doc.: ieee 802.11-11/1342r0 report sept 2011 adrian stephens, intel corporationslide 1 802.11 sept...

83
doc.: IEEE 802.11-11/1342r0 Report Sept 2011 Adrian Stephens, Intel Corp Slide 1 802.11 Sept 2011 Closing Plenary Reports Date: 2011-09-22 N am e C om pany A ddress Phone em ail A drian Stephens Intel Corporation +44 792 008 4900 (m obile) [email protected] Authors:

Upload: samson-fowler

Post on 02-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

doc.: IEEE 802.11-11/1342r0

Report

Sept 2011

Adrian Stephens, Intel CorporationSlide 1

802.11 Sept 2011 Closing Plenary Reports

Date: 2011-09-22

Name Company Address Phone email Adrian Stephens Intel

Corporation +44 792 008

4900 (mobile)

[email protected]

Authors:

doc.: IEEE 802.11-11/1342r0

Report

Sept 2011

Adrian Stephens, Intel CorporationSlide 2

Abstract

• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the Sept 2011 closing plenary meeting.

doc.: IEEE 802.11-11/1342r0

Report Slide 3

802.11 WG Editor’s Meeting (Sept ‘11)

Date: 2011-09-19

Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,

MS SJ-14-4, San Jose, CA 95134-1706

+1-408-527-0815 [email protected]

Authors:

Adrian Stephens, Intel Corporationfrom slide 1/5 of 11-11-1249r2 by Peter Ecclesine (Cisco Systems)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Slide 4

Volunteer Editor Contacts• TGmb – Adrian Stephens – [email protected]

• TGaa – Alex Ashley – [email protected]

• TGac – Robert Stacey – [email protected]

• TGad – Carlos Cordeiro – [email protected]

• TGae – Henry Ptasinski – [email protected]

• TGaf – Peter Ecclesine – [email protected]

• TGah – Minyoung Park – [email protected]

• TGai – Tom Siep – [email protected]

• Editors Emeritus:

– TGk – Joe Kwak– [email protected]

– TGp – Wayne Fisher –

– TGr – Bill Marshall – [email protected]

– TGs – Kazuyuki Sakoda – [email protected]

– TGu – Necati Canpolat – [email protected]

– TGv – Emily Qi – [email protected]

– TGw – Nancy Cam-Winget – [email protected]

– TGz – Menzo Wentink – [email protected]

Adrian Stephens, Intel Corporation

September 2011

from slide 2/5 of 11-11-1249r2 by Peter Ecclesine (Cisco Systems)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

802.11 Style Guide

• See 11-09-1034-03-0000-wg11-style-guide.doc

• Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts.

• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual

• Note that the Stle Guide evolves with our practice

Slide 5 Adrian Stephens, Intel Corporationfrom slide 3/5 of 11-11-1249r2 by Peter Ecclesine (Cisco Systems)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Slide 6

Editor Amendment Ordering

Amendment Number Task Group REVCOM Date802.11 Amendment 8 TGv Feb 2011

802.11 Amendment 9 TGu Feb 2011

802.11 Amendment 10 TGs Sept 2011

802.11 Revision 802.11mb Mar 2012*est.

802.11-2011 Amendment 1 TGae Jun 2012

802.11-2011 Amendment 2 TGaa Jun 2012

802.11-2011 Amendment 3 TGad Dec 2012

802.11-2011 Amendment 4 TGaf Mar 2013

802.11-2011 Amendment 5 TGac Dec 2013

802.11-2011 Amendment 6 TGah July 2013

802.11-2011 Amendment 7 TGai Sept 2013

• Data as of Sept 2011• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm

Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!

Adrian Stephens, Intel Corporationfrom slide 4/5 of 11-11-1249r2 by Peter Ecclesine (Cisco Systems)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Most current doc shaded

green.TG Published or Draft Baseline DocumentsSource MEC

Style Guide Editor

Snapshot Date

Published

s mb ae aa ad af ac ah ai

s Y Frame 8.0 Yes 2009 Kazuyuki Sakoda 19-Jul

mb Y 10.1 Frame 9.0 Yes 2009 Adrian Stephens 21-Sep

ae Y 12.0 9.0 5.0 OpenOffice 3.2

Yes 2009 Henry Ptasinski 19-Jul

aa Y 11.0 9.0 3.0 6.0 Word Yes 2009 Alex Ashley 19-Jul

ad Y 10.0 5.0 6.0 5.0 Word Yes 2009 Carlos Cordero 21-Sep

af Y 10.0 5.0 6.0 4.0 1.03 Frame 9.0 No 2009 Peter Ecclesine 22-Sep

ac Y 12.0 9.0 4.0 5.0 3.0 1.0 1.0 Frame 9.0 No 2009 Robert Stacey 19-Jul

ah No 2009 Minyoung Park 19-Jul

ai Frame 10.0

No 2009 Tom Siep 22-Sep

Changes from last report shown in red.

