doug neely, pe aashto technical subcommittee for movable

29
Chincoteague Bridge Replacement Doug Neely, PE AASHTO Technical Subcommittee for Movable Bridges May 16 th , 2011

Upload: others

Post on 06-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Chincoteague Bridge Replacement

Doug Neely, PE

AASHTO Technical Subcommittee for Movable Bridges

May 16th, 2011

Page 2: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Project Location

• Bridge on Rte 175 Over Black

Narrows and Lewis Creek Channel

• Accomack County and Town of

Chincoteague, Virginia

• 100 Miles from Norfolk

• Owner: VDOT

• Designer: Hardesty & Hanover

• Contractor: American Bridge

• Contractor Bid: $68.7 million

• CEI: Jacobs

Page 3: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Old Bridge Alignment

Old BlackNarrows Bridge

Old ChincoteagueSwing Bridge

Site Plan

Page 4: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Existing Site Conditions

Town of Chincoteague & Marsh Island

Old Chincoteague Bridge

Page 5: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Existing Soil Conditions

Page 6: Doug Neely, PE AASHTO Technical Subcommittee for Movable

C-3

C-4

C-5

C-2

Maddox

C

Alignment Study

Page 7: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Selected Bridge Alignment

Old ChincoteagueSwing Bridge

Old BlackNarrows Bridge

New SingleLeaf Bascule

New Rte 175 Bridge

New Marsh IslandConnector Bridge

Site Plan

Page 8: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Constructability Adjustment

Site Plan New SingleLeaf BasculeNew Rte 175 Bridge

New Marsh IslandConnector Bridge

Page 9: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Overview

• Fabricator: Steward Machine

• 92’-0” Span Length

• Closed Pit Pier

• 5” Half-Filled Grating*

• 1662 Kip Leaf

* With 1” overfill

Page 10: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Typical Section

Page 11: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Clearances

Span Closed

• 60’-0” navigable channel

• 15’-8” min. clearance

Page 12: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Clearances

Span Open

• 60’-0” navigable channel

• Unlimited vertical clearance

Page 13: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Fabrication

Page 14: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Fabrication

• Bascule span and towers shop

assembled

• Included permanent assembly

of trunnion

• Rack supports after trunnion

shaft and hub

Page 15: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Fabrication

Page 16: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Pier Deck Removed

Page 17: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Pier Stringers Removed

Page 18: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Removed

Page 19: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Pier Construction

Page 20: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Pier Construction

Page 21: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Pier Construction

Page 22: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Pier Construction

Page 23: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Operating Machinery

• Fabricator: Hardie-Tynes

• Reducers: Chicago Gear

• 26” Trunnion diameter

• Gear driven

• 3:40 operating cycle time

• 65mph max. sustained wind

Page 24: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Operating Machinery

• 10hp squirrel cage w/ chain drive

• Control of e drive at desk

• Manually install chain

• Two 75hp motors

• Primary: 122hp @ 870rpm

• Secondary: 224hp @ 150rpm

Page 25: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Electrical System

• Contractor: Dorey Electric Company

• Vendor: Link Control Systems

• Control System: Electromagnetic relays

• Interlocking control logic

Page 26: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Electrical System

• Service: 3 phase, 4 wire, 200 amp (min.) at

480 volts

• 150kW standby generator

• System A / System B

Page 27: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Complete

Page 28: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Bascule Span Complete

Page 29: Doug Neely, PE AASHTO Technical Subcommittee for Movable

Questions?

• Dedication Ceremony: October, 2010

• Winner: 2010 ACI Infrastructure Award