Sr. No. Name fo District Name of Taluka Name of Substation Tentative feasible RE integration (in MW) Name of EHV Source S/S Remark 1 Bharuch Valiya 132/66KV Valia 50-70 2 Bharuch Valiya 66KV Daheli 40-50 3 Bharuch Netrang 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Petiya 6 Bharuch Netrang 66KV Bitada 7 Bharuch Netrang 66KV Mauza (Chasvad) 8 Narmada Dediapada 66KV Dediapada 9 Narmada Dediapada 66KV Saddapani 10 Narmada Dediapada 66KV Chikda 11 Narmada Dediapada 66KV Bal (Mozda) 12 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A 13 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B 14 Bharuch Ankleshwar 66KV Ankleshwar (Urban) 15 Bharuch Hansot 66KV Hansot 16 Bharuch Ankleshwar 66KV Panoli GIDC 17 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B 21 Surat Choryasi 66KV Bhestan(Eklera) 22 Valsad Dharampur 66KV Dharampur 23 Valsad Dharampur 66KV Nani Vahiyal 24 Valsad Valsad 66KV Atak Pardi (Valsad) 25 Valsad Dharampur 66KV Piprol 26 Valsad Valsad 66KV Valandi (Navera) 27 Valsad Valsad 66KV Magod (Meh) 28 Valsad Valsad 66KV Gundalav GIDC 29 Valsad Pardi 66KV Khadki Dungri 30 Valsad Pardi 66KV Kolak 31 Valsad Valsad 66KV Valsad City 30-40 32 Valsad Umargam 220/66KV Bhilad 50-70 33 Valsad Umargam 66KV Umargam 34 Valsad Umargam 66KV Sarigam GIDC 35 Valsad Umargam 66KV Sanjan 36 Valsad Umargam 66KV Vangam(Umargam-II) 37 Valsad Umargam 66KV Palgam 38 Valsad Umargam 66KV Bhilad 30-40 39 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-70 40 Dang Vaghai 66KV Waghai 41 Dang Ahwa 66KV Ahwa 42 Dang Ahwa 66KV Saputara 43 Navsari Chikhli 66KV Tankal 44 Navsari Vansda 66KV Vansda 45 Navsari Vansda 66KV Ankalachh 46 Navsari Vansda 66 KV Mahuwas (Kevadi) Details of district wise substations for RE integration as on April-2018 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. South Gujarat 132 KV Valia -- 30-40 30-40 220 KV Atul -- 30-40 220 KV Bhilad -- 30-40 50-70 132 KV Ankleshwar -- 50-70 132 KV Bhestan -- 30-40 30-40 220 KV Chikhli --

Upload: duongnhan

Post on 14-Mar-2019

286 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

1 Bharuch Valiya 132/66KV Valia 50-702 Bharuch Valiya 66KV Daheli 40-503 Bharuch Netrang 66KV Netrang4 Bharuch Netrang 66KV Datt Nagar5 Bharuch Netrang 66KV Petiya6 Bharuch Netrang 66KV Bitada7 Bharuch Netrang 66KV Mauza (Chasvad)8 Narmada Dediapada 66KV Dediapada9 Narmada Dediapada 66KV Saddapani

10 Narmada Dediapada 66KV Chikda11 Narmada Dediapada 66KV Bal (Mozda)12 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A13 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B14 Bharuch Ankleshwar 66KV Ankleshwar (Urban)15 Bharuch Hansot 66KV Hansot16 Bharuch Ankleshwar 66KV Panoli GIDC17 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-4018 Surat Choryasi 66KV Govalak (Udhana-B) 30-4019 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B21 Surat Choryasi 66KV Bhestan(Eklera)22 Valsad Dharampur 66KV Dharampur23 Valsad Dharampur 66KV Nani Vahiyal24 Valsad Valsad 66KV Atak Pardi (Valsad)25 Valsad Dharampur 66KV Piprol26 Valsad Valsad 66KV Valandi (Navera)27 Valsad Valsad 66KV Magod (Meh)28 Valsad Valsad 66KV Gundalav GIDC29 Valsad Pardi 66KV Khadki Dungri30 Valsad Pardi 66KV Kolak31 Valsad Valsad 66KV Valsad City 30-4032 Valsad Umargam 220/66KV Bhilad 50-7033 Valsad Umargam 66KV Umargam34 Valsad Umargam 66KV Sarigam GIDC35 Valsad Umargam 66KV Sanjan36 Valsad Umargam 66KV Vangam(Umargam-II)37 Valsad Umargam 66KV Palgam38 Valsad Umargam 66KV Bhilad 30-4039 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-7040 Dang Vaghai 66KV Waghai41 Dang Ahwa 66KV Ahwa42 Dang Ahwa 66KV Saputara43 Navsari Chikhli 66KV Tankal44 Navsari Vansda 66KV Vansda45 Navsari Vansda 66KV Ankalachh46 Navsari Vansda 66 KV Mahuwas (Kevadi)

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

South Gujarat

132 KV Valia --

30-40

30-40

220 KV Atul --

30-40

220 KV Bhilad --30-40

50-70

132 KV Ankleshwar --50-70

132 KV Bhestan --30-40

30-40220 KV Chikhli --

Page 2: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

47 Navsari Chikhli 66KV Chikhli 48 Navsari Khergam 66KV Khergam49 Navsari Chikhli 66KV Fadvel (Matwad)50 Navsari Chikhli 66KV Rankuwa (Manekpor) 51 Navsari Chikhli 66KV Rumla (Amadhra) 52 Navsari Chikhli 66KV Godthal53 Navsari Chikhli 66KV Anaval54 Navsari Vansda 66KV Bhinar55 Valsad Valsad 66KV Dungri (Valsad)56 Valsad Valsad 66KV Untadi(Malvan Bigri)57 Navsari Chikhli 66KV Balwada (Wagaldhara)58 Surat Choryasi 220/66KV Ichhapore 50-7059 Surat Olpad 66KV Veluk60 Surat Olpad 66KV Olpad61 Surat Choryasi 66KV Pala62 Surat Surat City 66KV Adajan63 Surat Choryasi 66KV SVNIT64 Surat Choryasi 66KV Gujarat Hira Bourse65 Surat Choryasi 66KV Pal66 Surat Choryasi 66KV Bhatha ( Pal-2)67 Surat Choryasi 66KV Variav68 Surat Choryasi 66KV Kosad (Amroli)69 Surat Olpad 66KV Gothan70 Surat Choryasi 66KV Mora71 Surat Choryasi 66KV Ichhapore 30-4072 Surat Mandvi 220/66KV Kim 50-7073 Surat Kamrej 66KV Kamrej74 Surat Kamrej 66KV Velanja75 Surat Kamrej 66KV Karjan 50-7076 Surat Mandvi 66KV Karanj77 Surat Mandvi 66KV Areth (Nogama)78 Surat Mandvi 66KV Umarkhadi (Maldha)79 Surat Mangrol 66KV Vankal80 Surat Mangrol 66KV Zankhvav81 Surat Mangrol 66KV Mosali (Mangrol)82 Surat Mangrol 66KV Palod (Kim)83 Surat Olpad 66KV Vadoli 84 Surat Olpad 66KV Mindhi85 Surat Mangrol 66KV Fair deal Text Park 30-4086 Surat Mangrol 66KV Palod-2 30-4087 Surat Bardoli 66KV Bardoli88 Surat Bardoli 66KV Sarbhon (Bardoli)89 Surat Bardoli 66KV Afva(Dungar) 90 Surat Mahuva 66KV Bamaniya91 Surat Mahuva 66KV Singod92 Surat Mahuva 66KV Mahuva93 Surat Bardoli 66KV Kadod94 Surat Bardoli 66KV Madhi95 Surat Mandvi 66KV Mandvi

220 KV Icchapore --

50-60

30-40

30-40

30-40

30-40

30-40

South Gujarat

30-40

30-40

--

220 KV Kim --

30-40

30-40

15-20

30-40

220 KV Chikhli --

220 KV Mota

(Bardoli)

Page 3: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

96 Surat Bardoli 66KV Mota 30-4097 Surat Kamrej 66KV Sampura98 Surat Mandvi 66KV Kasal99 Surat Kamrej 66KV Parab (Mankna) 50-70

