Overview of Presentation:
Audit OverviewBenefitsChronologyMeasurementsCalculationsResults / ReportConclusion
![Page 3: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/3.jpg)
Audit Overview :
Inspection of the steam path(Comparison to new & clean conditions)
Results: clear priority for maintenance decisions
Benefit: maintenance dollars used with the highest return
Verification of maintenance
![Page 4: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/4.jpg)
Overview:
What: Inspection of the steam path (determined by VWO heat balance conditions)
When: Immediately after steam path is exposed and again after maintenance has been performed
![Page 5: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/5.jpg)
BenefitsOPENING AUDITIdentification of degradationCost-effective maintenance actions
CLOSING AUDITQuality check on maintenance performed during the outagePerformance improvement resulting from individual maintenance actionsExpected return-to-service performance
![Page 6: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/6.jpg)
Required ResourcesComputerLoss Calculation SoftwareOne or Two AuditorsMeasurement Tools
Radial Packing Gauge6” Digital CaliperTape measureBall GaugesSurface Roughness Comparator
![Page 7: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/7.jpg)
Maintenance Action Itemsfor B/C > 3.5
Heat Rate Heat Rate Benefit Benefit Repair cost Action Item (Btu/kWh) ($1,000) ($1,000) Benefit/Cost ______________________________________________________________________________ Sharpen HP stg 6 interstage packing 3.1 9.3 0.3 31.0 Sharpen HP stg 4 interstage packing 2.8 8.4 0.3 28.0 Sharpen HP stg 5 interstage packing 2.6 7.8 0.3 25.0 Sharpen HP stg 2 interstage packing 2.5 7.5 0.3 25.0 Sharpen HP stg 3-6 interstage packing 7.0 21.0 1.2 17.5 Replace IP stg 1 tip spill strip 13.0 39.0 4.0 9.8 Polish HP nozzles 13.0 39.0 4.0 9.8 Replace IP stg 2 tip spill strips 9.0 27.0 4.0 6.8 Polish IP nozzles, exhaust side 8.0 24.0 4.0 6.0 Second reheat stage minor repairs 10.0 30.0 8.0 3.8 Replace top half snout rings 23.0 69.0 19.0 3.6 ______________________________________________________________________________
![Page 8: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/8.jpg)
Maintenance Action Itemsfor B/C < 3.5
Sharpen stg 1 tip spill strip 0.3 0.9 0.3 3.0 Replace IP stg 3-6 tip spill strips 12.0 36.0 16.0 2.3 Sharpen stg 2 tip spill strip 0.2 0.6 0.3 2.0 Replace stg 2 interstage packing 4.0 12.0 7.5 1.6 Replace stg 6 interstage packing 3.5 10.5 7.5 1.4 Polish LP Nozzles, exhaust side 3.0 9.0 7.0 1.3 Replace stg 4 interstage packing 3.0 9.0 7.5 1.2 Replace stg 5 interstage packing 3.0 9.0 7.5 1.2 Second reheat stage major repairs 15.0 45.0 55.0 0.8 Replace bottom half snout rings 2.0 6.0 19.0 0.3 ______________________________________________________________________________ Total repair cost for B/C >3.5 45.4 Total repair cost for B/C < 3.5 127.6
![Page 9: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/9.jpg)
Chronology
Model
On Site
Analysis / Report
![Page 10: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/10.jpg)
Model
Create model using the Thermal Kit
Design heat balance (VWO)Turbine cross sectionClearance and steam seal diagramFirst stage shell pressure curve
![Page 11: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/11.jpg)
SPA On-Site Time-Line
TURBINE O UTAG E
S h u t d ow n S t a rt u p
Pre-Outage Test Opening SteamPath A udit
Closing SteamPath A udit
Upgrade andMaintenanc e
Pos t-OutageTes t
Disassembly Reassembly
![Page 12: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/12.jpg)
Measurements
GeometryClearancesSurface roughnessDamage
Solid Particle ErosionThroat OpeningsSteam Path Length
![Page 13: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/13.jpg)
Clearance Measurements
![Page 14: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/14.jpg)
What Tooth Throttles Steam?
