Use of ACCO
Competence Center
April 2009
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 2/37
Agenda
1. High Level ACCO Overview
2. ACCO Usage Scenarios in ND RNP Projects
3. Using ACCO Greenfield
4. Using ACCO Optimisation
5. Summary & Examples
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 3/37
All Rights Reserved © Alcatel-Lucent 2008, 20093 | Use of ACCO | April 2009
High Level ACCO Overview
1
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 4/37
All Rights Reserved © Alcatel-Lucent 2008, 20094 | Use of ACCO | April 2009
High Level ACCO Overview
Fully integrated with A9155
Performs the tasks that are tedious & timeconsuming to perform
Site selection
Site placement
Antenna tilt & azimuth optimisation
Radio feature selection
Allows a large RNP to be performed in substantially less time with greaterconsistency and repeatability
Broken into two modules:
ACCO Greenfield
Primarily for site placement but also for site selection, tilt azimuth optimisationand radio features selection
– Doesn’t consider interference
ACCO Optimisation
Does everything except new site placement
Selected as the officialACP tool for Alcatel-
Lucent
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 5/37
All Rights Reserved © Alcatel-Lucent 2008, 20095 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
2
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 6/37
All Rights Reserved © Alcatel-Lucent 2008, 20096 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
Network Design Process
Radio Network Dimensioning
Required receive levels for different morphos (based on LKB analysis)
Site configuration for different morphos
No. Carriers, Max. Subs / Site, Radio Features, etc.
An indicative site count for the different morphos and areas
Next Step RNP study to confirm site count and locations
Radio N etwork
Optimisation
Radio N etwork Planning
(Or Cell Planning)
Radio N etwork Dime nsioning
(Or Cell Dimensioning)
PhasesInputs Outputs
Coverage
Requirements
Land Usage / Area
Traffic Requirements
Offered services
Service bit rate, traffic
Volume, subscriber density
QoS Requirements
BLER, Blocking, Coverage
Probabil ity, Indoor
Penetration…
Link Budget, Number
of sites, cell size
calculation
Node-B configuration
Feature scheduling
Performance Analysis
I n c r
e a s e d
A c c u r a c y
I n c r
e a s e d
A c c u r a c y
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 7/37All Rights Reserved © Alcatel-Lucent 2008, 20097 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
Network Design Process
Radio Network Planning
No site information known
Some or all site locations are known
Candidate site locations
Radio N etwork
Optimisation
Radio N etwork Planning
(Or Cell Planning)
Radio N etwork Dime nsioning
(Or Cell Dimensioning)
PhasesInputs Outputs
Coverage
Requirements
Land Usage / Area
Traffic Requirements
Offered services
Service bit rate, traffic
Volume, subscriber density
QoS Requirements
BLER, Blocking, Coverage
Probabi lity, Indoor
Penetration…
Link Budget, Number
of sites, cell size
calculation
Node-B configuration
Feature scheduling
Performance Analysis
I n c r e a s e d
A c c u r a c y
I n c r e a s e d
A c c u r a c y
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 8/37All Rights Reserved © Alcatel-Lucent 2008, 20098 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
1) No site information known – True Greenfield
Use ACCO Greenfield - the steps to follow are:
1. Fulfill pre-requisite inputs in A9155 for ACCO Greenfield
2. Optionally select vectors for dedicated highway coverage
3. For each clutter and vector:
Define the target RX Levels, associate one or more site templates
Optionally define a range of heights and if considering capacity constraints per site definetraffic densities
4. Optionally select a traffic map
5. Optionally define site template traffic limits and site template costs6. Run Greenfield Optimisation
Sites will be placed to meet the defined coverage and capacity requirements
7. Perform a sanity check in A9155 on the results
Check coverage is neither too aggressive or conservative (inline with dimensioning)
Due to the optimised ACCO Greenfield algorithms it is not possible to meet the coverageobjective 100%. If too conservative then reduce the “Site Density Slider” in ACCO Greenfield orif too aggressive, increase the “Site Density Slider” and return to step 6
Tweak any site locations that don’t make sense by manually adding/removing some sites orrepositioning them
9. The “True Greenfield” rollout is then complete
This method should be quite fast, as an indication for 500 sites (depending on the resolution &coverage size of course), it should take in the order of 30-45mins (to run the optimisation).