Slide 7

Sept 2011 Draft Development Snapshot

Slide 7 Adrian Stephens, Intel Corporation

September 2011

from slide 5/5 of 11-11-1249r2 by Peter Ecclesine (Cisco Systems)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 8

Closing ReportDate: 2011-09-23

Name Company Address Phone email

Clint Chaplin Samsung Electronics 3000 Orchard Parkway San Jose, Ca 95134

+1 408 544 2740 firstname dot lastname at gmail dot com

Authors:

from slide 1/3 of 11-11-1345r0 by Clint Chaplin, Chair (Samsung)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 9

Abstract

Closing report for WNG SC for September 2011, Okinawa, Japan

from slide 2/3 of 11-11-1345r0 by Clint Chaplin, Chair (Samsung)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 10

• Presentations at September 2011 meeting– Proposed Use Case & Improve ad-hoc mode for 802.11ah/a/b/g/n (11-11-

1138-01-00ah-packet-radio-mode-for-802-11ah-a-b-g-n.ppt) – Romana Challans

– IP over Congested WLAN (11-11-1183-01-00ai-ip-over-congested-wlan.ppt) – Masataka Ohta

• Minutes

– 11-11-1287-00-0wng-sept-2011-meeting-minutes.doc

• Plans for November 2011

– 1 2 hour session

from slide 3/3 of 11-11-1345r0 by Clint Chaplin, Chair (Samsung)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 11

ARC Closing Report Date: 2011-09-21

Name Affiliations Address Phone email Mark Hamilton Polycom, Inc. 1765 W 121st Ave,

Westminster, CO, 80234

720-872-7445 [email protected]

Authors:

from slide 1/5 of 11-11-1310r0 by Mark Hamilton, Polycom, Inc.

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Abstract

This document is the closing report for ARC SC, September 2011, Okinawa meeting

Adrian Stephens, Intel CorporationSlide 12from slide 2/5 of 11-11-1310r0 by Mark Hamilton, Polycom, Inc.

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 13

Work Completed• 802 Overview and Architecture Draft 1.2 letter ballot

– Proposed text for 802.11RM Annex, agreed• Updated architectural RM figure, based on Figure 4-15 in REVmb

D10.0, to show MAC-SAP access when 802.1X is not in use

– Discussed a comment for the “front material” of the 802 O&A to clarify that the O&A is a continually evolving document to reflect newly developed technologies and architectural concepts

• Minutes are in 11-11/1251

from slide 3/5 of 11-11-1310r0 by Mark Hamilton, Polycom, Inc.

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 14

Teleconferences• No specific plan, will schedule with 10 days notice• Topic(s):

– “Front material” comment for 802 O&A

from slide 4/5 of 11-11-1310r0 by Mark Hamilton, Polycom, Inc.

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 15

November 2011 Goals• Will be a working meeting with 802 to complete ballot comment

resolution• One 802.11 meeting slot planned for any “homework” items or

discussion we need to support the comment resolution

from slide 5/5 of 11-11-1310r0 by Mark Hamilton, Polycom, Inc.

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Adrian Stephens, Intel Corporation

Slide 16

JTC1 SC September 2011 - Closing Report• 22 Sept 2011

Name Company Phone email

Andrew Myles Cisco +61 284461010 [email protected]

Bruce Kraemer Marvell [email protected]

Authors:

Meeting document: 11-11-1273

from slide 1/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

JTC1 SC agenda items

– Status of WAPI in SC6

– Status of 802.1X/AE and 802.16 security replacements

– Status of N-UHT (802.11ac replacement)

– Plan for 8802 standards

– Plan for next SC6 meeting Feb 2012 in Guangzhou

Adrian Stephens, Intel Corporation

Slide 17from slide 2/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

ISO/IEC JTC1/SC6 met in San Diego in June 2011 and will meet in Guangzhou,

China in Feb 2012 – SC6 has a F2F meeting every 9 months or so

– The last meeting was held on 20-24 June 2011 in San Diego• All WGs met in San Diego

– WG1: Physical and data link layers

– WG7: Network and transport layers (also known as Future Network)

– WG8: Directory

– WG9: ASN.1 and registration

– The next meeting is in Guangzhou, China in February 2012• Now confirmed for week of 20 Feb 2012

• Only two WGs are planning to meet– WG1: Physical and data link layers

– WG7: Network and transport layers

• The IEEE 802 will need to send a delegation again!– Please start planning to attend!

