Download - 738 Method statement - cavity drain
METHOD STATEMENT Cavity drain system to vault
165 Barnsbury Road N1 0EP
October 2017
CONTENTS
1.0 Introduction
2.0 Specification of the cavity drain system
3.0 Installation method
4.0 Delta-PT LATH brochure/data sheets
5.0 Delta KOSTER NB1 brochure/data sheets
METHOD STATEMENT Cavity drain system to vault
165 Barnsbury Road, N1 0EP October 2017
1.0 Introduction This documents accompanies an application for approval of details reserved by conditions 3, 4 and 5 related to Listed Building Consent ref. P2017/1863/LBC, submitted to the Local Authority, and it should be read in conjunction with attached drawings 738.270-277. 2.0 Specification of the cavity drain system The existing vault is to be fully waterproofed with a cavity drain system supplied and installed by Delta Membrane Systems Ltd. The following products are proposed: Walls: 8mm Delta-PT LATH studded polyethylene membrane Floor: Delta KOSTER NB1 cementitious waterproofing slurry 3.0 Installation method Waterproofing layers: Delta-PT LATH sheets to be installed vertically to walls and to underside of vaulted ceiling, fixed to existing concrete walls/ceiling with Delta-PT fixing plugs at 250mm vertical and horizontal centres (see brochure below for details). Overlapped joints to be facilitated with a non-meshed section. Delta drainage channel to be fitted to the perimeter of all rooms, i.e. at floor-to-wall junctions, to collect surface water from the wall cavity. The channel is to be fixed in place by a concrete or blockwork upstand (refer to drawing 738.277 for details). The water from the channel is to be discharged to the existing inspection chamber in the vault, via Delta Kessel Staufix Backwater non-return valve, to reduce the risk of foul water backing up into the cavity drain system. The floor of the vault is to be waterproofed with Delta KOSTER NB1 cementitious slurry, a thin coating applied directly onto the existing concrete floor. Finishes: Walls are to be finished with gypsum plaster applied in two coats: 1st coat of 6mm pushed into dimples of the Delta-PT LATH membrane, and 2nd coat of 9mm. Floor to be finished with 50mm cement screed on top of Delta KOSTER NB1 cementitious waterproofing slurry, then boarded up with either plywood or chipboard.
METHOD STATEMENT Cavity drain system to vault
165 Barnsbury Road, N1 0EP October 2017
4.0 Delta-PT LATH brochure/data sheets
DELTA DELTA 02/06
DELTA®-PT DELTA®-LATH
Insulates and isolates damp and contaminated walls, vaults, and basements.The Guaranteed Solution.
The The ‘Original’‘Original’WWaterpraterproof Membroof Membrane Systemane System
DELTA®-PT insulates dampstructural surfaces and alsoprovides a bonding base forgypsum plaster, lime plasterrender and reinforcedshotcrete wall finishes.
The ProblemOld buildings often have dampness inwalls and other inside surfaces due toinadequate or defective waterproofing.Rewaterproofing of an existingfoundation wall is usually expensive - orimpossible when outside access is limitedby neighbouring structures. The damagemust therefore be repaired from theinside: by installing a new masonry shellcovering the damp inner surface.However, this is not a cure-all as the newshell too will soon become humid bycontinuing dampness migration from thestructure - and takes up considerablespace within the structure.
The Solution
DELTA®-PT – the watertight dimpledsheet with an integrated mesh beddingfor the inside surface finish. Its 8 mmstud structure on one side provides anair gap which ensures continuousventilation and full-surface drainage toremove incoming moisture.
The rugged HDPE mesh on the otherside provides secure bonding with avariety of surface finishes includinggypsum plasters, lime cement rendersand (using steel mesh reinforcement)reinforced shotcrete.
DELTA®-PT in UndergroundStructures> TunnelsThe unsecure inside surfaces of thetunnel is first removed and levelled. Thetunnel is then lined with DELTA®-PT(installed with the studded side againstthe structure).
The stud design provides full surfacedrainage capacity. Incoming water isredirected to take-off pipes below. A steelreinforcing cage installed on the meshside of the DELTA®-PT sheet provides thebase for the shotcrete finishing layer.
Examples of the many tunnelssuccessfully renovated with DELTA®-PTinclude the Vienne, Clelles and Sorbièresrailroad in France, the Wipking tunneland the Filisur pressure shaft inSwitzerland and the Rehberg,Büdenholz and Brachbach tunnels inGermany.
In the Brachbach tunnel project, DELTA®-PT was installed over a quick-drying shotcrete levelling layer toprovide full-surface drainage.
The inward-facing mesh provided asecure bed for application of the innershotcrete shell.
> Public transport SystemsDELTA®-PT‘s combination of drainagecapacity and mesh bedding is alsoideally suited for applications inunderground railway construction.
Some examples of DELTA®-PTunderground station renovation projects:In Great Britain, the Oval, Clapham,Tooting Broadway and Tooting Becunderground stations in London: InSpain, the El Clot L1 Pca. Espanya, ElClot L2, Tres Torres metro stations andSabadell main station in Barcelona.
> Underground parking GaragesAn example from Taiwan - the FarEastern Plaza parking garage facility inthe city of Taipeh.
In this application DELTA®-PT’s drainagecapacity eliminated the need for costlylarge-scale waterproofing measures.
DELTA®-PT: – Technical DataDimpled sheeting with plastic mesh welded on, suitable as a damp-proof base for plaster orshotcrete, e.g., as a seepage layer in tunnel construction, or for repairing basements internally
Material: high density polyethyleneThickness: approx. 0.5 mmStud height: approx. 8 mmRoll size: 2.0 x 20 m / 1.5 x 10 mCompressive strength: approx. 70 kN/m2
Drainage capacity: approx. 5 l/s · mapprox. 300 l/min · mapprox. 18 100 l/h · m
Void between studs: approx. 5.5 l/m2
Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to root penetration,
rotproof, neutral towards drinking waterBehaviour in fire: B2 accord. to DIN 4102
Delta Membrane Systems Ltd.Bassett Business Centre, Hurricane Way, North Weald, Epping, Essex CM16 6AA
Telephone: 01992 523 811 Fax: 01992 524 046e-mail: [email protected] www.deltamembranes.com
FINISHING WORKSPLASTERINGDelta-PT should be plastered with either:
• ‘Whitewall’ plaster
• Carlite Bonding.
A 6mm scratch coat must be applied and allowed to set beforeapplying the next coat, in accordance with in BS 8481: 2006, BS EN13914 -2 : 2005 (and / or the appropriate Agrément Certificate). The standard of installation should comply with the requirements ofBS 8000-10 : 1995.
The plaster should be a minimum total depth of 15 mm.
Where a sand-cement mix is to be used internally, two coats areapplied and finished with a 3 mm thick gypsum-based skim coat.
A further plaster option is Roundtower Natural Hydraullic Lime Plaster- seek advice from Delta.
RENDERING EXTERNALLYWhere Delta-PT has been used externally it must be rendered with acement-lime-sand (1:1:6) render applied in three coats to a totalthickness of 20 mm using the procedures defined in BS EN 13914 -1 :2005. The standard of installation should comply with therequirements of BS 8000-10 : 1995.
The render should be applied in three coats with seven to ten daysbeing allowed between coats.
Due to the difference in thermal characteristics between Delta-PT andthe render, expansion joints through the render to the membranemust be trowelled in along each lap joint to reduce the possibility ofcracking. These joints must be filled with a suitable flexible polymer-based sealant.
Alternatively, polymer modified render should be applied in twocoats. The render is polymer/fibre modified, and eliminates the needfor extensive expansion joints, other than what is required to meetbuilding regulations.
A 5 mm ventilation gap at the top, and at least 10 mm at the bottomshould be left to assist the ventilation of the air-gap behind the Delta-PT membrane. Delta-PT profile is secured to the membrane andsubstrate to maintain these gaps.
DRY LININGA Bonding plaster to BS EN 13279-1: 2005, is mixed and applied invertical strips over the fixing centres and in bands along the top andbottom of the membrane. The plaster dabs are applied to a minimumthickness of 8 mm, and should cover a minimum of 50% of themembrane.
Gypsum plasterboard to BS EN 520: 2004, or similar dry lining boardscovered by Agrément Certificate, are pressed onto the plaster dabs andjointed in the usual manner. Temporary spacers approximately 20mm to 25 mm high are positioned under the dry lining to support itduring the curing period.
