  • 7/27/2019 Division 10

    1/6

    Project Number : 3206Document Name.: Civil SpecificationsDate: March 7, 2009Project : Cut & Bend Processing Bldg.Owner : Rajhi Steel Industries

    Saudi Designers Eng. Consultant Division-10 Page 1 of 6

    DIVISION 10

    FINISH HARDWARE

    SECTION 10000 HARDWARES AND ACCESSORIES

    SUBSECTION: INDEX

    PART 1GENERAL

    1.01 Description1.02 Related Work1.03 Reference Standards1.04 Submittals1.05 Storage and Handling

    1.06 Job Conditions

    PART 2PRODUCTS

    1.01 Hinges, Butts and Pivots1.02 Closers and Door Control Devices1.03 Door Trim Units1.04 Stripping Seals1.05 Hardware Finishes1.06 Fabrication1.07 Keying System1.08 Hardware Sets

    PART 3-EXECUTION

    1.01 Hardware Mounting Heights1.02 Installation1.03 Adjust and Clean

    Part 1 General

    1.01 Description

    A. Work in this Section includes, but is not limited to; the furnishing andinstallation of all finish hardware as shown on the schedule.

    B. Required finish and related items include:

    1. Butt and Hinges2. Lock sets3. Closers4. Stops5. Silencers6. Flush Bolts7. Weather Stripping and Bottom Seals

  • 7/27/2019 Division 10

    2/6

    Project Number : 3206Document Name.: Civil SpecificationsDate: March 7, 2009Project : Cut & Bend Processing Bldg.Owner : Al Rajhi Steel

    Saudi Designers Eng. Consultants Division-10 (Page 2 of 6)

    8. Panic Device9. Holder10. Threshold

    1.02 Related Work

    A. Section 08000 Metal Doors and Frames

    1.03 Reference Standards

    A. Builders Hardware Manufacturers Association (BHMA) :

    1. Products Standards 601 Series 40002.

    B. Door and Hardware Institute (DHI) :

    1. Recommended Locations for Builders Hardware.

    1.04 Quality Assurance

    A. Manufacturer : In so far as possible, obtain each kind of hardware from onlyone manufacturer; even though several may be indicated as acceptablemanufacturers.

    B. Departure from Scheduled Designation. Except as otherwise indicated, theuse of one manufacturers numeric designation system in schedules does notimply that another manufacturers products will not be acceptable, unless theyare not acceptable in design, or not equal in size, weight , finish, function or

    other quality of significance.

    1.05 Submittals

    A. Manufacturers Data; Finish Hardware: Submit manufacturers product data,including illustrations for each item of hardware. Include whatever informationmay be necessary to show compliance with requirements and includeinstructions for installation and for maintenance of operating parts andexposed finishes. Wherever needed, furnish templates to fabricators of otherwork which is to receive finish hardware.

    B. Hardware Schedule; Finish Hardware: Submit copies of the hardwareschedule, in the manner and format specified for approval. Hardware

    schedules are intended for coordination of the work. Review and acceptanceby the Companys Representative does not relieve the CONTRACTOR of hisexclusive responsibility to fulfill the requirements as shown and specified.

    C. Comply with Companys Representative requirements regarding keying oflocks. Submit copies of a separate key schedule, showing clearly how thecompany representative final instructions on keying of locks have beenfulfilled.

  • 7/27/2019 Division 10

    3/6

    Project Number : 3206Document Name.: Civil SpecificationsDate: March 7, 2009Project : Cut & Bend Processing Bldg.Owner : Al Rajhi Steel

    Saudi Designers Eng. Consultants Division-10 (Page 3 of 6)

    D. Samples : Prior to submittal of the final hardware schedule and prior todelivery of hardware. Submit one sample of each exposed hardware unit,finished as required, and tagged with full description for coordination with the

    schedule. Sample will be reviewed by the Companys representative fordesign, color and texture only. Compliance with other requirements shall bethe exclusive responsibility of the CONTRACTOR. Units which are acceptableand remain undamaged through submittal, review and field comparisonprocedures may, after final check of operation, be used in the work, withinlimitation of keying coordination requirements.

    1.06 Storage and Handling

    Provide secure lock-up for hardware delivered to the project, but not yet installed.Control the handling and installation of hardware item which are not immediatelyreplaceable, so that the completion of the work will not be delayed by hardwarelosses, both before and after installation.

    1.07 Job Conditions

    A. Coordination : Coordinate hardware with other work. Tag each item orpackage separately, with identification related to the final hardware schedule,and include basic installation in the package. Furnish hardware items ofproper design for use on doors and frames of the thickness, profile, swing,security and similar requirements indicated, as necessary for properinstallation and function. Deliver individually packaged hardware items at theproper times to the proper locations (shop or project site) for installation.

    B. Templates : Furnish hardware templates to each fabricator of doors, framesand other work to be factory prepared for the installation of hardware. Uponrequest, check the shop drawings of such other work, to confirm that

    adequate provisions are made for the proper installation of hardware.