Adrian Stephens, Intel Corporation

Slide 18from slide 3/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

The 802.11 WG has liaised various Sponsor Ballot drafts to ISO/IEC JTC1/SC6

– Bruce Kraemer will send the red highlighted documents after Okinawa

– The WG told SC6 it will liaise 802.11ac as soon as it passes a LB

– 802.11-2012 will be submitted to SC6 when approved by the SASB – early 2012

Adrian Stephens, Intel Corporation

Slide 19

Task Group

AfterSD

After Hawaii

After Dallas

AfterLA

AfterSing.

After Palm Sp

After SanFran

After Okinawa

July 10 Sept 10 Nov 10 Jan 11 Mar 11 May 11 July 11 Sept 11

TGae - - - - - - - D5.0

TGaa - - - - - - - D6.0

TGac - - - - - - - -

TGmb - - D6.0 - D8.0 - - D10.0

TGs - - D8.0 - D10.0 - Ratified -

TGu D11.0 - D13.0 - - Ratified - -

TGv D13.0 D15.0 - - - Ratified - -

TGz D12.0 D13.0 - - - Ratified - -

from slide 4/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

There have been attempts to make progress on WAPI NP at a series of CRM

teleconferences– In San Diego, the US NB proposed that progress could be made on resolving the WAPI NP comments by teleconference

– IEEE objective is to expunge false commentary on 802.11 security

– SC6 subsequently agreed to hold comment resolution meetings (The CRMs were held • 10 Aug, 31 Aug, 15 Sept held so far, 21 Nov scheduled (probably last!)

• US, UK, Switzerland, China, Korea and IEEE 802 have been represented

• Convenor: Mr Seung Ok Lim (Korea) – also new WG1 Chair

– After the first two teleconference made little progress, it was decided to use e-mail as well• Hundreds of e-mails resulted

Adrian Stephens, Intel Corporation

Slide 20from slide 5/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

The Chair would like to thanks various individuals for representing IEEE 802 at

the CRMs

Adrian Stephens, Intel Corporation

Slide 21

• Bruce Kraemer

• Dan Harkins

• Dorothy Stanley

• Jodi Haaz

• Brian Weis

10 August

• Bruce Kraemer

• Dan Harkins

• Dorothy Stanley

• Jodi Haaz

• Brian Weis

31 August

• Bruce Kraemer

• Dan Harkins

• Dorothy Stanley

• Jodi Haaz

15 September

from slide 6/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

There will be one final CRM on 21 November ...– The CRM convenor stated that there will only be one more CRM

• It will be held on 21 November

• E-mail discussion is encouraged in the meantime

– The various parties are far apart ...• Latest e-mails are not very encouraging

• China NB & Swiss NB technical experts do not seem to understand the implementation of functional entities defined by 802.11i

• Swiss NB rep is continuing to asserting that all of 802.11i is insecure because it includes WEP and TKIP

• US NB, UK NB and IEEE 802 reps appear to be aligned

• SC6 Chair has stated, “Unless the allegations around 'serious security loopholes' in the NP are deleted and the NP form is revised, it's chair's position not to accept the DoC”

Adrian Stephens, Intel Corporation

Slide 22from slide 7/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Other topics in SC6– China NB has proposed

• An 802.1X/AE replacement

• An 802.16 security replacement

• An 802.11ac replacement

– Withdrawal of a number of standards including the 8802 series – responsibility delegated to IEEE 802 to report back with definitive list in February 2012

Adrian Stephens, Intel Corporation

Slide 23from slide 8/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

The discussion in San Francisco decided to send 802 standards to ISO/IEC under

certain conditions• Summary from San Francisco 802 plenary meeting

– There was consensus that it was important for 802 to send standards to ISO/IEC for “registration”

– Need to guarantee that these will not be edited without the explicit agreement of the 802 owner

– An implementation plan will be further explored during the November plenary

Adrian Stephens, Intel Corporation

Slide 24from slide 9/9 of 11-11-1341r0 by Andrew Myles, Cisco

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 25

IEEE 802.11 Regulatory SCOkinawa Closing Report

Date: 2011-09-23

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/5 of 11-11-1309r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 26