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 9/37
All Rights Reserved © Alcatel-Lucent 2008, 20099 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
2) Some or All Locations Known – Partial Greenfield
There are a number of types of deployment scenarios that fall into this category:
Where there are some site locations that are mandated for use by the customer
There may be an existing network for which coverage is being extended
The customer is densifying their existing network with new infill sites
The process is the same as the True Greenfield scenario
Exception: For Step 1 any existing sites that must be considered by ACCO Greenfield
should be active in A9155
ACCO Greenfield will first run predictions for the existing sites without optimising any of
their parameters (tilt, azimuth, height)
ACCO will then progressively place new sites to fill the gaps between the existing sites
This method will be faster than the True Greenfield scenario as many of the sitelocations will already be fixed
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 10/37
All Rights Reserved © Alcatel-Lucent 2008, 200910 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
3) Existing + Candidate Sites – Overlay
This scenario is more typical than the Partial Greenfield scenario
Some deployment scenarios that fall into this category include: An existing network (e.g. a 2G network) where one or more of their existing sites are
to be reused for an “overlay” network (e.g. a 3G network)
Customer asks ALU to recommend which sites to “overlay” and where new sites are required
The pool of existing sites may be from a site leasing company or from anotheroperator (tower sharing)
Customer asks ALU to recommend which sites to “overlay” and where new sites are required
The process is the same as that outlined above for the True Greenfield scenario
Exception: For Step 1
Any existing sites that must be considered by ACCO Greenfield must be active inA9155
Any candidate site location should be defined in A9155 as sites without transmitters
Exception: For Step 5 the input “Select Candidate Location if Performance >=” must beappropriately defined
Depends on the importance of using candidate sites as opposed to new sites
This method will be slightly slower than the True Greenfield scenario
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 11/37
All Rights Reserved © Alcatel-Lucent 2008, 200911 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
What About ACCO Optimisation?
With the functionality now provided with ACCO Greenfield there is no
requirement to also use ACCO Optimisation
After running any one of the three Greenfield usage scenarios there is always the
option to run ACCO Optimisation after finishing the Greenfield optimisation, this
can be beneficial when
Want to further optimise the site azimuths and tilts In particular if coverage quality is an important requirement
Need to ensure coverage requirements are achieved with more precision
Want to demonstrate to a customer the trade-off between number of sites and
achieved coverage There is a important requirement to maximise coverage quality, i.e. minimise
interference
Note that with ACCO Optimisation you can’t place new sites!
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 12/37
All Rights Reserved © Alcatel-Lucent 2008, 200912 | Use of ACCO | April 2009
ACCO Usage Scenarios in ND RNP Projects
Overall Recommendations
ACCO Greenfield is now very flexible – use Greenfield to both place new sites as
well as select amongst candidate sites
Don’t have to run ACCO Optimisation
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 13/37
All Rights Reserved © Alcatel-Lucent 2008, 200913 | Use of ACCO | April 2009
Using ACCO Greenfield
3
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 14/37
All Rights Reserved © Alcatel-Lucent 2008, 200914 | Use of ACCO | April 2009
ACCO Greenfield
Pre-requisites in A9155
The A9155 RNP project must be setup for running predictions:
Clutter and DTM databases configured
Clutter specific parameters defined, i.e. indoor losses, std dev, etc
Propagation model configured
Transmitter and cell parameters properly defined
ACCO can consider the placement of one or more different site templates fordifferent clutters and/or vectors
Site templates must be defined in A9155
Computation zone defined
The target receive levels for the different morphologies of interest
Optional: Existing sites should be activeOptional: Candidate sites should have their transmitters deleted
Optional: Vectors for which highway coverage is to be provided
Optional: A traffic map to define the subscriber distribution
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 15/37
All Rights Reserved © Alcatel-Lucent 2008, 200915 | Use of ACCO | April 2009
ACCO Greenfield
Launching ACCO Greenfield
Create
Optimization
Environment
Load
Optimization
Results
Run ACCO
Optimization
Run ACCO
Greenfield
Create
Measurement
Environment
Always used Advanced Mode!
