2017 Waste Management SymposiaMarch 5-9, 2017
Visit: Enercon at Booth 624
and ETEBA at Booth 321
Safety Presentation By: Erik Vogeley, Enercon
ORNL is managed by UT-Battelle for the US Department of Energy
ORNL Small Business Outreach
Randy Pickens
MPO Manager
January 26th, 2017
3 Presentation_name
What is MPO?
Planning
Design
Construction
• Strategic Planning• Facilities Data Integration and Metrics
• Engineering (Civil, Structural, Electrical, Mechanical)
• Architecture
• New Construction• Renovations• Demolition• Project Management
Internal Logo
4 Presentation_name
Oak Ridge National Laboratory Facts and Figures• ORNL is a small city:
– 354 Buildings and Trailers (354 roofs)– 5.3M square feet– 4,559 staff, including scientists and engineers
5 Presentation_name
Challenge the Status Quo
• Optimizing ORNL’s capital investment in facilities and infrastructure.– Challenge the status quo– Increased bid competition– Increased subcontractor
interest through larger project portfolio
6 Presentation_name
MPO/McCarthy Strategic Partnership
• McCarthy Design/Builder• McCarthy - A/E Design • 2 year contract with 3rd
year option• Total value $49M
7 Presentation_name
New Way of Doing Business
Old
New
• Same list of subcontractors• Had to be “in the know”• Two pre-qualified subcontractors
recently retired:•NRM•Tennessee Roofing
• Simplifying ways of doing business
• Outreach• Builders Exchange
8 Presentation_name
Sewage Treatment Plant
9 Presentation_name
Chemical and Materials Sciences Building
Gross Area (sqft): 155,712
10 Presentation_name
Carbon Fiber Technology FacilityGross Area (sqft): 42,000
11 Presentation_name
Chestnut Ridge MaintenanceGross Area (sqft): 24,000
12 Presentation_name
4500N Wing 3 RenovationGross Area (sqft): 20,200
13 Presentation_name
4508 Reroof
14 Presentation_name
Fiber Network Upgrade
15 Presentation_name
2,300 SF Building
• Elevated concrete dock
• Structural steel frame
• Brick and block masonry
• Standing seam metal roof
• Dock leveler and bumpers
Existing facility to be replaced
Gas Bottle Storage Facility
16 Presentation_name
Safety
General Safety Plan
Project Specific Safety Plan
MPO Safety SME: Dave Ausmus
17 Presentation_name
How can you help?
• Sign on to Construction Labor Agreement (CLA)
• Company Health and Safety Program
• Complete Pre-qualifications (http://web.ornl.gov/adm/contracts/eligible.shtml)
• Bid
18 Presentation_name
Key Personnel
• MPO Outreach Coordinator• [email protected]
James Payne
• MPO Manager• [email protected]
Randy Pickens
19 Presentation_name
Questions?