AbstractThis presentation is the closing report for the September

20, 2011 IEEE 802.11 Regulatory Standing Committee meeting in Okinawa.

from slide 2/5 of 11-11-1309r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Regulatory Summary – North America

• US– FCC 5 GHz rules changes update – industry input for NPRM

– OMB approved spending for Part 15 Subpart H• Establishment of database(s) only remaining hurdle

– Forty-five day geo-location database trial begun September 19th

– US House of Representatives looking to auction ALL spectrum

• Canada– TVWS Consultation: 802.18 prepared a response (18-11/75r3)

• SMSE-012-11 Consultation on a Policy and Technical Framework for the Use of Non-Broadcasting Applications in the Television Broadcasting Bands Below 698 MHz

– Radio Advisory Board of Canada (RABC) meetings to discuss TVWS

Slide 27 Adrian Stephens, Intel Corporationfrom slide 3/5 of 11-11-1309r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Regulatory Summary – European Union

• Ofcom

– Geo-location database planning

– Results of consultation on “Implementing Geolocation”

– Next steps• Consult on and publish Statutory Instrument (SI) to license-

exempt TVBDs

• Cooperate with industry partners to enable information on licensed services

• Continue engagement with industry and EU regulatory and standards groups to developed harmonized approach

– Trials running in three locations in the UK

Slide 28 Adrian Stephens, Intel Corporationfrom slide 4/5 of 11-11-1309r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Regulatory Summary - Asia

• UHT/EUHT Standards in China– UHT = Ultra-High Throughput (802.11n equivalent)

– EUHT = Enhanced Ultra-High Throughput (802.11ac equivalent)

– CCSA approval then application for ISO recognition

– Claim to coexist with Wi-Fi

– EUHT is LTE-like (TDD)

Slide 29 Adrian Stephens, Intel Corporationfrom slide 5/5 of 11-11-1309r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 30

Smart Grid SC–Closing Report- September 2011

Date: 22 September 2011

Discussion topics during September Okinawa Session

Name Company Address Phone emailBruce Kraemer Marvell 5488 Marvell Lane,

Santa Clara, CA, 95054

+1-321-751-3988 [email protected]

Abstract:

1 – NIST PAP22 – November Tutorial

Meeting Document 11-11-1268r1

from slide 1/5 of 11-11-1340r1 by Bruce Kraemer, Marvell

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

802 Goals in the PAP02 Context802 Goals

•Recognition of IEEE 802 wireless standards in NIST Catalog of Standards

•Acceptance of wireless standards as viable in Smart Grid deployments

Meeting Goals

•Information about NIST SGIP PAP02 status and plans

•Determine best method for developing or reviewing key deliverables

Engagement

•Participate in the PAP02 activity to develop Wireless Guideline 2.0

•Prepare and Submit application paperwork for 802 standards to NIST for inclusion in the Catalog of Standards

Adrian Stephens, Intel CorporationSlide 31from slide 2/5 of 11-11-1340r1 by Bruce Kraemer, Marvell

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 32

SDO Update – Modeling Tool

Range Est 2.0

One area that has exhibited a considerable amount of progress is the propagation model.

from slide 3/5 of 11-11-1340r1 by Bruce Kraemer, Marvell

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

802 Work Plan Discussion

Adrian Stephens, Intel CorporationSlide 33

• Determine best method for developing or reviewing key deliverables

• Can we adequately address Licensed vs unlicensed spectrum• Interference• Is setting the noise floor adequate representation

• Continue to define practical/achievable goals/results

• Is the multistory residence feasible in Guideline 2 schedule?

from slide 4/5 of 11-11-1340r1 by Bruce Kraemer, Marvell

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 34

Proposed Smart Grid Tutorial November 2011Possible Topics and Speakers

What is the Smart Grid? – Views of the elephantIEEE Activities including P2030– Bill AshEuropean Perspective (EC, ITU, ETSI) – Tom Siep, Larry TaylorWiFi Status Report – Dave HalaszSEP 2.0 - Bob HeileNIST SGIP PAP02 – Bruce KraemerEPRI Status Report – Tim Godfrey15.4g Status Report – Phil BeecherPAP15 & P1901 - ?

from slide 5/5 of 11-11-1340r1 by Bruce Kraemer, Marvell

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 35

September 2011 Closing Report -TGmbDate: 2011-09-22

Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave

Sunnyvale, CA 94089

+1 630-363-1389

[email protected]

