n e c t / plat form/ l inux /udev/51−k ine c t . r u l e s / e t c /
udev/ r u l e s . d
![Page 56: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/56.jpg)
50
7.1.5 Installing Boost
Boost is a set of libraries for the C++ programming language that provides
support for multi-threading, network communication, regular expressions, and com-
pression. It contains over eighty individual libraries. Install boost by following this
link
7.2 Environment for Smartlab server (Windows Environment-Lattepanda)
Lattepanda is x86 Single board computer and it is able to run windows 10
operating system. This SBC provides the advantage of utilizing Microsoft driver for
accessing Kinect. It has 1.8GHz clock speed and 2GB of DDR3 RAM and 100Mbps
Ethernet port. Windows board is specifically chosen to analyze the advantage of
using Microsoft SDK. The fallowing are the set of libraries that are to be installed
on Lattepanda. Another advantage for choosing x86 SBC is to obtain Skeleton joints
using NiTE middleware.
• OpenCV 3.2
• OpenNI 2.2
• NiTE 2.0
• Microsoft Kinect SDK 1.8(driver for Kinect Xbox 360)
• Boost 1 63 0 (For Boost.asio network library)
7.3 Building SmartLab server in Linux
SmartLab server is build in linux using cmake, and executable is generated.
Before creating the executable make sure that all the dependencies are configured
![Page 57: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/57.jpg)
51
and appropriate paths are set. There after compile the code link the binary with all
dependencies. The following CMakeLists.txt file illustrates the flow of command for
building SmartLab server.
p ro j e c t ( smar t l ab s e rv e r )cmake minimum required (VERSION 2 . 8 )# CONFIGURE OPENCVf ind package (OpenCV REQUIRED)# CONFIGURE BOOSTf ind package ( Boost REQUIRED COMPONENTS system thread io s t r eams )# CONFIGURE OPENNI2f i n d l i b r a r y (OPENNI2 LIBRARY
NAMES OpenNI2PATHS ”˜/OpenNI−Linux−Arm−2.2/ Redist ”
)f i nd path (OPENNI2 INCLUDE DIR OpenNI . h
PATHS ”˜/OpenNI−Linux−Arm−2.2/ Inc lude ”)# CREATE EXECUTABLEl i n k d i r e c t o r i e s ( ${OPENNI2 LIBRARY})i n c l u d e d i r e c t o r i e s ( ${OPENNI2 INCLUDE DIR} ${Boost INCLUDE DIRS})f i l e (GLOB RECURSE SRC FILES s r c /∗ . cpp )add executab le ( ${PROJECTNAME} ${SRC FILES})t a r g e t l i n k l i b r a r i e s ( ${PROJECTNAME} ${OPENNI2 LIBRARY} ${
OpenCV LIBS} ${Boost LIBRARIES})
7.4 Building SmartLab server in Windows
In windows platform SmartLab is build using Visual studio and all the includes
and library dependencies are configured in in Project solution. The executable can
be moved into another system and it can be executed perfectly fine. But, OpenNI
headers and library are required along with the executable
![Page 58: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/58.jpg)
52
7.5 Running SmartLab server in Linux
Initializing the server script on SBC startup is easy way to run smartlab server.
To make a startup script, create a shell script mystartuo.sh with following contents
under /etc/init.d/ directory and provide executable permissions. Also, create an-
other script named startupscript.sh under home directory and provide executable
permissions. Start the mystartup service with the instructions shown in the listing.
########## / etc / i n i t . d/mystartup . sh #############!/ bin /bashecho ” S ta r t i ng smartlab s e r v e r ”# smar t l ab s e rv e r s c r i p t path/home/ odro id / s t a r t up s c r i p t . sh
######## s t a r t up s c r i p t . sh ###########!/ bin /bashecho ”Smartlab s e r v e r s e s s i o n s t a r t ed ” > ˜/ s t a r tup l og . txtdate >> ˜/ s t a r tup l og . txt#Running the smartlab s e r v e r s c r i p t˜/ servermodule−l inux−arm/ smar t l ab s e rv e r >> ˜/ s t a r tup l og . txt 2>&1
#s t a r t your s e r v i c es e r v i c e mystartup . sh s t a r t
#I n s t a l l s e r v i c e to be run at boot−timeupdate−rc . d mystartup . sh d e f a u l t s
7.6 Running SmartLab server in Windows
In windows initiating the SmartLab server is a easy task, just copy the server
module executable to startup folder. Everytime when windoes SBC boots smart-
lab server is initiated.
![Page 59: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/59.jpg)
53
7.7 SmartLab client
SmartLab is designed for desktop PC, and it is platform independent. On
windows platform SmartLab client application is compiled using Visual studio, where
as on linux platforms cmake is used. Building the executable in both platforms is
similar to that of server.
7.8 Running SmartLab client
For running SmartLab client module necessary details required are server IP
address and port number. Place these details in config.json file and also set the
selected data stream to true. The config.json file is shown below.
{”NETWORKCONFIG” :{
”SERVER1” :{”IP ADDRESS” : ” 1 2 7 . 0 . 0 . 1 ” ,”PORTNO” :2000
}} ,”VIDEO CONFIG” :{
”SOURCE CONFIG” :{”KINECT” : true ,”CAMERA” : fa l se
} ,”IMAGE CONFIG” :{
”BGR IMAGE” : true ,”IR IMAGE” : fa l se
} ,”DEPTH CONFIG” :{
”DEPTHMAP” : true ,”POINT CLOUDMAP” : fa l se
} ,”BODYJOINTS CONFIG” :{
”SKELETON” : true} ,”BACKGROUNDSUBTRACTION” :{
”RGB SUBTRACTION” : false ,”DEPTH SUBTRACTION” : fa l se
![Page 60: Design and Implementation of SmartLab Infrastructuresci.tamucc.edu/~cams/projects/521.pdflike Raspberry pi, Odroid-XU4 and Lattepanda were tested and found that all the three boards](https://reader034.vdocument.in/reader034/viewer/2022052023/6038279cd668f34452032bc3/html5/thumbnails/60.jpg)
54
} ,”COMPRESSION” :{
”SELECTED” : fa l se}
}}
Save the config.json file in the same folder where executable is located. Run the
client executable to view the selected data stream.