Discharge Pathway Project. Girish Kunigiri Fabida Noushad Mohammed Abbas Colin Gell Sarah Cassie Ayesha Ahmed Terri Eynon. CMHT in Leicestershire. Town Hall Chambers. Melton. Hawthorne. Rutland. Orchard. Market Harborough. Cedars. CMHT challenges in Leicestershire. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/1.jpg)
www.leicspt.nhs.uk
Discharge Pathway Project
Girish Kunigiri
Fabida Noushad
Mohammed Abbas
Colin Gell
Sarah Cassie
Ayesha Ahmed
Terri Eynon
![Page 2: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/2.jpg)
www.leicspt.nhs.uk
![Page 3: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/3.jpg)
www.leicspt.nhs.uk
CMHT in Leicestershire
Town Hall Chambers
Melton
Rutland
Market Harborough
Cedars
Orchard
Hawthorne
![Page 4: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/4.jpg)
www.leicspt.nhs.uk
CMHT challenges in Leicestershire
Longstanding culture Variation in practices across localities Dependency on psychiatrist Overloaded outpatient clinics Waiting lists for first appointment (average 4-5
weeks; up to 13 weeks) Clinicians struggle when Service User need to be
seen urgently
![Page 5: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/5.jpg)
www.leicspt.nhs.uk
Mental Health Facilitator (MHF)in Leicestershire
MHF are mental health professions at Band 5/6/7 Managed in the primary care (along side the IAPT) Currently in the county (n=18 MHF)
Role• Help GP in assessment and management of SU with SMI
(mild to moderate)
• Ensure SU on SMI register are followed up and have annual health check
![Page 6: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/6.jpg)
www.leicspt.nhs.uk
Outpatient clinics Consultant case load – 350-600 (largely on their own) Average clinics by one community consultants
4-5/week; Junior doctors 2-3 clinics/week
No. of patients seen/week in outpatient clinics 4-5 new About 40-50 follow ups
Discharge range : 35-127 per year per consultant
![Page 7: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/7.jpg)
www.leicspt.nhs.uk
Outpatient clinics Leicestershire
![Page 8: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/8.jpg)
www.leicspt.nhs.uk
East Midlands MH Trusts benchmarking audit
![Page 9: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/9.jpg)
www.leicspt.nhs.uk
East Midlands MH Trusts benchmarking audit
![Page 10: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/10.jpg)
www.leicspt.nhs.uk
East Midlands MH Trusts benchmarking audit
![Page 11: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/11.jpg)
www.leicspt.nhs.uk
East Midlands MH Trusts benchmarking audit
![Page 12: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/12.jpg)
www.leicspt.nhs.uk
Limitations of clustering exercise
Audit done in May 2011- however training of clinicians in clustering completed only by September 2011
![Page 13: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/13.jpg)
www.leicspt.nhs.uk
![Page 14: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/14.jpg)
www.leicspt.nhs.uk
Aim of discharge pathway project
To identify and discharge service users with SMI who have been stable back to primary care
To support the primary care in managing such patients
![Page 15: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/15.jpg)
www.leicspt.nhs.uk
Intended benefits of the project
To make efficient use of resources in secondary care services in managing service users with SMI
To reduce waiting time to see urgent and new referrals in CMHT
Clinicians to be able to provide more active psychological and crisis intervention to their SU
Smooth transition of SU between primary and secondary care
![Page 16: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/16.jpg)
www.leicspt.nhs.uk
Methodology
Set up a steering group Rolled as a pilot in NWL from Feb 2011-Jan 2012 Developed a tool to help identify SU who could be
potentially discharged back to GP• Those stable for one year or longer with no interventions• Advice to primary care included (medication, early signs of
relapse, risks and its intervention)• Consulted with all the clinicians and GP for their views on the tool• Clinician had option of using the tool at discharge or incorporate
the content of it in their clinic letter to GPs
![Page 17: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/17.jpg)
www.leicspt.nhs.uk
Methodology cont…
Educated the CMHT Educated the GP Encouraged clinicians to review patients who are
stable for discharge• During MDT/CPA meeting
• OPC Discussing with patients and carers regarding
discharge on their next appointment
![Page 18: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/18.jpg)
www.leicspt.nhs.uk
Methodology cont…
Joint decision to discharge to primary care• When necessary involved MHF/GP
Copy of the final care plan/clinic letter given to SU
Fast tract when necessary
Providing advice to primary care
![Page 19: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/19.jpg)
www.leicspt.nhs.uk
Evaluation of the project
Questionnaire sent at 6 months and 12 months post discharge• To SU
• To GP
Questionnaires identified• Care provided in primary care
• Increase in workload in primary care
• Satisfaction by SU and GP
![Page 20: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/20.jpg)
www.leicspt.nhs.uk
Results: Caseload
![Page 21: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/21.jpg)
www.leicspt.nhs.uk
Referrals (n=117)
![Page 22: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/22.jpg)
www.leicspt.nhs.uk
Discharges (n=143)
![Page 23: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/23.jpg)
www.leicspt.nhs.uk
Type of discharge (n=143)
![Page 24: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/24.jpg)
www.leicspt.nhs.uk
Diagnosis
![Page 25: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/25.jpg)
www.leicspt.nhs.uk
Results- Evaluation
So far responses from 5 GP’s• Discharge letter helpful
• Received help from secondary care when appropriate
• None of these patients had personalisation and advance directive
• No additional work
Patient responses- still awaited
![Page 26: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/26.jpg)
www.leicspt.nhs.uk
Challenges LPT Clinicians
• Reluctant discharging SU• Concerned that SU might not get the right care in primary care• Wary about providing advice to primary care when SU not
open to secondary care• Practicality of fast track
GP• Concerned about increase in case load• Expertise in managing when in relapse
![Page 27: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/27.jpg)
www.leicspt.nhs.uk
Challenges cont…
Service Users• Concerned that there may be no continuity of care
• Fear of delay in re-referral/acceptance by secondary care
• SU choice
• Issue with benefits
![Page 28: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/28.jpg)
www.leicspt.nhs.uk
The way forward
Integrating the discharge pathway project with care pathway development
Continue to review existing caseload on a regular basis
Openness with SU about reasons for discharge
Setting the goals and duration of treatment when SU are first referred to the services
![Page 29: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/29.jpg)
www.leicspt.nhs.uk
Integrating the discharge pathway results with care pathway development
Periodic review of care clusters• CPA
• Change in clinical status
• Set up maximum time frame
Defining possible time frame for each cluster
![Page 30: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/30.jpg)
www.leicspt.nhs.uk
![Page 31: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/31.jpg)
www.leicspt.nhs.uk
Cluster pathway 11
![Page 32: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/32.jpg)
www.leicspt.nhs.uk
Conclusions Significant proportion of service users are in secondary care who
are relatively stable and could be managed in primary care. Service users should receive the right care at the right time and for
right period of time. This pilot has shown that 32 patients were stable enough to be
discharged. Service evaluation have shown satisfaction within GP’s. There
needs to be a cultural shift with clinicians and service users in bringing this change.
Integrating results with care pathway development is the way forward.
![Page 33: Discharge Pathway Project](https://reader035.vdocument.in/reader035/viewer/2022062315/56815904550346895dc63864/html5/thumbnails/33.jpg)
www.leicspt.nhs.uk
Acknowledgements
Christine Green & Sue Scarborough Clinical staff GP’s Service users