100 Tapi Vyara 66KV Vyara101 Tapi Vyara 66KV Borakhadi102 Tapi Vyara 66KV Rupwada103 Tapi Vyara 66KV Chikhalvav104 Tapi Vyara 66KV Magarkui105 Tapi Vyara 66KV Vyara-2106 Tapi Valod 66KV Bhimpor (Kanjod)107 Tapi Valod 66KV Valod108 Tapi Valod 66KV Virpor (Pathakwadi)109 Tapi Valod 66KV Karanjkhed110 Tapi Vyara 66KV Dolvan111 Tapi Vyara 66KV Mangaliya (Chimer)112 Tapi Vyara 66KV Kalakva113 Navsari Gandevi 66KV Billimora114 Navsari Gandevi 66KV Gandevi115 Navsari Gandevi 66KV Amalsad116 Navsari Jalalpore 66KV Sultanpur(Dandi)117 Navsari Gandevi 66 KV Chhapar (Kotha)118 Navsari Jalalpore 66KV Eroo119 Navsari Navsari 66KV Chhapra (Navsari -B)120 Navsari Navsari 66KV Navsari city121 Navsari Jalalpore 66KV Maroli 30-40122 Navsari Navsari 66KV Vesma 30-40123 Surat Choryasi 66KV SUSM-1124 Surat Choryasi 66KV Bhatia125 Surat Choryasi 66KV Sachin -B126 Surat Choryasi 66KV Vanz (Susml)127 Surat Palsana 66KV Erthan (Lingad) 128 Surat Palsana 66KV GETP129 Navsari Jalalpore 66KV Mangrol 30-40130 Surat Choryasi 66KV Khajod (Magadalla)131 Surat Choryasi 66KV Jiyav (Bamroli)132 Surat Choryasi 66KV Vadod133 Surat Choryasi 66KV Vesu134 Surat Choryasi 66KV Vesu-2 (Magdalla)135 Surat Choryasi 66KV Dumas136 Surat Choryasi 66KV Pandesara137 Surat Choryasi 66KV Jiav (Pandesara-II)138 Surat Choryasi 66KV Sachin -A139 Surat Choryasi 66KV Sachin-D140 Surat Choryasi 66KV Sachin ‘C141 Bharuch Wagra 220/66KV Rahiyad 50-70142 Bharuch Wagra 66KV Samatpore (Sambheti) 50-70143 Bharuch Wagra 66KV Galenda 50-70144 Bharuch Wagra 66KV Suva 30-40

30-40

30-40

30-40

30-40

220 KV Sachin

(Talangpore)

--

--

30-40

40-50

30-40

30-40

South Gujarat

30-40

220 KV Navsari --

30-40

30-40 220 KV Popda --

220 KV Mota

(Bardoli)--

220 KV Suva

(Rahiyad)--

Page 4: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

145 Bharuch Wagra 220/66KV Dahej 50-70146 Bharuch Wagra 66KV Dahej147 Bharuch Wagra 66KV Luna148 Bharuch Wagra 66KV Vadadala (Dahej)149 Bharuch Wagra 66KV Jolva150 Bharuch Wagra 66KV Bhesali151 Valsad Dharampur 66KV Motaponda (Kakadkopar)

152 Valsad Pardi 66KV Paria153 Valsad Pardi 66KV Chival (Dhagadmal)154 Valsad Vapi 66KV Kocharava(Rata Koparali)

155 Valsad Kaparada 66KV Kaparada156 Valsad Kaparada 66KV Astol157 Valsad Kaparada 66KV Sutharpada158 Valsad Kaparada 66KV Shahuda159 Valsad Umargam 66KV Damanganga GIDC160 Valsad Vapi 66KC Chandor161 Valsad Vapi 66KV GIDC -Vapi 30-40162 Valsad Vapi 66KV GIDC Vapi -III rd. Ph.163 Valsad Vapi 66KV Dungra164 Valsad Vapi 66KV GIDC Vapi - IV th Ph.165 Valsad Vapi 66KV GIDC -Vapi Ph.-II 30-40166 Valsad Vapi 66KV Morai167 Valsad Vapi 66KV Morai-2168 Surat Kamrej 66KV Kosmada169 Surat Choryasi 66KV Godadara170 Surat Palsana 66KV Kadodara171 Surat Palsana 66KV Palsana172 Surat Palsana 66KV Tatithaiya173 Surat Palsana 66KV Jolva174 Surat Choryasi 66KV Punakumbharia175 Surat Kamrej 66KV Laskan176 Surat Kamrej 66KV Laskana -2177 Surat Kamrej 66KV Vav 30-40178 Surat Olpad 66KV Sivan (Sayan west)179 Surat Olpad 66KV Delad180 Surat Palsana 66KV Niyol (Kadodara-2)181 Surat Choryasi 66KV Deladva182 Surat Choryasi 66KV Sarthana 30-40183 Bharuch Wagra 220/66KV Wagra 50-70184 Bharuch Wagra 66KV Vilayat185 Bharuch Bharuch 66KV Kukarwada186 Bharuch Bharuch 66KV Sayakha 30-40187 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70188 Surat Mangrol 66KV Kosamba189 Surat Mangrol 66KV Kharach (Tarsali)190 Tapi Songadh 66KV Borda191 Tapi Songadh 66KV Bhogvad192 Tapi Songadh 66KV Sagbara

220 KV Dahej --30-40

South Gujarat

30-40

220 KV Vapi --40-50

30-40

30-40

220 KV Wagra --30-40

400 KV Kosamba --30-40

40-50

220 KV Vav --

30-40

30-40

30-40

30-40

30-40 220 KV Ukai Hydro --

Page 5: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

193 Tapi Nizar 66KV Nizar194 Tapi Nizar 66KV Kelani (Kukarmunda)195 Tapi Nizar 66KV Balda/Nimbhora196 Tapi Uchchhal 66KV Rumkitalav197 Tapi Uchchhal 66KV Uchchhal198 Tapi Uchchhal 66KV Vadpada(Naranpur)

199 Tapi Songadh 66KV Chikhali Bheshrot (Khodtalav)

200 Tapi Songadh 66KV Vadi Bhesrot201 Tapi Songadh 66KV Sisor (Panchpipla)202 Tapi Songadh 66KV Ukai203 Tapi Songadh 66KV Songadh204 Tapi Songadh 66KV Kavla205 Tapi Songadh 66KV Jamkhadi (Hindala)206 Dang Subir 66KV Subir

1 Chhota Udaipur Chhotaudepur 132/66KV Chhota Udepur (Vasedi) 50-702 Chhota Udaipur Chhotaudepur 132/66 KV Zoz 40-503 Chhota Udaipur Kawant 66KV Kawant4 Chhota Udaipur Kawant 66KV Bhekhadiya (Bhaka)5 Chhota Udaipur Kawant 66KV Panvad6 Chhota Udaipur Chhotaudepur 66KV Vanar7 Chhota Udaipur Bodeli 66KV Bodeli8 Chhota Udaipur Bodeli 66KV Uchapan9 Chhota Udaipur Pavi-Jetpur 66KV Vadoth

10 Chhota Udaipur Pavi-Jetpur 66KV Pavi-Jetpur11 Chhota Udaipur Pavi-Jetpur 66KV Dev Mori (Rangli chokdi)

12 Chhota Udaipur Chhotaudepur 66KV Lehvant (Rangpur Sadli)

13 Chhota Udaipur Chhotaudepur 66KV Judavant14 Dahod Dahod 132/66KV Dahod 50-7015 Dahod Dahod 66KV Kharedi (Chhapri)16 Dahod Dahod 66KV Kharod (Chhapari)17 Dahod Zalod 66KV Karath (Limdi)18 Dahod Dahod 66KV Kathala19 Dahod Zalod 66KV Zalod 20 Dahod Zalod 66KV Gultora21 Dahod Dahod 66KV Navagam22 Dahod Garbada 66KV Garbada (Nalvai)23 Dahod Garbada 66KV Vajelav (Jesavada)24 Dahod Limkheda 132/66KV Limkheda 40-5025 Dahod Devgadh Bariya 66KV Devgadh-Baria

26 Dahod Limkheda 66KV Mota Ambaliyara (Randhikpur)

27 Dahod Devgadh Bariya 66KV Piplod28 Dahod Devgadh Bariya 66KV Dabhwa (Fangiya)29 Dahod Dhanpur 66KV Singavali (Pipero) 30-4030 Dahod Limkheda 66KV Limkheda 30-40

Central Gujarat

132 KV Chhota Udepur (Vasedi)

--

30-40

30-40

30-40

30-40

30-40

30-40

South Gujarat

132 KV Dahod --50-70

30-40

132 KV Limkheda --30-40

220 KV Ukai Hydro --

Page 6: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

31 Vadodara Padra 66KV Samiyala (Tandalja)32 Vadodara Padra 66KV Padra33 Vadodara Padra 66KV Mahuvad34 Vadodara Vadodara 66KV Bhayli 50-7035 Vadodara Vadodara 66KV Koyali36 Vadodara Vadodara 66KV Sherkhi37 Vadodara Vadodara 66KV Vasana38 Vadodara Vadodara City 66KV Vidhyutnagar39 Vadodara Vadodara City 66KV Atladra40 Vadodara Vadodara 66KV Gotri-B41 Vadodara Vadodara City 66KV Subhanpura42 Vadodara Vadodara City 66KV Gorwa43 Kheda Kheda 66KV Kheda44 Kheda Kheda 66KV Matar45 Kheda Kheda 66KV Samadra46 Kheda Matar 66KV Limbasi47 Kheda Vaso 66KV Vaso48 Kheda Mehemdabad 66 KV Wathwadi 49 Kheda Mehmedabad 66KV Aklacha50 Kheda Mehmedabad 66KV Jinjar51 Kheda Mehmedabad 66KV Haldarwas52 Kheda Mehmedabad 66KV Varsola (Devki Vansol/Vamali)

53 Vadodara Savli 132/66KV Manjusar 50-7054 Vadodara Desar 66KV Desar55 Vadodara Savli 66KV Savli56 Vadodara Savli 66KV Tundav57 Vadodara Savli 66KV Alindra(Manjusar)58 Anand Anand 66KV Samarkha59 Kheda Galteshwar 66KV Vadad60 Kheda Nadiad 66KV Chaklasi 61 Kheda Nadiad 66KV Malarpura (Chaklasi Party)

