2017 waste management symposia march 5-9, 2017 visit ... · 7 presentation_name. new way of doing...

19
2017 Waste Management Symposia March 5 - 9, 2017 Visit: Enercon at Booth 624 and ETEBA at Booth 321 Safety Presentation By: Erik Vogeley, Enercon

Upload: others

Post on 07-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

2017 Waste Management SymposiaMarch 5-9, 2017

Visit: Enercon at Booth 624

and ETEBA at Booth 321

Safety Presentation By: Erik Vogeley, Enercon

Page 2: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

ORNL is managed by UT-Battelle for the US Department of Energy

ORNL Small Business Outreach

Randy Pickens

MPO Manager

January 26th, 2017

Page 3: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

3 Presentation_name

What is MPO?

Planning

Design

Construction

• Strategic Planning• Facilities Data Integration and Metrics

• Engineering (Civil, Structural, Electrical, Mechanical)

• Architecture

• New Construction• Renovations• Demolition• Project Management

Internal Logo

Page 4: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

4 Presentation_name

Oak Ridge National Laboratory Facts and Figures• ORNL is a small city:

– 354 Buildings and Trailers (354 roofs)– 5.3M square feet– 4,559 staff, including scientists and engineers

Page 5: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

5 Presentation_name

Challenge the Status Quo

• Optimizing ORNL’s capital investment in facilities and infrastructure.– Challenge the status quo– Increased bid competition– Increased subcontractor

interest through larger project portfolio

Page 6: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

6 Presentation_name

MPO/McCarthy Strategic Partnership

• McCarthy Design/Builder• McCarthy - A/E Design • 2 year contract with 3rd

year option• Total value $49M

Page 7: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

7 Presentation_name

New Way of Doing Business

Old

New

• Same list of subcontractors• Had to be “in the know”• Two pre-qualified subcontractors

recently retired:•NRM•Tennessee Roofing

• Simplifying ways of doing business

• Outreach• Builders Exchange

Page 8: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

8 Presentation_name

Sewage Treatment Plant

Page 9: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

9 Presentation_name

Chemical and Materials Sciences Building

Gross Area (sqft): 155,712

Page 10: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

10 Presentation_name

Carbon Fiber Technology FacilityGross Area (sqft): 42,000

Page 11: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

11 Presentation_name

Chestnut Ridge MaintenanceGross Area (sqft): 24,000

Page 12: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

12 Presentation_name

4500N Wing 3 RenovationGross Area (sqft): 20,200

Page 13: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

13 Presentation_name

4508 Reroof

Page 14: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

14 Presentation_name

Fiber Network Upgrade

Page 15: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

15 Presentation_name

2,300 SF Building

• Elevated concrete dock

• Structural steel frame

• Brick and block masonry

• Standing seam metal roof

• Dock leveler and bumpers

Existing facility to be replaced

Gas Bottle Storage Facility

Page 16: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

16 Presentation_name

Safety

General Safety Plan

Project Specific Safety Plan

MPO Safety SME: Dave Ausmus

Page 17: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

17 Presentation_name

How can you help?

• Sign on to Construction Labor Agreement (CLA)

• Company Health and Safety Program

• Complete Pre-qualifications (http://web.ornl.gov/adm/contracts/eligible.shtml)

• Bid

Page 18: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

18 Presentation_name

Key Personnel

• MPO Outreach Coordinator• [email protected]

James Payne

• MPO Manager• [email protected]

Randy Pickens

Page 19: 2017 Waste Management Symposia March 5-9, 2017 Visit ... · 7 Presentation_name. New Way of Doing Business. Old. New • Same list of subcontractors • Had to be “in the know”

19 Presentation_name

Questions?