Transcript

1

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Chincoteague Project Overview

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Henri Sinson, PE

Virginia Concrete Conference

March 6, 2008

Long Life Aspects

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Presentation Goals

• Project Overview• Site Conditions• Scope• Alignment• Constructability

• Bascule Span Highlights• Approach Substructure

• Satisfied Aesthetic Requirements• Satisfied Subsurface Conditions• Details for Long Life

• Approach Superstructure• Satisfied Aesthetic Requirements• Details for Long Life• Innovation for Efficiency• Innovation for Long Life

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Project Overview

• Bridge on Rte 175 Over Black Narrows and Lewis Creek Channel

• Accomack County and Town of Chincoteague, Virginia

• 4035’-0” low level bridge

• 123’-6” single leaf bascule span

• 729’-0” low level connector bridge

• Owner: VDOT

• Designer: Hardesty & Hanover, LLP

• Contractor: American Bridge

• Contractor Bid: $68.7 million

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Site Conditions

Town of Chincoteague & Marsh IslandOld Chincoteague Bridge

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Site Conditions

Mar

sh Is

land

Chinco

teague I

sland

Cha

nnel

Old ChincoteagueSwing Bridge

Old BlackNarrows Bridge

Site Plan

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Scope

Mar

sh Is

land

Chinco

teague I

sland

Cha

nnel

4035’-0”

Old ChincoteagueSwing Bridge

729’-0”

Old BlackNarrows Bridge

New SingleLeaf BasculeNew Rte 175 Bridge

New Marsh IslandConnector Bridge

Site Plan

2

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Alignment

Mar

sh Is

land

Chinco

teague I

sland

Cha

nnel

4035’-0”

729’-0”

Site PlanNew SingleLeaf BasculeNew Rte 175 Bridge

New Marsh IslandConnector Bridge

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Constructability

Mar

sh Is

land

Chinco

teague I

sland

Cha

nnel

4035’-0”

729’-0”

Site PlanNew SingleLeaf BasculeNew Rte 175 Bridge

New Marsh IslandConnector Bridge

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Span

• 92’-0” Span Length• Closed Pit Pier• 5” Half filled grating• 1662 Kip Leaf• 26” Trunnion Diameter• Gear Driven• 75 HP, 900 RPM Primary

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Span

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Span

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Pier

3

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Pier Deck Removed

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Pier Stringers Removed

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Bascule Span Removed

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Approach Substructure

Mar

sh Is

land

Chinco

teague I

sland

Site Plan

Cha

nnel

New SingleLeaf BasculeNew Rte 175 Bridge

New Marsh IslandConnector Bridge

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Approach Substructure

Mar

sh Is

land

Chinco

teague I

sland

Bents 1-49

Bents 50-59

Site Plan

Cha

nnel

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Substructure Aesthetics

Typical Trestle Bent

4

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Substructure Aesthetics

Cylinder Pile Bent

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Subsurface

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Substructure Details

Bent Elevation

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Substructure Details

43’-4”

12’-0” 12’-0” 12’-0”

Prestr.CylinderPile

CIP Pile Cap

Cheekwall

4’-6”

4’-2”

Prestr.CylinderPile

PileSection

3’-0”

BentSection

Bent Elevation

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Approach Substructure

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Approach SubstructurePhoto Courtesy of Jacobs Engineering Group Inc.

5

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Approach Superstructure

“Baseline” Bridge Elevation

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Superstructure Aesthetics

Addition of Cheekwalls

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Superstructure Aesthetics

Addition of Arched Fascia Beams

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Superstructure Details

80’-0” 80’-0” 80’-0” 80’-0”

4 Span Continuous Unit

Framing Plan

Prestr.Bulb-T

Prestr.FasciaBeam

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Superstructure Details

1’-8” 20’-0” 20’-0” 1’-8”

45” Prestr.Bulb-T

Prestr.FasciaBeam

Cross Section

9’-5” 9’-5”9’-5” 9’-5”

TL-4 Wyoming Railing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Efficiency

Arched Prestressed Fascia Beam

54”

45”

6

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Efficiency

Arched Prestressed Fascia Beam

Prismatic

Section

(Large Adjustm

ents)Arched Secti

on

(Constant)

Arched Section

(Constant)

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Efficiency

Arched Prestressed Fascia Beam

Arched Section

(Constant)

Prismatic

Section

(Shortened)

Arched Section

(Constant)

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Efficiency

Arched Prestressed Fascia Beam

Arched Section

(Constant)

Arched Section

(Constant)

End Section(Small Adjustments)

Prismatic

Section

(Shortened)

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Mar

sh Is

land

Chinco

teague I

sland

Cha

nnel

Site Plan

Intersection Framing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Intersection Framing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Arched Section

Prismatic

Section

Intersection Framing

7

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Intersection Framing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Dapped End

Arched Section

Intersection Framing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Arched Section

Intersection Framing

Dapped End

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Intersection Framing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Intersection Framing

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Innovation for Long Life

Intersection Framing

8

HARDESTY & HANOVER, LLPE N G I N E E R I N G

Virginia Concrete Conference, Chincoteague Project Overview

Chincoteague Project

• Project Overview

• Bascule Span Highlights

• Met Aesthetic Requirements

• Satisfied Challenging Site Conditions

• Innovation for Efficiency

• Innovation for Long Life