62 Kheda Nadiad 66KV Palaiya63 Kheda Nadiad 66KV Kamla (Nadiad City)64 Kheda Nadiad 66KV Dabhan65 Kheda Mehemdabad 66KV Sandhana 30-4066 Vadodara Savli 66KV Rania (Moxi) GIDC 67 Vadodara Vadodara 66KV Nandesari-I68 Vadodara Savli 66KV Poicha69 Vadodara Vadodara 66KV Nandesari-III 50-6070 Vadodara Vadodara 66KV Ranoli GIDC 30-4071 Anand Anand 132/66KV Ode 50-7072 Anand Anand 66KV Vasad73 Anand Anand 66KV Sarsa74 Anand Umreth 66KV Sureli75 Kheda Thasra 66KV Nesh76 Kheda Thasara 66KV Thasra77 Anand Anand 66KV Bhalej78 Anand Umreth 66KV Umreth79 Kheda Thasara 66KV Rakhiyal

50-70

132 KV Gotri --

50-70

50-70

50-70

30-40

30-40

132 KV Mahemdab

ad--

30-40

30-40

Central Gujarat

30-40 132 KV Nandesari --

30-40

132 KV Manjusar --30-40

30-40132 KV Nadiad --

30-40

132 KV Ode

30-40

30-40 --

Page 7: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

80 Ahmedabad Dascroi 132/66KV Narol 50-7081 Ahmedabad Dascroi 66KV Barejadi82 Ahmedabad Dascroi 66KV Vinjol (Gatrad)83 Ahmedabad Dascroi 66KV Bhuvaldi84 Ahmedabad Dascroi 66KV Bilasiya85 Ahmedabad Dascroi 66KV Vehlal86 Ahmedabad Dascroi 66KV Kanbha87 Ahmedabad Dascroi 66KV Hirapur88 Ahmedabad Dascroi 66 KV Nenpur89 Ahmedabad Dascroi 66KV Jetalpur90 Ahmedabad Dascroi 66 KV Navagam91 Ahmedabad Dascroi 66KV Lambha (Kamod) 15-2092 Kheda Kheda 66KV Bidaj (Vanch) 30-4093 Ahmedabad Ahmedabad 66KV Sarkhej (Shela)94 Ahmedabad Dascroi 66KV Bopal95 Ahmedabad Dascroi 66KV Science City96 Ahmedabad Dascroi 66KV Bhadaj97 Gandhinagar Gandhinagar 66KV Adalaj98 Gandhinagar Gandhinagar 66KV Sargasan99 Ahmedabad Ahmedabad City 66KV Traghad

100 Ahmedabad Dascroi 66KV Khoraj (shaligram)101 Ahmedabad Dascroi 66 KV Goderej City102 Chhota Udaipur Bodeli 66KV Chalamali (Vanadha)103 Chhota Udaipur Bodeli 66KV Koshindra104 Chhota Udaipur Naswadi 66KV Naswadi105 Chhota Udaipur Naswadi 66KV Sengpur (Khanda)106 Chhota Udaipur Naswadi 66KV Ratanpur

107 Chhota Udaipur Naswadi 66KV Vaghach (Gadhboriyad)

108 Narmada Nandod 66KV Navagam109 Narmada Nandod 66KV Amadla (Nandod)110 Narmada Nandod 66KV Garudeshwar (Devaliya)

111 Narmada Tilakwada 66KV Limpura (Utavdi) 30-40112 Narmada Tilakwada 66KV Soikuva 30-40113 Vadodara Dabhoi 66KV Chandod114 Vadodara Dabhoi 66KV Pisai (Sathod)115 Vadodara Sinor 66KV Simli (Segwa)116 Bharuch Zagadiya 220/132/66KV Achhalia 50-70117 Bharuch Zagadiya 66KV Rajpardi118 Bharuch Zagadiya 66KV Zagadia119 Bharuch Zagadiya 66KV Bhalod (Govali)120 Bharuch Zagadiya 66KV Panetha 30-40121 Narmada Nandod 66KV Rajpipla122 Narmada Nandod 66 KV Anijara (Lachhras)123 Narmada Nandod 66KV Bhacharwada124 Narmada Nandod 66 KV Amletha125 Narmada Nandod 66KV Pratapnagar (Umalla)126 Narmada Nandod 66 KV Rajuwadiya127 Narmada Nandod 66KV Ori

132 KV Narol

30-40

30-40

40-50 400 KV Vadavi

--30-40132 KV

Sabarmati

Central Gujarat

220 KV Achhalia --

30-40

25-30

50-70

30-40

30-40

132 KV Tilakwada --

50-70

30-40

--

Page 8: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

128 Ahmedabad Sanand 220/66 KV Bhat 50-70129 Ahmedabad Sanand 66KV Sanathal130 Ahmedabad Dascroi 66KV Visalpur131 Ahmedabad Sanand 66KV Chharodi132 Ahmedabad Viramgam 66KV Thuleta133 Ahmedabad Sanand 66KV Madhavnagar134 Ahmedabad Sanand 66 KV Shella135 Ahmedabad Sanand 66 KV Ambali136 Ahmedabad Sanand 66KV Sanand GIDC137 Ahmedabad Dascroi 66KV Bhat (Bavla)138 Ahmedabad Sanand 66KV Changodar139 Panchmahal Halol 220/66KV Chandrapura 50-70140 Panchmahal Ghoghamba 66KV Ghoghamba 141 Panchmahal Ghoghamba 66KV Simaliya (Rinchhvani)142 Panchmahal Halol 66KV Shivrajpur143 Panchmahal Halol 66KV GIDC Halol B144 Panchmahal Halol 66KV Tarkhanda (Panchdevla)

145 Panchmahal Halol 66KV GIDC - Halol 30-40146 Panchmahal Kalol 66KV Madhwas 30-40147 Vadodara Savli 66KV Ankaliya (Nharpura)148 Panchmahal Halol 66KV Baska149 Panchmahal Halol 66KV KhaKharia150 Panchmahal Godhra 220/132/66KV Godhra 50-70151 Panchmahal Kalol 66KV Vejalpur152 Panchmahal Kalol 66KV Kalol153 Panchmahal Kalol 66 KV Bhadroli Khurd154 Panchmahal Godhra 66KV Lilesara 30-40155 Panchmahal Godhra 66KV Santroad156 Panchmahal Morvahadaf 66KV Rajayata 157 Panchmahal Morvahadaf 66KV Chandpur158 Panchmahal Morvahadaf 66KV Mota Amalia159 Panchmahal Godhra 66KV Jafrabad (Govindi)160 Panchmahal Godhra 66KV Timba161 Panchmahal Godhra 66KV Tuva(kankanapur)162 Panchmahal Morvahadaf 66KV Gokulpur (Morwa Raina)

163 Panchmahal Shehra 66KV Shehera164 Panchmahal Shehra 66KV Nandarva165 Panchmahal Shehra 66KV Padardi166 Vadodara Vadodara 220/132/66KV Jambuva 50-70167 Vadodara Dabhoi 66KV Dabhoi168 Chhota Udaipur Sankheda 66KV Sankheda169 Chhota Udaipur Sankheda 66KV Bhatpur170 Vadodara Vadodara 66KV Indrapuri171 Vadodara Vadodara City 66KV Waghodia Road172 Vadodara Vadodara 66KV Gajrawadi173 Vadodara Vadodara City 66KV Motibaug174 Vadodara Vadodara City 66KV Tarsali175 Vadodara Vadodara City 66KV Makarpura-GIDC-B176 Vadodara Vadodara City 66KV Makarpura GIDC-A

Central Gujarat

220 KV Godhra --

30-40

30-40

30-40

30-40

220 KV Bhat

30-40

30-40

220 KV Chandrapur

a--

30-40

30-40

220 KV Jambuva --

30-40

50-70

30-40

50-70

--

Page 9: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

177 Vadodara Padra 220/66KV Gavasad 50-70178 Vadodara Padra 66KV Karkhadi179 Vadodara Padra 66KV Gavasad180 Vadodara Padra 66KV Mobha 181 Bharuch Zagadiya 220/66KV Jhagadia 50-70182 Bharuch Zagadiya 66KV Randedi 50-70183 Bharuch Zagadiya 66KV Dadheda (Zagadia GIDC) 30-40

