designing the building of the future practical experience in it deployment collaborate to accelerate

36
Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Upload: david-dean

Post on 12-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Designing the Building of the Future

Practical Experience in IT Deployment

Collaborate to Accelerate

Page 2: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Panduit Confidential – Internal Use onlyFORM C2-0765 DATE 01JUL08

UPI Phase 2 Convergence Align

System Architecture

Converge

Systems & Software Integration

Optimize

Design Optimization Lifecycle Management

Deploy with Speed, guaranteed performance, maximize air flow, assist with cooling, recover space, provide tools to managed and increase value

PViQ DC Design

Page 3: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

CO2 Emissions from Energy Use

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

1.2

1.4

1.6

1.8

2.0

2.2

2.4Buildings

Industrial

Transportation

Source: U.S. Energy Information Administration

(Bil

lio

n M

etri

c T

on

s o

f C

O2

)

Page 4: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Phase 1: 28,000m2

LEED Gold Building

World Class Implementation• Cisco Connected Real Estate (CRE) • Panduit Connected Building Solutions (CBS)• Panduit Data Center Solutions (DCS)

Phase 1 Capacity – >800 Employees

Key Features of Panduit WHQ

Page 5: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Industry Gap – Connected Building Solution

Internal Alignment External Alignment

Security Sustainability Operational Efficiency

Enhanced Experience

Page 6: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

LEED Statistics &Technologies

5 Points

14Points

15 Points

13 Points

17 Points

Innovation 4 Points

RECOVERY

Page 7: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Making a Connected Building

Page 8: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Making a Connected Building

Page 9: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Traditional Solution - Security

Page 10: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Traditional Solution - BAS

Page 11: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Traditional Solution - All Systems Deployed

Page 12: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Think Differently Think UPI

Page 13: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Unified Physical Infrastructure

Page 14: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Information Technology Strategy

• Middleware and Software

• Connected Building Data Centers

• Telecommunications Rooms

• Pathways

• Consolidation and Endpoints

Page 15: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Converged Network Pathways

•Design Consolidation

•Contracting Simplification

•Construction Speed

•Operations and Maintenance

Page 16: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Head Quarters Benefits

Estimated Annual return of our Connected Building

$0.74/ft2 = $184,000 / year

White Paper (May 2009): “Achieving Financial and Functional Advantagesin Connected Building Solutions with the Unified Physical InfrastructureSM (UPI)”

Page 17: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Intelligent infrastructure

Think Differently

Page 18: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

SM

Shorten Horizontal Cables Using Main Distribution Points

• Zone Distribution Areaso Reduces Cable Congestiono Reduces Power Consumptiono Rapid Deployment of

Connections

o Reduces deployment costs up by 16%

CONFIDENTIAL - For Internal Use Only

Smarter Physical DeploymentZone Cabling

www.fols.org

Page 19: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Move to Standard Ethernet/IP

Churn Rate 22.5%

Page 20: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Standard Cabling TopologyZone Cabling Topology

Page 21: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Telecommunication Enclosures

Page 22: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Connected Building Product Portfolio

Page 23: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

FM

FM

X

IT

M

F

Warehouse

MDA

Data Center

NOC

PBX

UTILS

Elec. Rm

M

F

F

M

TC

DayCare

F

MCafeteria

Kitchen

Data Cabling Video SecurityHVAC Cabling

Backbone Cabling

Access Control Cabling

Zone Enclosures

Enterprise Solution

Page 24: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Quick Server Deployment

1. SAN Isolation

Data Centre -Zone Distribution Area Layout

Page 26: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Connected Building Brochure •Leverage real-time information •Reduce infrastructure and systems•Deployment of platform-agnostic, open architecture.•Deliver high degree of system availability and reliability•Converge and optimize critical systems•Maximize ROI.•Drive infrastructure and business process improvements•Reduce operational costs and mitigating risk.•Create a sustainable technology infrastructure

Page 27: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Integration Creates Value

Save $60,000 / annum for every 1000 users

Page 28: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Power 0ver EthernetIt is a Managed DC power distribution system

IEEE 802.3af 48volts 350mamps 15watts

IEEE 802.3at51volts 600mamps 24watts

Key is 30 watts per port

Page 29: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Powered Devices - Examples

VoIP Phones

Wireless Access Points

Security Cameras

Access Control

RFID Tracking Devices

Lighting Controllers

Industrial Devices

Smoke & Heat Detectors

Mobile Phone & PDA Chargers

Vending/Gaming Machines

Clocks

5- 8 watts8- 12 watts

10- 12 watts

8- 12 watts

Page 30: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

AC UPS

AC

AC-DC

AC-DCDC-AC

DC UPS

AC

Panduit

AC-DC

33% power loss

7% power loss

Green PoE Deployment

Page 31: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Managing Power Distribution -PoE

Power On/Off

Power Off timed

Real Time

Pre- TimedEvent D

riven

UPS utilisation

Building Access

PanduitMidspan

Page 32: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Panduit Customer

800 Staff Call Centre400 Too Hot400 Too Cold

Route CauseDesk Top PC 200 WattsColour Monitor 70 watts

Page 33: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Managed POE reduces energy consumption

Data + POE

Data + POE

Power

Data

Building Access Security

Data

3.5 Watts

7 Watts

15 Watts

<30 Watts

Page 34: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Generic Thin Client solution

Data + POE AT Power+12volts

Data

Building Access Security

Data

3 -8 Watts 15- 18 Watts

Power+5volts

Splitter

Splitter

Data

Page 35: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Airbus A380

Think DifferentValueDC Power Distribution

Watch for OLED

LightingSignageDesk Tops

Page 36: Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate

Questions ?