Transcript
Page 1: 70 Trinity St - LJF 002-FF GArobertgamlenhomes.co.uk/.../70-trinity-st-first-floor-layout.pdf · Breathable membrane to be fixed over rafters with 25 x 38mm treated softwood tile

SVP 02

BATHROOM

SVP 3

SVP 4

SVP 06

BATHROOM

SV

P 12

SVP 10

SVP 1

SVP 14

SVP 07

SVP 08

SVP 09

SVP 11

SVP 13

SVP 15

BATHROOM

BATHROOM

BATHROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM 1

BEDROOM

LIVING / KITCHEN

LIVING / KITCHEN

LIVING / KITCHEN

LIVING / KITCHEN

CORRIDOR

W/M

F/F

W/M

F/F

BEDROOM 2

BATHROOM

LIVING / KITCHEN

W/M

F/F

BEDROOM 2

SVP 17

BEDROOM 1

BEDROOM 1

LIVING / KITCHEN

F/F

W/M

W/M

F/F

LIVING / KITCHEN

F/FW/M

F/F

W/

M

C/BD

C/BD

C/BD

C/BD

C/BD

C/BD

C/BD

CORRIDOR

F/F

W/M

Service riser

10

16

13

24

58

911

12

13

14

17

15

76

10 16

13 245

8

9 11 12 13 14 1715

7 6

ensure flush

finish between

wall types

First Floor Plan

87

76

20

28

11

35

89

01

13

58

90

11

35

15

63

2012113520131802113531401135156511353590113518022014180111351339113515738901135201591020151135890

66

31

13

5

33

7

13

40

11

35

13

40

67

51

34

01

13

51

34

04

50

11

36

75

22

54

91

13

55

65

25

75

1

1

4

2

1

3

6

0

1

1

4

0

2575 2025 1585 1790

16

77

28

62

11

35

11

27

42

33

59

21

58

57

70

91

0

564

1360 565

20

41

1004 1135 1115 1135 772 793 1585 739 1364 910 1364 675 1585 675 1254 1135 1254 734 1586 783 778 1139 1115 1135 1000

26760

11

03

3

5400

15

26

26

82

4

43398

4498663

663

W/R

15

85

90

1

1136 2014

BATHROOM

BEDROOM 1

BEDROOM 2

BATHROOM

LIVING / KITCHEN

APART 8

APART 9

APART 10

APART 13

APART 14

APART 15

APART 12

APART 11

4 x 112.5 R

3 x 250 G

1A *

9A *

9E

9B **9C *

9D

8A *

8B **

8C **

8D

10A *

10B **

10C **

10D

11B **

11C **

11D

12A *

12B **

12C **

12D

14B **

14C **

14D

14E

15B **

15C **

15D

15E **

15F

WF

O2

WFO3 WFO4

WF

O5

WFO6

WFO7

WF08

WF09

WF

10

WF

11

WF13

WF16

WF17

WF18

WF19

WF20

WF21

WF22

WF23

WF

24

WF

25

WF

26

WF

27

WF

28

WF29

WF

31

W

F

3

0

WF

32

WF

33

WF

34

WF

35

WFO1

WF

12

WF14

WF

15

WF

36

D12 *

D11 *

11E **

11F

11G

14H

11A *

12A *

12D

12B **

12C **

12E

12E **

12F

D14 *

D13 *

14A *

15A *

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP RWP

RWP

RWP

RWP

RWP

RWP

A

G

A

J

D

E

E

K

F

H

K

G

F

RWP

D

J

H

7736

13136

5161 3117 3639 2935 3643 3103 5163

SVP 07

70.00 External Wall Construction70.1 Cavity walls: See Specification of Materials for full details of each wall type

GenerallyCavity wall ties spaced at no more than 440mm horizontal intervals and 750mm vertically. Atopenings place ties at 225mm away from edge and at no more than 300mm horizontally.Continuous DPC is to be a minimum of 150mm above ground level.Timber / MDF skirting to clients specification.