184 Bharuch Bharuch 132/66KV Bharuch 50-70 132 KV Bharuch --

185 Bharuch Bharuch 220/132/66KV Haldarwa 50-70186 Bharuch Amod 66KV Samni (Kurchan)187 Bharuch Bharuch 66KV Palej188 Bharuch Bharuch 66KV Zanor (Nabipur)189 Bharuch Wagra 66KV Muller190 Bharuch Bharuch 66KV Bharuch -B191 Bharuch Bharuch 66KV Bori (Hingala)192 Bharuch Wagra 66KV Wagra193 Bharuch Bharuch 66KV Panchbatti194 Bharuch Bharuch 66KV Kadod 30-40195 Bharuch Bharuch 66KV Haldarva 30-40196 Vadodara Karjan 66KV Rarod (Nareshwar)197 Vadodara Karjan 66KV Saring198 Kheda Kapadvanj 220/66KV Kapadwanj 50-70199 Kheda Kapadvanj 66KV Kapadwanj GIDC 30-40200 Kheda Kapadvanj 66KV Nirmali201 Kheda Kapadvanj 66KV Attarsumba202 Kheda Kapadvanj 66KV Hamirpura (Bhailakui)203 Kheda Kapadvanj 66KV Torna204 Kheda Kathalal 66KV Aral 205 Kheda Kathlal 66KV Chhipadi (Khalal)206 Kheda Kathlal 66KV Kathlal207 Kheda Mahutha 66KV Mahudha208 Kheda Kapadvanj 66KV Vyas Vasna209 Kheda Kathlal 66KV Apruji 210 Kheda Kathlal 66KV Anara 30-40211 Kheda Thasra 66KV Chetarsumba212 Kheda Mahutha 66KV Shehri (Alina)213 Mahisagar Balasinor 66KV Jorapura214 Mahisagar Balasinor 66KV Relia215 Kheda Galteshwar 66KV Sevalia216 Kheda Balasinor 66KV Rozva217 Mahisagar Balasinor 66KV Balasinor218 Anand Petlad 66KV Mahelav219 Anand Petlad 66KV Changa220 Ahmedabad Dascroi 220/66KV Khanpur 50-70221 Ahmedabad Dascroi 66KV Kuha222 Ahmedabad Dascroi 66 KV Bahiyal

223 Anand Anand 66KV Mogar 50-70 220 KV Mogar --

15-20

220 KV Jhagadia --

Central Gujarat

220 KV Gavasad --50-70

30-40

30-40

220 KV Haldarwa --

30-40

220 KV Kapadwanj --

30-40

30-40

30-40

30-40 400 KV Kasor --

220 KV Khanpur --30-40

Page 10: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

224 Vadodara Karjan 220/66KV Karjan 50-70

225 Vadodara Dabhoi 66KV Karvan (Kayavarohan)

226 Vadodara Karjan 66KV Simali227 Vadodara Sinor 66KV Sadhali228 Vadodara Sinor 66KV Sinor

229 Vadodara Karjan 66KV Kashipura (Ramangamdi) 30-40

230 Vadodara Karjan 66KV Lakodara 30-40231 Anand Anand 66KV Anand232 Anand Anand 66KV Gopalpura233 Anand Anand 66KV Boriavi (Jol)234 Anand Anand 66KV V.V. Nagar 30-40235 Anand Anand 66KV Vithal Udyognagar 30-40236 Anand Anand 66KV Karamsad 30-40237 Anand Anklav 66KV Anklav238 Anand Anklav 66KV Navakhal (Khedasa)239 Anand Borsad 66KV Borsad240 Anand Borsad 66KV Shinglav241 Anand Anand 66KV Navli242 Anand Anklav 66KV Khadol (Haldari)243 Anand Borsad 66KV Ras244 Anand Petlad 66KV Virsad245 Anand Petlad 66KV Nar246 Anand Petlad 66KV Petlad247 Anand Sojitra 66KV Kasor 30-40248 Kheda Nadiad 66KV Uttarsanda249 Kheda Nadiad 66KV Akhdol250 Ahmedabad Ahmedabad 220/132/66KV Ranasan 50-70251 Ahmedabad Ahmedabad 66KV Naroda252 Ahmedabad Ahmedabad 66KV Odhav253 Ahmedabad Ahmedabad 66KV Kathvada254 Gandhinagar Gandhinagar 66KV Muthia 30-40255 Ahmedabad Dascroi 66KV Chandkheda256 Ahmedabad 66 KV Bhat257 Vadodara Waghodiya 400/220/66KV Asoj 50-70258 Vadodara Vadodara 132/66KV Fertilizarnagar 50-70259 Vadodara Savli 66KV Khakhariya 30-40

260 Vadodara Savli 66KV Pratapnagar (Godampura)

261 Vadodara Waghodiya 66KV Asoj (Paldi)262 Vadodara Waghodiya 66KV Vyankatpura263 Vadodara Waghodiya 66KV Jarod264 Vadodara Vadodara 66KV Amaliyara 265 Vadodara Vadodara City 66KV Chhani-A266 Vadodara Vadodara City 66KV Chhani -B 267 Vadodara Vadodara City 66KV Sama

220 KV Karjan

30-40

Central Gujarat

--

30-40

220 KV Karamsad /

220 KV Mogar

--30-40

30-40

30-40

30-40

220 KV Ranasan --

30-40

30-40

400 KV Asoj --

30-40

Page 11: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

268 Mahisagar Lunawada 220/66KV Savdasna Muvada 50-70269 Mahisagar Lunawada 66KV Lunawada270 Mahisagar Santrampur 66KV Movasa271 Mahisagar Lunawada 66KV Kothamba272 Mahisagar Lunawada 66KV Ved(vardhadari)273 Mahisagar Kadana 66KV Ditvas274 Mahisagar Khanpur 66KV Bakor (Lavana)275 Mahisagar Khanpur 66KV Motakhanpur276 Mahisagar Santrampur 66KV Santrampur

277 Mahisagar Santrampur 66KV Valakhedi (Gothib)Vaneda

278 Mahisagar Santrampur 66KV Sarasva279 Mahisagar Lunawada 66KV Budhajina Tekra 30-40280 Mahisagar Santrampur 66KV Limda Muvadi (Moti Sarsan)281 Mahisagar Santrampur 66KV Mora282 Mahisagar Santrampur 66KV Malvan283 Ahmedabad Bavla 220/66KV Salejada 50-70284 Ahmedabad Bavla 66KV Juval rupavati285 Ahmedabad Bavla 66KV Kerala286 Ahmedabad Sanand 66KV Zamp287 Ahmedabad Sanand 66KV Daduka (Rethal)288 Ahmedabad Bavla 66KV Bavla289 Ahmedabad Sanand 66KV Nani Devti290 Ahmedabad Sanand 66KV Rajoda291 Ahmedabad Sanand 66KV Moraiya292 Ahmedabad Sanand 66KV Vendor Park 293 Ahmedabad Sanand 66KV Bol-2(GIDC)294 Ahmedabad Sanand 66KV Sanand-2295 Ahmedabad Bavla 66KV Bol-1(GIDC)296 Ahmedabad Bavla 66KV Kalyangadh297 Ahmedabad Dholka 66KV Dholka City 30-40298 Ahmedabad Dholka 66KV Koth299 Ahmedabad Dholka 66KV Raipur300 Ahmedabad Dholka 66KV Simej301 Ahmedabad Dholka 66KV Walthera302 Ahmedabad Dholka 66KV Ingoli road303 Ahmedabad Dholka 66KV Dholka GIDC304 Ahmedabad Dholka 66KV Pisawada305 Ahmedabad Dholka 66 KV Shetra306 Kheda Kheda 66KV Shetra 30-40307 Kheda Nadiad 66KV Navagam (Nyka) 30-40308 Ahmedabad Detroj 66KV Kanz 30-40309 Ahmedabad Viramgam 66KV Jakhawada 30-40310 Vadodara Waghodiya 220/66KV Vyankatpura 40-50311 Panchmahal Halol 66KV Madar (Koprej) 30-40312 Vadodara Waghodiya 66KV Rustampura313 Chhota Udaipur Bodeli 66KV Surya314 Vadodara Vadodara 66KV Khatamba315 Vadodara Vadodara City 66KV Harni

30-40

220 KV Savdasna

Mauda--

30-40

30-40

30-40

220 KV Viramgam --

220 KV Vyankatpur

a--30-40

40-50

Central Gujarat

30-40

30-40

30-40

220 KV Salejada

Maximum 50-70 MW RE injection

feasible

Page 12: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

1 Gandhinagar Gandhinagar 132/66KV Chiloda 50-702 Gandhinagar Gandhinagar 66KV Unava3 Gandhinagar Dehgam 66KV Sadra4 Gandhinagar Mansa 66KV Manekpur (Grambharti)5 Gandhinagar Gandhinagar 66KV Shahpur 30-406 Gandhinagar Gandhinagar 66KV Dabhoda 30-407 Banaskantha Deesa 66KV Bhildi8 Banaskantha Deesa 66KV Lorwada9 Banaskantha Deesa 66KV Balodhar

10 Banaskantha 66KV Manekpura11 Banaskantha 66KV Juna Deesa12 Banaskantha 66KV Ranpur13 Banaskantha 66KV Kant14 Patan Patan 132/66KV Patan 40-5015 Patan Harij 66KV Dunawada16 Patan Patan 66KV Anawada17 Patan Patan 66KV Kamliwada 30-4018 Patan Saraswati 66KV Kansa19 Patan Shihori 66KV Anganwada20 Banaskantha Vadgam 66KV Basu 21 Banaskantha Vadgam 66KV Kakoshi22 Banaskantha Vadgam 66KV Chhapi 30-4023 Mehsana Unjha 66KV Kahoda 30-4024 Patan Sidhpur 6KV Khali25 Patan Unjha / Mehsana 66KV Tundav26 Patan Sidhpur 66KV Mudana27 Patan Sidhpur 66KV Sujanpur28 Sabarkantha 66KV Prantij29 Sabarkantha 66KV Talod GIDC30 Sabarkantha 66KV D'Muvadi31 Sabarkantha 66KV Tajpur32 Sabarkantha Talod 66KV Harsol 30-4033 Banaskantha Lakhani 220/66KV Agathala 50-7034 Banaskantha 66KV Rantila35 Banaskantha 66KV Lakhani36 Banaskantha 66KV Agathala37 Banaskantha 66KV Soni38 Banaskantha 66KV Shergadh39 Banaskantha 66KV Kotda (D)40 Banaskantha 66KV Chekara41 Banaskantha Lakhani 66KV Motakapra 30-4042 Banaskantha Tharad 66KV Taruva 30-4043 Sabarkantha Himmatnagar 66KV Dedhrota44 Sabarkantha 66KV Munpur45 Sabarkantha 66KV Hansalpur46 Sabarkantha Himmatnagar 66KV Kali Dungar47 Sabarkantha 66KV Chandrani48 Sabarkantha 66KV Kaniyol