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 16/37
All Rights Reserved © Alcatel-Lucent 2008, 200916 | Use of ACCO | April 2009
ACCO Greenfield
ACCO “Advanced Greenfield” Configuration Window
Rx level = CPICH Tx Power + Antenna Gain - Feeder losses – MAPL (MAPL accounts for body loss, interference margin,penetration margin and shadowing margin)
Template: 1 or more per morpho (nonemeans no sites)
Optional Heights: Space delimited, will uselargest unless capacity limited
Optional Add Vectors: For highwaycoverage.
Optional Edit Templates: Can edit A9155site templates directly from here.
Optional Traffic Density: used to define atraffic density per clutter type if no trafficdensity map has been specified.
Optional Traffic Map: Bil format traffic map
Site Density Slider: Controls the aggressiveness of the site placement, a lower setting results in less sites and a highersetting results in more sites. One of the drawbacks of ACCO Greenfield’s highly optimised coverage computation algorithmsis that the tool does not calculate the coverage levels at all pixels during the optimisation.
Optional Sites in Corridor Along Vector:Gives greater flexibility on where to placesites
Optional Minimum captured traffic persite: Sites placed only when justified bysufficient traffic, i.e. where the returnjustifies the investment
Allowed gap length: allows to adjust thesize of coverage gaps that are allowedduring placement.
N
E
W
F
E
A
T
U
R
E
S
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 17/37
All Rights Reserved © Alcatel-Lucent 2008, 200917 | Use of ACCO | April 2009
ACCO Greenfield
ACCO “Advanced Greenfield” Configuration Window - site density slider
The site density can be varied, relative to the defined
thresholds. For example:
If the coverage probability is easily reached, less sites may
be sufficient. Thus, the user can reduce the thresholds by
“1” (which equals -1dB in the required coverage) and
rerun the deployment. Instead of a coverage of e.g. -
80dBm, a value of -80dBm -1 -81dBm will be targeted
and hence less sites needed
If a slightly higher coverage probability is needed, the
slider has to be put towards the right hand side. Instead
of -80dBm, e.g. -78dBm may be targeted and hence more
sites are proposed
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 18/37
All Rights Reserved © Alcatel-Lucent 2008, 200918 | Use of ACCO | April 2009
ACCO Greenfield
ACCO “Advanced Greenfield” Configuration Window
Optional Traffic Limit = This allows the maximum traffic per site template to be defined (only relevant if you havespecified a traffic density or have specified a traffic map. If this limit is exceeded the cell range will be reduced)
Optional Cost = Used to find most cost effective solution (only relevant when you have more than 1 site template selected
per clutter or vector)
Optional Applicable for: Controls when a sitetemplate can be used:
All Sites / New Sites / Candidate Sites / None
Select Candidate Location if performance>=: This parameter allows to prefercandidate locations over new site locations.It is similar to a cost reduction of candidatesites compared to new sites.
On the example, if a candidate site providesat least 25% of a new site’s coverage, it willbe selected.
Optional Allow candidates only: If checked,no new sites will be created, only candidatesites will be used.
Optional Consider sites without
transmitters as candidates: sites withouttransmitters in A9155 will be considered ascandidate locations. Azimuth and tilt will beoptimized.
Optional Consider sites with only inactivetransmitters as candidates: sites where onlyinactive transmitters are assigned will beconsidered as candidates. No furtherparameter optimizations will be done.
