Page 1: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in
Page 2: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

By CHHIENG Pich,Director, DICONational Project Director, TDSPDirector, EIF-NIU

Progress Update on Trade SWAp, TDSP and EIF

Page 3: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

1. Progress Update on Trade SWAp2. Progress Report on TDSP

A. Financial ManagementB. Procurement ManagementC. Project Implementation

3. Progress Report on EIFA. Financial Management B. Project Implementation

Page 4: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

1. Conducting Awareness Raising Workshop on CTIS 2014-2018 in Sihanouk Ville from 18-19 Dec 2014,

2. Graduate School of International Studies, Korea University team made study visit to learn on AfT in Cambodia and the roles of MoC in managing AfT on 20 Jan 2015, (seven graduates and undergraduates),

3. Vanuatu delegation made a study visit to Cambodia to learn about international best-practices in Trade Mainstreaming and the use of EIF Funds in Cambodia from 21-22 Jan 2015.

4. Recruitment of Medium-term Plan (MTP) consultants to formulate and mainstream trade in Cambodia was posted on UNDP website and the deadline was 16 Feb 2015. We expect the consultants will be onboard in early Mar 2015. https://jobs.undp.org/cj_view_jobs.cfm?cur_categ_id=2

Page 5: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Cumulative Expenditure $9,950,545

(64%)

Funds Required for DICO Operations & including various consultants

$950,809(6%)

Balance Commitment under all MOUs including GDA, TTRI & BRD but excluding the closed project (3 from TPD, 3 from GDCE, 1 from RSA &

1 from TDSI, 1 from CAMCONTROL, 1 from CDC & 1 from ISC)$ 4,548,646

(30%)MoC/DICO-FU

TDSP Funds PositionAs of 31st December 2014

(Unaudited - Expressed in Percentage of the Total Grant Amount of US$ 15.450 million)

Quarterly disbursement:We have $5,499,455 need to be spent in the next 6 quarters. We have to spend $917,000 each quarter.

Page 6: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

TDSP FundActual Disbursement against Projected Disbursement by Quarter, Year 2014

As of 31st December 2014

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

Q1 Q2 Q3 Q4

1,019,005

593,715 592,966482,674

Disbursement Projection Actual Disbursement

128%

653,425

81%

798,281

82%

1,206,693

361,49061%

Average quarterly disbursement: $680,000

Page 7: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

2014 2015 2016

3,003,008

4,851,090

504,830

TDSP FundFuture Disbursement Projection by Year (including 2014)

Each quarter we have to spend: $1.2million

Page 8: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

TDSP FundDisbursement by Year, As of 31st December 2014

(Expressed in Percentage of the Total Grant Amount of US$ 15.450 million)

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

2009 2010 2011 2012 2013 2014

116,584615,558

1,674,943

2,751,160

2,087,570

2,704,645

17.5%

4%

0.75 %

10.8%

17.8%

13.5%

NOTE: *. Cumulative Disbursement = USD 9,950,545**. Cumulative Disbursement as a Percentage of Total Grant = 64%

Page 9: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Procurement Progress as of 30 September 2014

• Benchmark by end of 31 December 2014: $9,500,000• Actual total contract value of the signed contracts up to 31 December 2014• New Procurement Plan has been developed and got NOL from WB

No Type of Contract Actual Achievement (USD)

Total % against benchmark($9.5M)

1 Goods 3,067,269.72

11,051,301.10 116.32 %2 Non-Consultant

Services491,799.24

3 Consultant Services

7,492,232.14

Page 10: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Contracts signed in 1st Quarter 2015 (From 1st Jan-16th Feb 2015)

No Type of Contract

Description of contract Contract Amount(USD)

1 Goods Laboratory Equipment and Mobile Testing Kits(TDSP/2014/027)

Lot 1: US$ 72,777.00Lot 2: US$ 42,273.42

Lot 3: US$ 8,194.62Lot 4: US$ 20,700.00Lot 5: US$ 30,960.00

Total: US$ 174,905.04

Newsletter Printing for CCC(TDSP/2014/092/01)

US$ 3,300.00

3 Months Contract Extension with Viettel for ICT Master Plan-Wide Area Network (WAN) (TDSP-CKP-12-NCB-G-010/2)

US$ 32,340.00

Supply and Delivery of Office Furniture for 8 New Department(TDSP/2014/128/02)