Authors:

from slide 1/6 of 11-11-1346r0 by Dorothy Stanley (Aruba Networks)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 36

Abstract

This document contains the TGmb closing report for September 2011.

from slide 2/6 of 11-11-1346r0 by Dorothy Stanley (Aruba Networks)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 37Slide 37

Accomplishments

• Completed fourth Recirculation SB Comment Resolution (D10.0)– 257 comments

– Fifth Recirculation SB (15 day) to start in early October

• Scheduled teleconference calls – To be announced

– 10am Eastern (7am Pacific), 2 hours

from slide 3/6 of 11-11-1346r0 by Dorothy Stanley (Aruba Networks)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 38Slide 38

Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests

Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion• Jan 2011 – Sponsor Recirc. Start• Nov 2011 – WG/EC Final Approval• March 2012 – RevCom/SASB Approval

from slide 4/6 of 11-11-1346r0 by Dorothy Stanley (Aruba Networks)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 39Slide 39

Goals for Sept - Nov 2011

• Recirculation Sponsor Ballot on D11.0

• Comment resolution on any comments received on D11.0

• Recirculation SB on D12.0 (if needed) or D11.0 (unchanged)

• November (Atlanta) meeting– Comment Resolution on any comments received on D12.0 (if

required)

– EC Approval to forward the draft to Revcom

– Standards Board Continuous Process

from slide 5/6 of 11-11-1346r0 by Dorothy Stanley (Aruba Networks)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 40

References

from slide 6/6 of 11-11-1346r0 by Dorothy Stanley (Aruba Networks)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

802.11aa – Robust Audio Video Transport Streaming Okinawa Closing Report

Date: 2011-09-21

Authors:

Name Affiliation Address Phone email David Hunter WireFi Networks Santa Barbara, CA 93110 +1 805 259 8564 [email protected]

Adrian Stephens, Intel CorporationSlide 41from slide 1/4 of 11-11-1319r0 by David Hunter, WireFi Networks

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Slide 42

Meeting Topics

• 802.11aa Draft D6.0– Is in the second week of its first Sponsor Ballot– Sponsor Ballot 1 votes are due October 12, 2011

• There were no discussions in the current meeting.

Adrian Stephens, Intel CorporationSlide 42from slide 2/4 of 11-11-1319r0 by David Hunter, WireFi Networks

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Slide 43

Teleconferences(reminder from July 2011 meeting)

October 24, 27 and 31 2011; November 03 2011

1130-1330 Hrs ET

Adrian Stephens, Intel CorporationSlide 43from slide 3/4 of 11-11-1319r0 by David Hunter, WireFi Networks

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Slide 44

Plans

• In the teleconferences and at the November 2011 meeting:

– Work on resolutions of comments from SB 1– Complete resolutions and begin another SB

Adrian Stephens, Intel CorporationSlide 44from slide 4/4 of 11-11-1319r0 by David Hunter, WireFi Networks

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 45

TGac September 2011 Closing ReportDate: 2011-09-22

Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,

Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw

ei.com

Authors:

from slide 1/5 of 11-11-1338r0 by Osama Aboul-Magd (Huawei Technologies)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 46

Abstract

This document is the closing report for the TGac for the September 2011 session.

from slide 2/5 of 11-11-1338r0 by Osama Aboul-Magd (Huawei Technologies)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Work Completed

Adrian Stephens, Intel CorporationSlide 47

• Continue to resolve LB 178 comments– 590 technical comments are resolved

– 350 technical comments are remaining to be resolved

• Resolved comments related to GCMP.

• Plan an Ad Hoc meeting in San Jose, California on November 2-4, to speedup the resolution of comments.

• Agenda is available at: https://mentor.ieee.org/802.11/dcn/11/11-11-1165-05-00ac-september-2011-tgac-meeting-agenda.ppt

from slide 3/5 of 11-11-1338r0 by Osama Aboul-Magd (Huawei Technologies)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 48

November 2011 Goals

• Complete resolutions of LB 178 comments on D1.0.