DECORATIONOnce the plastered, dry-lined or rendered surface has dried, thesurface can be painted or wallpapered using traditional methods andmaterials.
Material: high density polyethyleneThickness: approx. 0.5 mmStud height: approx. 8 mm / 8mm / 4mmRoll size: 2.0 x 20 m / 1.5 x 10 m / 1.0 x 15mCompressive strength: approx. 70 kN/m2Drainage capacity: approx. 5 l/s · m
approx. 300 l/min · mapprox. 18 100 l/h · m
Void between studs: approx. 5.5 l/m2Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to root penetration,
rotproof, neutral towards drinking waterBehaviour in fire: Class E
01/08/11
A 7-8mm scratch coat must be applied and allowed to set beforeapplying the next coat, in accordance with in BS 8481: 2006, BS EN13914-2 : 2005 (and / or the appropriate Agrément Certificate).The standard of installation should comply with the requirements ofBS 8000-10 : 1995.
A Bonding plaster to BS EN 14496: 2005, is mixed and applied invertical strips over the fixing centres and in bands along the top andbottom of the membrane. The plaster dabs are applied to aminimum thickness of 8 mm, and should cover a minimum of 50%of the membrane.
Gypsum plasterboard to BS EN 520: 2004, or similar dry lining boardscovered by Agrément Certificate, are pressed onto the plaster dabsand jointed in the usual manner. Temporary spacers approximately 20mm to 25 mm high are positioned under the dry lining to support itduring the curing period.
DECORATIONOnce the plastered, dry-lined or rendered surface has dried, thesurface can be painted or wallpapered using traditional methods andmaterials.
Delta PT Brochure 2011:Layout 1 31/08/2011 16:16 Page 1
DELTACERTIFICATE 00/3742
APPROVALINSPECTIONTESTINGCERTIFICATION
DELTA MEMBRANE SYSTEMS LTD.
DELTA
DELTASEALANT
8mm
60mm (min)
DELTA
DELTA-PT
DELTA®-PT has beenspecially designed withdamp control in mind.Dampness, which isfound in many olderproperties, can beeasily controlled usingDELTA®-PTor DELTA®-LATH.
The MaterialDELTA®-PT is a special high performancepolyethylene membrane which isextruded into a series of studs. The purpose of the studs is to create acontinuous air gap behind thewaterproof membrane. On the face ofthe membrane a welded mesh allowsplasters and renders to bond efficientlyto achieve dry and durable finishes.DELTA®-PT is watertight, resistant to highand low temperature extremes,chemically resistant to acids, alkalis, oiland solvents and is approved for use indrinking water applications.
Constant Ventilation forPermanent Dry FinishesThe 8 mm stud design of DELTA®-PTprovides a continuous air gap whichserves two purposes. Firstly to isolate thedamp wall from the new plaster anddecorative finishes and secondly to allowventilation of the wall for permanentdampness control.
Ventilation can be achieved by using theDELTA®-PT profile or the ‘air gap’ can bevented externally via passive air vents.
Ventilation gaps located at both top andbottom of the system allow circulationfor this purpose.
The DELTA®-PT PROFILEThe DELTA®-PT PROFILE can be used atboth the upper and lower edges of themembrane. The profile has ventilationslots incorporated to ensure thatoptimum ventilation is achieved. Theprofile section also acts as a guide forplaster or render coats.
DELTA®-PT can also be used as a drainedcavity in conjunction with the sealedsystem 500. See separate brochure.
Installation of DELTA®-PTDELTA®-PT sheets are installed vertically.Overlapped joints are facilitated with anon-meshed section, which is availablealong one edge of each sheet. The sheetis secured to the substrate with DELTA®-PT FIXING PLUGS at 250 mm verticaland horizontal centres.
The transparent sheet allows easylocation of fixings so that the brick orstone can be identified from the mortarjoints. Ventilation gaps can be used atfloor and ceiling level to ensure theoptimum air circulation.
DELTA®-PTprovides a full range of options forinternal finishes which include CarliteBonding, Tarmac Whitewall, 1.1.6 cementlime sand render or dab fixed plasterboard or Roundtower Natural HydraullicLime Plaster. (Contact our TechnicalDept. for separate advice)
Plasters and renders should be trowelapplied in two coats. The first coat ispushed into the dimples, and givingcover over the mesh of 6mm. This islightly scratched and allowed to drybefore the second coat of 9mm isapplied. Skim finish plaster can be usedin the normal way.
When dab fixing plasterboard theadhesive dabs are applied directly overthe fixing heads. The adhesive dabsshould cover 50% of the area. Theboards are then wedged at the bottomand offered up to the dabs.
DELTA® is a registered trade mark of Ewald Dörken AG, Germany
DESIGN DATAGENERAL – VENTILATED SYSTEMDelta-PT is satisfactory for use as a support for a dry lining fixed byplaster dabs, or for replastering/rendering, over internal walls of alltypes of construction, in the following situations:
(a) Existing damp walls not under hydrostatic pressure
(b) In conjunction with a remedial dpc system where the walls havea high salt content and/or it is necessary to complete the installationimmediately without allowing a period for initial drying in accordancewith BS.6576 : 2005
(c) Over a wall which has a friable or painted surface, iscontaminated with oil or mould, or has a high salt content
(d) Delta-PT is also satisfactory for use as a waterproof support forrender on walls in exposed external situations, and/or where thebrickwork has deteriorated
(e) When DELTA-PT is used as a substitute for DELTA-MS 500 and/orinstalled as a ‘Sealed System’ in accordance with BBA certificate No.00/3742, it may be deemed to be suitable for walls, vaulted ceilingsor archways or cellars in the following additional situations:
• Damp walls in underground situations subject to high groundwater levels, and perennial moisture
• On vaulted ceilings of archways or cellars subject to dripping water
• As a waterproofing or ‘tanking’ in areas subject to vibration
• The system is satisfactory for use as Type C (drained protection) inaccordance with BS.8102 : 1990.
FINISHING WORKSWhen the membrane is installed, the walls can be replastered asrecommended in the current Delta technical literature.
Where Delta-PT is installed internally and plastered, permanentdecoration, such as vinyl papers or oil paint, may be applied.Temporary permeable decoration (necessary when a remedial dpcinstallation is replastered conventionally) is not necessary when Delta-PT is used.
RESISTANCE TO WATER AND WATER VAPOUR
The membrane is water resistant and has a high resistance to thetransmission of water vapour. Consequently, when used internallywhere the surface is damp, there must be a flow of air across it.
RESISTANCE TO SALT TRANSFERThe system provides an effective barrier to the transmission of salts orother contaminants from the substrate.
IMPACT RESISTANCEDelta-PT, plastered, rendered or dry-lined, has a satisfactory resistanceto soft and hard body impacts.
WALL-MOUNTED FITTINGSWall-mounted fittings (apart from lightweight items such as framedpictures) should be fixed (using recommended proprietary fixings)through the membrane and lining board, plaster or render, to theloadbearing structure behind. Holes made in the membrane shouldbe filled with a flexible sealant before inserting the fixing.
DURABILITY
Under normal conditions of use, the product will provide an effectivebarrier to the transmission of salts, liquid water and water vapour forthe life of the structure in which it is installed.
DELTA®-LATH - Technical DATACompressivestrength 70 KN/m2 (10 PSI)Tensile strength 400 N/3 cm (76lb/in)Ventilation Space 5,51 m2Weight 530 g/m2Stud height 8 mm / 4 mmOverlap detail 100 mmRoll sizes 1.5 x 10 m, 1m x 15mColour Clear or Brown
For further advice or information contact ourtechnical department, telephone 01992 523811.
DELTA®-PT LATH is now available inthree roll sizes and two stud heights. The2m x 20m, and 1.5m x 10m have an8mm profile. They are now joined by the'Slimline' PT which has a 4mm profile anda roll size of 1m x 15m, making it idealfor damp-proofing, window reveals orspace sensitive areas.
The system is satisfactory for use as Type C (drained protection) inaccordance with BS.8102 : 2009.
Delta PT Brochure 2011:Layout 1 31/08/2011 16:16 Page 2
DELTA
DELTA®-LATH - Technical DATACompressivestrength 70 KN/m2 (10 PSI)Tensile strength 400 N/3 cm (76lb/in)Ventilation Space 5,51 m2Weight 530 g/m2Stud height 8 mm / 4 mmOverlap detail 100 mmRoll sizes 1.5 x 10 m, 1m x 15mColour Clear or Brown
For further advice or information contact ourtechnical department, telephone 01992 523811.