US$ 31,720.00

2 Services

Contract Extension for International M&E Consultant (Individual) of DICO(TDSP/2012/074/03)

US$ 13,619.00

International Energy Study for CCC(TDSP/2012/081/02/1)

US$36,138.00

National Consultant to Draft Manual on IP Enforcement for DIPR US$ 14,087.50

International Consultant to Draft Manual for IP Enforcement for DIPR US$ 42,490.00

Total Contract Value (USD) US$ 348,599.54

% against Benchmark (0.5M) 69.71%

Page 11: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Expected Contracts signing in 1st Quarter 2015No Type of

ContractDescription of contract Expected

Date/Month (Contract Signing)

1 Goods Supply and Delivery of ASYUDA GDCE(TDSP/2014/131/2)

February 2015

Office Equipment for SPS, ASYUDA, CCC…(TDSP/2014/095)

March 2015

2 Services

National Database Consultant for CCC(TDSP/2014/081/08)

February 2015

Contract Extension for all DICO’s and IA’s Consultant both for International and National

March 2015

Firm-Media Agency to Produce Video Documentary(TDSP/2014/129)

February 2015

Consultant to conduct Tax Review for CCC (TDSP/2012/81/02/2) February 2015

National Project Implementation Consultant for TTRI(TDSP/2014/106/3)

March 2015

Firm-Conduct Value Chain Study on 3 Cambodian Products(TDSP/2014/106/2)

March 2015

National Consultant for Office Renovation Design for TTRI(TDSP/2014/106/5)—Re-selection

March 2015

Accreditation Service Provider for Systems Certification Scheme for Rice Mills (SSS)(TDSP/2014/120)

March 2015

Page 12: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Expected Contracts signing in 1st Quarter 2015 (Cont)

No Type of Contract

Description of contract Expected Date/Month

(Contract Signing)

2 Services

International Consultant for the Formulation of the MoCTrade Training and Research Institute Sustainability Strategy and Business Plan(TDSP/2014/106/4)

March 2015

Firm/Institution to Develop Training Curriculum and Provide Trade-Related Training for the MoC/TTRI(TDSP/2014/106)

March 2015

International Conformity Assessment Consultant (TDSP/2011/068/12)

March 2015

National Conformity Assessment Consultant (TDSP/2011/068/13)

March 2015

3 Position for IT Consultant for ASYUDA March 2015

Page 13: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Tracking Procurement package for Supply and Installation of Business Registration System

Activity Time PeriodInt./Nat

Planned Actual

Preparation• Planned = 30 calendar days• Actual = 17 calendar days

Specification and cost estimate prepared 3w/1w 01 Dec 14 01 Dec 14

Bidding Document drafted 3w/1w 15 Dec 14 02 Dec 14

Bidding Document Approved by Committee 1w 22 Dec 14 16 Dec 14

Bidding Document Submitted to Bank 1w 23 Dec 14 16 Dec 14

NOL Issued 1d 30 Dec 14 18 Dec 14

Bidding Period• Planned = 32 calendar days• Actual = 37 calendar days

Specific Procurement Notice Issued 1d 31 Dec 14 23 Dec 14

Bidding Period 6w/4w

Bid Closing Date 1d 30 Jan 15 29 Jan 15

Bid Opening Minutes Distributed 1d 01 Feb 15 29 Jan 15

Evaluation• Planned = 27 calendar days• Actual = …

Evaluation of Bids 4w/2w 14 Feb 15

Procurement Committee Review 2w/1w 20 Feb 15

Evaluation Sent to Bank 1w 22 Feb 15

NOL Issued 1d 28 Feb 15

Contract Formation• Planned = 7 calendar days• Actual = …

Notification of Award Issued 1d 02 Mar 15

Performance Security Received 3w

Contract Signed 1d 09 Mar 15

Letter of Credit Established 2w/NA

Special Commitment Applied for 2w/NA

Special Commitment Issued 1d/NA

Contract Effective 1d 09 Mar 15

Contract Implementation Delivery Period 180 d 05 Sept 15

Goods delivered/Taking Over Cert Issued

Final Acceptance (goods) 2w 18 Dept 15

Start of Warranty/Latent Defects

Expiry of Warrant/Latent Defects

108

days

for p

rocu

rem

ent p

roce

ss

Eight suppliers collected bidding doc and only six submitted bids – among six, the lowest bid is $550,000 and the highest bid is $2,279,516. PRC will review the technical evaluation on 20 Feb 2015.