• Prepare draft D2.0 and start WG Letter Ballot

from slide 4/5 of 11-11-1338r0 by Osama Aboul-Magd (Huawei Technologies)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 49

Conference Call Times

• Previously Approved– September 29, October 13

• 20:00 – 22:00 ET

– October 6• 10:00 – 12:00

• Oct 27, Nov 17, Dec 8– 20:00 – 22:00 ET

• Oct 20, Nov 3, Dec 1, Dec 15– 10:00-12:00 ET

from slide 5/5 of 11-11-1338r0 by Osama Aboul-Magd (Huawei Technologies)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

TGad September 2011 Closing Report

Adrian Stephens, Intel CorporationSlide 50

Date: 2011-09-22

Name Company Address Phone email Eldad Perahia Intel

Corporation

2111 NE 25th Ave Hillsboro, OR 97124

503-712-8081 [email protected]

Authors:

from slide 1/5 of 11-11-1219r0 by Eldad Perahia, Intel Corporation

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Abstract

This document is the closing report for TGad for the September 2011 session.

Adrian Stephens, Intel CorporationSlide 51from slide 2/5 of 11-11-1219r0 by Eldad Perahia, Intel Corporation

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Work Completed

• Resolved all comments on LB 183 this week

• TG and WG approved motion for recirculation letter ballot on D5.0

Adrian Stephens, Intel CorporationSlide 52from slide 3/5 of 11-11-1219r0 by Eldad Perahia, Intel Corporation

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Goals for November 2011

• Comment resolution on D5.0

• Conditional approval for Sponsor Ballot

Adrian Stephens, Intel CorporationSlide 53from slide 4/5 of 11-11-1219r0 by Eldad Perahia, Intel Corporation

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Conference call times

• Previously approved conference calls– Aug 25, Sept 8, Sept 29, Oct

13• 10:00 – 12:00 ET

– Aug 18, Sept 1, Sept 15, Oct 6, • 20:00-22:00 ET

• New conference calls– Not overlap with TGac

– Oct 27, Nov 17, Dec 8• 10:00 – 12:00 ET

– Oct 20, Nov 3, Dec 1, Dec 15• 20:00-22:00 ET

Adrian Stephens, Intel CorporationSlide 54from slide 5/5 of 11-11-1219r0 by Eldad Perahia, Intel Corporation

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 55

TGae Closing Report – September 2011Date: 2011-09-23

Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.

Mississauga, ON. Canada. L4W 0B4

+1-905-629-4746 [email protected]

Authors:

from slide 1/5 of 11-11-1330r0 by Michael Montemurro, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 56

Abstract

This document is the closing report for the TGae Task Group for the September 2011 session.

from slide 2/5 of 11-11-1330r0 by Michael Montemurro, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 57

Work Completed• Comment Resolution for Initial Sponsor Ballot

– https://mentor.ieee.org/802.11/dcn/11/11-11-0888-08-00ae-lb-180-comment-resolutions.xls

– Approved resolutions to 103 comments – 109 remaining.

• Teleconferences:– Weekly teleconferences beginning on Wednesday Oct 5 at 11am

ET for 1 hour, except Oct 19.

from slide 3/5 of 11-11-1330r0 by Michael Montemurro, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 58

TGae Timeline – September 2011

• Initial Working Group Letter Ballot: September ‘10

• Re-circulation Working Group Letter Ballot: January ‘11

• Form Sponsor Ballot Pool: May ’11

• Mandatory Editorial Check: May ’11

• Initial Sponsor Ballot: Aug ’11

• Sponsor Ballot Recirculation: Oct ‘11

• Final WG/EC Approval: Mar ‘12

• RevCom/Standards Board Approval: June ‘12

from slide 4/5 of 11-11-1330r0 by Michael Montemurro, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 59

November 2011 Goals• Resolve comments from latest Sponsor ballot• Prepare for recirculation Sponsor ballot

from slide 5/5 of 11-11-1330r0 by Michael Montemurro, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 60

TGaf San Francisco Closing Report

Date: 2011-09-23

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134

+1-408-527-0815 [email protected]

Authors:

from slide 1/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 61

AbstractThis presentation is the closing report for the eleventh

face-to-face meeting of IEEE 802.11 TGaf taking place the week of September 19, 2011 at the IEEE 802 Wireless Interim in Okinawa.

from slide 2/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Agenda

• Approve meeting, ad hoc and teleconference minutes

• Approve the LB171 comment spreadsheet in 11-11/277r17

• Approve draft P802.11af D1.03 as the working draft

• Approve agreed to comment resolution submissions

• Review of the progress since July

• Comment resolution

• PHY planning

Adrian Stephens, Intel CorporationSlide 62from slide 3/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

TGaf Accomplishments • Approved document >>11-11/1111r11<<

• Resolved 242 comments– 902 of 1302 comments have Approved resolutions

• Met with TGac PHY experts to discuss how TGaf can proceed prior to approval of the TGac draft – decided to create separate clause for TGaf PHY