220 KV Agiyol --

30-40

132 KV Deesa --Deesa 30-40

Deesa 30-40

North Gujarat

132 KV Chiloda --30-40

132 KV Patan --

15-20

15-20

30-40

132 KV Siddhpur --

30-40

30-40

Prantij 30-40 132 KV Talod --

220 KV Agathala --

Lakhni, Deodar 30-40

Deodar, Lakhani 30-40

Lakhani 30-40

30-40

30-40

Page 13: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

49 Sabarkantha 66KV Hajipur50 Sabarkantha 66KV Dalpur51 Sabarkantha 66KV Himmatnagar-152 Sabarkantha 66KV Gadhoda53 Sabarkantha 66KV Nikoda54 Sabarkantha 66KV Gadhi55 Sabarkantha 66KV Gambhoi56 Sabarkantha 66KV Rupal57 Sabarkantha 66KV Himmatnagar-258 Patan Bechraji / Mehsana 220/66KV Bechraji 50-7059 Patan Chanasma 66KV Maniyari60 Patan Bechraji / Mehsana 66KV Modhera61 Gandhinagar Kalol 66KV Pansar62 Gandhinagar Kalol 66KV Chhatral GIDC63 Gandhinagar Kalol 66KV Borisana64 Gandhinagar Kalol 66KV Vadsar65 Gandhinagar Kalol 66KV Kalol 30-4066 Gandhinagar Kalol 66KV Dhanot67 Mehsana Kalol 66KV Karannagar68 Mehsana Kadi 66KV Khavad69 Mehsana Kadi 66KV Sadra70 Mehsana Kadi 66KV Rangpurda (Nanikadi)71 Mehsana Kadi 66KV Nandasan72 Mehsana Kadi 66KV Rajpur73 Aravali Bhiloda 220/66KV Bhutiya 50-7074 Aravali Bhiloda, Vijaynagar 66KV Bhiloda75 Aravali Bhiloda, Vijaynagar 66KV Ubsal76 Aravali Bhiloda, Vijaynagar 66KV Torada77 Aravali Bhiloda, Vijaynagar 66KV Bhiloda78 Aravali Bhiloda, Vijaynagar 66KV Vijaynagar79 Aravali Bhiloda, Vijaynagar 66KV Pal80 Aravali Bhiloda, Vijaynagar 66KV Dantod81 Aravali Bhiloda 66KV Shamlaji (Palla)82 Aravali Bhiloda 66KV Bhetali83 Aravali Bhiloda 66KV Kheradi84 Sabarkantha 66KV Poshina85 Sabarkantha 66KV Golwada86 Sabarkantha 66 KV Makadchampa87 Sabarkantha 66KV Hingatiya88 Sabarkantha 66KV Khedbrahma89 Sabarkantha 66KV Kundala90 Sabarkantha 66KV Choriwad91 Sabarkantha 66KV Chitroda92 Sabarkantha 66KV Badoli93 Sabarkantha 66KV Sudarpur94 Sabarkantha 66KV Lai Ranasan95 Gandhinagar Gandhinagar 220/66KV Jamla 50-7096 Gandhinagar Gandhinagar 66KV Randheja97 Gandhinagar Gandhinagar 66KV Moti Adrej

220 KV Agiyol --

--

220 KV Jamla --

30-40

Himmatnagar 30-40

Himmatnagar, Prantij 30-40

15-20

30-40

220 KV Chhatral --

30-40

30-40

30-40

30-40

Idar 30-40

30-40

220 KV Bhutiya --

30-40

30-40

Poshina, Danta, Khedbrahma 30-40

Vijaynagar, Vadali 30-40

Idar 30-40

220 KV Becharaji

North Gujarat

Himmatnagar, Talod 30-40

Himmatnagar, Prantij

Page 14: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

98 Gandhinagar Kalol 66KV Soja - II99 Gandhinagar Kalol 66KV Nardipur

100 Mehsana Kadi 66KV Karjisan101 Gandhinagar Kalol 66KV Veda102 Gandhinagar Kalol 66KV Itla 30-40103 Mehsana 66KV Gozaria104 Mehsana 66KV Gozariya-2105 66KV Boru106 66KV Charada107 Mehsana 66KV Kharna108 Aravali Bayad, Dhansura 220/66 KV Dhansura 50-70109 Aravali Bayad, Dhansura 66KV Ambaliyara110 Aravali Bayad, Dhansura 66KV Akrund(Haripura)111 Aravali Bayad 66KV Demai112 Aravali Bayad 66KV Sangal (Vasnirel)113 Aravali Malpur, Dhansura 66KV Aniyor114 Aravali Malpur, Dhansura 66KV Khadol (Simali)115 Aravali Bayad 66KV Untarada116 Aravali Talod 66KV Rozad117 Sabarkantha 66KV Punsari118 Sabarkantha 66KV Bayal119 Aravali Modasa 220/66KV Faredi 50-70120 Aravali Modasa 66KV Modasa121 Aravali Modasa 66KV Tiintoi122 Aravali Modasa 66KV Medhasan123 Aravali Modasa 66KV Nani Isrol124 Aravali Malpur, Meghraj 66KV Malpur125 Aravali Malpur, Meghraj 66KV Limbodara126 Aravali Malpur, Meghraj 66 KV Ramgadhi127 Aravali Malpur, Meghraj 66KV Dugarwada (Kolikhad)128 Aravali Meghraj 66KV Meghraj129 Aravali Meghraj 66KV Relawada130 Aravali Meghraj 66KV Kasana131 Aravali Meghraj 66KV Rajpur (Ramghadi)132 Aravali Meghraj 66KV Navagam (isari) Kantalu133 Aravali Meghraj 66KV Lakshmanpura (Lusadiya)134 Banaskantha Deesa 220/66KV Jangral 50-70135 Banaskantha 66KV Sadarpur136 Banaskantha 66KV Samau137 Banaskantha 66KV Bhatsan138 Banaskantha 66KV Rasana139 Banaskantha 66KV Aseda140 Banaskantha 66KV Samdhi141 Banaskantha 66KV Sampra142 Banaskantha 66KV Umbari143 Banaskantha 66KV Kamboi144 Banaskantha Palanpur 66KV Gadh 30-40145 Patan Sarasvati 66KV Mesar 30-40146 Patan Sarasvati 66KV Dharusana 30-40

220 KV Jamla --

30-40

Gozariya 30-40

30-40

30-40

30-40

North Gujarat

220 KV Dhansura --

30-40

30-40

30-40

30-40

Talod 20

220 KV Jangral --

Deesa 30-40

Deesa, Palanpur 30-40

Sihori 30-40

220 KV Faredi --

Page 15: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

147 Patan Saraswati 66KV Jangral 30-40148 Patan Saraswati 66KV Kimbuva 30-40149 Patan Sidhpur 66KV Kalyana 30-40150 Gandhinagar Dehgam 66KV Rakhiyal 30-40151 Gandhinagar Dehgam 66KV Halisa152 Gandhinagar Gandhinagar 66KV Chhala153 Gandhinagar Dehgam 66KV Dehgam154 Gandhinagar Dehgam 66KV Kadadar(Zak)155 Gandhinagar Dehgam 66KV Chiskari 30-40156 Gandhinagar Gandhinagar 66KV Kadjodra 30-40157 Gandhinagar Gandhinagar 66KV Bahial158 Gandhinagar Gandhinagar 66KV Kudasana(Koba)159 Mehsana Kheralu 220/66KV Kheralu 50-70160 Mehsana Kheralu 66KV Sakari161 Banaskantha Vadgam 66KV Panchada162 Banaskantha Vadgam 66KV Kodram163 Banaskantha Danta 66KV Ambaji164 Banaskantha Danta 66KV Gorad165 Banaskantha Danta 66KV Kuvarsi166 Banaskantha Danta 66KV Satalsana167 Mehsana 66KV Kheralu 30-40168 Mehsana 66KV Varetha169 Mehsana 66KV Sudasana (Umari)170 Mehsana 66KV Otalpur171 Mehsana Kheralu 66KV Mandali172 Mehsana Unjha 66KV Dasaj173 Mehsana 66KV Satlasana174 Mehsana 66KV Dharoi175 Mehsana Unjha 66KV Unjha176 Mehsana Unjha 66KV Karli177 Mehsana Visnagar 66KV Umta178 Mehsana Visnagar 66 KV Thalota179 Mehsana 66KV Vadnagar180 Mehsana 66KV Undhai (Pipaldhar)181 Mehsana 66KV Jantral182 Mehsana 66KV Sunderpur183 Mehsana 66KV Ladol184 Mehsana Vadnagar 66KV Khanpur185 Mehsana Vijapur 66KV Techava186 Mehsana Mehsana 220/132/66KV Mehsana 50-70187 Patan Chanasma 66 KV Dhinoj188 Mehsana Becharji 66KV Motap189 Mehsana Mehsana 66KV Palavasna190 Mehsana Mehsana 66KV Nagalpur (Mehsana-II)191 Mehsana Visnagar 66KV Basna192 Mehsana Visnagar 66KV Udalpur193 Mehsana Visnagar 66KV Kamana 194 Mehsana Visnagar 66 KV Kherva195 Mehsana Visnagar 66KV Bhandu196 Mehsana Visnagar 66KV Valam