Page 14: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

No Identified Projects # of Projects

1. Total project under TDSP 27

2. Projects completed and closed 12

3. Ongoing projects 15

• Projects will be completed and closed by Mar 2015 Implementing Agency Capacity Enhancement Program (RSA) – to be closed in Feb 2015 Reviewing commercial laws (DNLC) – to be closed in Feb 2015 Support drafting E-commerce Law (DLAD) – to be closed in Feb 2015 Rules of Origin (DMUL) – to be closed in Mar 2015 MoC Core HR Function (DoP) – to be closed in Mar 2015 Strengthen Capacity of ISC (ISC-MIH) – to be closed in Mar 2015 Support to G-PSF (CCC) – to be closed in Mar 2015 Better Quality of Fish and Fishery Products (FiA-MAFF) – to be closed in Mar 2015

8

• Projects will be completed and closed by Aug 2016 ASYCUDA World System (GDCE-MEF), ICT Master Plan – Automation of Certificate of Origin (MoC), Automation of Business Registration (BRD), Automation of SPS Certificate (GDA-MAFF), Trade Training and Research Institute (TTRI-MoC), Drafts of Rice Standards – Certification Schemes for Rice (Accreditation System) (ISC-

MIH), Development of a stronger National system for IP generation, protection, administration

and enforcement (DIPR),

7

Page 15: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

1. Board approval date : 07 Jan 20092. Effective date : 09 Mar 20093. Duration : 5 years (until 31 Mar 2012)4. Project Development Objectives (PDOs): TDSP will contribute to

increase the Royal Government of Cambodia's efficiency in formulating and implementing effective trade policies.

5. First extension : 31 Jan 2014 (22 months)6. Second extension : 31 Mar 2015 (14 months)7. Third extension : 14 Aug 2016 (17 months)?8. WB Implementation Support Mission : also recommended the

extension,9. We submitted all the relevant documents to MEF and MEF had already

sent the official extension request to WB,10. Next step is to follow up with WB on our the extension request.

Page 16: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Preparations for TDSP Extension

1. Contract Extension:• Projects to be closed by 31 March 2015

– No contract extension to be made

• Strategic Projects to be extended until 2016– Extension period: until 31 March 2016 (12 months), but subject to available fund in RBAP,– Extension for firm: required performance report from IA,– Extension of individual consultants: required consultant’s evaluation report per DICO format,– No-cost extension ( i.e UNCTAD/GDCE): document required same as cost extension,– Attention for Re-selection of firm/IC: individual for ASYCUDA, WAN/Internet for ICT Master

Plan (ToR/Specification required ASAP without further delay),– All IAs must submit the request for contract extension to DICO by 01 Mar 2015.

2. MoU extension: IA needs to submit formal request to DICO by 01 Mar 2015.

Note: Signing of the extended contracts and MoU will be pending for formal TDSP extension (amendment of Financing Agreement).

Page 17: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Action Responsible Target date Status

Component1.a: TBT and SPS

1 Submit budgets for support to CNTM and CNTR

MEF Dec 2014 Completed

2 Finalize beta-version of Trade Portal for MoC/MEF review

WB/MoC/MEF Dec 2014 On-going

3 Complete compilation of NTR WB/MEF Feb 2015 On-going

4 Finalize all remaining activities under Fisheries program

FiA Mar 2015 On-going

5 Submit proposal for accreditation, rice standards

ISC Dec 2014 Completed

6 Commence bid for phyto-sanitary automation MAFF (GDA) Nov 2014 Completed

7 Finalize new process and changes to regulations for the new phyto-sanitary process

MAFF (GDA) Mar 2015 On-going

Page 18: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Action Responsible Target date Status

Component1.b: Trade Facilitation

8 Finalize agreed method of procurement for new Company registration

WB/MOC Dec 2014 Completed

9 Submit final ToR and Specifications for New Company registration for procurement

MoC ASAP Completed

10 Commence implementation transit, warehousing and e-payment modules in ASYCUDA

GDCE/UNCTAD Dec 2015 On-going

11 Outreach to stakeholders in order to activate ICT modules at MoC (e.g. email domain servers; etc.)

MoC Jun 2015 On-going

Page 19: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Action Responsible Target date Status