DELTA®-PT LATH is now available inthree roll sizes and two stud heights. The2m x 20m, and 1.5m x 10m have an8mm profile. They are now joined by the'Slimline' PT which has a 4mm profile anda roll size of 1m x 15m, making it idealfor damp-proofing, window reveals orspace sensitive areas.
telephone 01992 523 523.
DELTA
DELTA MEMBRANE SYSTEMS LTD.
DELTA DELTA
DELTA®-PT DELTA®-LATH
Insulates and isolates damp and contaminated walls, vaults, and basements.The Guaranteed Solution.
The The ‘Original’‘Original’WWaterpraterproof Membroof Membrane Systemane System
DELTA®-PT insulates dampstructural surfaces and alsoprovides a bonding base forgypsum plaster, lime plasterrender and reinforcedshotcrete wall finishes.
The ProblemOld buildings often have dampness inwalls and other inside surfaces due toinadequate or defective waterproofing.Rewaterproofing of an existingfoundation wall is usually expensive - orimpossible when outside access is limitedby neighbouring structures. The damagemust therefore be repaired from theinside: by installing a new masonry shellcovering the damp inner surface.However, this is not a cure-all as the newshell too will soon become humid bycontinuing dampness migration from thestructure - and takes up considerablespace within the structure.
The Solution
DELTA®-PT – the watertight dimpledsheet with an integrated mesh beddingfor the inside surface finish. Its 8 mmstud structure on one side provides anair gap which ensures continuousventilation and full-surface drainage toremove incoming moisture.
The rugged HDPE mesh on the otherside provides secure bonding with avariety of surface finishes includinggypsum plasters, lime cement rendersand (using steel mesh reinforcement)reinforced shotcrete.
DELTA®-PT in UndergroundStructures> TunnelsThe unsecure inside surfaces of thetunnel is first removed and levelled. Thetunnel is then lined with DELTA®-PT(installed with the studded side againstthe structure).
The stud design provides full surfacedrainage capacity. Incoming water isredirected to take-off pipes below. A steelreinforcing cage installed on the meshside of the DELTA®-PT sheet provides thebase for the shotcrete finishing layer.
Examples of the many tunnelssuccessfully renovated with DELTA®-PTinclude the Vienne, Clelles and Sorbièresrailroad in France, the Wipking tunneland the Filisur pressure shaft inSwitzerland and the Rehberg,Büdenholz and Brachbach tunnels inGermany.
In the Brachbach tunnel project, DELTA®-PT was installed over a quick-drying shotcrete levelling layer toprovide full-surface drainage.
The inward-facing mesh provided asecure bed for application of the innershotcrete shell.
> Public transport SystemsDELTA®-PT‘s combination of drainagecapacity and mesh bedding is alsoideally suited for applications inunderground railway construction.
Some examples of DELTA®-PTunderground station renovation projects:In Great Britain, the Oval, Clapham,Tooting Broadway and Tooting Becunderground stations in London: InSpain, the El Clot L1 Pca. Espanya, ElClot L2, Tres Torres metro stations andSabadell main station in Barcelona.
> Underground parking GaragesAn example from Taiwan - the FarEastern Plaza parking garage facility inthe city of Taipeh.
In this application DELTA®-PT’s drainagecapacity eliminated the need for costlylarge-scale waterproofing measures.
DELTA®-PT: – Technical DataDimpled sheeting with plastic mesh welded on, suitable as a damp-proof base for plaster orshotcrete, e.g., as a seepage layer in tunnel construction, or for repairing basements internally
Material: high density polyethyleneThickness: approx. 0.5 mmStud height: approx. 8 mmRoll size: 2.0 x 20 m / 1.5 x 10 mCompressive strength: approx. 70 kN/m2
Drainage capacity: approx. 5 l/s · mapprox. 300 l/min · mapprox. 18 100 l/h · m
Void between studs: approx. 5.5 l/m2
Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to root penetration,
rotproof, neutral towards drinking waterBehaviour in fire: B2 accord. to DIN 4102
Delta Membrane Systems Ltd.Bassett Business Centre, Hurricane Way, North Weald, Epping, Essex CM16 6AA
Telephone: 01992 523 811 Fax: 01992 524 046e-mail: [email protected] www.deltamembranes.com
Uniclass EPICL6813 F83
CI/SfBLn6 (L34)
February 2006
FINISHING WORKSPLASTERINGDelta-PT should be plastered with either:
• ‘Whitewall’ plaster
• Carlite Bonding.
A 6mm scratch coat must be applied and allowed to set beforeapplying the next coat, in accordance with in BS 8481: 2006, BS EN13914 -2 : 2005 (and / or the appropriate Agrément Certificate). The standard of installation should comply with the requirements ofBS 8000-10 : 1995.
The plaster should be a minimum total depth of 15 mm.
Where a sand-cement mix is to be used internally, two coats areapplied and finished with a 3 mm thick gypsum-based skim coat.
A further plaster option is Roundtower Natural Hydraullic Lime Plaster- seek advice from Delta.
RENDERING EXTERNALLYWhere Delta-PT has been used externally it must be rendered with acement-lime-sand (1:1:6) render applied in three coats to a totalthickness of 20 mm using the procedures defined in BS EN 13914 -1 :2005. The standard of installation should comply with therequirements of BS 8000-10 : 1995.
The render should be applied in three coats with seven to ten daysbeing allowed between coats.
Due to the difference in thermal characteristics between Delta-PT andthe render, expansion joints through the render to the membranemust be trowelled in along each lap joint to reduce the possibility ofcracking. These joints must be filled with a suitable flexible polymer-based sealant.
Alternatively, polymer modified render should be applied in twocoats. The render is polymer/fibre modified, and eliminates the needfor extensive expansion joints, other than what is required to meetbuilding regulations.
A 5 mm ventilation gap at the top, and at least 10 mm at the bottomshould be left to assist the ventilation of the air-gap behind the Delta-PT membrane. Delta-PT profile is secured to the membrane andsubstrate to maintain these gaps.
DRY LININGA Bonding plaster to BS EN 13279-1: 2005, is mixed and applied invertical strips over the fixing centres and in bands along the top andbottom of the membrane. The plaster dabs are applied to a minimumthickness of 8 mm, and should cover a minimum of 50% of themembrane.
Gypsum plasterboard to BS EN 520: 2004, or similar dry lining boardscovered by Agrément Certificate, are pressed onto the plaster dabs andjointed in the usual manner. Temporary spacers approximately 20mm to 25 mm high are positioned under the dry lining to support itduring the curing period.
DECORATIONOnce the plastered, dry-lined or rendered surface has dried, thesurface can be painted or wallpapered using traditional methods andmaterials.
Material: high density polyethyleneThickness: approx. 0.5 mmStud height: approx. 8 mm / 8mm / 4mmRoll size: 2.0 x 20 m / 1.5 x 10 m / 1.0 x 15mCompressive strength: approx. 70 kN/m2Drainage capacity: approx. 5 l/s · m
approx. 300 l/min · mapprox. 18 100 l/h · m
Void between studs: approx. 5.5 l/m2Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to root penetration,
rotproof, neutral towards drinking waterBehaviour in fire: Class E
A 7-8mm scratch coat must be applied and allowed to set beforeapplying the next coat, in accordance with in BS 8481: 2006, BS EN13914-2 : 2005 (and / or the appropriate Agrément Certificate).The standard of installation should comply with the requirements ofBS 8000-10 : 1995.
A Bonding plaster to BS EN 14496: 2005, is mixed and applied invertical strips over the fixing centres and in bands along the top andbottom of the membrane. The plaster dabs are applied to aminimum thickness of 8 mm, and should cover a minimum of 50%of the membrane.
Gypsum plasterboard to BS EN 520: 2004, or similar dry lining boardscovered by Agrément Certificate, are pressed onto the plaster dabsand jointed in the usual manner. Temporary spacers approximately 20mm to 25 mm high are positioned under the dry lining to support itduring the curing period.
DECORATIONOnce the plastered, dry-lined or rendered surface has dried, thesurface can be painted or wallpapered using traditional methods andmaterials.
Delta PT Brochure 2011:Layout 1 31/08/2011 16:16 Page 1
DELTA®-MS 500:
Cavity drainage membrane
for use on walls and floors,
as a waterproof system. A
choice of finishes are
available. Can also be used
externally for waterproof
protection of sub-ground
structures.
