010 bill no.10 substation 66kv rev 0

68
CP6C REV 0 10/1 66KV SUB-STATION LUSAIL PRIMARY INFRASTRUCTURE APPENDIX B - SCHEDULE OF PRICES AND RATES BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION Item Description Quantity Unit Rate Note: the following Items are not measured in accordance with CESMM3 Note: compliant and functional installation. works are to be priced in their entirety. The Contractor must allow for providing these works through an EPC type sub-contract with a Kahraama approved contractor. and the 66kV bays at LDS. ENGINEERING AND DESIGN A Item SUB-STATION STRUCTURE 66kV Sub-station Structure functional installation B Sum C Piling Sum D Concrete Works Sum E Blockwork Sum The scope of the 66kV sub-station works includes full design, procurement and installation of all elements, including but not limited to structure, plant, equipment, etc, in order to complete the works and provide a fully This pricing document is to act as a framework only. It is the Contractors responsibility to ensure that the The Contractor will be responsible for all co- ordination with the LDS super primary sub-station contractor and for ensuring the compatibility of the feeder differential protection being implemented within this scope of works Allow for all engineering and design services required to provide a fully compliant and functional installation. Construct sub-station structure, complete; include for all elements in order to provide a fully compliant and Allow for any additional excavation works if required

Upload: nilanjaniiml

Post on 22-Oct-2014

169 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/1 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

Note:

The scope of the 66kV sub-station works includes full

design, procurement and installation of all elements,

including but not limited to structure, plant, equipment,

etc, in order to complete the works and provide a fully

compliant and functional installation.

This pricing document is to act as a framework only. It

is the Contractors responsibility to ensure that the

works are to be priced in their entirety.

The Contractor must allow for providing these

works through an EPC type sub-contract with a

Kahraama approved contractor.

The Contractor will be responsible for all co-ordination

with the LDS super primary sub-station contractor and

for ensuring the compatibility of the feeder differential

protection being implemented within this scope of works

and the 66kV bays at LDS.

ENGINEERING AND DESIGN

A Allow for all engineering and design services required to

provide a fully compliant and functional installation. Item

SUB-STATION STRUCTURE

66kV Sub-station Structure

Construct sub-station structure, complete; include for

all elements in order to provide a fully compliant and

functional installation

B Allow for any additional excavation works if required Sum

C Piling Sum

D Concrete Works Sum

E Blockwork Sum

Page 2: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/2 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 3: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/3 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

SUB-STATION STRUCTURE

66kV Sub-station Structure

Construct sub-station structure, complete; include for

all elements in order to provide a fully compliant and

functional installation

A Roofing Sum

B Carpentry & Joinery Sum

C Metalwork Sum

D Structural Steelwork Sum

E Plumbing and Drainage Sum

F Air Conditioning / HVAC Sum

G Small Power and Lighting Sum

H Telecommunications Sum

I Fire Protection Sum

J Lightning Protection Sum

K Internal & External Finishes Sum

L External Works Sum

ELECTRICAL PLANT AND EQUIPMENT

66 kV GIS

M Single busbar; complete with gas-tight busbar end

pieces; all as Specification Section 38 Part 13 Item

N Cable Feeder Bays, complete with local control

cubicles; all as Specification Section 38 Part 13 2 No

O Transformer Feeder Bays, complete with local control

cubicle; all as Specification Section 38 Part 13 3 No

Page 4: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/4 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 5: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/5 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

ELECTRICAL PLANT AND EQUIPMENT

66 kV GIS (cont'd)

