ACTION PLAN FOR FIRE FIGHTING
-
7/29/2019 Action Plan for Fire Fighting (2)
2/10
Information inInformation in casecase ofof firefire at House of Swedenat House of Sweden
RecommendedRecommended entranceentrance forfor firefightingfirefighting -- notenote thethe drawingsdrawings
NoteNote separate instructions forseparate instructions for firefightingfirefighting whenwhen thethe floodproofingfloodproofing isis mountedmounted
ParticularParticular risks in therisks in the buildingbuilding ((notenote thethe drawingsdrawings))
The receptionist (The receptionist (dresseddressed with redwith red vestvest) gives information of) gives information of evacutionevacution status.status.
TelephonenumberTelephonenumber toto contactpersoncontactperson inin seperateseperate listlist
TheThe reassamblyreassambly placeplace isis situatedsituated closeclose to theto the boathouseboathouse by the Potomac riverby the Potomac river
The sprinklercentral iThe sprinklercentral i locatedlocated in the 1st floorin the 1st floornotenote thethe drawingsdrawings
Start and stop of fan forStart and stop of fan for firegasventilationfiregasventilation of atrium,of atrium, notenote separat instructionseparat instruction
PredistinedPredistined placesplaces insideinside andand closeclose to theto the buildingbuilding for the first information to thefor the first information to theevacuatedevacuated personspersonsnotenote thethe drawingsdrawings
Areas in theAreas in the buildingbuilding andand objectsobjects thatthat needneed extraextra attentionattentionnotenote this symbol inthis symbol in
thethe drawingsdrawings
SP
-
7/29/2019 Action Plan for Fire Fighting (2)
3/10
Maximum of 200
guests och occupants
Open roof terrace6th
floor
Approx. 20 residents
and 5 workspaces.
8 apartments. One apartment is
combined with an office
5th
floor
Approx. 20 residents
and 5 workspaces
9 apartments. One apartment is
combined with an office
4th
floor
37 workspacesOffice for Ministry of Foreign AffairsOne floor above the entrance floor3rdfloor
180 temporarypersons and 10
workplaces
Entrance, two receptions ( entrance forMinistry for Foreign Affairs and oneentrance for other visitors) exhibition hall
and one of the Ministry for F. A. offices.
Ground- and entrance floor
2ndFloor
320 temporarypersons
Technical rooms, storerooms, catering
pantry, office, auditorium, conferencecentre and exhibition hall.Split level floor1 stfloor
A few occupantsstaying temporarily
Parking for approx. 75 cars and a smallstore room
Under ground connecting HoS with the otherhouse on the same property
Parkinglevel
Number of occu-pantsin roomActivitiesPart of buildingFloor
DESCRIPTION OF ACTIVITIES AND MAXIMUM NUMBER OF PERSONS PER FLOOR
-
7/29/2019 Action Plan for Fire Fighting (2)
4/10
Action plan for parking level
Fire resistance rated walls. Least 2 hrs ( 120 min)
-
7/29/2019 Action Plan for Fire Fighting (2)
5/10
Action plan for 1st floorWay of attack
SP
SP Placing of watersprinkle-
central
Priority rooms
when fire fighting
ElectricalFire resistance rated walls 120 minutes
Stan
dpip
esystem
Fire inlet/ outlet Fire
inlet/
outl
et
-
7/29/2019 Action Plan for Fire Fighting (2)
6/10
Fire resistancerated walls 2 hrs
Action plan for 2nd floor
Way of attack
Sliding glass panel
Priority rooms whenfire fighting
Areas marked with this colour demand special entrance
permission before a rescue action
CAPlacing of the centralizedcontrol for the fire alarmFire comand center
CA
24 hrs manning reception
office hrs manning reception
CA
Sta
ndpipe
system
-
7/29/2019 Action Plan for Fire Fighting (2)
7/10
Action plan for 3rd floor
Priority area in case of fire fighting
The entire third floor ( except the stairwell and the elevator pit)
demand special entrance permission before a rescue action)
Fire resistance rated walls. Least 2 hrs ( 120 min)
Stan
dpip
esyst
em
-
7/29/2019 Action Plan for Fire Fighting (2)
8/10
Fire cell limit
Action plan for 4th floor
Fire resistance rated walls. Least 2 hrs ( 120 min)Fire resistance rated walls. Least 2 hrs ( 120 min)
Stan
dpip
esyst
em
-
7/29/2019 Action Plan for Fire Fighting (2)
9/10
Fire resistance rated walls. Least 2 hrs ( 120 min)
Action plan for 5th floor
Stan
dpipe s
yste
m
-
7/29/2019 Action Plan for Fire Fighting (2)
10/10
Action plan for open floor terrace ( 6th floor)
Stan
dpip
esyst
em