70.2 DPCs:Horizontal - continuous lengths on full even bed of fresh mortar, 100mm laps at joints and fulllaps at angles. Full Even bed of mortar to receive next masonry course. Joints with DPMs to becontinuous and effectively sealed.Vertical - form in one piece where possible. Joints to have 100mm upper part overlappinglower.Jambs - Full underlap joints with cavity trays/lintel at head. Full overlap joints withsill/horizontal DPC at base. Project into cavity 25mm.

70.3 Lintels: To be specified by Structural EngineerAll external lintels to be insulated with min 150mm minimum bearing at each end.Cavity trays and weep holes @ 450 centres are to be installed over all lintels unless otherwisespecified.

70.4 Wall plate:150x50mm treated softwoodAlign and position to give correct span and level for trusses, rafters and joists. Where joints areunavoidable use nailed half lap joints. Wall plates to be fully bedded on fresh mortar to correcthorizontal level.

80.00 Windows80.1 General u-PVC windows:

Standard: Manufactured to BS 7412 from extruded profiles.Manufacturer: Registered under a quality assurance scheme operated by a certification andinspection body accredited by the United Kingdom Accreditation Service (UKAS).New u-PVC windows installed to British Plastics Federation 'Code of practice for the installationof u-PVC windows and door sets in new domestic dwellings'To give minimum 1.60W/m²K U-value.

90.00 Doors90.1 External & Apartment Entrance:

New u-PVC units with a minimum 1.60W/m²K U-value. See drawings for opening details.Sills to extend beyond external leaf of walls by minimum 40mm with a drip groove. Levelaccess sills to meet Part M standardsAll doors to include ironmongery, lever handle and multipoint locks to comply with BS 4787. Tobe approved before order.

90.2 Internal:Non fire rated doors - Painted, 35mm thick flush doors sets to client specification, withsoftwood timber linings, 2no hinges, architrave, lever handle to comply with BS 4787.30 min Fire rated doors - Painted, min 44mm thick solid core flush door sets to clientsspecification, with intumescent strips and smoke seals, where indicated on drawings, with selfcloses. 3no hinges, architrave & lever handles to comply with BS 4787

100.00 Internal Partitions100.1 See Schedule of Materials for details of different wall types

Timber / MDF skirting to clients specification.

110.00 Roof Construction Refer to drawings for information regarding pitch.110.1 Cut roof Sections

100 x 50 wall plate. Pitched at 45°/48°/50° using treated softwood CLS timbers (refer toStructural Engineers details for size & strength class) min 175mm deepRafters & joists are to be set at 400mm c/c.At Skeiling ceilings - 150 mm Celotex FR5000 Insulation friction fitted between rafters, ensure amin 25mm unventalated air gap between insulation boards and top of rafters.At flat ceiling level - 270mm mineral wool insulation both between and over ceiling joists.

Breathable membrane to be fixed over rafters with 25 x 38mm treated softwood tile battenand either clay tiles or natural slate roof tiles. (Both to be to clients specification)Internally in all habitable areas fix 12.5mm plasterboard and with thistle skim finish.Roof strapped to wall plate at ceiling level with 30x2.5mm lateral restraint straps at 2m c/c.Above to achieve a u-value of 0.2w/m²k at skeiling ceilings

120.00 SERVICES

SCHEDULE OF MATERIALS

Wall type 1 - External brickwork walls

102.5mm Brickwork to local authority approval with 140mm

cavity, inc 90mm of Kingspan Kooltherm K8 insulation &

140mm Hemelite solid 7.3N/mm² blockwork internal leaf.