Component1.c: Legal Reforms

12 Trademark Law comments WB/MoC ASAP On-going13 Prakas on Minimum Capital and on Certificate of Marks WB/MoC Mar 2015 On-going14 E-Commerce Law OCM Mar 2015 On-goingComponent2: Performance Monitoring

15 Agreed action plan to increase Fiduciary rating to ‘Satisfactory’

MoC Feb 2015 Completed

Component3: Institutional and Human Capacity16 All workshops and study tours are carried out MoC Dec 2014 On-going

Component3: Institutional and Human Capacity17 Agreed amount of BETF to be spend for DICO

operational supportWB/MoC Dec 2014 On-going

18 Agreement on support to be provided to NTM, phyto Sanitary streamlining and database merging by WB

WB/MoC/MEF

Dec 2014 On-going

Page 20: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in
Page 21: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

EIF Tier 1 (Phase I and II)

1. Starting date: Feb 2010

2. Closing date: Jul 2015

3. Net amount of Phase 1: 709,900

4. Total amount of Phase 2: 584,000

5. Total amount (P1+P2): 1,293,900

6. Total fund received (P1+P2): 1,174,606

7. Total fund disbursed: 990,428

EIF Tier 2

1. Start date: Jul 2012

2. Closing date: Jun 2015

3. Total fund received: 150,000

4. Total fund disbursed: 42,389

As of December 31, 2014

Page 22: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

-

10,000

20,000

30,000

40,000

50,000

60,000

Q 1 Q 2 Q 3 Q 4

57,166 57,618

22,381

49,173

Page 23: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

2010 2011 2012 2013 2014

12,844

192,991

313,290 284,826

186,475

As of December 31, 2014 – Total Disbursement – US$ 990,428

Page 24: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

1. Organized DICO Retreat, 01-02 May 2014;2. Sent 13 MoC staffs to ACE for English training;3. Quarterly meeting between LO and Core Team, 30 Jun 2014;4. Sent 4 officials to attend EIF Monitoring and Evaluation and

Communication Capacity Development in Bangkok, 19-23 May 2014; 3 officials from DICO and 1 official from MIH;

5. Sent 3 officials to attend “THAIFEX -- World Food of Asia 2014, Impact Exhibition Center” Bangkok, 21-23 May 2014;

6. Updated Work and Budget Plan for Tier 1;7. Updated Budget Plan for Tier 2;8. Finalized NIU Capacity Development Plan;9. Facilitated WTO and EIF Team to conduct a study on “analysis to

consideration given to SPS issues in DTIS”;10. Organized a Workshop on “Aid for Trade and Tourism in Cambodia

Stocktaking and way forward” in cooperation with MoT, 27 Jun 2014;11. Preparing factsheet and newsletters of Trade SWAp;

Page 25: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

12. Preparing a joint communication plan for EIF &TDSP13. EIF-TFM Supervision Mission from 14-18 Jul 2014, received

recommendations on Tier 1, CEDEP I, CEDEP II and RACA,14. EIF-Tier 1 MoU Amendment #6 had been signed on 24 Jul 2014 by

revising work plan and budget plan,15. EIF-Tier 2 MoU Amendment 1 of CEDEP I had been signed on 14 Aug

2014 by revising work plan and budget plan,16. Received draft MoU of CEDEP II from EIF-ES, we will review and submit

to MoC management for signature soon,17. Core team:

• 16 core team members from line ministries have assigned,• 9 core team members from MoC, 7 have been assigned, (2 from

Europe, Middle East and Africa Department)18. Recruited two MTE consultants (CEDEP I), one National and one

International,

Page 26: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

19. Recruitment of EIF Program Manager:• Contract negotiation with the only candidate had failed, • ToR has been revised in consultation with EIF ES and UNOPS in the aim of

attracting more candidates to this position,• Advertising on 20 Oct 2014.

