BUILDING FROM THE GROUND UP
THE RIGHT WAY
Arch. Gene Arthur GoDINE Philippines 2015September 10, 2015 | Chippens Garden, Davao City
![Page 2: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/2.jpg)
GREEN TIPS
![Page 3: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/3.jpg)
PRE-DESIGN DESIGN & CONSTRUCTION OPERATIONS
OWNER- DEVELOPER
DECISION SUPPORT
ARCHITECTURE / ENGINEERING DESIGN and CONSTRUCTION TEAM
FACILITYMANAGER
OPERATIONS SUPPORT
DESIGN & COORDINATION SUPPORT
OWNER / DEVELOPER
COMMITMENTOPERATIONSCOMMITMENT
![Page 4: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/4.jpg)
PRE-DESIGNB
US
INE
SS
PLA
N PRELIMBUDGE
T…
![Page 5: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/5.jpg)
PRE-DESIGNS
ITE
SE
LEC
TIO
N
![Page 6: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/6.jpg)
TIME NEEDED TO DO A RESTAURANT PROJECT
90 – 120 – 150 DAYS
30 – 60 DAYSRENT FREE PERIOD GIVEN MALL /
LANDLORD
GREEN TIP
![Page 7: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/7.jpg)
OWNER
PROJECT MANAGER
ARCHITECTINTERIORDESIGNERKITCHEN PLANNER
GENERALCONTRACTOR
SUB-CONSSUPPLIERS
PR
E-D
ES
IGN
PRE-DESIGN
![Page 8: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/8.jpg)
DESIGN & CONSTRUCTIONS
CH
EM
ATIC
DE
SIG
N
![Page 9: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/9.jpg)
DE
SIG
N D
EV
ELO
PM
EN
TDESIGN &
CONSTRUCTION
UPDATE BUDGET… !
![Page 10: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/10.jpg)
CO
NTR
AC
T D
OC
UM
EN
TDESIGN &
CONSTRUCTION
![Page 11: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/11.jpg)
AVERAGE TIME NEEDED FOR MALL ENGINEERING AND CONSULTANTS TO REVIEW DRAWINGS
3 – 10 WORKING DAYS
7 – 30 WORKING DAYSAVERAGE TIME TO PROCESS BUILDING PERMITS
+
PERMITS AND REGULATORY COMPLIANCE
![Page 12: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/12.jpg)
GREEN TIP
MUST: KITCHEN PLAN
![Page 13: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/13.jpg)
GET UPDATED ESTIMATES TO PROTECT YOUR BUDGET
NO SURPRISES
KEEP CALMUNDERSTAND AND MOVE ON
GREEN TIP
PITSTOP: UPDATE
BUDGET ! ! !
![Page 14: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/14.jpg)
CO
NS
TRU
CTI
ON
DESIGN & CONSTRUCTION
![Page 15: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/15.jpg)
IF TIME IS ON YOUR SIDE, ADD 2 WEEKS
CALL FOR TENDER
NEGOTIATERELATIVE/FAMILY/FRIEND IS IN
CONSTRUCTION
EVALUATE AND UNDERSTANDBEFORE YOU SIGN OFF
GREEN TIP
![Page 16: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/16.jpg)
MARGIN EXPECTED BY CONTRACTORS
20% - 40% 10% - 30% UNACCOUNTED CONSTRUCTION WASTE< P25K
>/M2TYPICAL FIT-OUT BUDGET EXCLUDING SHELL
GREEN TIP
![Page 17: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/17.jpg)
COST OF FF&E (FURNITURE, FIXTURES, AND EQUIPMENT
30% - 60%
GREEN TIP
![Page 18: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/18.jpg)
LUMP SUM CONSTRUCTION PROPOSAL
SCOPE OF WORK = PESOGENERAL REQUIREMENTS: P400,000.00CARPENTRY WORKS: P 300,000.00PARTITIONING WORKS: P 200,000.00PAINTING WORKS: P 350,000.00ELECTRICAL WORKS: P 300,000.00MECHANICAL WORKS: P250,000.00SANITARY WORKS: P180,000.00
TOTAL: P1,980,000.00VALUE ADDED TAX (12%): P237,600.00TOTAL COST: P2,455,200.00
![Page 19: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/19.jpg)
ITEMIZED CONSTRUCTION COSTSCOPE OF WORK = PESO