NEW
FE
ATURES
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 19/37
All Rights Reserved © Alcatel-Lucent 2008, 200919 | Use of ACCO | April 2009
Using ACCO Optimisation
4
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 20/37
All Rights Reserved © Alcatel-Lucent 2008, 200920 | Use of ACCO | April 2009
ACCO Optimisation
Pre-requisites in A9155
The A9155 RNP project must be setup for running predictions:
Clutter and DTM databases configured
Clutter specific parameters defined, i.e. indoor losses, std dev, etc
Propagation model configured
Transmitter and cell parameters properly defined
Computation zone defined
All sites must be fully configured and active in A9155
Candidate sites to be considered by ACCO Optimisation must be fully configured but
inactive in A9155 (unlike Greenfield they should not have their transmitters deleted)
Inactive sites will be considered with the site activation optimisation feature
Optional: A traffic map to define the subscriber distribution
This is used in ACCO Optimisation when you wish to place greater emphasis on the
network performance in locations with higher traffic
Optional: Define additional TMAs for advanced technology activation
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 21/37
All Rights Reserved © Alcatel-Lucent 2008, 200921 | Use of ACCO | April 2009
ACCO Optimisation
Launching ACCO Optimisation
Create
Optimization
Environment
Load
Optimization
Results
Run ACCO
Optimization
Run ACCO
Greenfield
Create
Measurement
Environment
Key input that is critical for a typicalpre-sales ND project is the optimisationresolution which here is set to 100m
It is recommended to only use <100m ifthe project needs to be very precise
Results achievable with a 100mresolution are more than sufficient interms of accuracy for pre-sales needs
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 22/37
All Rights Reserved © Alcatel-Lucent 2008, 200922 | Use of ACCO | April 2009
ACCO Optimisation
Configuration Windows
Project Specifications
Select “Load network data”
Optional: Select a traffic map
Network Settings
Select the network of interest(usually there will only be one
anyway, selected by default)
Optional: Configure traffic map
settings (the traffic map if
selected in the project windowwill be selected by default
anyway)
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 23/37
All Rights Reserved © Alcatel-Lucent 2008, 200923 | Use of ACCO | April 2009
ACCO Optimisation
Optimisation Ranges
Select all of the Sectors in the left hand panel
If there is flexibility to adjust both tilt and
azimuth then select both
The default optimisation ranges are ok but
aggressive
It is not recommended to select “Pilot Power”
as an optimisation parameter
Optional: If some sites were inactive in the A9155project then you have the option of enabling
“Allow activation”. ACCO will select the optimum
site to activate.
Ignore: Do not worry about cost inputs – this is
much more for operator focused operational
needs.
Optional: Selecting the option “Allow TMA Modification” allows for the consideration of Advanced Technology Activation forthe handling of different radio features
This requires the definition of different “TMAs” in A9155 with appropriate Noise Figures, Reception Gains andTransmission Losses (the gains and losses can be positive or negative depending on the radio feature)
For example, a high power amplifier might be defined as a TMA a Noise Figure = 0dB, Reception Gain = 0dB andTransmission Loss = -3dB
Optional: Selecting “custom pattern list” allows modifications of the actual antenna pattern. Next to the checkbox 9155
ACCO displays the number of selected antenna pattern that are allowed for exchange during optimization. All antennapatterns in a 9155 project can be used.
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 24/37
All Rights Reserved © Alcatel-Lucent 2008, 200924 | Use of ACCO | April 2009
ACCO Optimisation
Optimisation Targets
To add optimisation targets:
In the UMTS example shown the recommended combination to consider is one coverage target based on Pilot RSCP and onequality target based on Pilot Ec/Io
For each optimisation target the following can be defined
A fixed target level for all morphologies or on a per clutter basis. It is recommended to specify these on a per clutter basis
The relative importance of achieving the optimisation target can be weighted by the clutter type and also by a traffic map(if selected earlier)
For Ec/Io, it is necessary to define the terminal, mobility and service. The terminal influences the body loss and themaximum transmit power, and the service influences the data rate and the maximum service power.
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 25/37
All Rights Reserved © Alcatel-Lucent 2008, 200925 | Use of ACCO | April 2009
ACCO Optimisation
Optimisation Targets – focus on clutter weights
9155 ACCO can combine and weight different optimization targets jointly
By applying a weight higher than zero the target is considered Global and clutter defined optimization requirements can be considered. In that case, the
global weight is the overall multiplier for the clutter weights.
Example:
Clutter A = 1Clutter B = 5
Clutter C = 1
Clutter D = 0.5
With the enabled clutter dependentweighting we can see that the areadescribed by Clutter B is 5-times moreimportant than Clutter A and Clutter Cand 10-times more important thanClutter D.
Practically, this means that an
additional 1km2 in coverage in Clutter Bis 5-times the value as an additional1km2 in coverage in Clutter A and C ,and 10-times the value than in ClutterD.
RECOMMENDED
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 26/37
All Rights Reserved © Alcatel-Lucent 2008, 200926 | Use of ACCO | April 2009
ACCO Optimisation
Optimisation Targets – focus on traffic weights
You can apply traffic limits to each of the cells, and to weight the target by a traffic map.
Balance footprints: If the option is active, the optimization algorithms will generate a
compromise between the largest possible target objective and balanced footprints.