30-40

30-40

30-40

North Gujarat220 KV Jangral --

30-40

30-40

30-40

30-40

30-40

Vadnagar

30-40Vijapur

30-40

220 KV Mehsana

220 KV Kheralu --

30-40

30-40

Kheralu

30-40Satlasana

30-40

Satlasana 30-40

--

220 KV Khanpur --

Page 16: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

197 Mehsana Jotana 220/66 KV Mitha 50-70198 Mehsana Mehsana 66KV Asjol 30-40199 Mehsana Mehsana 66KV Balol 30-40200 Mehsana Jotana 66KV Mitha 30-40201 Mehsana 66KV Suraj202 Mehsana 66KV Kasalpur (Jotana)203 Mehsana 66KV Mudarda 204 Mehsana Detroi / Ahmedabad 66KV Katosan205 Mehsana Mehsana 66KV Langhnaj206 Mehsana Mehsana 66KV Linch207 Mehsana Mehsana 66KV Mandali208 Mehsana Mehsana 66KV Akhaj209 Banaskantha Palanpur 220/66KV Palanpur 50-70210 Banaskantha Amirgadh 66KV Amirgadh211 Banaskantha Amirgadh 66KV Iqbagadh 212 Banaskantha Amirgadh 66KV Hebatpur213 Banaskantha Amirgadh 66KV Bhayala214 Banaskantha Amirgadh 66KV Virampur215 Banaskantha Amirgadh 66KV Malan216 Banaskantha Amirgadh 66KV Vasan217 Banaskantha Amirgadh 66KV Palanpur-2218 Banaskantha Vadgam, Danta 66KV Moriya219 Banaskantha Vadgam, Danta 66KV Jalotra220 Banaskantha Vadgam, Danta 66KV Danta221 Banaskantha Vadgam, Danta 66KV Gangva222 Banaskantha Vadgam, Danta 66KV Gidasan223 Banaskantha Vadgam, Danta 66KV Vadgam224 Banaskantha Vadgam, Danta 66KV Pilucha225 Banaskantha Vadgam, Palanpur 66KV Kanodar226 Banaskantha Vadgam, Palanpur 66KV Lalwada227 Banaskantha Vadgam, Palanpur 66KV Gadalwada228 Banaskantha Dantiwada, Palanpur 66KV Bhakar229 Banaskantha Dantiwada, Palanpur 66KV Chandisar230 Banaskantha Dantiwada, Palanpur 66KV Dantiwada231 Banaskantha Dantiwada, Palanpur 66KV Bhutedi232 Banaskantha Palanpur 66KV Palanpur-1 30-40233 Banaskantha 66KV Khariya234 Banaskantha 66KV Un235 Patan Radhanpur 66KV Bhandhvad (Dev)236 Patan Kankrej 66KV Jakhel237 Patan Sankhari 220/66KV Sankhari 50-70238 Patan Chanasma 66KV Chanasma239 Patan Chanasma 66KV Kamboi240 Patan Chanasma 66KV Ziliya (Keshani)241 Patan Patan 66KV Balisana242 Patan Patan 66KV Manud243 Patan Patan 66KV Norta (Mandotri)244 Patan Unjha / Mehsana 66KV Unava

220 KV Mitha --Jotana 30-40

30-40

North Gujarat

220 KV Palanpur --

30-40

30-40

30-40

30-40

30-40

220 KV Sankhari --

15-20

30-40

30-40

30-40

30-40

Sihori, Kankrej 30-40 220 KV Radhanpur --

Page 17: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

245 Banaskantha 66KV Runi246 Banaskantha 66KV Rampura247 Banaskantha 66KV Tithgam248 Banaskantha 66KV Balodhan249 Banaskantha 66Kv Bhabar250 Banaskantha 66KV Jaloya251 Banaskantha 66KV Vav252 Banaskantha 66KV Kotarwada253 Banaskantha 66KV Makhanu254 Banaskantha 66KV Mera255 Banaskantha 66KV Chalva256 Banaskantha 66KV Jetda257 Banaskantha 66KV Del258 Banaskantha 66KV Miyal259 Banaskantha 66KV Lavana260 Banaskantha 66KV Ghodasar261 Banaskantha 66KV Asodar262 Banaskantha 66KV Keshargam263 Banaskantha 66KV Rah264 Banaskantha 66KV Pathamda265 Banaskantha 66KV Bhoradu266 Banaskantha Tharad 66KV Tadav 30-40267 Banaskantha 66KV Piluda268 Banaskantha 66KV Dedarada269 Banaskantha 66KV Dudhva270 Banaskantha 66KV Tharad271 Banaskantha Dhanera 220/66KV Thavar 50-70272 Banaskantha 66KV Jadiyali273 Banaskantha 66KV Nandala274 Banaskantha Dhanera 66KV Dhakha275 Banaskantha Tharad 66KV Duva276 Banaskantha 66KV Jadia277 Banaskantha 66KV Bhatib278 Banaskantha 66KV Dharnodhar279 Banaskantha 66KV Kuvarala280 Banaskantha 66KV Lavara281 Banaskantha 66KV Nanuda282 Banaskantha 66KV Malotra283 Banaskantha 66KV Siya284 Banaskantha Deesa 66KV Nanameda285 Banaskantha Dhanera 66KV Vaktapura286 Gandhinagar Kalol 66KV Moti Bhoyan 30-40287 Gandhinagar Kalol 66KV Khatraj288 Gandhinagar Kalol 66KV Santej289 Mehsana Kadi 66KV Kadi290 Mehsana Kadi 66KV Laxmipura291 Ahmedabad Detroj 66KV Katosan 30-40292 Mehsana Kadi 66KV Meda Adraj293 Mehsana Kadi 66KV Meda294 Mehsana Kadi 66KV Thol

30-40

30-40Dhanera

30-40

30-40

30-40

30-40

Deodar, Tharad 30-40

Lakhani, Tharad 30-40

220 KV Tharad --

220 KV Thavar

(Dhanera)--

Bhabar, Vav

Suigam, Vav

400 KV Vadavi

30-40

30-40

30-50

--

North Gujarat

Tharad 30-40

Lakhani 30-40

Page 18: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

295 Banaskantha Mera 66KV Mera296 Banaskantha Mera 66KV Mitha297 Banaskantha Mera 66KV Vadiya298 Banaskantha 66KV Ramvas299 Banaskantha 66KV Vakha300 Banaskantha 66KV Ravel301 Banaskantha 66KV Chamanpura302 Banaskantha 66KV Khimana303 Banaskantha 66KV Khoda304 Banaskantha 66KV Mithipaldi305 Banaskantha 66KV Vatam306 Banaskantha 66KV Kotda (F)307 Banaskantha Deodar 66KV Deodar 30-40308 Banaskantha 66KV Raiya309 Banaskantha 66KV Arniwada310 Banaskantha 66KV Jakhel311 Banaskantha 66KV Jasanvada (Khandosan)312 Banaskantha 66KV Terwada313 Banaskantha Kankrej 66KV Jalmor314 Banaskantha 66KV Sihori315 Banaskantha 66KV Padardi316 Banaskantha 66KV Dugrasan317 Banaskantha 66KV Thara318 Gandhinagar 66KV Mansa319 Gandhinagar 66KV Lodra320 Mehsana Mansa 66 KV Vihar321 Mehsana Visnagar 66KV Kada322 Sabarkantha 66KV Mau323 Sabarkantha 66KV Vasai324 Mehsana Vijapur 66KV Pilwai (Veda) 30-40325 Mehsana 66KV Malosan326 Mehsana 66KV Tatosan327 Mehsana 66KV Vadasan 328 Mehsana Visnagar 66KV Bhalak (Transwad) 30-40329 Mehsana 66KV Ranasan330 Mehsana 66KV Hirpura331 Banaskantha Dantiwada, Deesa 400/220/66KV Zerda 50-70332 Banaskantha 66KV Jegol333 Banaskantha 66KV Panthwada334 Banaskantha 66KV Vithodar335 Banaskantha 66KV Devsari336 Banaskantha 66KV Pechhdal337 Banaskantha 66KV Nagfana338 Banaskantha Deesa 66KV Malgadh 30-40339 Banaskantha 66KV Ramun340 Banaskantha 66KV Sherpura341 Banaskantha 66KV Zerda342 Banaskantha 66KV Khimat343 Banaskantha 66KV Dama344 Banaskantha 66KV Samsherpura345 Banaskantha 66KV Gadha346 Banaskantha 66KV Baiwada