Material: high density polyethyleneThickness: approx. 0.6 mmStud height: approx. 8 mmRoll size: available in clear(With flat edge of 7 cm 2.4 x 20 mon one side) 2.0 x 20 mCompressive strength: > 250 kN/m2
Drainage capacity: approx. 2.25 l/s · mapprox. 135 l/min · mapprox. 8 100 l/h · m
Air volume between studs: approx. 5.3 l/m2
Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to
root penetration, rotproof, neutral towards drinking water
Behaviour in fire: Class E
DELTA®-MS 20:
Dimpled sheeting with
particularly high drainage
capacity and compressive
strength, suitable for high
performance seepage layers
in building and civil
engineering construction.
Material: high density polyethyleneThickness: approx. 1 mmStud height: approx. 20 mmRoll size: 2.0 x 20 m
In the case of special requirements, also available in board format
Compressive strength: approx. 150 kN/m2
Drainage capacity: approx. 10 l/s · mapprox. 600 l/min · mapprox. 36 100 l/h · m
Air volume between studs: approx. 14 l/m2
Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to
root penetration, rotproof, neutral towards drinking water
Behaviour in fire: Class E
DELTA
Delta Membrane Systems Ltd.
e-mail: [email protected] www.deltamembranes.com© DELTA MEMBRANE SYSTEMS LTD 1998
DELTA®-PT:
Dimpled sheeting with plastic
mesh welded on, suitable as a
damp-proof base for plaster or
shotcrete, e.g., as a seepage
layer in tunnel construction, or
for repairing basements
internally.
Material: high density polyethyleneThickness: approx. 0.5 mmStud height: approx. 8 mm / 8mm / 4mmRoll size: 2.0 x 20 m / 1.5 x 10 m / 1.0 x 15mCompressive strength: approx. 70 kN/m2
Drainage capacity: approx. 5 l/s · mapprox. 300 l/min · mapprox. 18 100 l/h · m
Void between studs: approx. 5.5 l/m2
Temperature resistance: – 30°C to + 80°CChemical properties: resistant to chemicals, resistant to
root penetration, rotproof, neutral towards drinking water
Behaviour in fire: Class E
DELTA®-FM is specificallydesigned for floor applications,to combat dampness, andcontamination. The special lowstud profile (3mm) minimiseschanges in floor levels but stillprovides an air gap to achievedamp pressure equalisation.
The membrane is a fast-trackapplication that allows variousfloor finishes to be achieved withzero ‘down time’. The R.H. levelsare isolated in the air gap, and
controlled. Delta-FM can be used in new build, remedial or refurbishment projects forfloors, and walls.
Material: Virgin high-performance PE-VHD
Application: Special low stud profile for floor.Can be used on walls
Sheet thickness: approx. 0.6 mm
Dimple height: approx. 3 mm
Compressive strength: approx 140 kN/m2
Roll dimensions: 20m x 2m (40m2)
Volume between dimples: approx 2.1 1/m2
Service temperature range: -30degC / +80degC
Behaviour in fire: Class E
DELTA®-FM:
Delta House, Merlin Way, North Weald, Epping, Essex CM16 6HR
Telephone: 01992 523 523 Fax: 01992 523 250
CERTIFICATE 00/3742
APPROVALINSPECTIONTESTINGCERTIFICATION
© DELTA MEMBRANE SYSTEMS LTD 1998© DELTA MEMBRANE SYSTEMS LTD 1998
25/05/2016
DELTA
DELTASEALANT
8mm
60mm (min)
DELTA
DELTA-PT
DELTA®-PT has beenspecially designed withdamp control in mind.Dampness, which isfound in many olderproperties, can beeasily controlled usingDELTA®-PTor DELTA®-LATH.
The MaterialDELTA®-PT is a special high performancepolyethylene membrane which isextruded into a series of studs. The purpose of the studs is to create acontinuous air gap behind thewaterproof membrane. On the face ofthe membrane a welded mesh allowsplasters and renders to bond efficientlyto achieve dry and durable finishes.DELTA®-PT is watertight, resistant to highand low temperature extremes,chemically resistant to acids, alkalis, oiland solvents and is approved for use indrinking water applications.
Constant Ventilation forPermanent Dry FinishesThe 8 mm stud design of DELTA®-PTprovides a continuous air gap whichserves two purposes. Firstly to isolate thedamp wall from the new plaster anddecorative finishes and secondly to allowventilation of the wall for permanentdampness control.
Ventilation can be achieved by using theDELTA®-PT profile or the ‘air gap’ can bevented externally via passive air vents.
Ventilation gaps located at both top andbottom of the system allow circulationfor this purpose.
The DELTA®-PT PROFILEThe DELTA®-PT PROFILE can be used atboth the upper and lower edges of themembrane. The profile has ventilationslots incorporated to ensure thatoptimum ventilation is achieved. Theprofile section also acts as a guide forplaster or render coats.
DELTA®-PT can also be used as a drainedcavity in conjunction with the sealedsystem 500. See separate brochure.
Installation of DELTA®-PTDELTA®-PT sheets are installed vertically.Overlapped joints are facilitated with anon-meshed section, which is availablealong one edge of each sheet. The sheetis secured to the substrate with DELTA®-PT FIXING PLUGS at 250 mm verticaland horizontal centres.
The transparent sheet allows easylocation of fixings so that the brick orstone can be identified from the mortarjoints. Ventilation gaps can be used atfloor and ceiling level to ensure theoptimum air circulation.
DELTA®-PTprovides a full range of options forinternal finishes which include CarliteBonding, Tilcon Whitewall, 1.1.6 cementlime sand render or dab fixed plasterboard or Roundtower Natural HydraullicLime Plaster. (Contact our TechnicalDept. for separate advice)
Plasters and renders should be trowelapplied in two coats. The first coat ispushed into the dimples, and givingcover over the mesh of 6mm. This islightly scratched and allowed to drybefore the second coat of 9mm isapplied. Skim finish plaster can be usedin the normal way.
When dab fixing plasterboard theadhesive dabs are applied directly overthe fixing heads. The adhesive dabsshould cover 50% of the area. Theboards are then wedged at the bottomand offered up to the dabs.
DELTA® is a registered trade mark of Ewald Dörken AG, Germany
DESIGN DATAGENERAL – VENTILATED SYSTEMDelta-PT is satisfactory for use as a support for a dry lining fixed byplaster dabs, or for replastering/rendering, over internal walls of alltypes of construction, in the following situations:
(a) Existing damp walls not under hydrostatic pressure
(b) In conjunction with a remedial dpc system where the walls havea high salt content and/or it is necessary to complete the installationimmediately without allowing a period for initial drying in accordancewith BS.6576 : 2005
(c) Over a wall which has a friable or painted surface, iscontaminated with oil or mould, or has a high salt content
(d) Delta-PT is also satisfactory for use as a waterproof support forrender on walls in exposed external situations, and/or where thebrickwork has deteriorated
(e) When DELTA-PT is used as a substitute for DELTA-MS 500 and/orinstalled as a ‘Sealed System’ in accordance with BBA certificate No.00/3742, it may be deemed to be suitable for walls, vaulted ceilingsor archways or cellars in the following additional situations:
• Damp walls in underground situations subject to high groundwater levels, and perennial moisture
• On vaulted ceilings of archways or cellars subject to dripping water
• As a waterproofing or ‘tanking’ in areas subject to vibration
• The system is satisfactory for use as Type C (drained protection) inaccordance with BS.8102 : 1990.
FINISHING WORKSWhen the membrane is installed, the walls can be replastered asrecommended in the current Delta technical literature.
Where Delta-PT is installed internally and plastered, permanentdecoration, such as vinyl papers or oil paint, may be applied.Temporary permeable decoration (necessary when a remedial dpcinstallation is replastered conventionally) is not necessary when Delta-PT is used.
RESISTANCE TO WATER AND WATER VAPOUR
The membrane is water resistant and has a high resistance to thetransmission of water vapour. Consequently, when used internallywhere the surface is damp, there must be a flow of air across it.
RESISTANCE TO SALT TRANSFERThe system provides an effective barrier to the transmission of salts orother contaminants from the substrate.
IMPACT RESISTANCEDelta-PT, plastered, rendered or dry-lined, has a satisfactory resistanceto soft and hard body impacts.