All to achieve a U-value of 0.2W/m²K

Internally apply 15mm soundbloc board (sound bloc MR in wet

areas) on dabs with skim coat and paint finish

Wall type 2 - External Cedar Cladding walls

100mm blockwork with 22mm thick T&G Cedar boarding on 25 x

38mm treated softwood battens and felt to local authority approval

with 140mm cavity, inc 90mm of Kingspan Kooltherm K8 insulation

& 140mm Hemelite solid 7.3N/mm² blockwork internal leaf

All to achieve a U-value of 0.2W/m²K

Internally apply 15mm soundbloc board (sound bloc MR in wet

areas) on dabs with skim coat and paint finish

Wall type 2 - External Rendered walls

100mm blockwork with 15mm painted render to local authority

approval with 140mm cavity, inc 90mm of Kingspan Kooltherm

K8 insulation & 140mm Hemelite solid 7.3N/mm² blockwork

internal leaf.

All to achieve a U-value of 0.2W/m²K

Internally apply 15mm soundbloc board (sound bloc MR in wet

areas) on dabs with skim coat and paint finish

EXTERNAL WALLS:

INTERNAL WALLS:

Wall type 4 - Party walls (between flat)

2 Skins of 100mm blockwork (density 1350 - 1600kg/m³) with

an 80mm cavity.

Internally apply 8mm (min) render sound coat with15mm

soundbloc board (sound bloc MR in wet areas) on dabs with

skim coat and paint finish

Wall type 6 - Party walls (between flat and common areas)

2 Skins of 100mm blockwork (density 1350 - 1600kg/m³) with

an 80mm cavity with 40mm Kingspan K8 insulation board.

Internally apply 8mm (min) render sound coat with15mm

soundbloc board (sound bloc MR in wet areas) on dabs with

skim coat and paint finish.

In bin & bike stores omit plasterboard and use fair-faced

blockwork with a paint finish

All to achieve a U-value of 0.2W/m²K

Wall type 5 - Party walls on second floor

2 Skins of 70mm steel 'C' studs each with 2 layers of gypsum

based wall board totaling 22kg/m² to outside face wall.

Inner face of boards to be a min 200mm apart

1 layer of 60mm unfaced Rockwool insulation batts (density

33-60kg/m²) between stud partitions

Walls between flats and common areas to achieve U-value of

0.2W/m²K

Wall type 5 - Internal partitions

70mm metal 'C' studs @ 600mm centres with 15mm sound

bloc fixed to both faces (use moisture resistant board in wet

areas)

Between bathrooms and bedrooms / living areas include

50mm acoustic insulation batts

Wall type 6 - Internal load bearing walls

140mm blockwork (density 1350 - 1600kg/m³) with

independent wall linings to both sides of 15mm sound bloc and

50mm acoustic insulation.

FFL 18.700

5A *

5B **

5D

Finished Floor Levels

Apartment Entrance doors

FD30 Solid Core doors giving 30min fire resistants - fitted with

intumescent strips, smoke seals & door closer

Internal doors

FD30 Solid Core doors giving 30min fire resistants

Internal doors

Non fire rated standard internal door to match others

NOTE:

Number relates to apartment number

D4 *

Other doors

FD30 Solid Core doors giving 30min fire resistants - fitted with

intumescent strips, smoke seals & door closer

External Windows & Doors (excluding bin & cycle store)

All external doors and windows are to be uPVC double glazed

units to give a U-value of 1.6W/m²K

Bin & Cycle Store Doors

Painted hardwood doors

WG14

70 Trinity Street, Fareham

Proposed Development of Flats

First Floor GA

For: Robert Gamlen Homes

LJF CARPENTRY & DESIGN LTD

Site

Project

Drawingtitle

Client

Scale 1:50 @ A0 Rev C 1

DrawingNumber

17/001/002 Initials JVF

Rev: Description: Date: Initials:

COPYRIGHT © RESERVED 2017 LJF CARPENTRY & DESIGN LTD

This drawing is the property of LJF Carpentry & Design Ltd and must not be

reproduced without prior consent.

Figured dimensions to be used only ~ do not scale from drawing

Contractor to confirm all dimensions on site prior to works commencing

C 1 Issued for construction 21.08.2017 JVF

For further information such as wall types & floor

construction refer to LJF C&D additional plans,

elevations and sections