30-40

Sihori

Sihori 30-40

30-40

220 KV Deodar (Vakha)

--

Kankrej, Deesa, Sihori, Deodar 30-40

Deodar, Lakhani 30-40

Shihori, Deodar 30-40

Sihori, Kankrej

30-40

220 KV Vijapur --

30-40

30-40

30-40

Idar

30-40

30-40

North Gujarat

400 KV Kansari (Zerda)

--

30-40

Lakhani, Deesa 30-40

Deesa

Dantiwada, Deesa

Deesa

Vijapur

Vijapur

Mansa

30-40

Deesa 30-40

Deesa 30-40

Page 19: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

1 Rajkot Jamkandorna 132/66KV Bhayavadar 40-502 Rajkot Upleta 66KV Arni 30-403 Rajkot Dhoraji 66KV Supedi4 Rajkot Dhoraji 66KV Moti Vavdi5 Rajkot Jamkandorna 66 KV Khajurada6 Junagadh Junagadh 132/66KV Junagadh 40-507 Junagadh Junagadh 66KV Bilkha8 Junagadh Mendarda 66KV Chiroda9 Junagadh Junagadh 66KV Bagdu (Prabhatpur)

10 Junagadh Bhesan 66KV Chhodvadi11 Jamnagar Jamnagar 132/66KV Naghedi 40-5012 Jamnagar Jamnagar 66KV Shapar (Baid)13 Jamnagar Jamnagar 66KV Lakha Baval 14 Jamnagar Jamnagar 66KV Lal Bangalow15 Jamnagar Jamnagar 66KV Bedeshwar16 Jamnagar Jamnagar 66KV Saatrasta17 Jamnagar Jamnagar 66KV Hapa GIDC18 Jamnagar Jamnagar 66KV Jamnagar-C 30-4019 Devbhumi Dwarka Jam-Khambhaliya 66KV Vadinar 30-40 132 KV Sikka --20 Gir Somnath Veraval 66KV Veraval21 Gir Somnath Veraval 66KV Moraj22 Gir Somnath Veraval 66KV Adri23 Gir Somnath Veraval 66KV Ghusia24 Rajkot Rajkot 132/66KV Vikram 40-5025 Rajkot Rajkot 66KV Punitnagar (Rajkot-B)26 Rajkot Rajkot 66KV Mavdi Rd. (Rajkot)27 Rajkot Rajkot 66KV Shastri medan 28 Rajkot Rajkot 66KV Laxminagar29 Rajkot Rajkot 66KV Mota Mava30 Rajkot Rajkot 66KV Khokhadad31 Rajkot Rajkot 66KV Tramba32 Rajkot Rajkot 66KV Kotharia33 Rajkot Rajkot 66KV Nilkanth34 Bhavnagar Mahuva 220/66KV Otha (Mahuva) 50-7035 Bhavnagar Mahuva 66KV Kalsar36 Bhavnagar Talaja 66KV Datha37 Bhavnagar Talaja 66KV Pithalpur38 Bhavnagar Talaja 66KV Mannar39 Bhavnagar Ghogha 66KV Navagam40 Bhavnagar Talaja 66KV Talaja41 Bhavnagar Mahuva 66KV Dudhal-242 Bhavnagar Mahuva 66KV Khuntvada43 Bhavnagar Mahuva 66KV Bila44 Bhavnagar Mahuva 66KV Belampur 30-4045 Rajkot Gondal 66KV Vasavad46 Rajkot Gondal 66KV Moviya47 Rajkot Gondal 66KV Shrinathgadh48 Rajkot Jasdan 66KV Sanathali

30-40

30-40

30-40

30-40

Saurashtra

30-40

30-40

30-40 132 KV Talaja --

30-40

30-40

30-40

30-40 220 KV Gondal --

220 KV Mahuva (Otha)

Maximum 50-70 MW RE injection

feasible

132 KV Naghedi

Maximum 40-50 MW RE injection

feasible

132 KV Junagadh

Maximum 40-50 MW RE injection

feasible

132 KV Bhayavadar

Maximum 40-50 MW RE injection

feasible

132 KV Vikram

Maximum 40-50 MW RE injection

feasible

Page 20: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

49 Gir Somnath Girgadhada 220/66KV Dhokadva 50-7050 Gir Somnath Girgadhada 66KV Dhokadva51 Gir Somnath Girgadhada 66KV Gir Gadhada52 Gir Somnath Girgadhada 66KV Rabarika53 Gir Somnath Girgadhada 66 KV Navaugla54 Gir Somnath Una 66KV Samter (Una-II) 30-4055 Gir Somnath Una 66 KV Dandi 25-3056 Gir Somnath Girgadhada 66KV Bodidar57 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz58 Gir Somnath Una 66KV Vajadi 30-4059 Jamnagar Jamnagar 66KV Aliabada60 Jamnagar Jamnagar 66KV Jam Wanthali61 Jamnagar Jamnagar 66KV Jamnagar-B62 Jamnagar Jamnagar 66KV Morkanda 63 Jamnagar Lalpur 66KV Rajhans (GIDC Ph-III)64 Jamnagar Lalpur 66KV Lalpur65 Jamnagar Lalpur 66KV Pipli66 Jamnagar Lalpur 66 KV Haripar67 Jamnagar Lalpur 66 KV Mota Kadba (Vavdi)

68 Jamnagar Jamnagar 66KV Chandra gadh (Chela) (Changapatiya)

69 Rajkot Kotda-sangdi 66KV Shapar70 Rajkot Kotda-sangdi 66KV Siddheshwar (Shapar-II)

71 Rajkot Kotda-sangdi 66KV Veraval (Rajkot)72 Rajkot Rajkot 66KV Vavdi 30-3573 Rajkot Rajkot 66KV Kothariya (Solvant)74 Junagadh Keshod 220/66KV Keshod 50-7075 Junagadh Keshod 66KV Keshod 30-3576 Junagadh Mendarda 66KV Patrama (Khalipipli)77 Junagadh Keshod 66KV Ajab78 Junagadh Keshod 66KV Koylana79 Junagadh Maliya Hatina 66KV Amrapar80 Junagadh Keshod 66 KV Bhat Simroli81 Junagadh Keshod 66 KV Moti Ghasri82 Junagadh Mangrol 66 KV Mangrol83 Junagadh Keshod 66 KV Khirsara84 Junagadh Keshod 66 KV Ishara85 Junagadh Maliya Hatina 66KV Malia (Hatina)86 Junagadh Maliya Hatina 66 KV Kadaya87 Junagadh Maliya Hatina 66KV Chuldi88 Junagadh Maliya Hatina 66KV Chorwad (Gadu) 30-3589 Junagadh Maliya Hatina 66KV Mendarda90 Junagadh Maliya Hatina 66KV Nani Khodiyar91 Junagadh Mangrol 66KV Chotli Vidi92 Junagadh Maliya Hatina 66KV Budhecha

Saurashtra

30-40

30-40

220 KV Dhokadava

50-70

30-40

30-40

30-40

30-35

30-40

30-40

220 KV Jamnagar

Maximum 50-70 MW RE injection

feasible

30-40

30-40

30-40

30-35

Maximum 50-70 MW RE injection

feasible

220 KV Keshod

Maximum 50-70 MW RE injection

feasible

220 KV Kangashiyal

i

Maximum 50-100 MW RE injection

feasible

Page 21: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

93 Surendranagar Limbdi 220/132/66KV Limbdi 40-5094 Surendranagar Chuda 66KV Chuda95 Surendranagar Chuda 66 KV Khandiya (Kanthariya)

96 Surendranagar Chuda 66KV Ranpur97 Surendranagar Chuda 66KV Chokadi98 Surendranagar Wadhwan 66KV Vastadi99 Surendranagar Chuda 66KV Chachka

100 Surendranagar Muli 66KV Muli101 Surendranagar Sayla 66KV Sayla102 Surendranagar Wadhwan 66KV Tuva (Timba) 30-40103 Surendranagar Wadhwan 66KV Surendranagar104 Surendranagar Wadhwan 66KV Wadhvan105 Surendranagar Muli 66KV Lakhtar106 Rajkot Lodhika 66KV Metoda107 Rajkot Lodhika 66KV Metoda GIDC-II108 Rajkot Lodhika 66KV Central Metoda GIDC109 Rajkot Lodhika 66KV Khirsara110 Rajkot Paddhari 66KV PadadhriI111 Rajkot Paddhari 66KV Targhadi112 Rajkot Paddhari 66KV Mota Khijadia113 Rajkot Paddhari 66KV Nyara114 Rajkot Rajkot 66KV Ghanteshwar (Rajkot-D)

115 Rajkot Rajkot city 66KV University Rd.116 Rajkot Rajkot 66KV Raiyadher117 Junagadh Vanthali 220/132/66KV Shapur 50-70118 Junagadh Bhesan 66KV Mendpara119 Junagadh Junagadh City 66KV Junagadh (GIDC)120 Junagadh Junagadh City 66KV Zanzarda (JU. City)121 Junagadh Junagadh 66KV Choki122 Junagadh Junagadh 66KV Majevadi123 Junagadh Mendarda 66KV Arniyana 124 Junagadh Vanthali 66KV Mahobatpur (Navagam)125 Junagadh Vanthali 66KV Vadala126 Junagadh Manavadar 66KV Katakpara 30-40127 Junagadh Vanthali 66KV Shapur 30-40128 Junagadh Vanthali 66KV Kanza 30-40129 Gir Somnath Sutrapada 66KV Moradiya 30-40130 Gir Somnath Sutrapada 66KV Lodhwa (Singsar)131 Gir Somnath Sutrapada 66 KV Gorakhmadi132 Gir Somnath Kodinar 66KV Sindhaj133 Gir Somnath Kodinar 66KV Aranej134 Gir Somnath Sutrapada 66KV Prashnavada135 Gir Somnath Sutrapada 66KV Kanjotar(Barda)136 Gir Somnath Sutrapada 66KV Singasar 30-40137 Gir Somnath Sutrapada 66KV Sutrapada138 Gir Somnath Veraval 66KV Veraval (GIDC)139 Gir Somnath Veraval 66KV Bhalka(GIS)140 Gir Somnath Veraval 66KV Prabhas Patan