• Revised the P802.11af timeline

• Planned for November meeting, and weekly teleconferences– Tuesdays at 21:00 ET

Adrian Stephens, Intel CorporationSlide 63from slide 4/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Plans for September

• Complete comment resolution• Prepare draft 2.0 and ask the WG to begin our

second Letter Ballot

Adrian Stephens, Intel CorporationSlide 64from slide 5/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 65

TGaf Timeline – Updated September 2011

• New

• Initial Working Group Letter Ballot: January 2011

• Second Working Group Letter Ballot: November 2011

• Recirculation Letter Ballot: March 2012

• Form Sponsor Ballot Pool: June 2012

• Initial Sponsor Ballot: September 2012

• Recirculate Sponsor Ballot: November 2012

• Final WG/EC Approval: March 2013

• RevCom/Standards Board Approval: March 2013

from slide 6/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Teleconferences

• Weekly on Tuesdays:

• Time: 21:00 ET for 120 minutes

Adrian Stephens, Intel CorporationSlide 66from slide 7/7 of 11-11-1334r1 by Rich Kennedy, Research In Motion

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 67

IEEE 802.11ah Closing Report forJuly 2011Date: 2011-9-22

Name Affiliations Address Phone email David Halasz Aclara 2315 W. 9th Street

Austin, TX 78703 330-283-2715 dave.halasz@oaktreewirel

ess.com

Authors:

from slide 1/5 of 11-11-1333r0 by David Halasz, OakTree Wireless

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Activity in TGah

• Initial specification framework document adopted!– 11-11-1137-02-00ah-specification-framework-for-tgah.docx

– Contains some text on Bandwidth, channelization and spatial multiplexing

Adrian Stephens, Intel CorporationSlide 68from slide 2/5 of 11-11-1333r0 by David Halasz, OakTree Wireless

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Going forward

•Update Specification Framework document, providing details on functional blocks

Adrian Stephens, Intel CorporationSlide 69from slide 3/5 of 11-11-1333r0 by David Halasz, OakTree Wireless

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Teleconferences

• October 10th at noon ET 1.5 hours

• October 31st at 10 AM ET 1.5 hours

• Desire to have rolling time of noon, 10 AM and 7 PM

Adrian Stephens, Intel CorporationSlide 70from slide 4/5 of 11-11-1333r0 by David Halasz, OakTree Wireless

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Timeline

• No update, see 11/285 for details– Internal Task Group Ballot : July 2012

– Initial Letter Ballot : November 2012

– Initial Sponsor Ballot : November 2013

– EC Approval : September 2014

– Revcom Approval : November 2014

Adrian Stephens, Intel CorporationSlide 71from slide 5/5 of 11-11-1333r0 by David Halasz, OakTree Wireless

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 72

IEEE 802.11TGaiClosing Report

Date: 2011-09-22

Authors:

Name Company Address Phone email

Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN

+81-3-5719-7630 [email protected]

Marc Emmelmann Fraunhofer FOKUS

Fraunhofer FOKUSKaiserin-Augusta-Alle 3110589 BerlinGermany

+49-30-3463 7268

[email protected]

from slide 1/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report Adrian Stephens, Intel CorporationSlide 73

AbstractThis presentation is the closing report for the Okinawa

meeting of the IEEE 802.11 TGai.

from slide 2/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Plan for this weekOkinawa , Sep 2011

• Official time slot – Monday PM2, EVE (Tutorial)– Tuesday AM2, PM2– Wednesday AM1– Thursday AM1,PM2

• Goals for the Meeting:– Review and Approve the San Francisco and Teleconference meeting

minutes– Presentation of submissions

• Submission of Initial technical contributions• General submissions

– TIME line of task group– Plan for November conference

Adrian Stephens, Intel CorporationSlide 74from slide 3/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Accomplishments TGai 1/3• Reviewed and Approved the Singapore and Teleconference

meeting minutes

• Approved TGai evaluation methodology document– July 2011 San Francisco session minutes,

• 11/11-11-1097-00-00ai-july-2011-san-francisco-session-minutes.doc

– Aug to Sep Teleconference minutes• 11/11-11-1110-06-00ai-aug-sep-teleconference-minutes.doc

Adrian Stephens, Intel CorporationSlide 75from slide 4/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Accomplishments TGai 2/3• Technical contribution