WALL-MOUNTED FITTINGSWall-mounted fittings (apart from lightweight items such as framedpictures) should be fixed (using recommended proprietary fixings)through the membrane and lining board, plaster or render, to theloadbearing structure behind. Holes made in the membrane shouldbe filled with a flexible sealant before inserting the fixing.
DURABILITY
Under normal conditions of use, the product will provide an effectivebarrier to the transmission of salts, liquid water and water vapour forthe life of the structure in which it is installed.
DELTA®-LATH - Technical DATACompressivestrength 70 KN/m2 (10 PSI)Tensile strength 400 N/3 cm (76lb/in)Ventilation Space 5,51 m2Weight 530 g/m2Stud height 8 mm / 4 mmOverlap detail 100 mmRoll sizes 1.5 x 10 m, 1m x 15mColour Clear or Brown
For further advice or information contact ourtechnical department, telephone 01992 523811.
DELTA®-PT LATH is now available inthree roll sizes and two stud heights. The2m x 20m, and 1.5m x 10m have an8mm profile. They are now joined by the'Slimline' PT which has a 4mm profile anda roll size of 1m x 15m, making it idealfor damp-proofing, window reveals orspace sensitive areas.
The system is satisfactory for use as Type C (drained protection) inaccordance with BS.8102 : 2009.
Delta PT Brochure 2011:Layout 1 31/08/2011 16:16 Page 2
FINISHING WORKSPLASTERINGDelta-PT should be plastered with either:
• ‘Whitewall’ plaster
• Carlite Bonding.
A 6mm scratch coat must be applied and allowed to set beforeapplying the next coat, in accordance with in BS 8481: 2006, BS EN13914 -2 : 2005 (and / or the appropriate Agrément Certificate). The standard of installation should comply with the requirements ofBS 8000-10 : 1995.
The plaster should be a minimum total depth of 15 mm.
Where a sand-cement mix is to be used internally, two coats areapplied and finished with a 3 mm thick gypsum-based skim coat.
A further plaster option is Roundtower Natural Hydraullic Lime Plaster- seek advice from Delta.
RENDERING EXTERNALLYWhere Delta-PT has been used externally it must be rendered with acement-lime-sand (1:1:6) render applied in three coats to a totalthickness of 20 mm using the procedures defined in BS EN 13914 -1 :2005. The standard of installation should comply with therequirements of BS 8000-10 : 1995.
The render should be applied in three coats with seven to ten daysbeing allowed between coats.
Due to the difference in thermal characteristics between Delta-PT andthe render, expansion joints through the render to the membranemust be trowelled in along each lap joint to reduce the possibility ofcracking. These joints must be filled with a suitable flexible polymer-based sealant.
Alternatively, polymer modified render should be applied in twocoats. The render is polymer/fibre modified, and eliminates the needfor extensive expansion joints, other than what is required to meetbuilding regulations.
A 5 mm ventilation gap at the top, and at least 10 mm at the bottomshould be left to assist the ventilation of the air-gap behind the Delta-PT membrane. Delta-PT profile is secured to the membrane andsubstrate to maintain these gaps.
DRY LININGA Bonding plaster to BS EN 13279-1: 2005, is mixed and applied invertical strips over the fixing centres and in bands along the top andbottom of the membrane. The plaster dabs are applied to a minimumthickness of 8 mm, and should cover a minimum of 50% of themembrane.
Gypsum plasterboard to BS EN 520: 2004, or similar dry lining boardscovered by Agrément Certificate, are pressed onto the plaster dabs andjointed in the usual manner. Temporary spacers approximately 20mm to 25 mm high are positioned under the dry lining to support itduring the curing period.
DECORATIONOnce the plastered, dry-lined or rendered surface has dried, thesurface can be painted or wallpapered using traditional methods andmaterials.
A 7-8mm scratch coat must be applied and allowed to set beforeapplying the next coat, in accordance with in BS 8481: 2006, BS EN13914-2 : 2005 (and / or the appropriate Agrément Certificate).The standard of installation should comply with the requirements ofBS 8000-10 : 1995.
A Bonding plaster to BS EN 14496: 2005, is mixed and applied invertical strips over the fixing centres and in bands along the top andbottom of the membrane. The plaster dabs are applied to aminimum thickness of 8 mm, and should cover a minimum of 50%of the membrane.
Gypsum plasterboard to BS EN 520: 2004, or similar dry lining boardscovered by Agrément Certificate, are pressed onto the plaster dabsand jointed in the usual manner. Temporary spacers approximately 20mm to 25 mm high are positioned under the dry lining to support itduring the curing period.