A Bus Section and Metering/Earthing Bay, complete with

local control cubicle; all as Specification Section 38 Part

13 2 No

B Overhead gantry crane for the 66 kV switchgear building

; all as Specification Section 38 Part 13 1 No

11 kV Metalclad Switchgear

C 11 kV Double Busbar Configuration; complete; all as

Specification Section 38 Part 16 Item

D Transformer Infeed Panels; ; all as Specification

Section 38 Part 16 3 No

E Bus Section and Metering/Earthing Panels; all as

Specification Section 38 Part 16 2 No

F Bus Coupler; all as Specification Section 38 Part 16 2 No

G Cable Feeder Panels; all as Specification Section 38

Part 16 30 No

Power Transformers

H Power Transformers 40/50 MVA; all as Specification

Section 38 Part 14 3 No

I Earthing/Auxiliary 11/0,415kV Transformers; all as

Specification Section 38 Part 14 3 No

J AC and DC Supply and Distributional as Specification

Section 38 Part 14 Item

Substation Auxiliary Supply,

K AC Distribution Panels (415 V AC) Item

L DC Distribution Panels Item

Page 6: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/6 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 7: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/7 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

ELECTRICAL PLANT AND EQUIPMENT

Substation Auxiliary Supply (Cont'd)

A Batteries and Chargers (110 V DC System) Item

B Batteries 2 Sets

C Charger and voltage control units 2 Sets

Control, Supervision

D PMS System Item

E 66 kV Protection System Item

Cables/Feeders

F 66 kV Cable Feeder Bays 4 Sets

G 66kV Transformer Feeder Bays 4 Sets

H 66 kV Bus Section Feeder Bays 4 Sets

I 66 kV Busbar and Breaker Failure Protection Item

J Connection Cables and Interface Cubicles Item

K Connection Cables for the entire Substation Item

L 66kV single-core XLPE cables Item

M 11kV single-core XLPE cables Item

N For connection of 50 MVA transformers 3 Sets

O For connection of the Earthing Transformers 3 Sets

STATION AUXILIARY SUPPLY (LVAC SYSTEM)

P 1 push button of each type used 1 Set

Q 1 control/selector switch of each type used 1 Set

Page 8: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/8 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 9: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/9 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

STATION AUXILIARY SUPPLY (LVAC SYSTEM) (CONT'D)

A 1 position indicator of each type used 1 Set

B 1 set of 50 lamps of each type used 1 Set

C 1 aux. relay and aux. contactor of each type used 1 Set

D 1 PCB of each type used (battery charger) 1 Set

E 1 motorized CB of each type used (AC/DC) 1 Set

F 1 complete maintenance tool box for batteries and

rectifiers 1 Set

G 1 MCB and MCCB of each type used 1 Set

H 1 set of 5 fuses of each type used 1 Set

I 1 time relay of each type used 1 Set

J 1 measuring/indicating instrument of each type used 1 Set

K 1 alarm annunciation device of each type used 1 Set

L 10% of the total no. of battery cells 1 Set

M Two (2) Kits of Comprehensive Electrician Tools 2 Set

CONTROL, SUPERVISION AND PROTECTION

N One relay/module (as applicable) of each type used for

the equipment as mentioned above 1 Set

O Test plugs for each type of protection relay supplied 1 Set

P Portable PC (latest model) with software for parameter

setting, monitoring, diagnostic, etc. for all numeric

protection relays 1 No

Page 10: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/10 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 11: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/11 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

PMS

A One CPU module/PCB board (as applicable) of each

type used 1 Set

B One data acquisition unit of each type used (including

local control panels) 1 Set

C One UPS 1 No

D One set of operation/diagnostics/maintenance tools 1 Set

TELECOMMUNICATION EQUIPMENT

E One No. of each module type for new optic terminal

equipment (OLTE), TKS, PSE, and alarm equipment.

Additionally two sets of each type of interconnection

data/coaxial cords together with respective connectors. 1 Set

Spare parts for the new 48 V DC power supply:

F 2 Nos. of all control/alarm cards and relays 2 No

G 1 No. of each MCB, Fuse types 1 Set

H 1 No. of input transformer 1 No

I 2 sets of dropping diodes 2 Set

J 1 set of each type of meters 1 Set

K 1 set of consumables 1 Set

L 10% of the total No. of the battery cells 1 Set

M 10% of the conductor links between battery cells 1 Set

N 1 No. of tool box including all tools required for

maintenance and cable termination 1 Set

O one set of testing equipment and tools, including digital

analyser with digital source for PDH and SDH (one

each), portable optical power meter, optical attenuator

and data converter to interface with PC. 1 Set

Page 12: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/12 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 13: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/13 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

