[Product-case] | [Type] case study 1 CASE STUDY Design, production and installation of 11kV 390kVAr capacitor banks for City Walk mall center in Dubai. Objective: Arteche’s Capacitor Bank provides reactive power, maintains the voltage level of the power system and improves the power factor for City Walk, a Mall Center in Dubai destined to become a popular and vibrant retail destination with shops, restaurants, entertainment and fitness centers where numerous events are held. This commercial building in Dubai uses a chiller unit for air conditioning, which consumes reactive power in high amount and creates frequent voltage dips. Arteche’s capacitor bank provides reliable performances and fit in a very limited space marked by the extreme heat of the region. Solution: Arteche’s team designed and manufactured a customized capacitor bank that met all the customer’s specifications, tailored to fit in a very limited space and supplied the required reactive power maintaining the voltage level. It was designed in such a way that there was no need for a separate relay to control and monitor it, as the feeder relay executed this function, so the separate control box was eliminated.

Upload: others

Post on 28-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

[Product-case] | [Type] case study

1

CASE STUDY

Design, production and installation of 11kV 390kVAr capacitor banks for City Walk mall center in Dubai.

Objective:

Arteche’s Capacitor Bank provides reactive power, maintains the voltage level of the power system and improves the power factor for City Walk, a Mall Center in Dubai destined to become a popular and vibrant retail destination with shops, restaurants, entertainment and fitness centers where numerous events are held. This commercial building in Dubai uses a chiller unit for air conditioning, which consumes reactive power in high amount and creates frequent voltage dips. Arteche’s capacitor bank provides reliable performances and fit in a very limited space marked by the extreme heat of the region. Solution:

Arteche’s team designed and manufactured a customized capacitor bank that met all the customer’s specifications, tailored to fit in a very limited space and supplied the required reactive power maintaining the voltage level. It was designed in such a way that there was no need for a separate relay to control and monitor it, as the feeder relay executed this function, so the separate control box was eliminated.

[Product-case] | [Type] case study

2

CASE STUDY

Company Overview:

CITY WALK is a premium outdoor destination providing an urban lifestyle experience with a unique mix of 52 retail and upscale gourmet outlets.

Designed for discerning visitors with eclectic taste, CITY WALK features intelligent and harmonious architecture fringed with low rise pavilion-style buildings.

Strategically located in upscale Jumeirah at the junction of Al Wasl and Al Safa Road, the bustling public promenade is a perfect destination to meet, socialize and network. An idyllic venue for business meetings and coffee mornings, the mixed-use development blends street café culture with hifh-end dining. City WALK includes a children’s play area, alongside a fountain and an interactive water feature.

This exciting new development will become a focal point of this established community and a destination for visitors and residents across Dubai.

Customer Requirements

CITY WALK needed a 11kV 390 kVAr Capacitor Bank with a 12/28/75 kV insulation level, able to fit in a very limited space.

The CITY WALK commercial building, located in Dubai, uses a chiller unit for air conditioning.

A chiller unit uses motors to circulate liquid through the heat exchanger, consuming reactive power in high amount and creating frequent voltage dips during its operation.

Arteche was able to offer an automatic capacitor bank as a solution for the successful operation of the power network by supplying the required reactive power and maintaining the voltage level.

Application and Implementation The Arteche’s capacitor bank supplied for this project was designed and manufactured by our highly qualified and experienced team in Spain.

The capacitor bank was customized to meet all the customer’s specifications, and tailored to fit in the limited space provided.

The auxiliary relays were installed on the power panel, eliminating the need for a separate control box. The capacitor bank was designed in such a way that there was no requirement for a separate relay to control and monitor the capacitor bank. This function was executed through capacitor bank feeder relay.

[Product-case] | [Type] case study

3

CASE STUDY

BENEFITS

Fits in a very limited space, without compromising its high performances.

Allows the use of a power chiller in Dubai.

Provides the required reactive power.