DECORATIONOnce the plastered, dry-lined or rendered surface has dried, thesurface can be painted or wallpapered using traditional methods andmaterials.
CERTIFICATE 00/3742
APPROVALINSPECTIONTESTINGCERTIFICATION
METHOD STATEMENT Cavity drain system to vault
165 Barnsbury Road, N1 0EP October 2017
5.0 Delta KOSTER NB1 brochure/data sheets
:���:DWHUSURR
ILQJ�V\VWHP
V7HFKQLFDO�'DWD�6KHHW�:��������,VVXHG������������.�67(5�1%���*UH\
��2IILFLDO�WHVW�FHUWLILFDWH��,QVWLWXWH�IRU�+\JLHQH��*HOVHQNLUFKHQ��7DQN�DQG�WDQN�OLQLQJ��DFFRUGLQJ�WR�WKH�UHJXODWLRQV�RI�WKH�'9*:��7HFK��UHJXODWLRQV�IRU�SRWDEOH�ZDWHU��1DWLRQDO�7HFKQLFDO�$SSURYDO�3�������������03$�%6�E\�WKH�03$�%UDXQVFKZHLJ�0LQHUDO�:DWHUSURRILQJ�6OXUU\�IRU�:DWHUSURRILQJ�RI�&RQVWUXFWLRQV�DFFRUGLQJ�WR�%XLOGLQJ�5HJXODWLRQ�/LVW��%DXUHJHOOLVWH��$��3DUW����1R��������:RUNVKHHW�:������'HFHPEHU�������DERXW�WKH�UHSURGXFWLRQ�RI�PLFUR�RUJDQLVPV�RQ�PDWHULDOV�IRU�XVH�LQ�GULQNLQJ�ZDWHU�HQYLURQPHQWV��7HVW�&HUWLILFDWH�%DXWHVW�*PE+��'UHVGHQ
0LQHUDO ZDWHUSURRILQJ V\VWHP IRU SRVLWLYH DQG QHJDWLYH VLGHZDWHUSURRILQJ�DJDLQVW�SUHVVXUL]HG�ZDWHU
.�67(5�%$8&+(0,(�$*'LHVHOVWUD¡H�������������$XULFK
���:����
(1������������3URGXFW�IRU�VWUXFWXUDO�DQG�QRQVWUXFWXUDO�UHSDLU�IRU�FRQFUHWH$SSO\LQJ�PRUWDU�E\�KDQG������
(1���������=$���D
&RPSUHVVLYH�VWUHQJWK &ODVV�5�&KORULGH�LRQ�FRQWHQW ด�������$GKHVLYH�ERQG ต�����03D5HVWUDLQHG�VKULQNDJH�H[SDQVLRQ 13'&DUERQDWLRQ�UHVLVWDQFH 13'(ODVWLF�PRGXOXV ต����*3D5HDFWLRQ�WR�ILUH &ODVV�(
)HDWXUHV.�67(5 1% � *UH\ LV D PLQHUDO FRDWLQJ FRQWDLQLQJ FU\VWDOOLVLQJ DQGFDSLOODU\�SOXJJLQJ DJHQWV� ,W FDQ EH XVHG IRU ZDWHUSURRILQJ DJDLQVWJURXQG PRLVWXUH� DQG IRU QRQ�SUHVVXUL]HG DQG SUHVVXUL]HG ZDWHU�:DWHUSURRILQJ GRQH ZLWK .�67(5 1% � *UH\ LV FKDUDFWHUL]HG E\H[FHOOHQW UHVLVWDQFH WR SUHVVXUH DQG DEUDVLRQ DV ZHOO DV FKHPLFDO DQGVXOSKDWH UHVLVWDQFH� $SSOLHG DV D FORVHG OD\HU� .�67(5 1% � *UH\ LVDEVROXWHO\ ZDWHUSURRI WR SUHVVXUL]HG ZDWHU XS WR �� EDU� 'XH WR LWVSHQHWUDWLRQ LQWR WKH VWUXFWXUDO PHPEHU� WKH VOXUU\ GHYHORSV DQ LQWHQVHERQG WR WKH VXEVWUDWH DQG WKH FDSLOODULHV DUH SOXJJHG� %HVLGHV WKHK\GUDXOLF FXULQJ RI WKH VHDOLQJ VOXUU\� FU\VWDOOL]LQJ UHDFWLRQV DUHDFWLYDWHG LQ WKH VOXUU\ZKLFK FDQ OHDG WR D VHOI KHDOLQJ HIIHFW ZKHQPLFUR�FUDFNV�GHYHORS�
:DWHUSURRILQJ ZLWK .�67(5 1% � *UH\ VKRXOG RQO\ EH FDUULHG RXW RQVXEVWUDWHV WKDW DUH IUHH RI PRYLQJ FUDFNV� 0RYLQJ FUDFNV VKRXOG EHFRQVLGHUHG FRQVWUXFWLRQ MRLQWV DQG WUHDWHG DFFRUGLQJO\ ZLWK .�67(5-RLQW 7DSH� .�67(5 ,QMHFWLRQ 5HVLQV� RU .�67(5 -RLQW 6HDODQW )6�.�67(5�6%�%RQGLQJ�(PXOVLRQ�LQWURGXFHV�IOH[LELOLW\�WR�WKH�PDWHULDO�
$GYDQWDJHV���SRVLWLYH�DQG�QHJDWLYH�VLGH�ZDWHUSURRILQJ�DJDLQVW�SUHVVXUL]HG�ZDWHU��UHVLVWDQW�DJDLQVW�FKORULGHV��VXOSKDWHV�DQG�SKRVSKDWHV��FHUWLILHG�IRU�GULQNLQJ�ZDWHU�HQYLURQPHQWV� SHQHWUDWHV LQWR WKH VXUIDFH ZKHUH FU\VWDOOL]DWLRQ OHDGV WR LQVHSDUDEOHZDWHUSURRILQJ�VXEVWUDWH�ERQG��GRHV�QRW�FRQWDLQ�FRUURVLRQ�SURPRWLQJ�LQJUHGLHQWV��QR�92&��QR�HPLVVLRQV�RI�HQYLURQPHQWDOO\�KDUPIXO�LQJUHGLHQWV� ZRUNV DOVR RQ PDVRQU\ DQG RQ YHU\ SRURXV VXEVWUDWHV OLNH VKRWFUHWH�DHUDWHG�FRQFUHWH�DQG�FLQGHUEORFN��VXEVWUDWH�GRHV�QRW�KDYH�WR�EH�FRQWLQXDOO\�NHSW�ZHW�WR�FXUH� LQKLELWV VDOW PRYHPHQW LQ WKH VXEVWUDWH ZKHQ XVHG DV D V\VWHP
WRJHWKHU�ZLWK�.�67(5�3RO\VLO�7*������HDV\�DSSOLFDWLRQ��ORQJ�SRW�OLIH��VHDPOHVV�DSSOLFDWLRQ
7HFKQLFDO�'DWD)UHVK�PRUWDU�GHQVLW\ �����NJ���O0RGXOXV�RI�(ODVWLFLW\ DSSUR[���������1�PPt&RPSUHVVLYH�VWUHQJWK�����KRXUV� !���1���PPt&RPSUHVVLYH�VWUHQJWK����GD\V� !����1���PPt&RPSUHVVLYH�VWUHQJWK�����GD\V� !����1���PPt)OH[XUDO�WHQVLOH�VWUHQJWK !���1���PPt)OH[XUDO�WHQVLOH�VWUHQJWK����GD\V� !�����1���PPt)OH[XUDO�WHQVLOH�VWUHQJWK�����GD\V� !����1���PPt$GKHVLYH�WHQVLOH�VWUHQJWK !�����1���PPt:DWHUSURRI DJDLQVW SUHVVXUL]HGZDWHU��SRVLWLYH�DQG�QHJDWLYH�VLGH�
XS�WR����EDU
&RHIILFLHQW RI ZDWHU YDSRU GLIIXVLRQUHVLVWDQFH��͏�
��
3RW�OLIH DSSUR[����KRXUV5HVLVWDQW�WR�IRRW�WUDIILF DIWHU�DSSUR[����GD\V)XOO�FXUH DIWHU�DSSUR[����ZHHNV
)LHOGV�RI�$SSOLFDWLRQ.�67(5 1% � *UH\ FDQ EH XVHG LQ QHZ FRQVWUXFWLRQ DQG UHSDLU IRUKRUL]RQWDO DQG YHUWLFDO ZDWHUSURRILQJ RI FRQFUHWH� PDVRQU\ RUFHPHQWLWLRXV SODVWHU� RQ SRURXV FRQFUHWH� RQ VKRWFUHWH� LQ ZHW URRPV�EDWKURRPV� VKRZHUV� QHZ EDVHPHQWV� LQVLGH RI EDVHPHQWV� LQVLGHHOHYDWRU VKDIWV� WXQQHOV� OHDNLQJ UHWDLQLQJ ZDOOV� XQGHUVLGH RI OHDNLQJFHLOLQJV� WDQNV� VLORV� VHZDJH WUHDWPHQW SODQWV� PDQKROHV� GULQNLQJZDWHU�WDQNV�HWF��
6XEVWUDWH7KH PLQHUDO VXEVWUDWH KDV WR EH VRXQG DQG VROLG DV ZHOO DV IUHH RIERQGLQJ LQKLELWLQJ DJHQWV VXFK DV JUHDVH DQG RLO� 5HPRYH DOO ERQGEUHDNLQJ VXEVWDQFHV VXFK DV ODLWDQFH� ORRVH SDUWLFOHV� GXVW� IRUPZRUNUHOHDVH RLO HWF� 7KH VXEVWUDWH PXVW EH RSHQ SRUHG VR WKDW WKH .�67(51% �*UH\ FDQ SHQHWUDWH� 6XEVWUDWHV KDYH WR EHZHWWHG �DYRLG VWDQGLQJZDWHU� RU WUHDWHG ZLWK .�67(5 3RO\VLO 7* ��� SULRU WR WKH DSSOLFDWLRQRI .�67(5 1% � *UH\� 'XVW\ RU VDOW�GDPDJHG VXEVWUDWHV KDYH WR EHEUXVKHG RII DQG SULPHG ZLWK .�67(5 3RO\VLO 7* ��� �� � �� PLQXWHVSULRU�WR�WKH�DSSOLFDWLRQ�RI�.�67(5�1%���*UH\�
$SSOLFDWLRQ7KH PDWHULDO PXVW EH PL[HG XVLQJ D VORZ VSHHG PL[HU ZKHUHE\ WKHSRZGHU VKRXOG EH DGGHG WR WKH PL[LQJ ZDWHU RU UHVSHFWLYHO\ WR WKHSRO\PHU�OLTXLG��$����NJ�EDJ�RI�.�67(5�1%���*UH\�LV�PL[HG�ZLWK�����O�RI�ZDWHU�SOXV���O�.�67(5�6%�%RQGLQJ�(PXOVLRQ�RU����MHUU\�FDQ����O��RI�.�67(5�1%���)OH[�RU����O�RI�ZDWHU
7KH DGGLWLRQ RI .�67(5 6%�%RQGLQJ (PXOVLRQ RU .�67(51% � )OH[
7KH LQIRUPDWLRQ FRQWDLQHG LQ WKLV WHFKQLFDO GDWD VKHHW LV EDVHG RQ WKH UHVXOWV RI RXU UHVHDUFK DQG RQ RXU SUDFWLFDO H[SHULHQFH LQ WKH ILHOG� $OO JLYHQ WHVW GDWD DUH DYHUDJH YDOXHV ZKLFK KDYH EHHQ REWDLQHG XQGHU GHILQHGFRQGLWLRQV� 7KH SURSHU DQG WKHUHE\ HIIHFWLYH DQG VXFFHVVIXO DSSOLFDWLRQ RI RXU SURGXFWV LV QRW VXEMHFW WR RXU FRQWURO� 7KH LQVWDOOHU LV UHVSRQVLEOH IRU WKH FRUUHFW DSSOLFDWLRQ XQGHU FRQVLGHUDWLRQ RI WKH VSHFLILF FRQGLWLRQVRI WKH FRQVWUXFWLRQ VLWH DQG IRU WKH ILQDO UHVXOWV RI WKH FRQVWUXFWLRQ SURFHVV� 7KLV PD\ UHTXLUH DGMXVWPHQWV WR WKH UHFRPPHQGDWLRQV JLYHQ KHUH IRU VWDQGDUG FDVHV� 6SHFLILFDWLRQV PDGH E\ RXU HPSOR\HHV RUUHSUHVHQWDWLYHV ZKLFK H[FHHG WKH VSHFLILFDWLRQV FRQWDLQHG LQ WKLV WHFKQLFDO JXLGHOLQH UHTXLUH ZULWWHQ FRQILUPDWLRQ� 7KH YDOLG VWDQGDUGV IRU WHVWLQJ DQG LQVWDOODWLRQ� WHFKQLFDO JXLGHOLQHV� DQG DFNQRZOHGJHG UXOHV RIWHFKQRORJ\ KDYH WR EH DGKHUHG WR DW DOO WLPHV� 7KH ZDUUDQW\ FDQ DQG LV WKHUHIRUH RQO\ DSSOLHG WR WKH TXDOLW\ RI RXU SURGXFWV ZLWKLQ WKH VFRSH RI RXU WHUPV DQG FRQGLWLRQV� QRW KRZHYHU� IRU WKHLU HIIHFWLYH DQG VXFFHVVIXODSSOLFDWLRQ��7KLV�JXLGHOLQH�KDV�EHHQ�WHFKQLFDOO\�UHYLVHG��DOO�SUHYLRXV�YHUVLRQV�DUH�LQYDOLG�
Delta Membrane Systems Ltd, Delta House, Merlin Way, North Weald, Epping, Essex CM16 6HRTel: 01992 523 523 . Email: [email protected] . Website: www.deltamembranes.com
.�67(5�1%���*UH\ ���
:���:DWHUSURR
ILQJ�V\VWHP
VWR WKH PL[LQJ ZDWHU UDLVHV WKH DELOLW\ RI WKH PDWHULDO WR UHWDLQ ZDWHU DQGSUHYHQWV D SUHPDWXUH GU\LQJ RI WKH FRDWLQJ LQ FDVHV RI XQIDYRUDEOHZHDWKHU�FRQGLWLRQV���ZDUP��GU\��ZLQG\��
:KHQ XVHG LQ GULQNLQJ ZDWHU UHVHUYRLUV RQO\ WKH DGGLWLRQ RI � O RI ZDWHUWR HDFK �� NJ EDJ RI .�67(5 1% � *UH\ LV SHUPLWWHG� 7KH DGGLWLRQ RI.�67(5 1% � )OH[ RU .�67(5 6%�%RQGLQJ (PXOVLRQ ZLOO QHJDWH WKH'ULQNLQJ�:DWHU�&HUWLILFDWLRQ�
7KH PDWHULDO LV DSSOLHG LQ DW OHDVW WZR FRDWV ZLWK D EUXVK RU D VXLWHGVSUD\LQJ GHYLFH� 0DNH VXUH WKDW WKH FRDWLQJ LV QRW H[SRVHG WR KHDW�IURVW DQG VWURQJ ZLQG GXULQJ WKH DSSOLFDWLRQ DQG IRU DW OHDVW �� KRXUVDIWHUZDUGV� 7KH PDWHULDO VKRXOG EH EUXVKHG YHUWLFDOO\ DQG KRUL]RQWDOO\WR�ZRUN�LW�LQWR�WKH�VXEVWUDWH�
$SSOLFDWLRQ�([DPSOHV�+LJKO\ HIIHFWLYH ZDWHUSURRILQJ ZLWK ELWXPLQRXV EXLOGLQJPDWHULDOV:KHQ DSSO\LQJ D FRPELQHG ZDWHUSURRILQJ V\VWHP PDGH RI .�67(51% � *UH\ DQG ELWXPLQRXV FRDWLQJV �.�67(5 %LNXWKDQ� .�67(5'HX[DQ RU .�67(5 .%(�/LTXLG )LOP�� .�67(5 1% � *UH\ FDQ EHDSSOLHG GLUHFWO\ WR D YRLG IUHH PDVRQU\ ZLWK IOXVK�ILOOHG MRLQWV� $IWHU DFXULQJ WLPH RI �� KRXUV� WKH ELWXPLQRXV FRDWLQJ LV EUXVKHG� WURZHOHG RUVSUD\HG RQ� 7KH VXEVWUDWH SUHSDUDWLRQ ZLWK .�67(5 1% � *UH\LQFUHDVHV WKH VDIHW\ RI WKH V\VWHP VLJQLILFDQWO\� ,W LV DQ DGGLWLRQDOZDWHUSURRILQJ OD\HU� ,W SUHYHQWV ODWHUDO PRYHPHQW RI ZDWHU DQG DW WKHVDPH WLPH LW IXQFWLRQV DV D QHJDWLYH VLGH ZDWHUSURRILQJ GXULQJ WKHFRQVWUXFWLRQ�SKDVH�
1HJDWLYH VLGH ZDWHUSURRILQJ LQ FDVH RI UHSDLU RI ZLGHVSUHDGPRLVWXUH�SHQHWUDWLRQ$FWLYH OHDNDJHV DQG ZDWHU ZHHSLQJ GRZQ WKH ZDOO FDQ EH VWRSSHG ZLWKWKH .�67(5 .' 6\VWHP� %ULWWOH DQG ORRVH PDWHULDO KDV WR EH FOHDQHGRXW RI MRLQWV DQG MRLQWV KDYH WR EH FORVHG IOXVK ZLWK .�67(5 5HSDLU0RUWDU 3OXV� $IWHU D ZDLWLQJ WLPH RI DSSUR[� � KRXUV WKH VXUIDFH ZKLFK LVJRLQJ WR EH VHDOHG KDV WR EH SULPHG ZLWK .�67(5 3RO\VLO 7* ����&RQVXPSWLRQ� PLQ� ��� J � Pt� LQ FDVH RI VWURQJO\ DEVRUEHQW VXEVWUDWHVXS WR ��� J � Pt�� $IWHU D ZDLWLQJ WLPH RI �� PLQXWHV� WKH ILUVW FRDW RI.�67(5 1% � *UH\ LV DSSOLHG �&RQVXPSWLRQ� ��� NJ � Pt�� :KHQ WKHILUVW FRDW RI .�67(5 1% � *UH\ KDV VHW VXIILFLHQWO\ VR WKDW LW LV QRWGDPDJHG E\ WKH DSSOLFDWLRQ RI D VHFRQG FRDW� D VHFRQG FRDW RI.�67(5 1% � *UH\ LV DSSOLHG �&RQVXPSWLRQ� ��� NJ � Pt�� 7KH ILQDOKDUGHQLQJ LV FDUULHG RXW E\ DSSOLFDWLRQ RI D FRDW RI .�67(5 3RO\VLO 7*�����&RQVXPSWLRQ��PLQ������J���Pt��
$IWHUWUHDWPHQW2Q KLJKO\ DEVRUEHQW VXEVWUDWHV� LQ VWURQJ ZLQG RU GLUHFW VXQOLJKW� WKHPDWHULDO PD\ WHQG WR SUHPDWXUHO\ GU\� ,I SUHPDWXUH GU\LQJ LV REVHUYHG�HDUO\ OLJKWHQLQJ RI WKH VXUIDFH�� VSUD\ ZLWK D ERWWOH PLVWHU ZLWK ZDWHUXQWLO�WKH�VXUIDFH�LV�GDUN�
