Devizes RFC Floodlights and Grounds Improvement Project Summer 2013 Updated June 2013

Upload: conan

Post on 23-Feb-2016

34 views

Category:

Documents


0 download

DESCRIPTION

Devizes RFC Floodlights and Grounds Improvement Project. Summer 2013 Updated June 2013. Contents. Pictures to demonstrate our plans Permanent Floodlights Car Park Upgrade General Pitch Maintenance Pitch-side Drainage and Walkway Pitch-side Safety Fencing Pitch-side Dug Outs - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Devizes RFC Floodlights and Grounds Improvement Project

Devizes RFC Floodlights and Grounds Improvement Project

Summer 2013Updated June 2013

Page 2: Devizes RFC Floodlights and Grounds Improvement Project

Contents

• Pictures to demonstrate our plans– Permanent Floodlights– Car Park Upgrade– General Pitch Maintenance – Pitch-side Drainage and Walkway– Pitch-side Safety Fencing– Pitch-side Dug Outs– Enhanced Spectator Viewing Facilities– Upgrade Training Area Lights

Page 3: Devizes RFC Floodlights and Grounds Improvement Project

Permanent Floodlights – Top Pitch

Work completed, 100% success

Page 4: Devizes RFC Floodlights and Grounds Improvement Project

Car Park Improvements

Nearly complete, resurfacing is done, lights and edges to be completed shortly

Page 5: Devizes RFC Floodlights and Grounds Improvement Project

General Pitch Maintenance

We will Shockwave Aerate, de-

compact, re-seed, weed supress and Hollow Bore treat our 2 pitches and

training area.Re-surface top of

training area.In progress.

Page 6: Devizes RFC Floodlights and Grounds Improvement Project

Pitch-side Drainage and Walkway

In progress

Page 7: Devizes RFC Floodlights and Grounds Improvement Project

Pitch-side Safety Fencing

In progress

Page 8: Devizes RFC Floodlights and Grounds Improvement Project

Pitch-side Dug Outs

Two Dug-Outs on hard standing concrete to be

installed on the far touchline.

About to start, plans updated,

now one dug out either side of the

pitch.

Page 9: Devizes RFC Floodlights and Grounds Improvement Project

Enhanced Spectator Viewing Facilities

In progress

Page 10: Devizes RFC Floodlights and Grounds Improvement Project

Upgrade Training Area Lights

Work in progress, completed in the next 2 weeks

Page 11: Devizes RFC Floodlights and Grounds Improvement Project

Summary – DRFC Lights and Grounds Improvement Plan

Cricket Pitch

Tennis Courts

Club House

New FloodLights

New Fence

Existing Fence

Spectator Area

2 Dug Outs

New Car Park

Resurface existingCar Park

Walkway

UpgradeExisting Training

Lights

Wiltshire Police HQ Complete

In ProgressAbout to Start

AdditionallyWe will be replacing theexisting score board and having a second board on the far touch line