don espc program m&v briefing russell dominy, cem
TRANSCRIPT
![Page 1: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/1.jpg)
DoN ESPC PROGRAMM&V Briefing
Russell Dominy, CEM
![Page 2: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/2.jpg)
DoN ESPC Program• 42 Projects at 28 Navy &
Marine Corps installations worldwide
• Core ESPC Team - NFESC / NAVFACCO Port Hueneme
• Utilize specialized expertise on project specific basis
• Responsible for
– Marketing– Project development
and execution through award
– Energy program support
![Page 3: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/3.jpg)
DoN ESPC Program(Contracting Vehicles)
• DOE Regional and Technology Specific
• Army COE Huntsville 4-State and 46-State
• Air Force Regional
• DoN Stand-alone
![Page 4: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/4.jpg)
Navywide Alternative Financing Project
AwardsFY 1999 FY 2000 FY 2001 FY 2002
Number ofAwards
26 21 33 34
Annual Savings(MMBTU)
665,000 746,000 896,000 1,200,000
Total CapitalCosts
$79M $74 M $130 M $180 M
Total Life-CycleCost Savings
$256M $210 M $300 M $350 M
![Page 5: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/5.jpg)
DoN ESPC Program(M&V Strategy)
• Based on FEMP M&V
Guidelines
• Project specific M&V Plan
• ESCO develops, with facility
input
• Assumptions defined by
ESCO and agreed to by
Govt. throughout process
• Contractor assumes
performance risk
![Page 6: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/6.jpg)
DoN ESPC Program (M&V Process)
• General strategy discussed during Kick-off Meeting
• Baseline Measurement / Monitoring Strategy developed during Initial Proposal / Site Survey Phase
• Baseline Measurement Methodology agreed to prior to Final Proposal / Feasibility Study development
• M&V Plan fully developed during Feasibility Study / Detailed Energy Survey
![Page 7: DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM](https://reader033.vdocument.in/reader033/viewer/2022051401/56649e755503460f94b76034/html5/thumbnails/7.jpg)
DoN ESPC Program (Recent Developments)
• Navy IG Team
– Will EO energy reduction Goals be met
– Evaluate tools to Meet EO Goals
– Interested in actual vs. proposed savings
• Equipment Commissioning
– Establishing post installation baseline
– Impact on savings
– System performance
• Energy Manager Training
• Energy Project Execution Guide
– Defines process for both ESPC and UESC program
– Unified approach to alternative financing