dipl.-ing. klaus scherer fraunhofer inhaus-center & ims-irg

11
Fraunhofer-inHaus-Center Intelligent Room- and Building-Systems Aims, Organisation, Facilities and Examples of Innovations Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG

Upload: lok

Post on 17-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

Fraunhofer-inHaus-Center Intelligent Room- and Building-Systems Aims, Organisation, Facilities and Examples of Innovations. Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG. Fraunhofer inHaus-Center - Introduction MISSION STATEMENT. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Fraunhofer-inHaus-CenterIntelligent Room- and Building-Systems

Aims, Organisation, Facilities and Examples of Innovations

Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG

Page 2: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 2

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction MISSION STATEMENT

o R&D for the process optimization in residential and commercial properties by

new systems solutions

o based on an integrated, sustainably createdcooperation network of commercial and research partners

o with the use of jointly planned and constructedinnovation workshops (inHaus 1+2)

o for the development, test, demonstration and market test of novel, integrable product components, integrated

systems solutions and services

Task 1.1Task 1.1

Task 1.5Task 1.5

Page 3: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 3

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction INHAUS FACILITIES

Task 1.1Task 1.1

Task 1.5Task 1.5

inHaus1

inHaus2

inHaus1

inHaus2

SmartHome-Lab

SmartBuilding-LabsArea:8000 sqm

inHaus1-Labs:250 sqm

inHaus2-Labs:5200 sqm

Page 4: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 4

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction ORGANISATION & MANAGEMENT

Task 1.1Task 1.1

Task 1.5Task 1.5

inHaus-Center ManagementGeneral Management

Innovation Management Operating of inHaus Facilities

Fraunhofer-IMS

inHaus-Fraunhofer-

InstituteConsortiaIBP-IMS

inHaus-Centerresearch labs 1 + 2

Living(IMS)

FhG-UMSICHT

FhG-IDMT

FhG-IML

FhG-IPA

FhG-ISE

FhG-ISST

FhG-IAO

FhG-IBP

FhG-IMS

Construction(IBP)

Operation&FM(ISE)

Office(IAO)

Health &Care

(ISST/IMS)

Hotel &Event

(IAO/IMS)

Network of business partners

Medium-sized and big Businesses

Network of research partners

e.g. Universities

inHaus Innovation Projects

Page 5: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 5

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction SYSTEMS INNOVATION PROCESS

Task 1.1Task 1.1

Task 1.5Task 1.5

Ideas for new system solutions

Ideas for new system solutions

Establishing system of componentsand development of system prototypes

Technology tests in theinHaus technology laboratories

Demostration and application tests in the inHaus application laboratories

Demonstration and marketingof new systemssolutions

Know-how, technologies and componentkit of the FhG´and the business partners1

4

32

5

6

Page 6: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 6

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction SYSTEMS INTEGRATION PROCESS

Task 1.1Task 1.1

Task 1.5Task 1.5

smart components with system integration capability (material, electronics, software)

System-integration process and technologies

(system engineering)

Optimized functions and processes (with UI-process-cockpit)

Intelligent, integrated room- and building systems

Page 7: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 7

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction INHAUS SYSTEMS LAYER MODEL

Task 1.1Task 1.1

Task 1.5Task 1.5

Con

stra

ints

Sensor-, Actuator-, Controller-Components

Systems-Applications, Processes

Basic Services

Middleware(OSGi, .NET, JAVA)

Communication(EIB, LON, Ethernet/IP, BT, wLAN, GSM, UMTS)

Operating System(Linux, Windows)

Hardware Platform

Page 8: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 8

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction INHAUS SMART HOME SYSTEMS ARCHITECTURE

Task 1.1Task 1.1

Task 1.5Task 1.5

Glasfaser

Koaxial

Kupfer

PC Sicherheit

Thermostat

Telefon

weiße Ware Geräte

WarmwasserHeizungssystem

Licht

Audio / Video

Steckdosen

Verbrauchs-

Netzwerk-Controller

Drahtlos-Meßgeräte

Bedieneinheiten

ServicesPlatform

IntranetInternet

Middleware-Server

(embedded) Integration &Applications

Satellit

DSL, BK, UMTS

Diverse Access Technologies

Local AssistanceService Functions

Tele AssistanceService Functions

User Tele-Interfaces toSmartHomes&Buildingsand to Service Providers

Computer aidedFacility Management

Page 9: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 9

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction INNOV. EXAMPLE DECANTALISED PUMP SYSTEM

Task 1.1Task 1.1

Task 1.5Task 1.5

Current practice

No hydraulically balanced condition

too cold

too warm

Decentralized pumping system

Automatic hydraulically balanced condition

Networked mini-pumps with central.-control-module

o WILO / FhG-IMS

Page 10: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

Duisburg, 2-September-2009 Master Presentation page 10

Workshop Design and Operation of Smart, Energy Efficient   Buildings - Establishing European Networks for Innovation -

Fraunhofer inHaus-Center - Introduction INNOV. EXAMPLE FUTURE HOTEL ROOM SYSTEM

Task 1.1Task 1.1

Task 1.5Task 1.5

Page 11: Dipl.-Ing. Klaus Scherer  Fraunhofer inHaus-Center & IMS-IRG

That`s it, thank you for your attention !

Workshop Design and Operation

of Smart, Energy Efficient Buildings

www.inhaus.de