    Part 2 Products

    2.01 Hinges, Butts and Pivots

    A. Templates : Provide only template-produced units.

    B. Hinge Pins : Except as otherwise indicated, provide hinge pins as follows:

    1. Steel Hinges: Steel Pins2. Non-Ferrous Hinges: Stainless Steel Pins3. Exterior Doors: Non-removable pins

    4. Tips: Flat button and matching plug, finished to match levels, exceptwhere hospital tip is indicated.

    C. Number of Hinges: Provide number of Hinges indicated, or if not indicated,not less than 3 hinges of door leaf for door 2200 mm or less in height and oneadditional hinge for each 750 mm of additional height.

  • 7/27/2019 Division 10

    4/6

    Project Number : 3206Document Name.: Civil SpecificationsDate: March 7, 2009Project : Cut & Bend Processing Bldg.Owner : Al Rajhi Steel

    Saudi Designers Eng. Consultants Division-10 (Page 4 of 6)

    2.02 Closer and Door Control Devices

    A. Size of the Units : Except as otherwise indicated, comply with the

    manufacturers recommendation for the size of door control unit, dependingupon the size of the door, exposure to weather and anticipated frequency ofuse. Where parallel arms are indicated for closers, provide closer unit onesize larger than recommended for use with standard arm.

    2.03 Door Trim Units

    A. Fasteners : Provide manufacturers standard exposed fasteners for door trimunits where indicated, either machine screws or self-tapping screw.

    B. Protection Plates : 18 gauge stainless steel x 203 mm high x 50 mm less thandoor width for single doors and 25 mm less than door width for pairs of doors.

    2.04 Stripping and Seals

    A. Continuity of Stripping : Except as otherwise indicated, it is required that thestripping at each scheduled opening be continuous and without unnecessaryinterruptions at door corners and hardware.

    B. Replaceable Seal Strips : It is required that the resilient or flexible seal strip ofevery unit be easily replaceable and readily from stocks maintained by themanufacturer.

    2.05 Hardware Finishes

    A. Provide the finishes specified or scheduled, otherwise, provide matching

    finishes for hardware units at each door or opening, to the greatest extentpossible. In general, match items to the manufacturers standards finish forthe latch and lock set (or push-pull units if no latch-lock sets) for color andtexture.

    2.06 Fabrication

    A. Hand of door : The drawings (floor plan) show the direction of swing or handof each door leaf. Furnish each item of hardware for proper installation andoperation of the door movement as shown.

    B. Base Metals : Produce hardware units of the basic metal and forming methodindicated, using the manufacturers standard metal alloy, composition, temper

    and hardness. Do not furnish optional materials for forming methods forthose indicated, except as otherwise specified.

    C. Fasteners : Manufacturer hardware to conform to published templates,generally prepared for machine screw installation. Do not provide hardwarewhich has been prepared for self-tapping sheet metal screws, except asspecifically indicated.

  • 7/27/2019 Division 10

    5/6

    Project Number : 3206Document Name.: Civil SpecificationsDate: March 7, 2009Project : Cut & Bend Processing Bldg.Owner : Al Rajhi Steel

    Saudi Designers Eng. Consultants Division-10 (Page 5 of 6)

    D. Furnish screws or through bolts for installation, with each hardware item.Provide Philips flat-head screws except as otherwise indicated. Finishexposed (exposed under any condition) screws and bolts to match the

    hardware finish or, if exposed in surfaces of other work, to match the finish ofsuch other work as closely as possible, including prepared for paint insurface to received painted finish. Provide through bolts for closers.

    E. Tools for Maintenance : Furnish a complete set of specialized tools asneeded for continued adjustment, maintenance and removal and replacementof builders hardware.

    2.07 Keying System

    A. General : Lock sets shall be registered and keyed at factory. Master keyingshall be coordinated with the Companys Representative and shall be to hisapproval. Equip locks with manufacturers special six-pin tumbler cylinder,

    with construction master key feature, which permits voiding of constructionkeys without cylinder removal.

    B. Furnish three change keys for each lock; five master keys for each mastersystem, and five grandmaster keys for each grandmaster system. Furnishone extra blank for each lock. Stamp keys and locks Do not Duplicate.

    C. Deliver keys to the Companys Representative.

    2.08 Hardware Sets

    A. Provide one of the following designs in cold forged and reinforcedconstruction:

    1. YALE WINDSOR2. SCHLAGE A53PD, D53PD3. RUSSWIN ASHFORD

    B. Hardware finish except where noted otherwise : US32D.

    C. Acceptable Manufacturers : An asterisk (*) indicates manufacturers numberused in hardware sets to indicate project requirements:

    1. Mortise Cylinder Lock : Yale, Schlage A53PD or approved equal.2. Butts and Hinges : Stanley, Schlage or approved equal.3. Locks Latch Set : Yale, Corbin, Schlage A53PD.

    4. Overhead Closers with covers : Corbin, Yale, Schlage D53PD, Dorma.5. Threshold : Corbin, Russwin or approved equal. Provide A-155,

    aluminum 127 mm wide where scheduled.6. Door Stops and Holder : Glynn-Johnson, Dorma or approved equal.7. Door Silencers : Yale, Russwin8. Flush Bolts with Strikes : Corbin, Stanley or approved equal.9. Panic Device : Russwin, Yale or approved equal.

    Part 3 - Execution

  • 7/27/2019 Division 10

    6/6