– 11-11-0977r2 TGai Upper Layer Setup Proposal / Hitoshi Morioka (Root,.INc)  – 11-11-1167r0 Upper Layer Data IE / Hiroki Nakano (TNT)– 11/11-1108r1 Providing IP address config param to the STA during auth /Gabor Bajko

(Nokia)– 11-11/1047r3 Using Upper Layer Message IE in Tgai

/Ping Fang, Zhiming, Ding, Phillip Barber (Huawei)– 11-11-1169r0 FILS association / JH Lee (LG)

• General submissions– 11-11-1232/r1 Active-Scanning-Improvement.pptx

/ Marc Emmelmann (Fokus)– 11-11-1233/r1 Passive-Scanning-Improvements.pptx

/ Marc Emmelmann (Fokus)– 11-11-1015r2 Optimized Network Selection / Gabor Bajok (Nokia)– 11-11-1183/r0 IP over Congested WLAN / Masatak Ohta (Tokyo Institute of

Technology)• 11-11/1160/r2 Fast Re-authentication / George Cherian (Qualcomm Inc.)

– Security Topics / Robert Moskoviz (Verizon business)– 11/11-1014-02-00ai-ip-config-during-assoc-norm.docx / Gabor Bajko (Nokia)– 11-11-1306-00-00ai-security-discussions / Robert Moskowitz (Verizon business)– 11-11-1326-00-00a-Early Key Generation by ECDH and PKC /Hiroki Nakano (TNT)

Sep 2011

Adrian Stephens, Intel CorporationSlide 76from slide 5/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Accomplishments TGai 3/3

• Editors Report– 11-11/1278r0 Editors_Report /Tom Siep (CSR)

• Approved Weekly Teleconference schedule

• Approved Joint session with REG-SC in Atlanta

• Approved Time Line

• Approved Plan for November

Sep 2011

Adrian Stephens, Intel CorporationSlide 77from slide 6/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Monday Tutorial

• Standardization activities in Japan (15.4 & 11ai)

• Session 2 802.11ai (FILS) topics 19:30-21:30– 2a. 11ai over view (PAR, Scope and current status)

• Hiroshi Mano (Root,Inc.)

– 2b. Prospected Use case reference• 11-11/1154r Tom Siep (CSR)

– 2c. Basic technical ideas• Marc Emmelmann (Fokus)

– 2d. Security requirements to IEEE802.11ai• Paul Lambert (Marvel)

Sep 2011

Adrian Stephens, Intel CorporationSlide 78from slide 7/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Time line of TGai

PAR Approved, Modified, or Extended 2010-12-0

– Close of initial submissions for creating draft 0.1 Jan 12

– WG Letter Ballots Initial / Recirc May 12 / Sep 12

– Form Sponsor Ballot Pool / Reform Mar 13

– MEC Done Mar 3

– IEEE-SA Sponsor Ballots Initial / Recirc May13/ Sep 13

– Final 802.11 WG Approval Mar 14

– final or Conditional 802 EC Approval Mar 14

– RevCom & Standards Board Final or Continuous Process Approval May 14

– ANSI Approved N/A

Adrian Stephens, Intel CorporationSlide 79from slide 8/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Teleconference Schedule

• Motion: – Approve the following schedule of weekly teleconferences. – Tuesdays 10:00 EST (NY Time) continue from 4th Oct.– Duration 1Hour– Using WEB-EX that will be provided by Task Group Chair

• Moved: Tom Siep (CSR) , Seconded:Lee Armstrong (US DoT)

• Result: 10- 0 -4

Sep 2011

Adrian Stephens, Intel CorporationSlide 80from slide 9/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Plan for November

• Plan for November– Goal

• Approve minutes of Okinawa and teleconference.

• Submission of technical contribution

• General submission

• Time Line

• Plan for January

Sep 2011

Adrian Stephens, Intel CorporationSlide 81from slide 10/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Motion for joint session with REG SC in Atlanta

• Motion– Move the TGai Chair to request a joint session with IEEE 802.11 REG SC

in November to discuss regulatory issues involved in enabling active scanning in DFS bands in 5GHz.

• Moved: Marc Emmelmann

• Seconded: Lee Armstrong

• Yes: 12 No: 0 Abstain: 10

Sep 2011

Slide 82from slide 11/12 of 11-11-1339r0

Sept 2011

doc.: IEEE 802.11-11/1342r0

Report

Thanks to all who participated!

Adrian Stephens, Intel CorporationSlide 83from slide 12/12 of 11-11-1339r0 by Hiroshi Mano (Root Inc.)

Sept 2011