SPARE PARTS AND TOOLS

66kV HV Switchgear

Circuit Breaker (Primary Part)

A 1 (one) complete interrupter unit of the circuit breaker,

for highest current rating offered, with operating

mechanism part related only to the interrupter unit itself

without any accessories 1 No

B 1 complete set of arcing contacts (1-phase) for each

current rating 1 No

C 1 (one) set of nozzles (3-phase) for moving and fixed

contact for each current rating 3 No

D 1 (one) no. of auxiliary switch 1 No

E 3 (three) nos. of gas filters including gaskets 3 No

F 1 (one) no. of rupture disk including gasket 1 No

G 1 (one) no. of fine gauge for SF6 pressure 1 No

H 2 (two) nos. of complete density manometer including

gaskets 2 No

I 1 (one) no. of insulator rod 1 No

J Isolator / High Speed Earthing Switch (assuming that

the parts are identical for both devices, otherwise

spares for each device shall be considered) Item

K 1 (one) complete busbar disconnector unit, for each

current rating, with earthing device and main operating

mechanism 1 No

L 1 (one) complete high speed earthing switch with main

operating mechanism 1 No

M 1 (one) complete density manometer including the

gasket 1 No

Page 14: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/14 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 15: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/15 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

SPARE PARTS AND TOOLS

66kV HV Switchgear (Cont'd)

A 2 (two) nos. of motor for isolator 2 No

B 1 (one) set of nozzles (3-phase) for moving and fixed

contact for each rating for both isolator and high speed

earthing switch 1 No

C 1 (one) no. insulator-rod for isolator and high speed

earthing switch of each type 3 No

D 3 (three) nos. filters for isolator, busbar and cable zone

area (if required) of each type 3 No

E Complete VT 1 No

F Gantry Crane (66 kV Switchgear Hall) Item

G 1 (one) no. safety harness 1 No

H 2 (two) nos. of each type of fuse 1 Set

I 1 (one) contactor, each type 1 Set

J 1 (one) transformer, each type 1 Set

K 2 (two) nos. of each type of limit switch 1 Set

L 1 (one) no. of each type of brake resistor, rotor,

rectifier, friction disc Item

11 kV Switchgear

M 1 set of maintenance tools and accessories as required 1 Set

N 1 circuit breaker of each rating/type supplied, including

operating mechanism 1 No

O 1 feeder isolator/earthing switch of each rating/type

supplied 1 No

Page 16: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/16 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 17: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/17 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

SPARE PARTS AND TOOLS

11 kV Switchgear

A 1 set (3 phase) of current transformer of each type 1 Item

B 1 set (3 phase) of voltage transformer of each type 1 Item

C 1 set (3 phase) of cable plugs of each type supplied 1 Item

D 1 set of motors of each type supplied 1 Set

E 1 set of trip coil, fuses, aux. relays and contactors, etc. 1 Set

Transformers

Power Transformers 40/50 MVA

F 1 complete bushing of each type 1 No

G 1 post insulator of each type 1 No

H 3 complete fan units 1 Set

I 1 temperature monitor 1 Set

J 1 thermometer 1 Set

K 1 oil level gauge 1 Set

L 1 step position transmitter 1 No

M 1 transducer (4-20mA) 1 No

N 1 diode matrix 1 No

O 1 gas sampling device 1 No

P 1 gas testing device 1 No

Q 1 pressure relieve device 1 No

R 1 pressure relay 1 No

Page 18: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/18 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 19: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/19 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

SPARE PARTS AND TOOLS

Transformers (cont'd)

