![Page 1: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/1.jpg)
![Page 2: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/2.jpg)
Emotional Health
In a typical high school of 1000 pupils
• 50 are seriously depressed
• 100 suffer significant distress
• 5-10 girls have an eating disorder
• 10-20 pupils have obsessive compulsive disorder
![Page 3: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/3.jpg)
![Page 4: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/4.jpg)
![Page 5: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/5.jpg)
MCC currently piloting
software that will link the
Data to the correct
room/area within the model.
COBie Spreadsheet
Managing Room Data
![Page 6: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/6.jpg)
Model: Manchester Central Library
![Page 7: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/7.jpg)
Section of Basement Floor Plate
![Page 8: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/8.jpg)
Basement M&E infrastructure 3D Model
![Page 9: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/9.jpg)
Basement M&E infrastructure sat within Model
![Page 10: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/10.jpg)
Various Basement Plant Services
![Page 11: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/11.jpg)
Room selection on 3rd Floor
![Page 12: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/12.jpg)
Endless links to room specific Data
![Page 13: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/13.jpg)
Model: Manchester Town Hall Extension
![Page 14: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/14.jpg)
Section of Basement Floor Plate
![Page 15: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/15.jpg)
Plant room M&E sat within Model
![Page 16: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/16.jpg)
Endless links to specification Data
![Page 17: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/17.jpg)
M&E infrastructure on Lower Ground Floor
![Page 18: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/18.jpg)
Data Richness
Life Cycle Views
Roles or Disciplines
Business Process
Delivery Method
Timeliness/Response Change Management
Graphical Information
Spatial Capability
Information Accuracy
Interoperability/
IFC Support
2
3
4
5
6
7
8
9
10
1
0
MCC BIM Maturity Model
![Page 19: BIM from Manchester City Council Perspective - Liam Brady](https://reader033.vdocument.in/reader033/viewer/2022060106/54c14de94a7959267c8b45a8/html5/thumbnails/19.jpg)
• Link to fire strategy / evacuation plan
• Link to security strategy
• Thermal modelling (future building changes)
• Link to digital Signage.
• Using BIM (hand held technologies)
• Link to Energy Management System (Zoning, out of hours use, event management etc)
• Staff induction tool
• Customer communication tool
• Marketing tool, events and community schemes
• Link to operational zones, cleaning, events etc
• Ability to run logistical tests / models (flow and movement)
BIM – Other uses being considered