dock it customer intro 14 aug 09
DESCRIPTION
Are you looking for data center space? DockIT has the most economical soluiton.TRANSCRIPT
Your New Data Center
data stations + solutions
So, you finally decided to come out of the closet…
and get into a data center
If I told you how to SAVE
…would you be interested?
MONEY TIME ENERGY
36%-78%less on
your monthly
lease
get your data
center in weeksnot years
reduce electricity consumed
by
43%
1. MONEY savings
too smallretail / collocation
few racks
$300kW / month
too bigwholesale
10,000 sq.ft raised floor
$125kW / month
till now, you’ve had two choices
DockIT is just right
kW / month
mini-wholesale
DockIT is cost effective
• Traditional data center: 60% of the capital cost goes into:
generators, chillers and batteries
• DockIT infrastructure cost is17% with smaller containers
flywheel UPS + generatorelectrically powered chiller
2. TIME savingsYou purchase or lease:Data Center Container from
H-P VerariIBM SunDell RackableAPC AST
DockIT (or you) purchase or lease:
Back-Up Power Container: Active Power, or Others
Chiller Container from:Active Power, TAS or Others
DockIT saves time
• Vendors take 6 weeks to build, commission and ship containers.
• DockIT pre-builds data stationbuilding. Everything is ready for arrival of containers.
• Could take you 18-24 months to design and build your own building.
DockIT Data Station20 mini-wholesale data centers
electricity pre-wiredplenty of Internet providersroof over data center containerconcrete pad for support containersoffices
150 to 650 kW per container7 internet service providersconcrete tilt-slab buildingoverhead utility corridorsperimeter security
DockIT Data Station
Offices + Operations
Data CenterUPS + Generator
Chiller
designed & pre-built for containers
DockIT reduces risk•No real estate•No building design•No permitting•No construction•No delays•Plug and Play
3. ENERGY savings
big data centers:approx. 1.8 to 2.2
DockIT data centers:
1.25 or less
Power Usage Effectiveness (PUE) = total facility power
divided byIT equipment power
DockIT saves electricity
• Typical data centers work at 30% of the rated capacity--very inefficient
• DockIT generators and chillers are modular, match the load and run 75% of capacity--very efficient.
• Buy or lease just the capacity you need--no more waste.
FINAL THOUGHT
Your not going to buy just one data center.
Conventional Wisdom
“Put all of your eggs in one basket and then watch that basket.”
Andrew Carnegie
Current Wisdom
“Put copies of your eggs in many little baskets”
DockIT Network
Northern Virginia
New York Chicago
Silicon Valley
Los Angeles
Dallas
Data Center Biodiversity• Not everything needs to be Tier III
10%-15% high density + redundancy10%-15% medium density + redundancy70%-80% low density + little redundancy
• Mix and match Tier levels within a DockIT data station or between DockIT sites.
• DockIT has robust monitoringsystems and software.
• Dock IT is vendor neutral.
Contacts
Eliza I. Wojtaszek, CEOElectrical [email protected] 930-7733
Frank J. Piatkowski, COOArchitect & Developerfpiatkowski @yahoo.com202 330-9725
DockIT is ready now
• Gainesville,Virginia
• Ready for occupancy:6 containers
• Construction started: 20 containers
One more thing…
For server huggers, instead of containers,For server huggers, instead of containers,we can put regular racks in our data station.we can put regular racks in our data station.
Back-Up Slides
DockIT location
eGainesville
Virginia
Mini-wholesale data centerData Center Container• 1 to 20 racks• up to 1,200 blade servers• 175 to 625 kW= 4,000 sq.ft. of raised floor Generator + UPS• Match data center load• Tier I to Tier IVChiller Container• 120 tons of cooling--average• 67 degree water--closed loop
with data center container
Checklist for your data center• Power: 130-825 kW• Connectivity: 5 Internet providers• Building:
concrete walls: 7 ¼” thickoutdoor pad: 1,800 sq.ft. 50% coveredindoors: 900 sq.ft. offices air conditioned
• Security: perimeter access and alarms, each box has additional alarm system
• Fire Protection: sprinkled buildingeach box also has fire suppression system
• Permits: boxes are non-occupied equipment generator emissions