A 1 oil flow relay 1 No

B 1 oil sampling adapter (incl. hoses) 1 No

C 1 valve 1 No

D 1 drainage and venting plug 1 No

E 1 piece of each type mcb's, aux. relays, contactors,

heaters, lamps, push but-tons and limit switches 4 Set

F 1 complete set of all seals and gaskets used for each

transformer 1 Set

G 1 silicagel breather of each size 1 No

H 1 universal spanner for operation of three-way cocks for

each transformer unit 1 Set

I 1 spanner for butterfly valves of each type 1 No

J 1 set of diverter switch spares such as moving

contacts, arcing contacts, fixed contacts, current

limiting resistors for tap changer 1 Set

K 1 driving gear mechanism with driving motor for tap

changer 1 No

L 1 set of special tools for tap changer inspection and

maintenance incl. lifting device for diverter switch 1 Set

M 1 spare coil for neutral-grounding reactors 1 Set

N automatic oil dielectric test set suitable for testing up to

60 kV and to different Standards 1 No

Neutral Earthing Transformer

O 1 complete bushing 1 No

Page 20: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/20 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 21: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/21 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Note: the following Items are not measured in

accordance with CESMM3

SPARE PARTS AND TOOLS

Neutral Earthing Transformer (cont'd)

A 1 post insulator 1 No

B 3 complete fan units 1 Set

C 1 temperature monitor 1 Set

D 1 thermometer 1 Set

E 1 oil level gauge 1 Set

F 1 gas detecting relay 1 No

G 1 gas sampling device 1 No

H 1 gas testing device 1 No

I 1 pressure relieve device 1 No

J 1 pressure relay 1 No

K 1 oil flow relay 1 No

L 1 oil sampling adapter (incl. hoses) e 1 No

M 1 valve 1 No

N 1 drainage and venting plug 1 No

O 1 piece mcb's, aux. relays, contactors, heaters, lamps,

push but-tons and limit switches 1 Set

P 1 complete set of all seals and gaskets used for each 1 Set

transformer

Q 1 silicagel breather of each size 1 No

R 1 universal spanner for operation of three-way cocks for

each transformer unit 1 Set

S 1 spanner for butterfly valves 1 No

Page 22: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/22 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 23: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/23 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

TENDERER'S ADJUSTMENT SCHEDULE

NOTES

Any alterations to the Bills of Quantities will be ignored

and the text read as originally printed.

The Tenderer shall detail in the following pages any

items which he requires in addition to those in the Bills

of Quantities, or any of the printed items which he feels

should be omitted from the Bills of Quantities.

Items detailed shall be shown as unit quantities, in the

same format as the Bills of Quantities, each item having

a rate duly extended and the whole totalled and carried

to the Summary.

Should further pages be required by the Tenderer he

shall include these and amend the Summaries to suit

the revised pages.

This Section shall be deemed to be the whole of the

Additions and Omissions required by the Tenderer.

Page 24: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/24 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 25: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/25 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

TENDERER'S ADJUSTMENT SCHEDULE

ADDITIONS

Page 26: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/26 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 27: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/27 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

TENDERER'S ADJUSTMENT SCHEDULE

ADDITIONS

Page 28: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/28 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 29: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/29 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

TENDERER'S ADJUSTMENT SCHEDULE

OMISSIONS

Page 30: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/30 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 31: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/31 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

TENDERER'S ADJUSTMENT SCHEDULE

OMISSIONS

Page 32: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/32 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Summary

Page 33: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/33 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Summary

Page 10/1

Page 10/2

Page 10/3

Page 10/4

Page 10/5

Page 10/6

Page 10/7

Page 10/8

Page 10/9

Page 10/10

Page 10/11

Page 10/12

Page 10/13

Page 10/14

Page 10/15

Page 10/16

Page 34: 010 Bill No.10 Substation 66KV Rev 0

CP6C REV 0 10/34 66KV SUB-STATION

LUSAIL PRIMARY INFRASTRUCTUREAPPENDIX B - SCHEDULE OF PRICES AND RATES

BILL NO.10 - 66/11 KV GOLF 1 SUB-STATION

Item Description Quantity Unit Rate Total

Carried to Main Summary