Transcript
Page 1: 2nd Qatar BIM User Day  Design Technology

1Alan Lamont, Bentley Systems

Technology is the key to success

Design

Page 2: 2nd Qatar BIM User Day  Design Technology

2

Subjects

• Advantages of using 3D in design vs 2D

• Effect of BIM technology on design culture

• Design collaboration

• BIM technologies: evolutionary or revolutionary

Page 3: 2nd Qatar BIM User Day  Design Technology

3

We have been doing this for 1000 years or more

We have had the ability to work with BIM for nearly 28 yrs

Page 4: 2nd Qatar BIM User Day  Design Technology

4

3D vs 2D design• A designer is capable of imagining the design in it‘s

entirity and this requires thinking of a design in it‘s spacial context.

Page 5: 2nd Qatar BIM User Day  Design Technology

5

Page 6: 2nd Qatar BIM User Day  Design Technology

6

• 2D drawings represent what the author „believes“ they understood from the design specification

3D model

Page 7: 2nd Qatar BIM User Day  Design Technology

7

• The guy on site then builds their interpretation of what they saw in the drawing.....

Page 8: 2nd Qatar BIM User Day  Design Technology

8

Page 9: 2nd Qatar BIM User Day  Design Technology

9

Clash Detection (within AECOsim Building Designer):

Page 10: 2nd Qatar BIM User Day  Design Technology

10

Clash detection (in the field):

Page 11: 2nd Qatar BIM User Day  Design Technology

11

Tools of the trade

• Sketching

• Design „exploration“

• Design intent

• Analysis (Structural, Energy etc)

• Design detailing

• Quantities

• Construction detailing

• Manufacturing

Page 12: 2nd Qatar BIM User Day  Design Technology

12

Zah

a H

adid

Fost

er

Ge

hry

KP

F

Page 13: 2nd Qatar BIM User Day  Design Technology

13

Page 14: 2nd Qatar BIM User Day  Design Technology

14

Sketch Design

Final Building

Page 15: 2nd Qatar BIM User Day  Design Technology

15

Complex designs require multiple products

Page 16: 2nd Qatar BIM User Day  Design Technology

16

How has this affected the design culture?

Page 17: 2nd Qatar BIM User Day  Design Technology

17

Design iterationsSketch design Construction/ManufacturingHandover to „BIM“

<Fuzzy DetailedSupporting a workflow

Page 18: 2nd Qatar BIM User Day  Design Technology

18

Design iterationsSketch design Construction/ManufacturingHandover to „BIM“

<Fuzzy DetailedSupporting a workflow

Page 19: 2nd Qatar BIM User Day  Design Technology

19Foster & Partners

Page 20: 2nd Qatar BIM User Day  Design Technology

20Generative design with Bentley Generative Components

Page 21: 2nd Qatar BIM User Day  Design Technology

21

Thematic Visualization

Page 22: 2nd Qatar BIM User Day  Design Technology

22

Page 23: 2nd Qatar BIM User Day  Design Technology

23

Page 24: 2nd Qatar BIM User Day  Design Technology

2424 | WWW.BENTLEY.COM

Cox Architect & Arup

Square Stadium, Melbourne

Page 25: 2nd Qatar BIM User Day  Design Technology

2525 | WWW.BENTLEY.COM

Cox Architect & Arup

Square Stadium, Melbourne

Page 26: 2nd Qatar BIM User Day  Design Technology

26

HOK & Buro Happold

Langdowne Road Stadium, Dublin

Page 27: 2nd Qatar BIM User Day  Design Technology

27

Page 28: 2nd Qatar BIM User Day  Design Technology

28

Page 29: 2nd Qatar BIM User Day  Design Technology

29

ArtScience Museum

Innovation in Generative Design

Singapore

Arup

Page 30: 2nd Qatar BIM User Day  Design Technology

30

Arup – Art Science Museum

Page 31: 2nd Qatar BIM User Day  Design Technology

31

What about operations?

Page 32: 2nd Qatar BIM User Day  Design Technology

32

Thank you


Top Related