20. Full time National M&E consultant (CEDEP I) is onboard,21. CEDEP I Mid-Term Evaluation (MTE) is completed, awaiting the final

report which is expected on 27 Oct 2014,22. CEDEP II - RACA Component:

UNOPS puts the deadline of 13 Oct 2014 to submit all the agreed documents to UNOPS otherwise EIF will stop funding this component,

Obtained the letter from SIDA expressing the continuous support to RACA, Obtained the letter from OCM allowing the establishment of RACA, MoU between MoT, Shift360 and building owner has been signed, MoC has sent a letter to EIF ES requesting a 4-week extension of the

deadline, and awaiting positive response,23. First Board Meeting of Cassava Component (UNDP-CEDEP II) was held

on 16 Oct 2014 to review and approve work and budget plan,

Page 27: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

24. Completed CEDEP I Mid Term Evaluation,25. Sending officials to attend AirNet Conference in Bangkok from 10-12

September 2014 (HE Penn Sovichet and Mr. Suon Vichea),26. Sending officials to attend UN ESCAP seminars in Sri Lanka from 25-27

November 2014 (HE Penn Sovichet and Mr. You Mab),27. Sending officials to the 4th Exchange Program in Luang Prabang, Laos

PDR on Dec 3-5, 2014,28. Conducting Awareness Raising Workshop on CTIS 2014-2018 in

Sihanouk Ville from 18-19 Dec 2014,29. Prakas of ACAC signed by MoT on 26 Dec 2014,30. Submitted the project revision documents of ACAC of CEDEP II to EI &

UNOPS on 26 Dec 2014,31. Conducting M&E Seminar in Siem Reap 15-16 Jan 2015,32. Receiving a Korea University team to learn on Cambodia AfT on 20 Jan

2015, 33. Hosting a study visit by Vanuatu delegations from 21-22 Jan 2015,

Page 28: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

34. Communication: Published CTIS 2014-2018 (KH. 1,000 and Eng. 500 copies), Production of 2nd volume SWAp Newsletter (KH. 1,000 and Eng.

1,000 copies), Production of Story in success on High Value Silk component (KH

1,000 and Eng. 1,000 copies), Production of X-Stands (for six components) for awareness raising

workshop in SHV 18-19 Dec 2014 Production of six projects’ factsheet (KH. 1,000 and Eng. 1,000

copies), Production of Video on trade development in Cambodia, and Update Facebook and Website.

35. Completing Annual Narrative Report of EIF Tier 1,36. Completing Annual Narrative and M&E Reports of CEDEP I and CEDEP II,37. Preparing to attend EIF Global Platform in Geneva which schedules to

be held from 17-19 Mar 2015.

Page 29: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

Timetable for SSC-TD-TRI Meeting in 2015

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

SSC Thu 26

SSC Tue 26

SSC Thu 06

SSC Thu 19

Timetable for IC Meeting in 2015

ICTue 13

IC Tue 17

IC Tue 17

IC Tue 21

IC Tue 19

IC Tue 16

IC Tue 21

IC Tue 18

IC Tue 22

IC Tue20

IC Fir 13

IC Tue 15

Timetable for DICO and IAs Meeting in 2015

Thu 05 Feb

Tue 07 Apr

Thu 04 Jun

Tue 04 Aug

Tue 06 Oct

Thu 03 Dec

Timetable for D/ICO and Line Ministries Meeting in 2015 (Under EIF)

Tue 13 Thu 05 Thu 07 Tue 07 Tue 08 Thu 05

Page 30: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in

រកសងពាណជ�កម�

នាយកដ� នសហរ�តបត�ករអន�រជាត

ឣ‍សយដ‌� ន: ឡ�តេលខ ១៩-៦១ វ�ថរកសងពាណជ�កម� (១១៣េប), ភមទកថ‌� , សង‌� តទកថ‌� , ខណ�

ែសនសខ,

រ‌ជធានភ�េពញ ១២១០២

ទរសព�/ទរសារៈ ០២៣-៨៦៦-០៧៤

Email: [email protected]

www.moc.gov.kh | www.moc.gov.kh/tradeswap

Ministry of CommerceDepartment of International Cooperation

Lot 19-61, MoC Road (113B)Phum Teuk Thla, Sangkat Teuk ThlaKhan Sen Sok, Phnom Penh 12102

Cambodia

Tel/Fax: 023-866-074

Email: [email protected]

www.moc.gov.kh | www.moc.gov.kh/tradeswap

Page 31: Director, EIF- · PDF fileDirector, EIF-NIU. Progress Update on Trade SWAp, ... National Consultant to Draft Manual on IP Enforcement for DIPR: ... (DoP) – to be closed in