"Balanced" in this case means that neighboring footprints should have similar size (if notraffic density map is used) or similar traffic utilization (i.e. captured traffic / maximum
captured traffic if a density map is used).
Relative weight: Determines the weight of the footprint balancing target function in
relation to the "parent" target function. The absolute weight is the parent target function's
weight multiplied by the relative weight.
OPTIONAL
Apply traffic map: This option can only be enabled if a
global traffic density map has been defined. Trafficdensity weighting allows you to focus on the areaswhere the highest traffic occurs. High-traffic areas willbe more important, areas carrying less traffic will beless important during the optimization process.
Apply captured traffic limit: Allows the consideration of
maximum traffic limits for each sector in the network.This option can only be enabled if a global trafficdensity map has been defined. The traffic limits persector are defined in the Network settings tab sheet.
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 27/37
All Rights Reserved © Alcatel-Lucent 2008, 200927 | Use of ACCO | April 2009
ACCO Optimisation
Optimisation Options
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 28/37
All Rights Reserved © Alcatel-Lucent 2008, 200928 | Use of ACCO | April 2009
ACCO Optimisation
Optimisation Run Options
Set the optimisation mode to FAST
As the benefits from a moreaccurate optimisation will not be
perceivable.
Set the simulation resolution. Here the
minimum resolution you can use is the
resolution at which you created the
optimisation environment. It is recommended to only use
<100m if the project needs to be
very precise
The results achievable with a 100m
resolution are more than sufficient
in terms of accuracy for pre-salesneeds.
Start the optimisation and wait ……
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 29/37
All Rights Reserved © Alcatel-Lucent 2008, 200929 | Use of ACCO | April 2009
ACCO Optimisation
Verification of the optimization results in A9155
To verify the optimization results in A9155 the optimized configuration must
be loaded in A9155
The results can be loaded into the currently open .ATL project
By default a new project file with the same name as the result file will be
generated
CCO O
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 30/37
All Rights Reserved © Alcatel-Lucent 2008, 200930 | Use of ACCO | April 2009
ACCO Optimisation
Verification of the optimization results in A9155: Inspector
The Inspector is an efficient
visualization tool to quickly
identify the differences
between before and after
the optimization
You can access it by clickingon “visualize results” when
the optimisation is finished
The visualization includes:
• Parameters
• Predictions
ACCO O i i i
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 31/37
All Rights Reserved © Alcatel-Lucent 2008, 200931 | Use of ACCO | April 2009
ACCO Optimisation
Inspector: Visualization of parameter changes
The 9155 ACCO Inspector is to be used as complementary functionality to the
visualization in A9155 Parameter changes can be displayed easily for all relevant RF parameters
ACCO O ti i ti
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 32/37
All Rights Reserved © Alcatel-Lucent 2008, 200932 | Use of ACCO | April 2009
ACCO Optimisation
Inspector: Visualization of prediction plots
The 9155 ACCO Inspector helpsto display and localize parameter
modifications very efficiently
Very fast comparison of the
network configuration before
and after the optimization
Very fast processing of prediction
plots
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 33/37
All Rights Reserved © Alcatel-Lucent 2008, 200933 | Use of ACCO | April 2009
Summary & Examples
5
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 34/37
All Rights Reserved © Alcatel-Lucent 2008, 200934 | Use of ACCO | April 2009
Summary
Should be endeavoring to use ACCO for all RNP projects
There will always be some projects where it doesn’t make sense, e.g. very
small scale projects, etc
If you need support on whether ACCO makes sense for your RNP don’t hesitate
to contact the ND Competence Centre
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 35/37
All Rights Reserved © Alcatel-Lucent 2008, 200935 | Use of ACCO | April 2009
More than 83% of the uncovered areas eliminated with tilt
(electrical/mechanical) and azimuth changes.
A9155 A9155
Example: Better coverage, Ec/Io and capacity in A9155
A9155 ACCO
8/11/2019 2.9_Use of ACCO - Released
http://slidepdf.com/reader/full/29use-of-acco-released 36/37
All Rights Reserved © Alcatel-Lucent 2008, 200936 | Use of ACCO | April 2009
More than 47% of areas with insufficient Ec/Io removed
Potential served traffic increased by more than 6%
A9155 A9155
Example: Better coverage, Ec/Io and capacity in A9155