MATERIAL (QUANTITY X UNIT COST)
LABOR (QUANTITY x UNIT COST)
GREEN TIP
✔
![Page 20: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/20.jpg)
GREEN TIP
✔
![Page 21: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/21.jpg)
CO
NS
TRU
CTI
ON
DESIGN & CONSTRUCTION
![Page 22: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/22.jpg)
BE PREPARED TO ADD TO YOUR BUDGET
“I WANT TO GO GREEN…”
GREEN TIP
![Page 23: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/23.jpg)
CO
NS
TRU
CTI
ON
DESIGN & CONSTRUCTION
GREEN TIP
![Page 24: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/24.jpg)
CO
NS
TRU
CTI
ON
DESIGN & CONSTRUCTIONGREEN TIP
![Page 25: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/25.jpg)
CO
NS
TRU
CTI
ON
DESIGN & CONSTRUCTION
GREEN TIP
![Page 26: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/26.jpg)
CO
NS
TRU
CTI
ON
DESIGN & CONSTRUCTION
GREEN TIP
EXPECTATION REALITY
![Page 27: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/27.jpg)
VE
RIF
ICAT
ION
/ VA
LID
ATIO
NDESIGN &
CONSTRUCTION
![Page 28: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/28.jpg)
BU
ILD
ING
OP
ER
ATIO
NS
OPERATIONS
![Page 29: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/29.jpg)
BU
ILD
ING
OP
ER
ATIO
NS
OPERATIONS GREEN TIP
AUTO
16.0º C
23.0º C
Savings: up to P1000/month/unit*
![Page 30: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/30.jpg)
F&BOUTLET
WASTEVEGETABLE OIL (WVO)
BIODIESEL
http://alphabiofuels.sg/BU
ILD
ING
OP
ER
ATIO
NS
OPERATIONS
![Page 31: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/31.jpg)
CASE STUDY:
AZALEA Residences and Hotel Station 2, Boracay Island, Aklan
![Page 32: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/32.jpg)
case study:AZALEA Boracay
Lot Area : 5,482 sq.m.
Floor Area : 16,717.90 sq.m.
5 STOREYS with roof deck
285 ROOMS
Zone 7, Road C Manggayad,Brgy. Balabag, Station 2,
Boracay island,Malay, Aklan 5608
![Page 33: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/33.jpg)
PROJECTED BUDGET:
PhP 680 million
BUDGET:With Project Administration
Without Project Administration
PhP 520 million(Direct Cost)
PhP 40 million(Administration Fees)
PhP 25 million(Contingencies)
**Taxes at 12% of Admin Fees
![Page 34: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/34.jpg)
![Page 35: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/35.jpg)
![Page 36: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/36.jpg)
![Page 37: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/37.jpg)
![Page 38: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/38.jpg)
CASE STUDY:
UCC Clockwork
![Page 39: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/39.jpg)
case study:UCC Clockwork
Bluebay Walk EDSA cor. Macapagal Blvd.,
Pasay City
Freestanding:3-4 months construction
![Page 40: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/40.jpg)
![Page 41: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/41.jpg)
case study:UCC Clockwork
Estancia MallMeralco Avenue, Pasig City
Mall Fit-out:60-75 days construction
![Page 42: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/42.jpg)
![Page 43: Arch. Gene Go: Building from the Ground Up; the Right Way](https://reader035.vdocument.in/reader035/viewer/2022062522/58aac10d1a28ab16338b6c45/html5/thumbnails/43.jpg)
THANK YOU!