&RQVXPSWLRQ������NJ�Pt
&OHDQLQJ&OHDQ�WRROV�LPPHGLDWHO\�DIWHU�XVH�ZLWK�ZDWHU�
3DFNDJLQJ:�������� ���NJ�EDJ
6WRUDJH6WRUH WKH PDWHULDO GU\� ,Q RULJLQDOO\ VHDOHG SDFNDJHV� WKH PDWHULDO FDQEH�VWRUHG�IRU�D�PLQLPXP�RI����PRQWKV�
6DIHW\:HDU SURWHFWLYH JORYHV DQG JRJJOHV ZKHQ SURFHVVLQJ RI WKH PDWHULDO�2EVHUYH DOO JRYHUQPHQWDO� VWDWH� DQG ORFDO UHJXODWLRQVZKHQSURFHVVLQJWKH�PDWHULDO�
5HODWHG�SURGXFWV.�67(5�,1�� 3URG��FRGH�,1����.�67(5���,1�� 3URG��FRGH�,1����.�67(5�,1�� 3URG��FRGH�,1����.�67(5�,1�� 3URG��FRGH�,1����.�67(5�,1�� 3URG��FRGH�,1����.�67(5�-RLQW�6HDODQW�)6�9�EODFN 3URG��FRGH�-����.�67(5�-RLQW�6HDODQW�)6�+�EODFN 3URG��FRGH�-����.�67(5�-RLQW�7DSH��� 3URG��FRGH�-����
���.�67(5�3RO\VLO�7*���� 3URG��FRGH�0����.�67(5�5HVWRUDWLRQ�3ODVWHU���*UH\ 3URG��FRGH�0����
���.�67(5�5HVWRUDWLRQ�3ODVWHU���:KLWH 3URG��FRGH�0����
���.�67(5�5HVWRUDWLRQ�3ODVWHU���)DVW 3URG��FRGH�0����
���.�67(5�5HVWRUDWLRQ�3ODVWHU���/LJKW 3URG��FRGH�0����
���.�67(5�1%���:KLWH 3URG��FRGH�:����
���.�67(5�.%(�/LTXLG�)LOP 3URG��FRGH�:����.�67(5�%LNXWKDQ��& 3URG��FRGH�:����
���.�67(5�%LNXWKDQ��& 3URG��FRGH�:����
���.�67(5�'HX[DQ��& 3URG��FRGH�:����
���.�67(5�'HX[DQ�3URIHVVLRQDO 3URG��FRGH�:����
���.�67(5�.'���%OLW]�3RZGHU 3URG��FRGH�:����.�67(5�5HSDLU�0RUWDU 3URG��FRGH�:����
���.�67(5�5HSDLU�0RUWDU�3OXV 3URG��FRGH�:����
���.�67(5�:3�0RUWDU 3URG��FRGH�:����
���.�67(5�:DWHUVWRS 3URG��FRGH�:����
���.�67(5�6%�%RQGLQJ�(PXOVLRQ 3URG��FRGH�:����.�67(5�1%���)OH[ 3URG��FRGH�:����
���.�67(5�6'�3URWHFWLRQ�DQG�'UDLQDJH�6KHHW�����
3URG��FRGH�:�������
.�67(5�1%���%UXVK�IRU�VOXUULHV 3URG��FRGH�:�������
.�67(5�3HULVWDOWLF�3XPS 3URG��FRGH�:�������
.�67(5�'RXEOH�3DGGOH�0L[HU 3URG��FRGH�;�������
.�67(5�'LVF�6WLUUHU 3URG��FRGH�;�������
7KH LQIRUPDWLRQ FRQWDLQHG LQ WKLV WHFKQLFDO GDWD VKHHW LV EDVHG RQ WKH UHVXOWV RI RXU UHVHDUFK DQG RQ RXU SUDFWLFDO H[SHULHQFH LQ WKH ILHOG� $OO JLYHQ WHVW GDWD DUH DYHUDJH YDOXHV ZKLFK KDYH EHHQ REWDLQHG XQGHU GHILQHGFRQGLWLRQV� 7KH SURSHU DQG WKHUHE\ HIIHFWLYH DQG VXFFHVVIXO DSSOLFDWLRQ RI RXU SURGXFWV LV QRW VXEMHFW WR RXU FRQWURO� 7KH LQVWDOOHU LV UHVSRQVLEOH IRU WKH FRUUHFW DSSOLFDWLRQ XQGHU FRQVLGHUDWLRQ RI WKH VSHFLILF FRQGLWLRQVRI WKH FRQVWUXFWLRQ VLWH DQG IRU WKH ILQDO UHVXOWV RI WKH FRQVWUXFWLRQ SURFHVV� 7KLV PD\ UHTXLUH DGMXVWPHQWV WR WKH UHFRPPHQGDWLRQV JLYHQ KHUH IRU VWDQGDUG FDVHV� 6SHFLILFDWLRQV PDGH E\ RXU HPSOR\HHV RUUHSUHVHQWDWLYHV ZKLFK H[FHHG WKH VSHFLILFDWLRQV FRQWDLQHG LQ WKLV WHFKQLFDO JXLGHOLQH UHTXLUH ZULWWHQ FRQILUPDWLRQ� 7KH YDOLG VWDQGDUGV IRU WHVWLQJ DQG LQVWDOODWLRQ� WHFKQLFDO JXLGHOLQHV� DQG DFNQRZOHGJHG UXOHV RIWHFKQRORJ\ KDYH WR EH DGKHUHG WR DW DOO WLPHV� 7KH ZDUUDQW\ FDQ DQG LV WKHUHIRUH RQO\ DSSOLHG WR WKH TXDOLW\ RI RXU SURGXFWV ZLWKLQ WKH VFRSH RI RXU WHUPV DQG FRQGLWLRQV� QRW KRZHYHU� IRU WKHLU HIIHFWLYH DQG VXFFHVVIXODSSOLFDWLRQ��7KLV�JXLGHOLQH�KDV�EHHQ�WHFKQLFDOO\�UHYLVHG��DOO�SUHYLRXV�YHUVLRQV�DUH�LQYDOLG�
.�67(5�1%���*UH\ ���
Delta Membrane Systems Ltd, Delta House, Merlin Way, North Weald, Epping, Essex CM16 6HRTel: 01992 523 523 . Email: [email protected] . Website: www.deltamembranes.com
:���:DWHUSURR
ILQJ�V\VWHP
V.�67(5�0RUWDU�6WLUUHU�6HW 3URG��FRGH�;�������
Powered by TCPDF (www.tcpdf.org)
7KH LQIRUPDWLRQ FRQWDLQHG LQ WKLV WHFKQLFDO GDWD VKHHW LV EDVHG RQ WKH UHVXOWV RI RXU UHVHDUFK DQG RQ RXU SUDFWLFDO H[SHULHQFH LQ WKH ILHOG� $OO JLYHQ WHVW GDWD DUH DYHUDJH YDOXHV ZKLFK KDYH EHHQ REWDLQHG XQGHU GHILQHGFRQGLWLRQV� 7KH SURSHU DQG WKHUHE\ HIIHFWLYH DQG VXFFHVVIXO DSSOLFDWLRQ RI RXU SURGXFWV LV QRW VXEMHFW WR RXU FRQWURO� 7KH LQVWDOOHU LV UHVSRQVLEOH IRU WKH FRUUHFW DSSOLFDWLRQ XQGHU FRQVLGHUDWLRQ RI WKH VSHFLILF FRQGLWLRQVRI WKH FRQVWUXFWLRQ VLWH DQG IRU WKH ILQDO UHVXOWV RI WKH FRQVWUXFWLRQ SURFHVV� 7KLV PD\ UHTXLUH DGMXVWPHQWV WR WKH UHFRPPHQGDWLRQV JLYHQ KHUH IRU VWDQGDUG FDVHV� 6SHFLILFDWLRQV PDGH E\ RXU HPSOR\HHV RUUHSUHVHQWDWLYHV ZKLFK H[FHHG WKH VSHFLILFDWLRQV FRQWDLQHG LQ WKLV WHFKQLFDO JXLGHOLQH UHTXLUH ZULWWHQ FRQILUPDWLRQ� 7KH YDOLG VWDQGDUGV IRU WHVWLQJ DQG LQVWDOODWLRQ� WHFKQLFDO JXLGHOLQHV� DQG DFNQRZOHGJHG UXOHV RIWHFKQRORJ\ KDYH WR EH DGKHUHG WR DW DOO WLPHV� 7KH ZDUUDQW\ FDQ DQG LV WKHUHIRUH RQO\ DSSOLHG WR WKH TXDOLW\ RI RXU SURGXFWV ZLWKLQ WKH VFRSH RI RXU WHUPV DQG FRQGLWLRQV� QRW KRZHYHU� IRU WKHLU HIIHFWLYH DQG VXFFHVVIXODSSOLFDWLRQ��7KLV�JXLGHOLQH�KDV�EHHQ�WHFKQLFDOO\�UHYLVHG��DOO�SUHYLRXV�YHUVLRQV�DUH�LQYDOLG�
.�67(5�1%���*UH\ ���
Delta Membrane Systems Ltd, Delta House, Merlin Way, North Weald, Epping, Essex CM16 6HRTel: 01992 523 523 . Email: [email protected] . Website: www.deltamembranes.com