![Page 15: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/15.jpg)
Slant Tooth Packing
![Page 16: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/16.jpg)
Honeycomb Packing
![Page 17: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/17.jpg)
Mechanical Damage
![Page 18: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/18.jpg)
Solid Particle Erosion
![Page 19: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/19.jpg)
Throat Opening Measurements
![Page 20: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/20.jpg)
Ball Gauge Measurement
![Page 21: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/21.jpg)
Surface Roughness Measurement
![Page 22: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/22.jpg)
Miscellaneous Leakage Measurements
![Page 23: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/23.jpg)
Cover Deposits
![Page 24: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/24.jpg)
Nozzle Repair
![Page 25: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/25.jpg)
On Site - Day 1
After Top is Lifted
Inspect horizontal jointMeasure Stationary Blade GeometryMeasure top half tooth heightsMeasure packing clearancesInspect shell sealing surfaces
![Page 26: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/26.jpg)
On Site - Day 2Rotor Removed
Measure solid particle erosion damageMeasure deposit thicknessMeasure stationary and rotating blading surface roughnessInspect for mechanical damage
![Page 27: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/27.jpg)
On Site - Day 3
Measure bottom half tooth heightsMeasure trailing edge thicknessMeasure turbine geometryInspect snout rings
![Page 28: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/28.jpg)
Analysis / Preliminary Report
Input data & analysisPrint Steam Path Audit reportsGive preliminary presentation on
site
![Page 29: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/29.jpg)
Calculations
Martin’s Formula
General Flow Equation
Dollar Value of Heat Rate
Annual Fuel Cost Savings
Cost of Lost Capacity
![Page 30: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/30.jpg)
Martin’s Formula Calculation
![Page 31: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/31.jpg)
General Flow Equation
k
k
k
p
p
p
p
k
k
v
pKCAW
1
1
2
2
1
2
1
1 11
*5.2406
W = Flow (lb/h)K = Packing type constantC = Rubbed coefficientA = Area (sq in.)P1 = Upstream Pressure (psia)v1 = Upstream specific volume (ft 3/lb) P2 = Downstream Pressure (psia)k = Isentropic exponent (1.3 typical)2406.5 = Unit conversion constant
![Page 32: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/32.jpg)
Common Tooth Types
coefficient:2 TEETH: 0.403 TEETH: 0.334 TEETH: 0.295 TEETH: 0.26
SINGLE – AXIALFlow Equation
coefficient: 0.57
ROTATINGBLADE
STATIONARYBLADE
SINGLE – RADIALFlow Equation
coefficient: 0.57
DOUBLE STRAIGHTFlow Equation
coefficient: 0.70
TWO SINGLEFlow Equation
coefficient: 0.46
DOUBLE & SINGLEFlow Equation
coefficient: 0.52
STEPFlow Equation
![Page 33: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/33.jpg)
TIP SPILL STRIP CLEARANCE
Ken Cotton Chart – Reference Table [449]
kW loss per mil excess clearance per stage:7+ ((591.9 – 500) / (500 – 100)) x (7.0 -2.5) = 8.03 kW/mil
][ )t(C)tC(GAP L+L+R+R2
1=ave
C GAPave =1
8ave
ti
i 1
8
![Page 34: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/34.jpg)
1-34
Dollar Value of Heat Rate Degradation(Based on G.T.H.R.)
610*
8760***
BE
CFGRFCHRDV
FC = Cost of fuel $/million BTU’sGR = Rating of turbine in KWCF = Turbine capacity factor in %8760 = Hours in a YearBE = Boiler Efficiency
000,000,1*82
8760*75*000,500*00.2HRDV
= $8,012.20 / year
![Page 35: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/35.jpg)
1-35
Annual Fuel Savings - $ Year
000,000,000,10
*8760**** SHRHRFCFRAFS
R - Rating of turbine in KWCF - Turbine capacity factor in %F - Cost of fuel $/million BTU’sHR - Change in heat rate in %SHR - Station heat rate BTU’s/KW HR
Example:
000,000,000,10
9900*8760*0.1*00.2*75*000,500AFS
= $650,430/year
![Page 36: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/36.jpg)
1-36
Cost of Lost Capacity
710
8760*D*R*M*KL
Where: L = lost revenue $/yearK = percentage of year at max. capacity (%)M = average wholesale price of power ($/(MWh))R = unit capacity (kW)D = degradation in performance (%)
For:K = 50%M = 45 $/(MWh)R = 600,000 kWD = 1%
L = 1,182,600 $/year
![Page 37: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/37.jpg)
ResultsOPENING AUDITQuantification of losses measured in pre-outage testListed cost-effective maintenance actions
CLOSING AUDITQuality check on maintenance performed during the outagePerformance improvement resulting from individual maintenance actionsExpected return-to-service performance