Saurashtra

220 KV Limbdi --

20-30

15-20

30-40

30-40

30-40

50-70

50-70

220 KV Nyara

Maximum 50-100 MW RE injection

feasible30-40

50-70

30-40

30-40

220 KV Shapur

220 KV Timbdi

Maximum 50-70 MW RE injection

feasible

Maximum 50-70 MW RE injection

feasible

Page 22: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

141 Gir Somnath Kodinar 66 KV Devli142 Gir Somnath Kodinar 66 KV Kodinar143 Gir Somnath Kodinar 66 KV Jantrakhadi144 Gir Somnath Kodinar 66 KV Advi145 Gir Somnath Veraval 66KV Bhetali 30-40146 Gir Somnath Talala 66KV Raydi 30-40147 Gir Somnath Talala 66KV Ankolwadi148 Gir Somnath Talala 66KV Jasadhar149 Gir Somnath Sutrapada 66KV Pranchi150 Gir Somnath Kodinar 66KV Ghantwad151 Gir Somnath Kodinar 66KV Alidar152 Bhavanagar Palitana 220/66KV Sagapara (Palitana) 50-70153 Bhavanagar Bhavnagar 66KV Tana154 Bhavanagar Ghogha 66KV Dihor155 Bhavanagar Bhavnagar 66KV Trapaj156 Bhavnagar Talaja 66KV Mannar157 Bhavnagar Ghogha 66KV Navagam158 Bhavnagar Talaja 66KV Talaja159 Bhavnagar Talaja 66KV Devalia160 Bhavanagar Ghogha 66KV Timana161 Bhavanagar Palitana 66KV Gheti162 Bhavanagar Gariyadhar 66KV Mangadh163 Bhavnagar Gariyadhar 66KV Bhandariya164 Bhavanagar Bhavnagar 66KV Godidhal165 Amreli Bhavnagar 66KV Nonganvadar166 Bhavnagar Gariyadhar 66KV Mandvi167 Bhavanagar Palitana 66KV Palitana168 Bhavanagar Bhavnagar 66KV Bandar Road169 Bhavanagar Bhavnagar 66Kv Sardarnagar170 Bhavanagar Bhavnagar 66KV Sidsar171 Bhavanagar Ghogha 66KV Mamsa-2172 Bhavanagar Bhavnagar 66KV Bhumbhali173 Bhavanagar Bhavnagar 66KV Bhadi174 Bhavanagar Ghogha 66KV Nathugadh175 Bhavanagar Bhavnagar 66KV Bhavnagar176 Bhavanagar Bhavnagar 66KV Valketgate177 Bhavanagar Bhavnagar 66KV Vartej-II (Chitra)178 Bhavanagar Bhavnagar 66KV Nari Road179 Bhavanagar Bhavnagar 66KV Desainagar 30-35180 Bhavanagar Ghogha 66KV Kharakdi (Samdhiyara)181 Bhavanagar Shihor 66KV Songadh182 Bhavanagar Shihor 66KV Sar183 Bhavanagar Bhavnagar 66KV Navagam (Kardej)184 Bhavanagar Shihor 66KV Shihor185 Bhavanagar Shihor 66KV Sihor-2186 Bhavanagar Shihor 66KV Nesda187 Bhavanagar Shihor 66KV Ghanghali

30-50

50-70

30-40

220 KV Timbdi

Maximum 50-70 MW RE injection

feasible

30-40

220 KV Vartej

Maximum 50-70 MW RE injection

feasible

20-30

30-40

30-40

30-40

30-40

Saurashtra

20-30

30-40

30-40

220 KV Sagapara

Maximum 50-70 MW RE injection

feasible

Page 23: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

188 Amreli Dhari 66KV Bhader189 Amreli Dhari 66 KV Vekariya190 Amreli Dhari 66KV Dalkhania191 Amreli Dhari 66KV Kagdadi (Hamapur)192 Amreli Dhari 66KV Kubda193 Amreli Dhari 66KV Dudhala194 Amreli Dhari 66KV Dhari195 Amreli Dhari 66KV Malsika

196 Junagadh Bhesan 66 KV Junidhari Gundali (Tadka Pipliya)

197 Junagadh Bhesan 66KV Chuda198 Junagadh Bhesan 66KV Morvada199 Junagadh Bhesan 66KV Chanaka200 Junagadh Bhesan 66KV Ishwariya201 Junagadh Bhesan 66KV Bhesan202 Junagadh Visavadar 66KV Mota Kotda203 Junagadh Visavadar 66KV Dhebar204 Junagadh Visavadar 66KV Bhalgam205 Junagadh Visavadar 66KV Navihaliyad206 Junagadh Visavadar 66KV Ratang (Magharadi)207 Junagadh Visavadar 66KV Baradia208 Junagadh Visavadar 66KV Khambhaliya (Ozat) 30-40209 Junagadh Visavadar 66KV Govindpara (Jetalvad) 30-40210 Junagadh Visavadar 66KV Kankchiyala 30-40211 Junagadh Visavadar 66KV Bhutdi 30-40212 Amreli Savarkundla 66 KV Badhada213 Amreli Khambha 66 KV Mota Samadhiyala214 Amreli Dhari 66 KV Devla215 Amreli Khambha 66 KV Khambha216 Amreli Khambha 66 KV Dedan217 Amreli Khambha 66 KV Tataniya218 Amreli Rajula 66KV Mota Agariya219 Amreli Rajula 66KV Rajula220 Amreli Rajula 66KV Barpatoli221 Amreli Khambha 66KV Mota Burman222 Amreli Rajula 66KV Kadiyali223 Amreli Rajula 66KV Dungar224 Bhavnagar Mahuva 66KV Vangar225 Amreli Dhari 66KV Chalala226 Amreli Dhari 66KV Sarambhada227 Amreli Bagasara 66KV Bagasara228 Amreli Bagasara 66KV Hadala229 Amreli Bagasara 66KV Kunkavav230 Amreli Dhari 66KV Hudali231 Amreli Amreli 66 KV Savarkundla232 Amreli Savarkundla 66KV Kundla (Hathasani)233 Amreli Liliya 66 KV Liliya234 Amreli Liliya 66 KV Gundaran

220 KV Savarkundl

a

Maximum 50-70 MW RE injection

feasible

20-25

30-40

30-40

30-35

30-40

30-40

30-40

Saurashtra

220 KV Visavadar

Maximum 50-70 MW RE injection

feasible

30-40

30-40

Page 24: Details of district wise substations for RE integration as ... · 18 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 19 Surat Choryasi 66KV Bhagwati 20 66KV Bhestan-B ... 107 Tapi Valod

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative feasible RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on April-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

235 Amreli Amreli 66KV Chital236 Amreli Babara 66KV Kuwargadh (Chamardi)

237 Amreli Amreli 66KV Mota Ankadiya (Limbadia)

238 Amreli Kunka-vav 66KV Lunidhar239 Amreli Amreli 66KV Amreli - A240 Amreli Amreli 66KV Amreli - B241 Amreli Amreli 66KV Gavadka242 Rajkot Jetpur 400/220/66KV Jetpur 50-70243 Amreli Kunka-vav 66KV Vadiya244 Amreli Kunka-vav 66KV Amrapar245 Amreli Kunka-vav 66KV Kukavav246 Amreli Kunka-vav 66KV Nava Ujala (Kajuri Pipaliya)

247 Amreli Kunka-vav 66KV Tori 248 Rajkot Dhoraji 66 KV Moti Parabdi (Toraniya) 30-40249 Rajkot Dhoraji 66KV Jamkandorna 250 Rajkot Jetpur 66KV Jetpur-A251 Rajkot Jetpur 66KV Mandlikpur252 Rajkot Jetpur 66KV Jetalsar253 Rajkot Jetpur 66KV Arab Timbadi254 Rajkot Jetpur 66KV Devki Galol255 Rajkot Jetpur 66KV Jetpur-B256 Rajkot Jetpur 66 KV Amrapar (Reshamadi Galol) 30-40257 Rajkot Rajkot 66KV Navagam (Rajkot - F)258 Rajkot Rajkot 66KV Dudhsagar 259 Rajkot Rajkot 66KV Surya Rampara260 Rajkot Rajkot 66KV Kankot261 Rajkot Rajkot 66KV Aji-2262 Rajkot Rajkot 66KV Aji GIDC263 Rajkot Rajkot 66KV Vijaynagar 30-35264 Rajkot Rajkot 66KV Popatpara 30-40

Saurashtra

30-40

30-50 400 KV Hadala

Maximum 50-70 MW RE injection

feasible

30-40

400 KV Amreli

Maximum 50-70 MW RE injection

feasible

30-40

30-40

400 KV Jetpur

Maximum 50-70 MW RE injection

feasible

30-40

30-40

30-40