![Page 38: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/38.jpg)
![Page 39: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/39.jpg)
![Page 40: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/40.jpg)
Opening Audit LossHeat Rate Loss by Category
![Page 41: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/41.jpg)
Opening Audit LossHeat Rate Loss by Casing
![Page 42: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/42.jpg)
Opening Audit: Summary Change In Power Loss G.T.H.R. Audit Category kW Btu/kWh Interstage Packings 502.8 19.91 Tip Spill Strips 2333.2 81.87 Shaft End Packings 1166.2 34.44 Steam Seal System Loss 0.0 0.00 Miscellaneous Leakages 33.5 1.76 Flow Path Damages 149.8 4.36 Flow Change Impact 0.0 0.00 Surface Roughness 947.3 40.28 Trailing Edge Thickness 0.0 0.00 Cover Deposits 10.2 0.53 Hand Calculations 0.0 0.00 Turbine Total 5142.9 187.71
![Page 43: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/43.jpg)
HP Casing - Loss Summary Change In Power Loss G.T.H.R. Audit Category kW Btu/kWh Interstage Packings 279.7 8.14 Tip Spill Strips 1787.1 52.55 Shaft End Packings 1096.4 30.73 Miscellaneous Leakages 0.0 0.00 Flow Path Damages 27.0 0.78 Surface Roughness 414.0 12.06 Trailing Edge Thickness 0.0 0.00 Cover Deposits 0.0 0.00 Hand Calculations 0.0 0.00 Total 3604.2 105.92 True Casing Efficiency Change 6.25 % True Casing Efficiency 82.84 % Apparent Casing Efficiency 82.84 %
![Page 44: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/44.jpg)
HP Casing – Tip Spill StripsOpening Audit
Measured Design Eff Power Change In Clearance Wear Loss Loss G.T.H.R. in. in. in. % kW Btu/kWh Stage 1 0.081 0.060 0.021 1.69 84.9 2.47 Stage 2 0.063 0.040 0.023 2.91 127.3 3.70 Stage 3 0.063 0.040 0.023 3.15 143.3 4.17 Stage 4 0.136 0.040 0.096 10.68 505.5 14.74 Stage 5 0.110 0.040 0.070 7.20 352.4 10.26 Stage 6 0.106 0.040 0.066 5.02 258.7 7.53 Stage 7 0.082 0.040 0.042 2.94 159.2 4.63 Stage 8 0.077 0.040 0.037 2.73 155.7 4.53 Total 1787.1 52.55
![Page 45: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/45.jpg)
HP Casing – Tip Spill StripsClosing Audit
Measured Design Eff Power Change In Clearance Wear Loss Loss G.T.H.R. in. in. in. % kW Btu/kWh Stage 1 0.070 0.060 0.010 2.07 104.5 3.04 Stage 2 0.031 0.040 -0.009 -0.97 -42.6 -1.24 Stage 3 0.034 0.040 -0.006 -1.51 -68.6 -1.99 Stage 4 0.029 0.040 -0.011 -1.87 -88.3 -2.57 Stage 5 0.033 0.040 -0.007 -1.37 -65.7 -1.91 Stage 6 0.042 0.040 0.002 0.13 6.8 0.20 Stage 7 0.039 0.040 -0.001 -0.06 -3.3 -0.10 Stage 8 0.087 0.040 0.047 3.90 222.3 6.47 Total 65.1 1.89
![Page 46: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/46.jpg)
Tip Spill Strips - Opening Audit
![Page 47: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/47.jpg)
Tip Spill Strips - Opening Audit
![Page 48: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/48.jpg)
Tip Spill Strips - Closing Audit
![Page 49: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/49.jpg)
Tip Spill Strips - Opening Audit
![Page 50: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/50.jpg)
HP - Repair or Replacement Cost
Interstage Tip Spill Diaphragms / Total Packing Strips Buckets Cost
Stage 1 $3,000.00 $38,648.00 $41,648.00 Stage 2 $14,230.00 $2,915.00 $23,901.00 $41,046.00 Stage 3 $7,115.00 $2,915.00 $22,973.00 $33,003.00 Stage 4 $7,115.00 $3,115.00 $16,110.00 $26,340.00 Stage 5 $7,115.00 $2,415.00 $17,725.00 $27,255.00 Stage 6 $7,115.00 $2,815.00 $14,967.00 $24,897.00 Stage 7 $7,115.00 $1,715.00 $28,462.00 $37,292.00 Total $49,805.00 $18,890.00 $162,786.00 $231,481.00
![Page 51: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/51.jpg)
Economic AssumptionsAssumption
Rating 320,000 kW Cap. =1 Exp. = 0 1
Capacity Factor 30 %
Fuel Cost 3.5 $/ 10 6 Btu
Fuel Cost Escalation 6 %
Discount Rate 12 %
Economic Life 4 Years
Capital Escalation Rate 5 %
Year of Expenditure 1 Year
P.V. Carrying charge 1.34
(from financial Analysis/treasurer)
![Page 52: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/52.jpg)
ConclusionUsually not everything is worth replacing
or repairing The Opening Audit will identify
degradation and B/C ratioThe Closing Audit will quantify the
expected recovery
The audit results should be reconciled with the enthalpy drop tests.
![Page 53: Details of a Steam Path Audit Paul Roediger Encotech, Inc](https://reader036.vdocument.in/reader036/viewer/2022081501/56649e9e5503460f94ba058a/html5/thumbnails/53.jpg)
ConclusionIt is a fair question to ask if the
degradation would have been identified and repaired without the use of an audit.
Some would. Some may not. And some repairs may take place that were not really necessary.